- CN
- China
- Prior art keywords
- tunnel
- longitudinal drainage
- drainage system
- drainage
- maintainable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a maintainable tunnel drainage system, which comprises two longitudinal drainage ditches, a plurality of transverse and longitudinal drainage blind-ended tubes, a plurality of circumferential blind-ended tubes, a plurality of inspection shafts and two side ditches. The maintainable tunnel drainage system provided by the invention collects leakage water at the top and bottom of an arch of a tunnel, road surface water and flushing water by using the plurality of transverse and longitudinal drainage blind-ended tubes below a road surface, the plurality of circumferential blind-ended tubes behind a lining and the side ditches on two sides of the road surface respectively, gathers the water into the longitudinal drainage ditches on two sides of a roadbed and then drains the water out of the tunnel together, so that the stereoscopic tunnel drainage system is formed. In addition, when the longitudinal drainage ditches are blocked, the inspection shafts flush the longitudinal drainage ditches with high-pressure water, so that the whole drainage system can be maintained.
Description
Technical field
The invention belongs to the tunnel construction technology field, particularly relate to a kind of maintainable tunnel drainage system.
Background technology
The drainage system in tunnel be tunnel construction, normally use and the safe operation process in important step, particularly in seabed tunnel, drainage system is particularly important, it is directly connected to the success or failure of tunnel construction and the performance of function of use.
The tunnel of building in the past is because all relatively backward at aspects such as draining theory, adrainage material, drainage technology and equipment, therefore drainage system following point occurs through regular meeting: the fine grained in the country rock is easy to enter into drainage system, owing to there is not effective removal measure, often cause drainage system to stop up; In addition, because the groundwater environment of seabed tunnel is a seawater, concrete is had strong crystallization decompose complex class corrosivity and crystalline medium class corrosivity, if Concrete admixtures is selected improper and is caused losing efficacy, or cement generation alkali-aggregate reaction in the shotcrete layer, also all might form precipitation and cause drainage system to stop up, thereby seriously influence the normal use in tunnel.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of being convenient to when seepage occurring to handle and the tangible maintainable tunnel drainage system of waterproof effect.
In order to achieve the above object, maintainable tunnel drainage system provided by the invention comprises two longitudinal drainage ditches, many horizontal strokes, longitudinal drainage blind pipe, many hoop blind pipes, a plurality of manhole and two gutters; Wherein two longitudinal drainage bank tunnels vertically are separately positioned on the form concrete layer inboard of tunnel bottom both sides, and join with the pumping plant that catchments; Many horizontal strokes, longitudinal drainage blind pipes are the cross interlace mode and are connected between two longitudinal drainage ditches, and are formed with a plurality of gully-holes on its top periphery; Many hoop blind pipes are arranged in the form concrete layer of vault along the hoop standoff distance in tunnel, be formed with a plurality of gully-holes on every hoop blind pipe top periphery, and the two ends of hoop blind pipe are connected on two longitudinal drainage ditches by horizontal tapping pipe; Vertical standoff distance is arranged on the form concrete layer inboard of tunnel bottom both sides to a plurality of manholes along the tunnel, and links to each other with the longitudinal drainage ditch that is positioned at the same side by horizontal tapping pipe; Article two, lateral sulcus vertically is arranged on the form concrete layer inboard of tunnel bottom both sides along the tunnel, and links to each other with the longitudinal drainage pipe that is positioned at the same side by horizontal tapping pipe.
Spacing between the described hoop blind pipe is 5 meters.
Spacing between the described transverse drain is 25 meters.
Spacing between the described manhole is 100 meters.
Also be provided with well lid on the described manhole.
Maintainable tunnel drainage system provided by the invention be utilize many of road surface below horizontal vertical, collect percolating water and road surface water and the flushing water that tunnel vault, bottom occur respectively to draining blind pipe, lining cutting many hoop blind pipes and the gutter of both sides, road surface behind, and be pooled in the longitudinal drainage ditch of roadbed both sides, together drain into outside the tunnel then, thereby form three-dimensional tunnel drainage system.In addition, when the longitudinal drainage ditch takes place to stop up, can utilize water under high pressure that the longitudinal drainage ditch is washed, thereby realize the maintainability of whole drainage system by manhole.
Description of drawings
Fig. 1 is the tunnel lateral direction cross-sectional view that maintainable tunnel drainage system provided by the invention is installed.
Fig. 2 is a manhole position partial structurtes schematic diagram in the maintainable tunnel drainage system provided by the invention.
Fig. 3 is horizontal, a longitudinal drainage blind pipe structural representation in the maintainable tunnel drainage system provided by the invention.
The specific embodiment
As shown in Figure 1-Figure 3, maintainable tunnel drainage system provided by the invention comprises two longitudinal drainage ditches 1, many horizontal strokes, longitudinal drainage blind pipe 2,9, many hoop blind pipes 3, a plurality of manhole 4 and two gutters 5; Wherein two longitudinal drainage ditches 1 vertically are separately positioned on form concrete layer 6 inboard of tunnel bottom both sides along the tunnel, and join with the pumping plant that catchments; Many horizontal strokes, longitudinal drainage blind pipes 2,9 are the cross interlace mode and are connected between two longitudinal drainage ditches 1, and are formed with a plurality of gully-holes on its top periphery; Many hoop blind pipes 3 are arranged in the form concrete layer 6 of vault along the hoop standoff distance in tunnel, be formed with a plurality of gully-holes on every hoop blind pipe 3 top peripheries, and the two ends of hoop blind pipe 3 are connected on two longitudinal drainage ditches 1 by horizontal tapping pipe 7; Vertical standoff distance is arranged on form concrete layer 6 inboard of tunnel bottom both sides to a plurality of manholes 4 along the tunnel, and links to each other with the longitudinal drainage ditch 1 that is positioned at the same side by horizontal tapping pipe 7; Article two, lateral sulcus 5 vertically is arranged on form concrete layer 6 inboard of tunnel bottom both sides along the tunnel, and links to each other with the longitudinal drainage pipe 1 that is positioned at the same side by horizontal tapping pipe 7.
Spacing between the described hoop blind pipe 3 is 5 meters.
Spacing between the described transverse drain 2 is 25 meters.
Spacing between the described manhole 4 is 100 meters.
Also be provided with well lid 8 on the described manhole 4.
When percolating water occurring on the tunnel vault, this water can enter into its inside by the gully-hole on the hoop blind pipe 3, flows in the longitudinal drainage ditches 1 through horizontal tapping pipe 7 then; Various water in the tunnel on the road surface can enter into its inside by the gully-hole on horizontal stroke, the longitudinal drainage blind pipe 2,9, flow to the longitudinal drainage ditch 1 of both sides then; Gutter 5 is used to collect road surface water and flushing water, imports longitudinal drainage ditch 1 then; The water of above-mentioned all inflow longitudinal drainage ditches 1 will together flow into the pumping plant that catchments, and be pumped to outside the tunnel at last.Fine grained in country rock enters into drainage system, perhaps owing to seawater forms precipitation to the corrosiveness of concrete structure, thereby cause longitudinal drainage ditch 1 to occur stopping up, when the result influences the normal use in tunnel, the staff can utilize water under high pressure that longitudinal drainage ditch 1 is washed by manhole 4, then these rinse water is entered the pumping plant that catchments.Also can regularly check by manhole 4 every the regular hour to longitudinal drainage ditch 1.In addition, horizontal, longitudinal drainage blind pipe 2,9 adopts plastic conduit usually, and as the HDPE double-wall corrugated pipe, longitudinal drainage ditch 1 then adopts glass reinforced plastic pipe, and diameter is Ф 500, does not destroy so that can bear the flushing water pressure of 12MPa.In addition, all gutters all should have smooth inner surface, to guarantee that underground water can smooth and easyly flow.In addition, above-mentioned all gutters that have a gully-hole are all outer wraps up in layer of non-woven fabric, to prevent in the silt inflow pipe.Should guarantee the not crushed and obstruction of all gutters during construction, unimpeded to guarantee drainage system.In addition, the junction of above-mentioned all pipelines all adopts tee junction or four-way connection to connect.
Claims (5)
1. maintainable tunnel drainage system, it is characterized in that: described maintainable tunnel drainage system comprises two longitudinal drainage ditches (1), many horizontal strokes, longitudinal drainage blind pipe (2,9), many hoop blind pipes (3), a plurality of manhole (4) and two gutters (5); Wherein two longitudinal drainage ditches (1) vertically are separately positioned on form concrete layer (6) inboard of tunnel bottom both sides along the tunnel, and join with the pumping plant that catchments; Many horizontal strokes, longitudinal drainage blind pipes (2,9) are the cross interlace mode and are connected between two longitudinal drainage ditches (1), and are formed with a plurality of gully-holes on its top periphery; Many hoop blind pipes (3) are arranged in the form concrete layer (6) of vault along the hoop standoff distance in tunnel, be formed with a plurality of gully-holes on the periphery of every hoop blind pipe (3) top, and the two ends of hoop blind pipe (3) are connected on two longitudinal drainage ditches (1) by horizontal tapping pipe (7); Vertical standoff distance is arranged on form concrete layer (6) inboard of tunnel bottom both sides to a plurality of manholes (4) along the tunnel, and links to each other with the longitudinal drainage ditch (1) that is positioned at the same side by horizontal tapping pipe (7); Article two, lateral sulcus (5) vertically is arranged on form concrete layer (6) inboard of tunnel bottom both sides along the tunnel, and links to each other with the longitudinal drainage pipe (1) that is positioned at the same side by horizontal tapping pipe (7).
2. maintainable tunnel drainage system according to claim 1 is characterized in that: the spacing between the described hoop blind pipe (3) is 5 meters.
3. maintainable tunnel drainage system according to claim 1 is characterized in that: the spacing between the described transverse drain (2) is 25 meters.
4. maintainable tunnel drainage system according to claim 1 is characterized in that: the spacing between the described manhole (4) is 100 meters.
5. maintainable tunnel drainage system according to claim 1 is characterized in that: also be provided with well lid (8) on the described manhole (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010125676 CN101798939B (en) | 2010-03-17 | 2010-03-17 | Maintainable tunnel drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010125676 CN101798939B (en) | 2010-03-17 | 2010-03-17 | Maintainable tunnel drainage system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101798939A true CN101798939A (en) | 2010-08-11 |
CN101798939B CN101798939B (en) | 2013-04-24 |
Family
ID=42594765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010125676 Expired - Fee Related CN101798939B (en) | 2010-03-17 | 2010-03-17 | Maintainable tunnel drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101798939B (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678174A (en) * | 2012-05-28 | 2012-09-19 | 中交第一公路勘察设计研究院有限公司 | Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof |
CN103032097A (en) * | 2012-12-26 | 2013-04-10 | 湖南省交通规划勘察设计院 | Tunnel drainage structure applicable to water-rich strata under unsymmetrical pressure and construction method thereof |
CN103089303A (en) * | 2013-01-29 | 2013-05-08 | 武汉理工大学 | Tunnel side wall drainage net |
CN104265363A (en) * | 2014-09-24 | 2015-01-07 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Underground roadway gushing point dewatering device |
CN104389316A (en) * | 2014-10-28 | 2015-03-04 | 中国电建集团成都勘测设计研究院有限公司 | Pressure-proof structure of underground tunnel |
CN104594947A (en) * | 2015-01-19 | 2015-05-06 | 中铁十八局集团有限公司 | Water-rich narrow tunnel water drainage structure |
CN104975877A (en) * | 2015-07-08 | 2015-10-14 | 甘肃路桥建设集团有限公司 | Portal external road surface water blocking and discharging system with tunnel portal in downslope direction and manufacturing method for same |
CN105822347A (en) * | 2016-04-19 | 2016-08-03 | 同济大学 | Tunnel siphon water drainage system and construction method thereof |
CN105822348A (en) * | 2016-05-05 | 2016-08-03 | 中铁第勘察设计院集团有限公司 | In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure |
CN105887778A (en) * | 2016-03-23 | 2016-08-24 | 中山大学 | Controllable drainage system of free face near high-pressure tunnel |
CN105986836A (en) * | 2016-06-14 | 2016-10-05 | 中铁隧道勘测设计院有限公司 | Single-line railway tunnel substrate waterproof and drainage reinforcing system |
CN107044298A (en) * | 2016-12-20 | 2017-08-15 | 成都佰思汇信科技有限责任公司 | A kind of tunnel |
CN108049915A (en) * | 2017-12-12 | 2018-05-18 | 中国水利水电第十工程局有限公司 | The drainage system of underground traffic tunnels |
CN108561180A (en) * | 2018-01-12 | 2018-09-21 | 浙江大学 | A kind of longitudinal drainage system and method for disposition tunnel floor pore gas flow |
CN108798778A (en) * | 2018-07-23 | 2018-11-13 | 中铁十九局集团第六工程有限公司 | The levelling layer sewerage system of the reserved filling in tunnel and its construction method |
CN109505653A (en) * | 2018-12-20 | 2019-03-22 | 中国电建集团华东勘测设计研究院有限公司 | A kind of stifled arrange of convertible type of rich water tunnel combines supporting construction |
CN109611149A (en) * | 2018-12-11 | 2019-04-12 | 成都大学 | A kind of Tunnel Passing tomography containing water burst flow guiding structure and construction method |
CN109736885A (en) * | 2019-03-14 | 2019-05-10 | 中铁六局集团有限公司 | Tunnel water plug |
CN109989788A (en) * | 2019-03-14 | 2019-07-09 | 中铁隧道集团二处有限公司 | A kind of short abutment wall drain hole discharge structure in tunnel and construction method |
CN110130980A (en) * | 2019-04-11 | 2019-08-16 | 中铁隧道集团二处有限公司 | A kind of tunnel drainage device, system and its construction method |
CN111412013A (en) * | 2020-03-26 | 2020-07-14 | 中电建十一局工程有限公司 | Construction method of weak surrounding rock tunnel in water-rich area |
CN111778845A (en) * | 2020-06-12 | 2020-10-16 | 山东省交通科学研究院 | Comprehensive drainage-preventing and water-guiding method for bridge deck pavement |
CN111908646A (en) * | 2020-08-31 | 2020-11-10 | 中交路桥建设有限公司 | Anti-blocking tunnel drainage pipeline flushing system and method |
CN111924994A (en) * | 2020-08-31 | 2020-11-13 | 中交路桥建设有限公司 | Treatment system and method for blocking prevention of tunnel drainage pipeline |
CN112879035A (en) * | 2021-01-25 | 2021-06-01 | 中铁工程设计咨询集团有限公司 | Open cut tunnel structure |
CN112922670A (en) * | 2021-03-24 | 2021-06-08 | 广东大潮高速公路有限公司 | Visual and maintainable type anti-clogging drainage system for highway tunnel |
CN112963201A (en) * | 2021-02-07 | 2021-06-15 | 广东省交通规划设计研究院股份有限公司 | Mountain tunnel and underground water drainage mechanism |
CN113294206A (en) * | 2021-07-09 | 2021-08-24 | 重庆交通大学 | Anti-crystallization tunnel drainage system based on big data control |
CN113738442A (en) * | 2021-09-02 | 2021-12-03 | 中铁二院工程集团有限责任公司 | Tunnel sealing water-gas discharge system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1766289A (en) * | 2005-11-29 | 2006-05-03 | 长安大学 | Centralized water discharge apparatus and method for tunnelling |
CN101021155A (en) * | 2007-03-13 | 2007-08-22 | 柳自道 | Tunnel double-lining protection draining structure |
KR20090003029A (en) * | 2007-07-05 | 2009-01-09 | 이인범 | Fixing structure of drainpipe and waterproof sheet for tunnel |
CN101435342A (en) * | 2008-12-22 | 2009-05-20 | 长安大学 | Tunnel ring direction drainpipe equipped with strip heat-insulating layer |
KR100906194B1 (en) * | 2007-08-22 | 2009-07-03 | 연일화섬공업(주) | Drainage structure of tunnel, and its construction method, and sleeve socket used for the same |
CN201650362U (en) * | 2010-03-17 | 2010-11-24 | 中铁隧道勘测设计院有限公司 | Maintainable tunnel drainage system |
-
2010
- 2010-03-17 CN CN 201010125676 patent/CN101798939B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1766289A (en) * | 2005-11-29 | 2006-05-03 | 长安大学 | Centralized water discharge apparatus and method for tunnelling |
CN101021155A (en) * | 2007-03-13 | 2007-08-22 | 柳自道 | Tunnel double-lining protection draining structure |
KR20090003029A (en) * | 2007-07-05 | 2009-01-09 | 이인범 | Fixing structure of drainpipe and waterproof sheet for tunnel |
KR100906194B1 (en) * | 2007-08-22 | 2009-07-03 | 연일화섬공업(주) | Drainage structure of tunnel, and its construction method, and sleeve socket used for the same |
CN101435342A (en) * | 2008-12-22 | 2009-05-20 | 长安大学 | Tunnel ring direction drainpipe equipped with strip heat-insulating layer |
CN201650362U (en) * | 2010-03-17 | 2010-11-24 | 中铁隧道勘测设计院有限公司 | Maintainable tunnel drainage system |
Non-Patent Citations (4)
Title |
---|
李阳刚: "厦门海底隧道防排水施工技术", 《铁道标准设计》 * |
樊孝军: "厦门翔安海底隧道施工防排水设计与施工", 《国防交通工程与技术》 * |
瞿守信: "厦门翔安海底隧道防排水技术初步应用经验", 《岩石力学与工程学报》 * |
谭志文: "青岛胶州湾海底隧道防排水设计", 《隧道建设》 * |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678174A (en) * | 2012-05-28 | 2012-09-19 | 中交第一公路勘察设计研究院有限公司 | Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof |
CN102678174B (en) * | 2012-05-28 | 2015-03-18 | 中交第一公路勘察设计研究院有限公司 | Arrangement method of tunnel drainage system passing through permafrost region and non-frozen ground region |
CN103032097A (en) * | 2012-12-26 | 2013-04-10 | 湖南省交通规划勘察设计院 | Tunnel drainage structure applicable to water-rich strata under unsymmetrical pressure and construction method thereof |
CN103032097B (en) * | 2012-12-26 | 2015-09-23 | 湖南省交通规划勘察设计院 | Be applicable to tunnel drainage structure and the construction method thereof of bias voltage water rich strata |
CN103089303B (en) * | 2013-01-29 | 2015-04-08 | 武汉理工大学 | Tunnel side wall drainage net |
CN103089303A (en) * | 2013-01-29 | 2013-05-08 | 武汉理工大学 | Tunnel side wall drainage net |
CN104265363A (en) * | 2014-09-24 | 2015-01-07 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Underground roadway gushing point dewatering device |
CN104389316A (en) * | 2014-10-28 | 2015-03-04 | 中国电建集团成都勘测设计研究院有限公司 | Pressure-proof structure of underground tunnel |
CN104594947A (en) * | 2015-01-19 | 2015-05-06 | 中铁十八局集团有限公司 | Water-rich narrow tunnel water drainage structure |
CN104975877A (en) * | 2015-07-08 | 2015-10-14 | 甘肃路桥建设集团有限公司 | Portal external road surface water blocking and discharging system with tunnel portal in downslope direction and manufacturing method for same |
CN105887778A (en) * | 2016-03-23 | 2016-08-24 | 中山大学 | Controllable drainage system of free face near high-pressure tunnel |
CN105822347A (en) * | 2016-04-19 | 2016-08-03 | 同济大学 | Tunnel siphon water drainage system and construction method thereof |
CN105822347B (en) * | 2016-04-19 | 2019-02-01 | 同济大学 | A kind of tunnel siphon drainge system and its method of construction |
CN105822348A (en) * | 2016-05-05 | 2016-08-03 | 中铁第勘察设计院集团有限公司 | In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure |
CN105986836B (en) * | 2016-06-14 | 2018-12-14 | 中铁隧道勘测设计院有限公司 | A kind of single-track railway tunnel substrate guarded drainage strengthen the system |
CN105986836A (en) * | 2016-06-14 | 2016-10-05 | 中铁隧道勘测设计院有限公司 | Single-line railway tunnel substrate waterproof and drainage reinforcing system |
CN107044298A (en) * | 2016-12-20 | 2017-08-15 | 成都佰思汇信科技有限责任公司 | A kind of tunnel |
CN108049915B (en) * | 2017-12-12 | 2019-06-18 | 中国水利水电第十工程局有限公司 | The drainage system of underground traffic tunnels |
CN108049915A (en) * | 2017-12-12 | 2018-05-18 | 中国水利水电第十工程局有限公司 | The drainage system of underground traffic tunnels |
CN108561180A (en) * | 2018-01-12 | 2018-09-21 | 浙江大学 | A kind of longitudinal drainage system and method for disposition tunnel floor pore gas flow |
CN108798778A (en) * | 2018-07-23 | 2018-11-13 | 中铁十九局集团第六工程有限公司 | The levelling layer sewerage system of the reserved filling in tunnel and its construction method |
CN109611149A (en) * | 2018-12-11 | 2019-04-12 | 成都大学 | A kind of Tunnel Passing tomography containing water burst flow guiding structure and construction method |
CN109505653A (en) * | 2018-12-20 | 2019-03-22 | 中国电建集团华东勘测设计研究院有限公司 | A kind of stifled arrange of convertible type of rich water tunnel combines supporting construction |
CN109736885A (en) * | 2019-03-14 | 2019-05-10 | 中铁六局集团有限公司 | Tunnel water plug |
CN109989788B (en) * | 2019-03-14 | 2021-05-18 | 中铁隧道集团二处有限公司 | Drainage structure of tunnel short side wall drainage hole and construction method |
CN109989788A (en) * | 2019-03-14 | 2019-07-09 | 中铁隧道集团二处有限公司 | A kind of short abutment wall drain hole discharge structure in tunnel and construction method |
CN109736885B (en) * | 2019-03-14 | 2024-04-02 | 中铁六局集团有限公司 | Water pumping device for tunnel |
CN110130980A (en) * | 2019-04-11 | 2019-08-16 | 中铁隧道集团二处有限公司 | A kind of tunnel drainage device, system and its construction method |
CN111412013A (en) * | 2020-03-26 | 2020-07-14 | 中电建十一局工程有限公司 | Construction method of weak surrounding rock tunnel in water-rich area |
CN111778845A (en) * | 2020-06-12 | 2020-10-16 | 山东省交通科学研究院 | Comprehensive drainage-preventing and water-guiding method for bridge deck pavement |
CN111924994A (en) * | 2020-08-31 | 2020-11-13 | 中交路桥建设有限公司 | Treatment system and method for blocking prevention of tunnel drainage pipeline |
CN111908646B (en) * | 2020-08-31 | 2023-08-08 | 中交路桥建设有限公司 | Tunnel drainage pipeline flushing system and method capable of preventing blockage |
CN111924994B (en) * | 2020-08-31 | 2023-11-28 | 中交路桥建设有限公司 | Treatment system and method for preventing tunnel drainage pipeline from being blocked |
CN111908646A (en) * | 2020-08-31 | 2020-11-10 | 中交路桥建设有限公司 | Anti-blocking tunnel drainage pipeline flushing system and method |
CN112879035A (en) * | 2021-01-25 | 2021-06-01 | 中铁工程设计咨询集团有限公司 | Open cut tunnel structure |
CN112963201A (en) * | 2021-02-07 | 2021-06-15 | 广东省交通规划设计研究院股份有限公司 | Mountain tunnel and underground water drainage mechanism |
CN112922670A (en) * | 2021-03-24 | 2021-06-08 | 广东大潮高速公路有限公司 | Visual and maintainable type anti-clogging drainage system for highway tunnel |
CN113294206A (en) * | 2021-07-09 | 2021-08-24 | 重庆交通大学 | Anti-crystallization tunnel drainage system based on big data control |
CN113738442A (en) * | 2021-09-02 | 2021-12-03 | 中铁二院工程集团有限责任公司 | Tunnel sealing water-gas discharge system |
Also Published As
Publication number | Publication date |
---|---|
CN101798939B (en) | 2013-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101798939B (en) | Maintainable tunnel drainage system | |
CN201650362U (en) | Maintainable tunnel drainage system | |
CN103046565B (en) | Draining method for ultra-deep batholith deep foundation pit | |
CN204716291U (en) | Dewatering installation is drawn in tunnel pressure release | |
CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
CN108316952A (en) | Extremely frigid zones tunnel insulation waterproof and water drainage system | |
CN104005419B (en) | The box culvert structure of sinking method construction and construction method | |
CN203530996U (en) | Multi-well-point combined type precipitation facility | |
CN201896317U (en) | Construction device for complex soil sinking open caisson by undrained dredging | |
CN202247920U (en) | Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit | |
CN203939509U (en) | The waterproof construction of bolt-spary supports traffic tunnel | |
CN104775418A (en) | Underground continuous wall for energy collection and construction method thereof | |
CN106368239A (en) | Water stop structure arranged at position of expansion joint of urban underground comprehensive pipe rack and construction method of water stop structure | |
CN106545070B (en) | Diversion method for adding pipeline by adopting jacking pipe in existing inspection well | |
CN105569063A (en) | Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure | |
CN209428159U (en) | Phreatic water extracts restoration processing system out | |
CN102561501A (en) | Pressure pipeline leakage detection pipe ditch for collapsible loess regions | |
CN104404960A (en) | Grouting device for joint of underground diaphragm wall and construction method | |
CN103556989B (en) | A kind of construction freezing method pit shaft country rock water-pressure survey and restricted discharge device and construction method thereof | |
CN204402513U (en) | Device for solving water seepage and leakage of lining surface of underground cavern | |
CN204919578U (en) | Vacuum tubular well precipitation system under special geological conditions | |
CN205369281U (en) | Radial precipitation structure | |
CN103726567A (en) | Device for draining rain water by utilizing soil layer or rock stratum | |
CN204139229U (en) | A kind of Metro Deep Excavation dewatering well Accrete clearing device | |
CN114808864A (en) | Method for solving rear drainage failure of water gate wing wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180525 Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88. Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD. Address before: 300133 new Hongqiao Yi Fu Li 1, Hongqiao District, Tianjin Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130424 Termination date: 20210317 |
|
CF01 | Termination of patent right due to non-payment of annual fee |