CN101807075B - Automatic control system of hot rolled strip steel leveling unit - Google Patents

Automatic control system of hot rolled strip steel leveling unit Download PDF

Info

Publication number
CN101807075B
CN101807075B CN2010101819515A CN201010181951A CN101807075B CN 101807075 B CN101807075 B CN 101807075B CN 2010101819515 A CN2010101819515 A CN 2010101819515A CN 201010181951 A CN201010181951 A CN 201010181951A CN 101807075 B CN101807075 B CN 101807075B
Authority
CN
China
Prior art keywords
strip
coil
data
module
button
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101819515A
Other languages
Chinese (zh)
Other versions
CN101807075A (en
Inventor
王刚祥
李国安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN JIWEI TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
WUHAN JIWEI TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN JIWEI TECHNOLOGY DEVELOPMENT Co Ltd filed Critical WUHAN JIWEI TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN2010101819515A priority Critical patent/CN101807075B/en
Publication of CN101807075A publication Critical patent/CN101807075A/en
Application granted granted Critical
Publication of CN101807075B publication Critical patent/CN101807075B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an automatic control system of a hot rolled strip steel leveling unit, which comprises a production management control station MNG, a man-machine interface operator workstation HMI, a basic automatic controller and a communication network; the production management workstation MNG is used for receiving from the network or manually inputting through an interface steel coil production data, generating production strategies, collecting production filing data and uploading the data and the strategies to a tertiary computer system; and the basic automatic controller adopts SIMATIC TDC, and is used for realizing the logic order control, the speed coordination control, the gap setting control, the elongation control and the tension control functions of the hot rolled strip steel leveling unit, and completing the production process control to the hot rolled strip steel leveling unit. The automatic control system of the hot rolled strip steel leveling unit displays the operation, the communication and the control potential to the SIMATIC TDC control system, improves the production quality of the hot rolled strip steel leveling unit, and has the advantages of high efficiency in production management control, friendly interface, and a secondary computer system which is convenient to operate.

Description

A kind of automatic control system of hot rolled strip steel leveling unit
Technical field
The present invention relates to hot rolled strip steel leveling control technology field, also relate to the real time multiple task distributive control system of the SIMATIC TDC that adopts Siemens Company.
Background technology
The production of hot rolled strip steel leveling group will seek out desirable product quality; Require control system must fast, reliably realize the suitable control of hot rolled strip steel leveling group logic (LCO), speed coordination control (MRG), intermesh determination control (HGC), elongation control, Tension Control function, accomplish production run and control.As world-famous Automation Co., Ltd; The SIMATIC TDC of SIEMENS company (SIMATIC Technology and Drive Control); Established technology with drive automated system, be a kind of distributed digital control system of real-time multi-task, have that travelling speed is fast, reliability is high, characteristics such as powerful and easy configuration; Being good at the driving, control and the communication task that solve dealing with complicated, is the expansion desirable to SIMATIC S7.
But how the networking on the hot rolled strip steel leveling group of SIMATIC TDC control system is used; Bring into play the potential of its computing, communication and control; Improve the quality of production of hot rolled strip steel leveling group, and have that production management and control is efficient, friendly interface, the secondary machine system of being convenient to operate; Then be the research topic that a system uses, still do not have the report of this respect both at home and abroad.
Summary of the invention
Technical matters to be solved by this invention provides a kind of automatic control system of hot rolled strip steel leveling unit; The potential of computing, communication and the control of performance SIMATIC TDC control system; Improve the quality of production of hot rolled strip steel leveling group; And has efficient, the friendly interface of production management and control, the secondary machine system of being convenient to operate.
For solving the problems of the technologies described above, a kind of automatic control system of hot rolled strip steel leveling unit of the present invention comprises production management and control station MNG, man-machine interface operator workstation HMI, basic automatization controller and communication network, it is characterized in that,
Production management workstation MNG: be used for through network from three grades of machines receive or through interface manual entry coil of strip production data (PDI), generate production strategy, collection production actual achievement and upload three grades of machine systems.Three grades of machines are the factory management computer system, accomplish the production schedule and logistics management.
Man-machine interface operator workstation HMI: the production control and the appliance control interface that are used to show main operation interface, intermesh determination control (HGC) interface; Accomplish production schedule manual setting, control function selection, production process data monitoring, device failure alert, production report is printed;
Basic automatization controller: adopt SIMATIC TDC; Be used to realize that hot rolled strip steel leveling group logic is along control (LCO), speed coordination control (MRG), intermesh determination control (HGC), elongation control, Tension Control function, the production run control of completion hot rolled strip steel leveling group.
Communication network: adopt Ethernet TCP/IP network communication protocol between said production management workstation, man-machine interface operator workstation, the basic automatization controller; The basic automatization controller is connected through Profibus DP fieldbus with on-the-spot remote I/O, and spot sensor is connected with the basic automatization controller through signal cable.
Said production management workstation MNG comprises PDI data management module, factory formula administration module, production scheduling administration module and data communication module; Said PDI data management module is used for the manually original coil of strip data of input of operator, and the coil of strip data are inserted, delete, revised; Said factory formula administration module is used to work out the process data scheme of preparing to produce coil of strip; Said production scheduling administration module is used to work out the plan of coil of strip production; Said data communication module is used to receive three grades of coil of strip production schedule data on the machine, and coil of strip is produced filing data is uploaded to three grades of machines.
Said PDI data management module comprises the first operation interface module and the first data manipulation module,
The first operation interface module reads the coil of strip data of database, is that unit generates and demonstration coil of strip data and coil of strip data manipulation button with the steel reel number; Coil of strip data manipulation button comprises insertion button, delete button, modification button, shearing and bundling action button, material management button;
The first data manipulation module comprises inserts operational module, deletion action module, retouching operation module, shearing and bundling operational module, material administration module;
Insert button and trigger the execution of insertion operational module certain coil of strip data manipulation of coil of strip database insertion; Delete button triggers the operation that the deletion action module is carried out deletion coil of strip database coil of strip data; Revise button and trigger retouching operation module execution certain coil of strip data modification operation the coil of strip database; Shear to trigger and shear and the bundling operational module is used for cutting of certain coil of strip data of coil of strip database rolled up and the bundling attribute is provided with the bundling action button; It is that steel, density and the tension force attribute data of certain coil of strip data of coil of strip database a kind of is provided with management that material management button triggers the material administration module;
Said factory formula administration module is used to work out the process data scheme of preparing to produce coil of strip, comprises the second operation interface module and the second data manipulation module,
The said second operation interface module is used to read the data of coil of strip recipe database, generates and demonstration coil of strip formulation data and coil of strip formulation data control button; Coil of strip formulation data control button comprises insertion prescription button, deletion prescription button, revises the button of filling a prescription;
The said second data manipulation module comprises inserts prescription operational module, deletion prescription operational module, modification prescription operational module; Inserting prescription button triggering insertion prescription operational module is used for increasing the prescription record at the coil of strip recipe database; Deletion prescription button triggers deletion prescription operational module and is used at coil of strip recipe database deletion prescription record; Revising prescription button triggering modification prescription operational module is used for making amendment to certain coil of strip prescription attribute at the coil of strip recipe database;
Said production scheduling administration module comprises the 3rd operation interface module and the 3rd data manipulation module,
Said the 3rd operation interface module is used to read the generation of coil of strip data of database and shows the coil of strip data list, generates and show to prepare the data list of production coil of strip, generates to show that also row produces button, revokes button, assigns the production order button;
Said the 3rd data manipulation module comprises: row produces operational module, is used for selecting certain coil of strip from the coil of strip data list, and it is write the tabulation of preparation production coil of strip; Revoke operational module, be used for selecting certain coil of strip from preparing to produce the coil of strip data list, and with its deletion from prepare the tabulation of production coil of strip; Assign the production instruction module, be used for selecting certain coil of strip, and its data are sent to the basic automatization control system from preparing to produce the coil of strip data list,
Row produces button, revoke button, assign produce order button respectively the row of triggering product operational module, revoke operational module, assign the production instruction module;
Said the 3rd data manipulation module also comprises the move operation module of coil of strip order, be used for prepare to produce the coil of strip data list select the coil of strip that will adjust, the order of this coil of strip in tabulation adjusted;
Said coil of strip deletion action module, be used for prepare to produce the coil of strip data list select the coil of strip that will adjust, this coil of strip is deleted in tabulation;
Said data communication module comprises the 4th operation interface module and the 4th data manipulation module,
Said the 4th operation interface module reads three grades of machine coil of strip plan databases; Generate three grades of machine coil of strip plan database tabulations; This machine of generation coil of strip Database Lists and communication steering button comprise the reception button, return button, receive button and are used for triggering the reception operational module; Return button and be used to trigger the retraction operation module
Said the 4th data manipulation module comprises reception operational module, retraction operation module, receives operational module and is used for the coil of strip three grades of machine coil of strip plan databases tabulation selections with operating personnel, writes the coil of strip database in this machine; The retraction operation module is used for the coil of strip that operating personnel select in the coil of strip data list is deleted, and writes back to three grades of machine coil of strip plan databases tabulations;
Said the 4th data manipulation module also comprises editor filing module, is used for coil of strip is produced the filing data operation of making amendment;
Said the 4th operation interface module also is used to read the coil of strip production filing data of basic automation systems, generates coil of strip and produces filing data tabulation, editor's filing data button; Editor's filing data button triggers editor's filing module;
Said the 4th data manipulation module also comprises filing transmit operation module, is used for that coil of strip is produced filing data and sends three grades of machines to;
Said the 4th operation interface module also is used for generating sends coil of strip actual achievement data manipulation button, sends coil of strip actual achievement data manipulation button and triggers filing transmit operation module;
Said the 4th data manipulation module also comprises production operation time typing sending module, is used for the production operation time data of this order of classes or grades at school is carried out typing and is uploaded to three grades of machine systems.
Said the 4th operation interface module also generates typing and sends class's activity duration button, and typing is sent class's activity duration and triggered production operation time typing sending module.
Beneficial effect of the present invention: architecture is reasonable; The control real-time is high, realizes hot-strip flat line production process data automation collection, shows and uploads, the demonstration and the fault alarm of equipment running status, the potential of computing, communication and the control of performance SIMATIC TDC control system; Improve the quality of production of hot rolled strip steel leveling group; And have efficient, the friendly interface of production management and control, the secondary machine system of being convenient to operate can be applicable on the hot-strip flat line.
Description of drawings
Below in conjunction with accompanying drawing and embodiment technical scheme of the present invention is further specified.
Fig. 1 is a structure principle chart of the present invention.
Fig. 2 has represented to be the logic structure of data process flow diagram of the smooth unit automation control system of core with MNG.
Fig. 3 has represented the included PDI data management module of MNG, factory formula administration module, production scheduling administration module and four main functional modules of data communication module.
Fig. 4 has represented five the operation framework figures of PDI data management module to the coil of strip database.
Fig. 5 has represented the operation framework figure that insertion, modification, the deletion of factory formula management module coil of strip factory formula database are filled a prescription.
Fig. 6 has represented the flow process frame diagram of production scheduling administration module.
Fig. 7 has represented the data flowchart between NMG of the present invention and three grades of machines, the basic automation systems.
Fig. 8 is the MNG login interface.
Fig. 9 is the operation interface figure of four modules of MNG.
Figure 10 is the operation interface of PDI data management module.
Figure 11 is the operation interface behind the click increase coil of strip button in the PDI data management module.
Figure 12 is the coil of strip operation interface of revising or deleting in the PDI data management module.
Figure 13 is for cutting the operation interface of volume and bundling data in the PDI data management module.
Figure 14 is the operation interface of material quality data management in the PDI data management module.
Figure 15 is for producing the operation interface of formulation data management.
Figure 16 is the operation interface of establishment coil of strip production plan.
Figure 17 sends the operation interface of basic automation systems to for coil of strip production planning data.
Figure 18 is the operation interface of MNG and host computer data communication.
Figure 19 is the operation interface that MNG edits filing data in the data communication module.
Figure 20 is typing class activity duration and data upload given the operation interface of host computer in the data communication module.
Embodiment
Structure principle chart of the present invention as shown in Figure 1, automatic control system of hot rolled strip steel leveling unit comprises:
The L3 level: three grades of machines are the factory management computer system, accomplish the production schedule and logistics management;
The L2 level: production management and control station MNG, be used for through network from three grades of machines receive or through interface manual entry coil of strip production data (PDI), generate production strategy, collection production actual achievement and upload three grades of machine L3 systems;
L1 level: comprise basic automatization controller SIMATIC TDC, remote I/O, man-machine interface operator workstation HMI;
L0 level: comprise Electrified Transmission, mechanical drive, sensor.
Wherein, man-machine interface operator workstation HMI is used to show the production control and the appliance control interface at main operation interface, intermesh determination control (HGC) interface; Accomplish production schedule manual setting, control function selection, production process data monitoring, device failure alert, production report is printed;
Basic automatization controller: adopt SIMATIC TDC; Be used to realize that hot rolled strip steel leveling group logic is along control (LCO), speed coordination control (MRG), intermesh determination control (HGC), elongation control, Tension Control function, the production run control of completion hot rolled strip steel leveling group.
Communication network: adopt Ethernet TCP/IP network communication protocol between three grades of machines, production management workstation, man-machine interface operator workstation, the basic automatization controller; The basic automatization controller is connected through Profibus DP fieldbus with on-the-spot remote I/O, and spot sensor is connected with the basic automatization controller through signal cable.
Production management and control station MNG, man-machine interface operator workstation HMI are installed in respectively on the PC, and SIMATIC TDC, remote I/O ET200M, operator station OP and Profibus DP net are formed the PLC system.
Fig. 2 has represented to be the logic structure of data process flow diagram of the smooth unit automation control system of core with MNG.MNG respectively with L3, TDC, HMI communication, can also receive artificial logging data.
Fig. 3 has represented the included PDI data management module of MNG, factory formula administration module, production scheduling administration module and four main functional modules of data communication module.
Fig. 4 has represented five the operation framework figures of PDI data management module to the coil of strip database.
Fig. 5 has represented the operation framework figure that insertion, modification, the deletion of factory formula management module coil of strip factory formula database are filled a prescription.
Fig. 6 has represented the flow process frame diagram of production scheduling administration module.Row produces operational module and selects certain coil of strip from the coil of strip data list, and it is write the tabulation of preparation production coil of strip; Revoke operational module and select certain coil of strip from preparing to produce the coil of strip data list, and with its deletion from prepare the tabulation of production coil of strip; Assign and produce instruction module, and its data are sent to the basic automatization control system from certain coil of strip of preparation production coil of strip data list selection.
The move operation module of coil of strip order prepare to produce select in the coil of strip data list the coil of strip that will adjust, the order of this coil of strip in tabulation adjusted; Coil of strip deletion action module in prepare producing the coil of strip data list, select the coil of strip that will adjust, this coil of strip is deleted in tabulation.
Fig. 7 has represented the data flowchart between NMG of the present invention and three grades of machines, the basic automation systems.Receive the operational module data communication module and read three grades of machine coil of strip plan databases, generate three grades of machine coil of strip plan database tabulations, generate this machine coil of strip Database Lists; Receive operational module with the coil of strip that operating personnel select in three grades of machine coil of strip plan database tabulations, write the coil of strip database in this machine; The retraction operation module writes back to three grades of machine coil of strip plan database tabulations with the coil of strip deletion that operating personnel select in the coil of strip Database Lists;
Coil of strip data in this machine coil of strip database are produced the operation generation through row and are prepared to produce the coil of strip tabulation; Send to basic automation systems; Basic automation systems are according to the data production of preparing to produce the coil of strip tabulation; The coil of strip of generation is produced filing data and is sent to MNG, and MNG produces filing data through editor's filing module to coil of strip and carries out perhaps directly being sent in the coil of strip actual achievement database of L3 through filing transmit operation module behind the edit-modify.
In addition, the production operation time typing sending module of MNG receives the typing of operating personnel to the production operation time data of this order of classes or grades at school, and is uploaded to the teams and groups work data storehouse of three grades of machines, is convenient to the management statistics analysis.
For further specifying the present invention, provide the specific embodiment of MNG below.
Embodiment
The concrete implementation of MNG is following:
One, logins and log off
1.1 start WinCC, login interface appears in operation MNG, sees Fig. 8.
1.2 the user name of input, password, the hit OK button gets into system.
The MNG interface that on MNG master interface, shows mainly be divided into PDI data interface, production scheduling interface, factory formula interface and with the operation of four parts of host computer data communication, see that Fig. 9 shows.
Two, the operation interface of PDI data management module
If there is not upper level computing machine, raw data is manually imported through the operator, and operating personnel can insert, delete, revise the coil of strip data.Operating process:
The PDI data interface button of clicking Fig. 9 gets into the coil of strip data, then shows display interface shown in figure 10.
2.1 insert operation: the input steel reel number data of in screen, clicking the steel reel number with mouse button; Select the smooth or C-rewinding of processing mode S-; Steel; And the data of importing fields such as corresponding width, original depth, weight, extensibility, clicking increases this coil of strip record of coil of strip button insertion, sees Figure 11.
2.2 revise and deletion action: the selection coil of strip button of clicking Figure 11 can get into coil of strip information display interface and see Figure 12; The steel reel number that selection will be revised or delete; Automatically return main interface or click Figure 12 return push-button; If need to revise the coil of strip data, after having revised corresponding data, click the preservation coil of strip button of Figure 11.If deletion is then directly clicked Figure 11 and is deleted coil of strip button deletion coil of strip data.
Explain:
Extensibility [%]=(Chu beginning Hou Du – final thickness)/original depth x 100%
During rewinding, promptly processing mode is chosen as C, and extensibility is zero.
2.3 cut volume and bundling
It is cut mode that coil of strip is cut by length and weight dual mode, comprising: W-weight is sheared, and L-length is sheared, and n-does not cut.Operating process is following:
Click Figure 11 shears and volume and bundling data are cut in the entering of bundling button, then shows " cutting volume and the bundling data " interface shown in Figure 13 right side.
Cut the volume operation 2.3.1 increase: the data of in screen, selecting cut mode and importing respective field with mouse button, select the circumference bundling, clicking increases the branch volume record that the bundling button inserts this coil of strip.
2.3.2 revise or the operation of deletion bundling: the sub-steel reel number that in cutting the volume list box, will revise or delete with the mouse button selection, if need to revise the coil of strip data, after having revised corresponding data, click preservation bundling button.If deletion bundling button deletion bundling data are then directly clicked in deletion.
Return main interface 2.3.3 click return push-button.
2.4 material management
The material management is a kind of management to steel, density and tension data, and it should be set up before the input of PDI data.Operating process:
Click Figure 14 material management button and get into the material quality data management, then show the display interface shown in Figure 14 lower right corner.
2.4.1 increase operation: the data of input steel and respective field in screen, click the increase button and insert the steel record.
2.4.2 revise or deletion action: the steel that in the steel list box, will revise or delete with the mouse button selection, if need to revise data, after having revised corresponding data, click save button.If delete button deletion steel data are then directly clicked in deletion.
Return main interface 2.4.3 click return push-button.
Three, the operation interface of factory formula management:
Click Fig. 9 factory formula interface button and get into the factory formula data, then show display interface shown in figure 15.
3.1 increase the prescription operation: input prescription number in screen, select the data of processing mode and steel and input respective field, clicking increases the prescription button and inserts the record of filling a prescription.
3.2 revise or the operation of deletion prescription: the prescription of in the prescription list box, selecting to revise or to delete number with mouse button, if need to revise formulation data, after having revised corresponding data, click the preservation button of filling a prescription.If deletion prescription button deletion prescription record data are then directly clicked in deletion.
Return main interface 3.3 click return push-button.
Explain: must input prescription number to each prescription, select processing mode, steel, data such as input width, inlet thickness, extensibility or exit thickness.
Four, the operating process of production scheduling administration interface:
Click Fig. 9 production scheduling interface button and get into production schedule row product, then show display interface shown in figure 16.
4.1 row produces operation: the coil of strip of in screen coil of strip list box, selecting preparation to produce, clicking the prescription search button has the record of prescription to show at the prescription list box, and the row's of click product button coil of strip data get into to be prepared to produce in the coil of strip list box.
4.2 revoke operation: preparing to produce the steel reel number that will revoke with the mouse button selection in the coil of strip list box, click is revoked pushbutton data and is then turned back in the coil of strip list box.
4.3 transmit the basic automatization operation: preparing to produce in the coil of strip list box steel reel number of selecting to send to PLC with mouse button, clicking to assign and produce order button and send the coil of strip data to basic automation systems, then showing display interface shown in figure 17.
4.3.1 transmit the basic automatization operation: in the sub-steel reel number of screen list box, select to send to the sub-steel reel number of basic automatization with mouse button, whether the inspection data need to revise, and correctly then click to transmit the PLC button and send the coil of strip data to basic automatization.
4.3.2 regain the coil of strip data manipulation: on screen, click and regain the coil of strip data that the coil of strip data button will send basic automatization to, turn back to again and prepare to produce in the coil of strip list box.
Explain: coil of strip is cut volume, send basic automation systems to by sub-steel reel number order from small to large.
4.4, move, move down and deletion action on the coil of strip: in the coil of strip list box, select to adjust the steel reel number, click on the coil of strip move, coil of strip moves down and delete the coil of strip button coil of strip data are adjusted.
Five, the operating process of data communication:
Click Figure 18 and L3 data communication button and get into and host computer data communication interface, then show display interface shown in figure 19.
5.1, receive operation: in screen L3 coil of strip list box, select to prepare the coil of strip planning data that receives, click and receive button and receive the coil of strip record that reception is arranged in the plan column bezel, cluster at L2 and show.The row of click produces the entering of button coil of strip data and prepares to produce in the coil of strip list box.
5.2 retraction operation: the steel reel number that in L2 reception plan coil of strip list box, will return with the mouse button selection, click is return pushbutton data and is then turned back in the coil of strip list box.
5.3 editor's filing data operation: in coil of strip production actual achievement data rows bezel, cluster, choose the coil of strip that will revise, click editor's filing data button the coil of strip data are adjusted, then get into and revise or generate coil of strip filing data display interface, shown in figure 19.
5.3.1 preserve operation: on screen, click save button and will generate the coil of strip data or preserve the coil of strip data of revising.
5.3.2 return: click on the screen return push-button will turn back to host computer data communication interface on.
5.4 send the data manipulation of coil of strip actual achievement: in coil of strip production actual achievement data rows bezel, cluster, show the coil of strip actual achievement data of preparing to send to three grades of machines; Setting send mode is manual Man or automatic Auto (defaulting to manual Man); Transmitting the record number is that wall scroll writes down One or all writes down All (defaulting to wall scroll One), clicks transmission actual achievement data button and sends coil of strip production actual achievement data to three grades of machine systems.
5.5 class's activity duration operation: with three grades of machine data communication interfaces on, click typing and send class's activity duration button the work data of this order of classes or grades at school is carried out typing and is uploaded to three grades of machine systems, then show display interface shown in figure 20.
5.5.1 transmit operation: click transmission L3 button is uploaded to host computer with class's work data of typing on screen.
5.5.2 return: click on the screen return push-button will turn back to host computer data communication interface on.
Each coil of strip rolling intact after, related data like coil of strip weight, rolling time, amount of rolling, in the relevant form that leaves MNG in, is accomplished relevant report printing then.
It should be noted last that; Above embodiment is only unrestricted in order to technical scheme of the present invention to be described; Although with reference to preferred embodiment the present invention is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement technical scheme of the present invention; And not breaking away from the spirit and the scope of technical scheme of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (9)

1. an automatic control system of hot rolled strip steel leveling unit comprises production management and control station, man-machine interface operator workstation, basic automatization controller and communication network, it is characterized in that,
Production management and control station: be used for receiving or producing the PDI data, generate the production strategy, collect coil of strip production filing data and upload three grades of machines from three grades of machines through interface manual entry coil of strip through communication network;
Man-machine interface operator workstation: be used to show main operation interface, intermesh determination control, production control interface and appliance control interface; Realize production schedule manual setting, control function selection, production process data monitoring, device failure alert, production report printing;
Basic automatization controller: adopt SIMATIC TDC technology and drive automated system; Be used to realize hot rolled strip steel leveling group logic along control, speed coordination control, intermesh determination control, elongation control and Tension Control function, accomplish the production run control of hot rolled strip steel leveling group;
Communication network: adopt Ethernet TCP/IP network communication protocol between said production management and control station, man-machine interface operator workstation, the basic automatization controller; The basic automatization controller is connected through Profibus DP fieldbus with on-the-spot remote I/O, and spot sensor is connected with the basic automatization controller through signal cable;
Said production management and control station comprises PDI data management module, factory formula administration module, production scheduling administration module and data communication module;
Said PDI data management module is used for the operator manually to be imported coil of strip to produce the PDI data is the coil of strip data, and the coil of strip data are inserted, delete, revised;
Said factory formula administration module is used to work out the process data scheme of preparing to produce coil of strip;
Said production scheduling administration module is used to work out the plan of coil of strip production;
Said data communication module is used to receive the data of three grades of coil of strip production plans on the machine, and coil of strip is produced filing data is uploaded to three grades of machines.
2. automatic control system of hot rolled strip steel leveling unit according to claim 1; It is characterized in that said PDI data management module comprises insertion operational module, deletion action module, retouching operation module, shearing and bundling operational module and material administration module;
Said insertion operational module is carried out the coil of strip database is inserted certain coil of strip data manipulation;
Said deletion action module is carried out the operation of deletion coil of strip database coil of strip data;
Said retouching operation module is carried out certain the coil of strip data modification operation to the coil of strip database;
Said shearing and bundling operational module be used for to certain coil of strip data of coil of strip database cut the volume and the bundling attribute be provided with;
Said material administration module is used for the management that is provided with to the steel of certain coil of strip data of coil of strip database, density and tension force attribute data.
3. automatic control system of hot rolled strip steel leveling unit according to claim 2; It is characterized in that; Said PDI data management module also is used to read the coil of strip data of database; With the steel reel number is that unit generates and demonstration coil of strip data and coil of strip data manipulation button, comprises inserting button, delete button, modification button, shearing and bundling action button and material management button;
Said insertion button triggers and inserts operational module, delete button triggering deletion action module, and modification button triggering retouching operation module is sheared and the bundling action button triggers shearing and bundling operational module, and material is managed button triggering material administration module.
4. automatic control system of hot rolled strip steel leveling unit according to claim 1 is characterized in that, said factory formula administration module comprises insertion prescription operational module, deletion prescription operational module and revises the operational module of filling a prescription;
Said insertion prescription operational module is used for increasing the prescription record at the coil of strip recipe database;
Said deletion prescription operational module is used at coil of strip recipe database deletion prescription record;
Said modification prescription operational module is used for making amendment to certain coil of strip prescription attribute at the coil of strip recipe database.
5. automatic control system of hot rolled strip steel leveling unit according to claim 4; It is characterized in that; Said factory formula administration module also is used to read the data of coil of strip recipe database; Generate and demonstration coil of strip formulation data and coil of strip formulation data control button, comprise and insert prescription button, deletion prescription button and modification prescription button;
Said insertion prescription button triggers and inserts the prescription operational module, deletes the prescription button and triggers deletion prescription operational module, and modification prescription button triggers revises the prescription operational module.
6. automatic control system of hot rolled strip steel leveling unit according to claim 1 is characterized in that, said production scheduling administration module comprises:
Row produces operational module, is used for selecting certain coil of strip from the coil of strip data list, and it is write the data list of preparation production coil of strip;
Revoke operational module, be used for selecting certain coil of strip, and it is deleted from preparing to produce the coil of strip data list from preparing to produce the coil of strip data list;
Assign the production instruction module, be used for selecting certain coil of strip, and its data are sent to the basic automatization controller from preparing to produce the coil of strip data list.
7. automatic control system of hot rolled strip steel leveling unit according to claim 6; It is characterized in that; Said production scheduling administration module also is used to read the generation of coil of strip data of database and shows the coil of strip data list; Generate and show and prepare to produce the coil of strip data list, generation also shows that row produces button, revokes button, assigns the production order button; Said row produces button, revoke button, assign produce order button respectively the row of triggering product operational module, revoke operational module, assign the production instruction module.
8. automatic control system of hot rolled strip steel leveling unit according to claim 1 is characterized in that, said data communication module comprises reception operational module and retraction operation module,
Said reception operational module is used for the coil of strip in the coil of strip production plan database tabulation selection of three grades of machines with the operator, writes the coil of strip database in this machine;
Said retraction operation module is used for the coil of strip that the operator selects in the coil of strip data list is deleted, and writes back to the coil of strip production plan database tabulation of three grades of machines;
Said data communication module also comprises editor filing module, is used for coil of strip is produced the filing data operation of making amendment; Filing transmit operation module is used for that coil of strip is produced filing data and sends three grades of machines to; Production operation time typing sending module is used for the data of production operation time of this order of classes or grades at school are carried out typing and are uploaded to three grades of machines.
9. automatic control system of hot rolled strip steel leveling unit according to claim 8; It is characterized in that said data communication module also is used to read the coil of strip production plan database of three grades of machines, generate the coil of strip production plan database tabulation of three grades of machines; This machine of generation coil of strip Database Lists and communication steering button; Comprise receiving button and returning button, receive button and be used for triggering the reception operational module, return button and be used to trigger the retraction operation module;
Said data communication module also is used for: the coil of strip that reads the basic automatization controller is produced filing data, generates coil of strip and produces the filing data tabulation, generates editor's filing data button; Editor's filing data button triggers editor's filing module; Generate and send coil of strip actual achievement data manipulation button, send coil of strip actual achievement data manipulation button and trigger filing transmit operation module; Generate typing and send class's activity duration button, typing is sent class's activity duration button and is triggered production operation time typing sending module.
CN2010101819515A 2010-05-25 2010-05-25 Automatic control system of hot rolled strip steel leveling unit Expired - Fee Related CN101807075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101819515A CN101807075B (en) 2010-05-25 2010-05-25 Automatic control system of hot rolled strip steel leveling unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101819515A CN101807075B (en) 2010-05-25 2010-05-25 Automatic control system of hot rolled strip steel leveling unit

Publications (2)

Publication Number Publication Date
CN101807075A CN101807075A (en) 2010-08-18
CN101807075B true CN101807075B (en) 2012-03-21

Family

ID=42608895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101819515A Expired - Fee Related CN101807075B (en) 2010-05-25 2010-05-25 Automatic control system of hot rolled strip steel leveling unit

Country Status (1)

Country Link
CN (1) CN101807075B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102467099A (en) * 2010-11-18 2012-05-23 上海宝信软件股份有限公司 Address tag generation method of TDC (Technolegy Drive Control) controller
CN102339051B (en) * 2011-07-21 2014-04-09 西子奥的斯电梯有限公司 Automatic control system and method for wire rope cutting command
CN102749863B (en) * 2012-07-09 2014-10-29 首钢总公司 Methods for synchronizing data of steel rolls
CN103760856A (en) * 2014-01-09 2014-04-30 鞍钢股份有限公司 Cold strip steel leveling unit process control method
CN113290076B (en) * 2021-04-29 2022-11-15 邯郸钢铁集团有限责任公司 Control method for improving threading efficiency of hot galvanizing outlet double-coiler
CN114308199A (en) * 2021-12-08 2022-04-12 胡经文 Rice preparation process information tracking system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5303385A (en) * 1989-03-17 1994-04-12 Hitachi, Ltd. Control system having optimality decision means
CN201342426Y (en) * 2008-12-18 2009-11-11 鞍钢集团自动化公司 TDC hot rolling skin pass mill control system
CN201359698Y (en) * 2008-12-30 2009-12-09 大连三高重工设备有限公司 Automatic control system of large steel pipe production workshop
CN101670369B (en) * 2009-09-24 2011-08-03 唐山国丰钢铁有限公司 Full-automatic fast roll changing method for hot rolling mill

Also Published As

Publication number Publication date
CN101807075A (en) 2010-08-18

Similar Documents

Publication Publication Date Title
CN101807075B (en) Automatic control system of hot rolled strip steel leveling unit
CN201359698Y (en) Automatic control system of large steel pipe production workshop
CN205679985U (en) A kind of intelligence produces line process monitoring system
CN105843203A (en) Intelligent production line process monitoring system
CN206322012U (en) A kind of MES system for coal preparation plant
CN110784398B (en) Data acquisition system and data analysis method for industrial Internet of things processing equipment
CN201163361Y (en) Control system used for industry assembly line
CN102043394A (en) Direct numerical control (DNC) information acquisition method
CN107911367A (en) One kind digitlization workshop network and data exchange system
CN108681878A (en) The acquisition of intelligent plant production line data and billboard management system and method
CN105137928A (en) Full-automatic production line data collection method and system thereof
DE10304706A1 (en) Control of a plant in which there are a number of different machine systems linked onto a data bus and using programmable controllers that store historical data
CN103984308A (en) Remote Internet monitor system for gypsum plaster board production line data
CN102968101A (en) Mine multiple-system linkage control system based on imaging and control method thereof
CN106094775A (en) A kind of cutting production line long distance control system
CN106843125A (en) A kind of production line data exchange system
CN106843162A (en) A kind of industrial lathe automation remote intelligence control system
CN115857439A (en) Production line data mapping and fusing system and method based on digital twinning
CN103984326B (en) Production management system and method
CN115729187A (en) Processing method and device based on engine digital assembly verification
CN115480542A (en) Production line running state and related process data acquisition system
CN109100994A (en) A kind of production line for manufacturing battery method for real-time monitoring
CN102013054A (en) SMT production management information automatic system
CN108303955B (en) Method and system for batch production of products
TW200532408A (en) System and method for managing equipments

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120321