CN110158627A - A kind of basis in prefabricated transformer substation power distribution unit building and construction method - Google Patents

A kind of basis in prefabricated transformer substation power distribution unit building and construction method Download PDF

Info

Publication number
CN110158627A
CN110158627A CN201910361963.7A CN201910361963A CN110158627A CN 110158627 A CN110158627 A CN 110158627A CN 201910361963 A CN201910361963 A CN 201910361963A CN 110158627 A CN110158627 A CN 110158627A
Authority
CN
China
Prior art keywords
prefabricated
stub
ground beam
power distribution
distribution unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910361963.7A
Other languages
Chinese (zh)
Other versions
CN110158627B (en
Inventor
朱云祥
陈哲
袁建国
施首健
屠锋
陈崇敬
柳毅
杨杰
刘锡成
龚坚刚
高亚栋
俞辰颖
方瑜
吴祖咸
金国胜
尹康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Electric Power Engineering Design Consulting Co
Original Assignee
State Grid Corp of China SGCC
Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Huayun Electric Power Engineering Design Consulting Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinhua Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Zhejiang Huayun Electric Power Engineering Design Consulting Co filed Critical State Grid Corp of China SGCC
Priority to CN201910361963.7A priority Critical patent/CN110158627B/en
Publication of CN110158627A publication Critical patent/CN110158627A/en
Application granted granted Critical
Publication of CN110158627B publication Critical patent/CN110158627B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of bases in prefabricated transformer substation power distribution unit building, including stub, ground beam and bottom plate, the side wall of stub is equipped with and lifts platform and be provided with adjustment hole, the both ends of ground beam are respectively erected in the lifting on platform of two stubs, bottom plate is erected on ground beam, and levelling device is equipped in adjustment hole, is equipped with reinforcing bar on stub and ground beam, ground beam is erected at lift on platform after, the reinforcing bar on ground beam is fixedly connected with the reinforcing bar on stub.Construction method digs ground, stub is then put into ground and is being leveled, ground beam and bottom plate are put into, is being welded and fixed, last casting concrete.The invention has the advantages that due to the superstructure in transformer substation power distribution unit building and the progress of Standardization instrument, superstructure and the size and location of equipment load are relatively more fixed, the structure in power distribution equipment building and Equipment Foundations is allowed to be standardized arrangement, this is provided convenience to the production of large-scale prefabricated components, this prefabricated foundation can reduce design and produced on-site cost, easy for construction.

Description

A kind of basis in prefabricated transformer substation power distribution unit building and construction method
Technical field
The present invention relates to a kind of basis in prefabricated transformer substation power distribution unit building and construction methods.
Background technique
As the improvement of people's living standards, life productive power amount is increasing, is required to meet transmission of electricity, need to build Make more substations.The power distribution equipment building superstructure of substation mostly uses greatly steel construction at present, and infrastructure is all using existing Reinforced concrete foundation is poured, the cast-in-situ steel reinforced concrete foundation construction time is long, and construction environment is poor, can ambient enviroment and people's life There is large effect.
Summary of the invention
The purpose of the present invention is to provide a kind of basis in prefabricated transformer substation power distribution unit building and construction methods, can be effective Solve the problems, such as that existing transformer substation power distribution unit building construction-time is too long and construction environment is poor.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions: a kind of prefabricated substation matches The side wall on the basis in electric installation building, including prefabricated stub, prefabricated ground beam and prefabricated panel, the prefabricated stub is equipped with short beam; The prefabricated ground beam cross section is inverted T shape, between the both ends of the prefabricated ground beam and the short beam of two neighboring prefabricated stub There are post-cast strip, the prefabricated panel is placed in the space that prefabricated ground beam and prefabricated stub surround, and prefabricated panel with it is prefabricated All there are post-cast strip between ground beam and prefabricated stub, it is provided with leveling hole on the short beam and prefabricated ground beam, in the leveling hole Equipped with prefabricated stub and the levelling device of prefabricated ground beam levelness is adjusted, on the prefabricated stub, prefabricated ground beam and prefabricated panel There are exposed reinforcing bars, after prefabricated stub, prefabricated ground beam and prefabricated panel are installed, reserve prefabricated components are corresponding Reinforcing bar is fixedly connected, and pours post-cast strip.
Preferably, the levelling device includes inner sleeve and adjusting screw rod, and the inner sleeve is provided with internal thread hole, the tune Section screw rod is adapted with internal thread hole, and the inner sleeve is fixed in leveling hole.Turned by adjusting screw rod and the opposite of inner sleeve It is dynamic to adjust height, and being fixed in leveling hole of can be convenient of inner sleeve.
Preferably, the outer wall of the inner sleeve is fixed with gasket, and the width of the gasket is greater than leveling hole internal diameter, described short A pair of of buckle is equipped on beam by each leveling hole, the lower part of the buckle is located in short beam, and the top of the buckle is equipped with direction The elbow of another buckle, there are the gaps of insertion gasket between the elbow and short beam.It, will by the cooperation of gasket and buckle Levelling device is fixed, and levelling device will not move up and down.
Preferably, the gasket growth bar shaped, the width of the gasket are buckled less than two between the minimum between upper elbows Away from spacing and greater than two buckles between less than two buckles of length of the gasket go up the minimum spacings between elbows.Pad Piece uses such structure, it may be convenient to which inner sleeve is installed in leveling hole.
Preferably, the lower part of the buckle is equipped with horizontally disposed egative film, and the direction of the egative film is opposite with elbow direction. It allows buckle to have more stable fixation, while the intensity of the partial precast stub will not be reduced.
A kind of construction method on the basis in prefabricated transformer substation power distribution unit building, comprising the following steps:
A, ground excavates: subsoil is directly dug to estimated embedded depth of foundation;Reach estimated at the top of composite foundation mattress layer to bury It is deep;
B, levelling: it is levelling not less than the plain concrete of C15 that natural foundation directlys adopt 100mm;Composite foundation is in mattress layer Top is levelling not less than the plain concrete of C15 using 100mm;
C, unwrapping wire: prefabricated foundation unwrapping wire is carried out on screed-coat, determines the axial position of pre-constructed unit;
D, install prefabricated components: in place, levelling device mixes up level, then hoisting prefabricated ground beam to hoisting prefabricated stub, leveling Device mixes up level, then hoisting prefabricated bottom plate;
E, by prefabricated stub, prefabricated ground beam and the corresponding reinforcing bar of prefabricated panel by the way of welding or casing connection It is fixed together;
F, it is cast using post-cast strip concrete construction.
Preferably, it is excavated in the step A using full hall.
Preferably, in the step D, bottom filling is carried out using the pea gravel concreten not less than C40 after prefabricated stub leveling Slurry.
Preferably, in the step D, bottom filling is carried out using the pea gravel concreten not less than C40 after prefabricated ground beam leveling Slurry.
Preferably, in the step D, prefabricated panel is in place using the levelling rear installation of slurry processes is sat, and sits slurry and is not less than the thin of C40 Stone concrete.
Compared with prior art, the invention has the advantages that due to transformer substation power distribution unit building superstructure and equipment mark The size and location of the progress of standardization, superstructure and equipment load is relatively more fixed, so that the structure and equipment in power distribution equipment building Basis can be standardized arrangement, this is provided convenience to the production of large-scale prefabricated components, and this prefabricated foundation can drop Low design and produced on-site cost, it is easy for construction, site operation environment is greatly improved, site operation environment is made to become opposite Neatly.
1, for prefabricated components because curing condition is good, construction quality is good.
2, it uses reinforcement welding, then the method for rear pouring concrete to be attached between each prefabricated components, ensure that raft plate base The structural integrity of plinth and good basic transmission force property.
3, Equipment Foundations are prefabricated has buried, and can directly carry out equipment installation, accelerate and put the time into operation.
Detailed description of the invention
Fig. 1 is a kind of top view on the basis in prefabricated transformer substation power distribution unit building of the present invention;
Fig. 2 is the top view of prefabricated stub in the present invention;
Fig. 3 be the present invention in prefabricated stub connected with prefabricated ground beam after cross-sectional view;
Fig. 4 is the structural schematic diagram of levelling device in the present invention;
Fig. 5 is the structural schematic diagram buckled in the present invention;
Fig. 6 is the structural schematic diagram in the present invention on prefabricated stub after device for installing and leveling.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings.Below with reference to The embodiment of attached drawing description is exemplary, it is intended to is used to explain the present invention, and is not considered as limiting the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", The instructions such as " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of the description present invention and simplification is retouched It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.
Refering to fig. 1 to the embodiment on the basis that Fig. 6 is a kind of prefabricated transformer substation power distribution unit building of the present invention, a kind of prefabricated change The basis in power station power distribution equipment building, including prefabricated stub 1, prefabricated ground beam 2 and prefabricated panel 3, on the side wall of the prefabricated stub 1 Equipped with inverted T-shaped short beam 4;The prefabricated ground beam cross section be inverted T shape, can be convenient in this way prefabricated panel can be erected at it is pre- On ground beam processed, and guarantee that prefabricated panel is concordant with prefabricated ground beam or non-bulging excessive height, the both ends of the prefabricated ground beam 2 with There are post-cast strips between the short beam 4 of two neighboring prefabricated stub 1, and convenient last casting connection, the prefabricated panel 3 is placed on pre- In the space that ground beam 2 processed and prefabricated stub surround, there are post-cast strips for surrounding, convenient finally to pour connection, the short beam of the inverted T-shaped Leveling hole 5 is provided on 4 edges of a wing and 2 four jiaos of edges of a wing of prefabricated ground beam, the leveling hole 5 is interior equipped with the prefabricated stub of adjusting and prefabricated The levelling device of 2 levelness of ground beam, there are exposed reinforcing bar 6 on the prefabricated stub 1, prefabricated ground beam 2 and prefabricated panel 3, It is convenient to be connected in post-cast strip position reinforcing bar, after prefabricated stub 1, prefabricated ground beam 2 and prefabricated panel 3 are installed, by prefabricated components The corresponding reinforcing bar that reserves is fixedly connected, and pours post-cast strip.
By main prefabricated stub 1, prefabricated ground beam 2 and floor is all prefabricated carries out, and is directly spliced at the scene, is then led to Relative position is welded and fixed in the reinforcing bar 6 for crossing respective internal reservation, while levelling device is additionally used in this programme, is filled by leveling Set the flatness of adjustable prefabricated stub 1 and prefabricated ground beam 2.
Further, the levelling device includes inner sleeve 7 and adjusting screw rod 8, and the inner sleeve 7 is provided with internal thread hole, The adjusting screw rod 8 is adapted with internal thread hole, and the inner sleeve 7 is placed in leveling hole 5.Pass through adjusting screw rod 8 and inner sleeve The relative rotation of pipe 7 adjusts height, and being fixed in leveling hole 5 of can be convenient of inner sleeve 7.By rotating adjusting screw rod 8, The length of inner sleeve 7 is stretched out to control to adjust screw rod 8, to adjust height.
Further, the outer wall of the inner sleeve 7 is fixed with gasket 9, and the width of the gasket 9 is greater than leveling 5 internal diameter of hole, A pair of of buckle 10 is equipped on the short beam 4 by each leveling hole 5, the lower part of the buckle 10 is located in short beam 4, the buckle 10 Top be equipped with towards another buckle 10 elbow 11, between the elbow 11 and short beam 4 there are insertion gasket 9 gap. By the cooperation of gasket 9 and buckle 10, levelling device is fixed, levelling device inner sleeve 7 will not move up and down.The gasket 9 growth bar shapeds, the width of the gasket 9 buckle the minimum spacing on 10 between elbow 11, the length of the gasket 9 less than two Minimum spacings in spacing and greater than two buckles 10 between less than two buckles 10 between elbow 11.So in operation, Inner sleeve 7 is first inserted into leveling hole 5, the length direction of gasket 9 is vertical with the line of two buckles 10 at this time, and inner sleeve 7 is inserted into Rear gasket 9 is contacted with short beam 4, is rotated further by 90 degree of inner sleeves 7, and inner sleeve 7 is rotated with mobile gasket 9, the length direction of gasket 9 and two The line of a buckle 10 is parallel, so that entire levelling device be fixed.
In order to guarantee the stability of buckle 10, the lower part of the buckle 10 is equipped with horizontally disposed egative film 12, the egative film 12 direction is with elbow 11 towards opposite.
A kind of construction method on the basis in prefabricated transformer substation power distribution unit building, comprising the following steps:
A, ground excavates: subsoil is directly dug to estimated embedded depth of foundation;Reach estimated at the top of composite foundation mattress layer to bury It is deep;It is all made of and is excavated using full hall mode.
B, levelling: it is levelling not less than the plain concrete of C15 that natural foundation directlys adopt 100mm;Composite foundation is in mattress layer Top is levelling not less than the plain concrete of C15 using 100mm;
C, unwrapping wire: prefabricated foundation unwrapping wire is carried out on screed-coat, determines the axial position of pre-constructed unit;
D, install prefabricated components: in place, levelling device mixes up hoisting prefabricated stub 1, and horizontal prefabricated stub 1 uses after leveling Pea gravel concreten not less than C40 carries out bottom grouting, then hoisting prefabricated ground beam 2, levelling device mix up level, prefabricated ground beam 2 Bottom grouting is carried out using the pea gravel concreten not less than C40 after leveling, then hoisting prefabricated bottom plate 3, floor sets up prefabricated again On ground beam 2, prefabricated panel 3 is in place using the levelling rear installation of slurry processes is sat, and sits pea gravel concreten of the slurry not less than C40;
E, prefabricated ground beam 2 and prefabricated stub 1 are fixed together by the way of welding or casing connection;
F, it is cast using post-cast strip concrete construction.
G, levelling device can finally be removed.
Due to the superstructure in transformer substation power distribution unit building and the progress of Standardization instrument, superstructure and equipment load Size and location is relatively more fixed, and the structure in power distribution equipment building and Equipment Foundations is allowed to be standardized arrangement, this is to big rule The prefabricated components production of mould provides convenience, and this prefabricated foundation can reduce design and produced on-site cost, easy for construction.
1, for prefabricated components because curing condition is good, construction quality is good.
2, it is welded between each prefabricated components using reinforcing bar 6, then the method for rear pouring concrete is attached, and ensure that raft plate base The structural integrity of plinth and good basic transmission force property.
3, Equipment Foundations are prefabricated has buried, and can directly carry out equipment installation, accelerate and put the time into operation.
Above is only a specific embodiment of the present invention, but technical characteristic of the invention is not limited thereto, Ren Heben Within the field of the present invention, made changes or modifications all cover within the scope of the patent of the present invention the technical staff in field.

Claims (10)

1. a kind of basis in prefabricated transformer substation power distribution unit building, it is characterised in that: including prefabricated stub (1), prefabricated ground beam (2) and The side wall of prefabricated panel (3), the prefabricated stub (1) is equipped with short beam (4);The prefabricated ground beam cross section is inverted T shape, There are post-cast strip, the prefabricated bottoms between the both ends of the prefabricated ground beam (2) and the short beam (4) of two neighboring prefabricated stub (1) Plate (3) is placed in the space that prefabricated ground beam (2) and prefabricated stub (1) surround, and prefabricated panel (3) and prefabricated ground beam (2) and All there are post-cast strip between prefabricated stub (1), leveling hole (5), the tune are provided on the short beam (4) and prefabricated ground beam (2) Equipped with prefabricated stub (1) and the levelling device of prefabricated ground beam (2) levelness is adjusted in flat hole (5), the prefabricated stub (1), in advance There are exposed reinforcing bar (6), prefabricated stub (1), prefabricated ground beam (2) and prefabricated panels on ground beam (2) processed and prefabricated panel (3) (3) after being installed, the corresponding reinforcing bar that reserves of prefabricated components is fixedly connected, and pour post-cast strip.
2. a kind of basis in prefabricated transformer substation power distribution unit building as described in claim 1, it is characterised in that: the levelling device Including inner sleeve (7) and adjusting screw rod (8), the inner sleeve (7) is provided with internal thread hole, the adjusting screw rod (8) and internal screw thread Hole is adapted, and the inner sleeve (7) is placed in leveling hole (5).
3. a kind of basis in prefabricated transformer substation power distribution unit building as claimed in claim 2, it is characterised in that: the inner sleeve (7) outer wall is fixed with gasket (9), and the width of the gasket (9) is greater than leveling hole (5) internal diameter, each tune on the short beam (4) A pair of of buckle (10) is equipped with by flat hole (5), the lower part of the buckle (10) is located in short beam (4), the top of the buckle (10) Equipped with the elbow (11) towards another buckle (10), there are between insertion gasket (9) between the elbow (11) and short beam (4) Gap.
4. a kind of basis in prefabricated transformer substation power distribution unit building as claimed in claim 3, it is characterised in that: the gasket (9) Growth bar shaped, the width of the gasket (9) buckle the minimum spacing on (10) between elbow (11), the gasket less than two (9) length buckles the spacing between (10) less than two and is greater than between the minimum on two buckles (10) between elbow (11) Away from.
5. a kind of basis in prefabricated transformer substation power distribution unit building as claimed in claim 3, it is characterised in that: the buckle (10) Lower part be equipped with horizontally disposed egative film (12), the direction of the egative film (12) is with elbow (11) towards opposite.
6. a kind of construction method on the basis using prefabricated transformer substation power distribution unit building described in claim 1, it is characterised in that: packet Include following steps:
A, ground excavates: subsoil is directly dug to estimated embedded depth of foundation;Reach estimated buried depth at the top of composite foundation mattress layer;
B, levelling: it is levelling not less than the plain concrete of C15 that natural foundation directlys adopt 100mm;Composite foundation is at the top of mattress layer It is levelling not less than the plain concrete of C15 using 100mm;
C, unwrapping wire: prefabricated foundation unwrapping wire is carried out on screed-coat, determines the axial position of pre-constructed unit;
D, install prefabricated components: in place, levelling device mixes up level, then hoisting prefabricated ground beam (2) to hoisting prefabricated stub (1), adjusts Leveling device mixes up level, then hoisting prefabricated bottom plate (3);
E, by prefabricated panel, prefabricated ground beam (2) and the corresponding steel of prefabricated stub (1) by the way of welding or casing connection Muscle is fixed together;
F, it is cast using post-cast strip concrete construction.
7. the construction method on the basis in prefabricated transformer substation power distribution unit building as claimed in claim 6, it is characterised in that: the step It is excavated in rapid A using full hall.
8. the construction method on the basis in prefabricated transformer substation power distribution unit building as claimed in claim 6, it is characterised in that: the step In rapid D, bottom grouting is carried out using the pea gravel concreten not less than C40 after prefabricated stub (1) leveling.
9. the construction method on the basis in prefabricated transformer substation power distribution unit building as claimed in claim 6, it is characterised in that: the step In rapid D, bottom grouting is carried out using the pea gravel concreten not less than C40 after prefabricated ground beam (2) leveling.
10. the construction method on the basis in prefabricated transformer substation power distribution unit building as claimed in claim 6, it is characterised in that: described In step D, prefabricated panel (3) is in place using the levelling rear installation of slurry processes is sat, and sits pea gravel concreten of the slurry not less than C40.
CN201910361963.7A 2019-04-30 2019-04-30 Foundation of prefabricated substation distribution device building and construction method Active CN110158627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910361963.7A CN110158627B (en) 2019-04-30 2019-04-30 Foundation of prefabricated substation distribution device building and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910361963.7A CN110158627B (en) 2019-04-30 2019-04-30 Foundation of prefabricated substation distribution device building and construction method

Publications (2)

Publication Number Publication Date
CN110158627A true CN110158627A (en) 2019-08-23
CN110158627B CN110158627B (en) 2024-05-28

Family

ID=67633102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910361963.7A Active CN110158627B (en) 2019-04-30 2019-04-30 Foundation of prefabricated substation distribution device building and construction method

Country Status (1)

Country Link
CN (1) CN110158627B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111653955A (en) * 2020-05-21 2020-09-11 孝感科先电力工程咨询设计有限责任公司 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
DE202010001337U1 (en) * 2010-01-26 2011-06-09 GOLDBECK GmbH, 33649 Leveling system for a prefabricated foundation and column arrangement for buildings
CN103334496A (en) * 2013-07-19 2013-10-02 中建八局第一建设有限公司 Leveling bolt of embedded steel plate under isolation bearing and using method
CN106013811A (en) * 2016-05-13 2016-10-12 李藏柱 Mounting method of prefabricated building
CN106759420A (en) * 2016-12-21 2017-05-31 上海电力设计院有限公司 Prefabricated assembled transformer substation foundation structure
CN107761963A (en) * 2017-10-31 2018-03-06 广西旭腾实业集团有限公司 Concrete structure novel fabricated building system and its assembly method
CN207176726U (en) * 2017-08-09 2018-04-03 浙江省送变电工程公司 A kind of concrete foundation built-in fitting quick level adjusting device
CN207228148U (en) * 2017-09-20 2018-04-13 天元瑞信通信技术股份有限公司 A kind of single-pipe tower precast splice type basis
CN210194657U (en) * 2019-04-30 2020-03-27 国网浙江省电力有限公司金华供电公司 Foundation of prefabricated substation distribution device building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110061321A1 (en) * 2006-09-21 2011-03-17 Ahmed Phuly Fatigue reistant foundation system
DE202010001337U1 (en) * 2010-01-26 2011-06-09 GOLDBECK GmbH, 33649 Leveling system for a prefabricated foundation and column arrangement for buildings
CN103334496A (en) * 2013-07-19 2013-10-02 中建八局第一建设有限公司 Leveling bolt of embedded steel plate under isolation bearing and using method
CN106013811A (en) * 2016-05-13 2016-10-12 李藏柱 Mounting method of prefabricated building
CN106759420A (en) * 2016-12-21 2017-05-31 上海电力设计院有限公司 Prefabricated assembled transformer substation foundation structure
CN207176726U (en) * 2017-08-09 2018-04-03 浙江省送变电工程公司 A kind of concrete foundation built-in fitting quick level adjusting device
CN207228148U (en) * 2017-09-20 2018-04-13 天元瑞信通信技术股份有限公司 A kind of single-pipe tower precast splice type basis
CN107761963A (en) * 2017-10-31 2018-03-06 广西旭腾实业集团有限公司 Concrete structure novel fabricated building system and its assembly method
CN210194657U (en) * 2019-04-30 2020-03-27 国网浙江省电力有限公司金华供电公司 Foundation of prefabricated substation distribution device building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111653955A (en) * 2020-05-21 2020-09-11 孝感科先电力工程咨询设计有限责任公司 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation

Also Published As

Publication number Publication date
CN110158627B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN102758451B (en) Concrete cable channel construction process
CN206376276U (en) A kind of prefabricated pipe gallery
CN106759439B (en) Tower crane foundation for foundation pit and construction method thereof
CN105201012B (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN104264865A (en) Assembly type firewall
CN109098207B (en) Template system of prefabricated gas cabin of underground comprehensive pipe rack and construction method
CN107059920A (en) Loess formation piping lane construction technology
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN110397148A (en) A kind of prefabricated assembled catch pit structure and construction method
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN110924435B (en) Transverse pipeline fixing device below transverse structure and construction method thereof
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN114215114A (en) Cantilever plate peripheral water distribution construction structure and construction method
CN109137984A (en) Assembled integral mixes prefabricated pipe gallery
CN109706970A (en) A kind of prefabricated square cable active well
CN110158627A (en) A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN103669400A (en) Typical construction method for prefabricated tube bank
CN109137986A (en) Urban road inspection shaft walling crib green promotes reinforced construction method
CN105244835A (en) L-shaped concrete cable trench prefabricated component and production technology
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN210194657U (en) Foundation of prefabricated substation distribution device building
CN209675906U (en) A kind of prefabricated cable tank systems
CN221589693U (en) Once pouring template supporting and forming structure of ground well
CN205051308U (en) L type concrete cable pit prefab
CN218027861U (en) A prefabricated assembly quality for post-cast strip is as construction passageway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant