CN111653955A - Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation - Google Patents

Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation Download PDF

Info

Publication number
CN111653955A
CN111653955A CN202010434859.9A CN202010434859A CN111653955A CN 111653955 A CN111653955 A CN 111653955A CN 202010434859 A CN202010434859 A CN 202010434859A CN 111653955 A CN111653955 A CN 111653955A
Authority
CN
China
Prior art keywords
secondary screen
screen cabinet
base
transformer substation
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010434859.9A
Other languages
Chinese (zh)
Other versions
CN111653955B (en
Inventor
黄正丹
严祥武
吴建新
申腾
陈敏捷
曾峥
丁傲
赵渐进
喻祥喜
彭川
杨乘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiaogan Kexian Electric Power Engineering Consulting Design Co ltd
Original Assignee
Xiaogan Kexian Electric Power Engineering Consulting Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiaogan Kexian Electric Power Engineering Consulting Design Co ltd filed Critical Xiaogan Kexian Electric Power Engineering Consulting Design Co ltd
Priority to CN202010434859.9A priority Critical patent/CN111653955B/en
Publication of CN111653955A publication Critical patent/CN111653955A/en
Application granted granted Critical
Publication of CN111653955B publication Critical patent/CN111653955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/50Pedestal- or pad-mounted casings; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • H02B1/303Bases or feet

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention relates to the technical field of power equipment, in particular to a quick construction method for realizing a transformer substation secondary screen cabinet installation foundation, which specifically comprises the following steps: s1 slotting → S2 concrete preparation → S3 concrete pouring → assembly base → S5 base installation → S6 secondary screen cabinet installation of the substation. According to the invention, through excavating the base fixing groove with the depth of 0.4m and installing the bottom used for fixing the secondary screen cabinet of the transformer substation in the groove, the progress of civil engineering construction is accelerated, the construction difficulty is reduced, the aim of saving cost is achieved, the installation construction efficiency of the secondary screen cabinet base is improved, the working strength is reduced, the construction cost of civil engineering construction time is shortened, resources are saved, the operation reliability of a power grid is improved, the relative height of a nut is changed by adjusting the relative position of a fine adjustment bolt, the function of adjusting the height is realized, all horizontal heights of the base can be unified, and the structure is more stable.

Description

Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation
Technical Field
The invention relates to the technical field of power equipment, in particular to a quick construction method for realizing a transformer substation secondary screen cabinet installation foundation.
Background
The method of installing the secondary control screen (cabinet) by adopting the reserved foundation pit needs to excavate the original foundation and reserve enough space so that the electrical equipment can be safely connected with each other through the cable without influencing the original installation foundation. However, a foundation pit with a depth of 1.2m is excavated in the limited space of the main control room, and the construction difficulty is high by adopting the existing method for manufacturing the base foundation on the premise of not influencing the stability of the original equipment foundation, so that the construction progress is slow. In the foundation excavation process, the excavation amount of earthwork is large, and the generated abandoned soil outward transportation work is difficult to be unfolded.
Disclosure of Invention
The invention aims to provide a quick construction method for realizing a transformer substation secondary screen cabinet installation foundation, and aims to solve the problems of large workload and low construction speed of the conventional secondary control screen installation in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a quick construction method for realizing a transformer substation secondary screen cabinet installation foundation specifically comprises the following steps:
s1 slotting: selecting the installation position of a secondary screen cabinet of the transformer substation, excavating a foundation pit for installing a base of the secondary screen cabinet of the transformer substation at the selected position, and correcting the corner;
s2 preparation of concrete: c20 concrete is prepared on site, 12g of water is required to be mixed in every 100g of raw materials, and manual vibration is carried out for about 10min until the concrete has fluidity;
s3 pouring concrete: pouring concrete slurry in the excavated foundation pit, wherein the strength of the concrete is 35-50%;
s4 assembling the base: splicing various raw materials by using a base for installing a secondary screen cabinet of a transformer substation, and carrying out galvanizing treatment on the surface of the base;
s5 mounting base: after the concrete is solidified and formed, the spliced base is arranged at the top of the poured concrete, and the positions of all corners of the base are adjusted through a lifting support mechanism on the base, so that the top surface of the base is horizontal;
s6, mounting a secondary screen cabinet of the transformer substation: and moving the secondary screen cabinet of the transformer substation to the base for fixing.
Preferably, the depth of the foundation pit is 0.4m, and the bottom area of the foundation pit is the same as the floor area of the base.
As preferred, the base includes two sets of parallel arrangement's crossbeam and two sets of parallel arrangement's longeron, and two sets of crossbeams and two sets of longerons constitute the rectangle structure, and are two sets of two parallel arrangement's liftable supporting mechanism is all installed to the bottom of crossbeam, liftable supporting mechanism includes the supporting leg, install the bolt stationary blade on the supporting leg, the installation screw has been seted up to the center department of bolt stationary blade, installation screw female connection has the fine setting bolt, threaded connection has first nut and second nut on the fine setting bolt, first nut and second nut set up respectively in the upper and lower both sides of bolt stationary blade.
Preferably, the top seat is installed at the top of the supporting leg, mounting holes are formed in the edge portions of the two ends of the top seat, and connecting screw holes which are matched with the mounting holes in size, correspond to the mounting holes in position and are the same in number are formed in the bottom surface of the cross beam.
Preferably, the supporting legs sequentially penetrate through the mounting holes and the connecting screw holes through fixing bolts and are connected to the bottoms of the cross beams in a threaded mode.
Preferably, the cross beam, the longitudinal beam and the supporting legs are made of angle steel, and the thickness of the angle steel is 5 mm.
Preferably, the length of the cross beam is 800mm, the length of the longitudinal beam is 400mm, and the length of the supporting leg is 150 mm.
Preferably, the length of the fine adjustment bolt is 90mm, the thickness of the first nut and the second nut is 15mm, and the thickness of the nut is 15 mm.
Preferably, the bottom end of the fine adjustment bolt is a smooth screw rod, and the length of the fine adjustment bolt is 10 mm.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the quick construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation, the base fixing groove with the depth of 0.4m is excavated, and the bottom used for fixing the secondary screen cabinet of the transformer substation is installed in the groove, so that the progress of civil engineering construction is accelerated, the construction difficulty is reduced, the cost-saving target is achieved, the installation construction efficiency of the base of the secondary screen cabinet is improved, the working strength is reduced, the construction time and the construction cost of the civil engineering are shortened, the resources are saved, and the operation reliability of a power grid is improved.
2. Through the liftable supporting mechanism who sets up in this quick construction method who realizes transformer substation's secondary screen cabinet installation basis, simple structure, reasonable in design changes the relative height of nut through the relative position of adjusting the fine setting bolt to realize the function of adjustable height, can unify each level of base, the nut of welding in the channel-section steel bottom has the fixed action, reduces the removal that screw rod and base supported, makes the structure more stable.
Drawings
FIG. 1 is a schematic view of the base of the present invention;
FIG. 2 is an exploded view of the cross beam of the present invention;
the definitions of the various reference numbers in the figures are:
100. a cross beam; 101. mounting a screw hole;
200. a stringer;
300. a lifting support mechanism; 301. supporting legs; 302. connecting the top seat; 303. mounting holes; 304. a bolt fixing piece; 305. mounting a screw hole; 306. fine-tuning the bolt; 307. a first nut; 308. a second nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the equipment or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Example 1
A quick construction method for realizing a transformer substation secondary screen cabinet installation foundation specifically comprises the following steps:
s1 slotting: selecting the installation position of a secondary screen cabinet of the transformer substation, excavating a foundation pit for installing a base of the secondary screen cabinet of the transformer substation at the selected position, and correcting the corner;
s2 preparation of concrete: c20 concrete is prepared on site, 12g of water is required to be mixed in every 100g of raw materials, and manual vibration is carried out for about 10min until the concrete has fluidity;
s3 pouring concrete: pouring concrete slurry in the excavated foundation pit, wherein the strength of the concrete is 35-50%;
s4 assembling the base: splicing various raw materials by using a base for installing a secondary screen cabinet of a transformer substation, and carrying out galvanizing treatment on the surface of the base;
s5 mounting base: after the concrete is solidified and formed, the spliced base is arranged at the top of the poured concrete, and the positions of all corners of the base are adjusted through a lifting support mechanism on the base, so that the top surface of the base is horizontal;
s6, mounting a secondary screen cabinet of the transformer substation: and moving the secondary screen cabinet of the transformer substation to the base for fixing.
Furthermore, the depth of the foundation pit is 0.4m, and the floor area of the foundation pit is the same as the floor area of the base.
According to the quick construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation, the base fixing groove with the depth of 0.4m is excavated, and the bottom used for fixing the secondary screen cabinet of the transformer substation is installed in the groove, so that the progress of civil engineering construction is accelerated, the construction difficulty is reduced, the cost-saving target is achieved, the installation construction efficiency of the base of the secondary screen cabinet is improved, the working strength is reduced, the construction time and the construction cost of the civil engineering are shortened, the resources are saved, and the operation reliability of a power grid is improved.
Example 2
As a second embodiment of the present invention, as shown in fig. 1 and fig. 2, the base includes two sets of parallel cross beams 100 and two sets of parallel longitudinal beams 200, the two sets of cross beams 100 and the two sets of longitudinal beams 200 form a rectangular structure, two parallel liftable support mechanisms 300 are mounted at the bottoms of the two sets of cross beams 100, each liftable support mechanism 300 includes a support leg 301, a bolt fixing plate 304 is mounted on the support leg 301, a mounting screw hole 305 is formed at the center of the bolt fixing plate 304, a fine adjustment bolt 306 is connected to the mounting screw hole 305 through an internal thread, a first nut 307 and a second nut 308 are connected to the fine adjustment bolt 306 through an internal thread, and the first nut 307 and the second nut 308 are respectively disposed at the upper side and the lower side of.
Further, footstock 302 is installed at the top of supporting leg 301, mounting hole 303 has been seted up at the both ends edge portion of footstock 302, the bottom surface of crossbeam 100 is seted up with mounting hole 303 size looks adaptation, the corresponding and the same connection screw 101 of quantity in position, supporting leg 301 passes mounting hole 303 and connection screw 101 threaded connection in the bottom of crossbeam 100 in proper order through fixing bolt 400, be convenient for install or dismantle supporting leg 301, after long-term the use, if one or more of them supporting leg 301 damage is discovered, can change alone, save cost of maintenance.
Specifically, the cross beam 100, the longitudinal beam 200 and the supporting leg 301 are all made of angle steel, the thickness of the angle steel is 5mm, the length of the cross beam 100 is 800mm, the length of the longitudinal beam 200 is 400mm, the length of the supporting leg 301 is 150mm, the length of the fine adjustment bolt 306 is 90mm, the thicknesses of the first nut 307 and the second nut 308 are 15mm, the thickness of the nut is 15mm, the bottom end of the fine adjustment bolt 306 is an optical screw rod, the length of the fine adjustment bolt is 10mm, the remaining length of the fine adjustment bolt 306 is adjustable maximum length, and the adjustable maximum length of the fine adjustment bolt is 90-2 × 15-15-10-5 ═ 30 mm.
Through the liftable supporting mechanism 300 who sets up in the quick construction method of realization transformer substation secondary screen cabinet installation basis of this embodiment, simple structure, reasonable in design through the relative position of adjusting fine setting bolt 306, changes the relative height of nut to realize the function of adjustable height, can unify each level of base, the nut of welding in the channel-section steel bottom has the fixed action, reduces the removal that screw rod and base supported, makes the structure more stable.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, and the preferred embodiments of the present invention are described in the above embodiments and the description, and are not intended to limit the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. A quick construction method for realizing a transformer substation secondary screen cabinet installation foundation is characterized by comprising the following steps: the method specifically comprises the following steps:
s1 slotting: selecting the installation position of a secondary screen cabinet of the transformer substation, excavating a foundation pit for installing a base of the secondary screen cabinet of the transformer substation at the selected position, and correcting the corner;
s2 preparation of concrete: c20 concrete is prepared on site, 12g of water is required to be mixed in every 100g of raw materials, and manual vibration is carried out for about 10min until the concrete has fluidity;
s3 pouring concrete: pouring concrete slurry in the excavated foundation pit, wherein the strength of the concrete is 35-50%;
s4 assembling the base: splicing various raw materials by using a base for installing a secondary screen cabinet of a transformer substation, and carrying out galvanizing treatment on the surface of the base;
s5 mounting base: after the concrete is solidified and formed, the spliced base is arranged at the top of the poured concrete, and the positions of all corners of the base are adjusted through a lifting support mechanism on the base, so that the top surface of the base is horizontal;
s6, mounting a secondary screen cabinet of the transformer substation: and moving the secondary screen cabinet of the transformer substation to the base for fixing.
2. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 1, characterized in that: the depth of the foundation pit is 0.4m, and the bottom area of the foundation pit is the same as the floor area of the base.
3. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 1, characterized in that: the base includes crossbeam (100) and two sets of parallel arrangement's longeron (200) of two sets of parallel arrangement, and rectangular structure is constituteed with two sets of longerons (200) to two sets of crossbeam (100), and is two sets of liftable supporting mechanism (300) of two parallel arrangement are all installed to the bottom of crossbeam (100), liftable supporting mechanism (300) include supporting leg (301), install bolt fastening piece (304) on supporting leg (301), installation screw (305) have been seted up to the center department of bolt fastening piece (304), installation screw (305) female connection has fine setting bolt (306), threaded connection has first nut (307) and second nut (308) on fine setting bolt (306), first nut (307) and second nut (308) set up respectively in the upper and lower both sides of bolt fastening piece (304).
4. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 3, characterized in that: connecting footstock (302) is installed at the top of supporting leg (301), mounting hole (303) have been seted up at the both ends edge portion of connecting footstock (302), the bottom surface of crossbeam (100) seted up with mounting hole (303) size looks adaptation, the corresponding and the same connection screw hole (101) of quantity in position.
5. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 4, characterized in that: the supporting legs (301) sequentially penetrate through the mounting holes (303) and the connecting screw holes (101) through fixing bolts (400) and are connected to the bottom of the cross beam (100) in a threaded mode.
6. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 3, characterized in that: crossbeam (100), longeron (200) and supporting leg (301) all adopt the angle steel to make, and the thickness of angle steel is 5 mm.
7. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 6, is characterized in that: the length of crossbeam (100) is 800mm, the length of longeron (200) is 400mm, the length of supporting leg (301) is 150 mm.
8. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 6, is characterized in that: the length of the fine adjustment bolt (306) is 90mm, the thickness of the first nut (307) and the second nut (308) is 15mm, and the thickness of the nut is 15 mm.
9. The rapid construction method for realizing the installation foundation of the secondary screen cabinet of the transformer substation according to claim 6, is characterized in that: the bottom end of the fine adjustment bolt (306) is a smooth screw rod, and the length of the fine adjustment bolt is 10 mm.
CN202010434859.9A 2020-05-21 2020-05-21 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation Active CN111653955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010434859.9A CN111653955B (en) 2020-05-21 2020-05-21 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010434859.9A CN111653955B (en) 2020-05-21 2020-05-21 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation

Publications (2)

Publication Number Publication Date
CN111653955A true CN111653955A (en) 2020-09-11
CN111653955B CN111653955B (en) 2021-12-21

Family

ID=72349580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010434859.9A Active CN111653955B (en) 2020-05-21 2020-05-21 Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation

Country Status (1)

Country Link
CN (1) CN111653955B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081134A (en) * 2020-09-18 2020-12-15 广东电网有限责任公司佛山供电局 Power transformer base rapid conversion device and use method thereof
CN112739089A (en) * 2020-12-08 2021-04-30 南京迪港科技有限责任公司 Novel rack base convenient to installation
CN112850479A (en) * 2021-01-04 2021-05-28 中国十七冶集团有限公司 Track type installation method for electric box, disc and cabinet
CN118572533A (en) * 2024-07-29 2024-08-30 国网山东省电力公司滨州市沾化区供电公司 Assembled power supply unit support basis

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0964551A (en) * 1995-08-23 1997-03-07 Oki Electric Ind Co Ltd Fixing structure for adjuster foot
KR100746286B1 (en) * 2007-06-18 2007-08-13 유환홍 High voltage distributor
US20100290175A1 (en) * 2009-05-15 2010-11-18 Jacobsen Mark W Adjustable electrical switching apparatus mounting apparatus and switchgear apparatus including the same
CN202396106U (en) * 2011-11-18 2012-08-22 河南辉煌科技股份有限公司 Adjustable cabinet base
CN203194052U (en) * 2013-03-14 2013-09-11 中兴通讯股份有限公司 Adaptive installation part of communication cabinet pedestal
CN205298819U (en) * 2015-12-18 2016-06-08 金华电力设计院有限公司 Regulation prestressing mechanism of self -supporting cable support
CN105909006A (en) * 2016-05-06 2016-08-31 上海南华兰陵电气有限公司 Prefabricated splicing-combined transformer substation
CN107039897A (en) * 2017-06-20 2017-08-11 四川电力设计咨询有限责任公司 The mounting structure and installation method of electrical cubicle
CN107165288A (en) * 2017-06-05 2017-09-15 浙江省送变电工程公司 The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap
CN208674718U (en) * 2018-09-20 2019-03-29 华仪电气股份有限公司 A kind of adjustable mounting plate of box-type substation
CN110158627A (en) * 2019-04-30 2019-08-23 国网浙江省电力有限公司金华供电公司 A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN210482359U (en) * 2019-06-26 2020-05-08 国网吉林省电力有限公司松原供电公司 Special-shaped foundation structure of 10kV switch cabinet

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0964551A (en) * 1995-08-23 1997-03-07 Oki Electric Ind Co Ltd Fixing structure for adjuster foot
KR100746286B1 (en) * 2007-06-18 2007-08-13 유환홍 High voltage distributor
US20100290175A1 (en) * 2009-05-15 2010-11-18 Jacobsen Mark W Adjustable electrical switching apparatus mounting apparatus and switchgear apparatus including the same
CN202396106U (en) * 2011-11-18 2012-08-22 河南辉煌科技股份有限公司 Adjustable cabinet base
CN203194052U (en) * 2013-03-14 2013-09-11 中兴通讯股份有限公司 Adaptive installation part of communication cabinet pedestal
CN205298819U (en) * 2015-12-18 2016-06-08 金华电力设计院有限公司 Regulation prestressing mechanism of self -supporting cable support
CN105909006A (en) * 2016-05-06 2016-08-31 上海南华兰陵电气有限公司 Prefabricated splicing-combined transformer substation
CN107165288A (en) * 2017-06-05 2017-09-15 浙江省送变电工程公司 The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap
CN107039897A (en) * 2017-06-20 2017-08-11 四川电力设计咨询有限责任公司 The mounting structure and installation method of electrical cubicle
CN208674718U (en) * 2018-09-20 2019-03-29 华仪电气股份有限公司 A kind of adjustable mounting plate of box-type substation
CN110158627A (en) * 2019-04-30 2019-08-23 国网浙江省电力有限公司金华供电公司 A kind of basis in prefabricated transformer substation power distribution unit building and construction method
CN210482359U (en) * 2019-06-26 2020-05-08 国网吉林省电力有限公司松原供电公司 Special-shaped foundation structure of 10kV switch cabinet

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牟思浦: "《电气二次回路接线及施工》", 31 October 1999, 中国电力出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081134A (en) * 2020-09-18 2020-12-15 广东电网有限责任公司佛山供电局 Power transformer base rapid conversion device and use method thereof
CN112739089A (en) * 2020-12-08 2021-04-30 南京迪港科技有限责任公司 Novel rack base convenient to installation
CN112850479A (en) * 2021-01-04 2021-05-28 中国十七冶集团有限公司 Track type installation method for electric box, disc and cabinet
CN118572533A (en) * 2024-07-29 2024-08-30 国网山东省电力公司滨州市沾化区供电公司 Assembled power supply unit support basis
CN118572533B (en) * 2024-07-29 2024-10-18 国网山东省电力公司滨州市沾化区供电公司 Assembled power supply unit support basis

Also Published As

Publication number Publication date
CN111653955B (en) 2021-12-21

Similar Documents

Publication Publication Date Title
CN111653955B (en) Rapid construction method for realizing installation foundation of secondary screen cabinet of transformer substation
CN103711142A (en) GIS foundation for 220kv transformer substation
CN211898502U (en) High-position conversion foundation of construction elevator
CN102425188B (en) Method for adjusting height-adjustable tower foundation
CN116254926A (en) Construction method of inserted steel column foot
CN109989590A (en) For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN215290247U (en) Easily build reinforced structure of formula tower crane foundation
CN212642117U (en) Tool type supporting device for laminated bottom plate supporting system
CN208361753U (en) A kind of tower crane supporting leg anchoring pre-buried structure and tower crane
CN210714048U (en) Self-supporting iron tower base deviation correcting device
CN207905459U (en) A kind of steel truss and column base plate bolt fastening structure
CN220414843U (en) Post-pouring strip formwork system
CN207110676U (en) The prefabricated enclosure wall of integral type
CN221119306U (en) Beam reinforcing structure for construction design
CN111021394A (en) Construction elevator high-position conversion foundation and construction method thereof
CN220768972U (en) Reverse-acting installation support system for foundation shock insulation support of existing masonry structure
CN219794705U (en) Split mounting type bracket for mounting precast concrete overhanging balcony slab
CN216475738U (en) Assembled exterior wall cladding
CN217870973U (en) Assembled steel and concrete beam connected node structure
CN210976101U (en) Embedded part pre-installation device convenient for fine adjustment of embedded part
CN221664140U (en) Leveling piece, assembled overhead ground frame and assembled ground heating ground system
CN220888939U (en) Frame body formwork structure is exempted from to super thick floor of linear accelerator computer lab
CN219672137U (en) Adjustable stabilizer blade of concrete wall post template
CN212836171U (en) Light high strength floor structure
CN216552374U (en) Assembled building reinforced concrete member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant