CN105822348A - In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure - Google Patents

In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure Download PDF

Info

Publication number
CN105822348A
CN105822348A CN201610291423.2A CN201610291423A CN105822348A CN 105822348 A CN105822348 A CN 105822348A CN 201610291423 A CN201610291423 A CN 201610291423A CN 105822348 A CN105822348 A CN 105822348A
Authority
CN
China
Prior art keywords
prefabricated
pipe
water drainage
tunnel
cable tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610291423.2A
Other languages
Chinese (zh)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201610291423.2A priority Critical patent/CN105822348A/en
Publication of CN105822348A publication Critical patent/CN105822348A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/06Distributing electric power; Cable networks; Conduits for cables

Abstract

The invention relates to an in-tunnel prefabricated cable tube and a prefabricated water drainage pipe structure. In current tunnel engineering, the longitudinal cross-section of a water drainage ditch is commonly rectangular; a cable trough with a relatively small section area is formed in the outer side of the water drainage ditch; the water drainage ditch and the cable trough are made of concrete materials with relatively great dose, and cannot be flexibly changed when maintenance is needed once breakage happens. According to the invention, the prefabricated cable pipe and the prefabricated water drainage pipe are transversely arranged side by side at the inner side of a tunnel lining arch foot and the outer side of an inverted arch filling outer side; the outer side pipe wall of the prefabricated water drainage pipe is provided with a water drainage hole; a water guide tube is arranged in the tunnel surrounding rocks; the water guide tube is inserted into the water drainage hole; the diameter of the prefabricated water drainage pipe is greater than that of the prefabricated cable pipe; and the prefabricated water drainage pipe is positioned at the outer side of the prefabricated cable pipe. The conventional rectangular ditch cable trough is changed into a circular prefabricated pipe structure, and the manufacturing cost of the adopted fabricated pipe is obviously lower than the dose of concrete of the ditch cable trough, so that the cost is saved; and the prefabricated pipe is directly laid, so that the work of constructing ditch wall concrete, prefabricating a cover plate and the like is saved, and therefore, the construction is greatly convenient.

Description

Prefabricated cable tube and prefabricated drain structure in tunnel
Technical field
The present invention relates to a kind of novel cable and pass through tunnel and tunnel internal drainage structural system, be specifically related to prefabricated cable tube and prefabricated drain structure in a kind of tunnel.
Background technology
In existing tunnel engineering, tunnel drainage structure mainly uses the both sides inside tunnel-liner respectively to arrange the mode in a gutter, by the effect jointly such as splash guard, geotextiles, blind pipe, tunnel surrounding water is introduced gutter, outside discharge hole, it is provided with cable trough outside it, passes through tunnel for cabling.Longitudinal cross-section, gutter is the most rectangular, gutter and cable trough are concrete material, cover plate is armored concrete precast construction, large usage quantity, formwork erection difficulty during construction, difficulty of construction is relatively big, and progress is slow, take long in time limit, and ditch body is the most damaged, bottom of trench often produce ooze, disease of leaking, cover plate is prefabricated reinforced concrete, large usage quantity, occur breakage cannot exchange flexibly when needing repairing, owing to overall dimensions is relatively big, increase tunnel clearance section, cause investment waste, and occur breakage cannot exchange flexibly when needing repairing.
Summary of the invention
It is an object of the invention to provide prefabricated cable tube and prefabricated drain structure in a kind of tunnel, use drain pipe and cable tube, convenient construction and the later maintenance of prefabricated pipe form.
The technical solution adopted in the present invention is:
Prefabricated cable tube and prefabricated drain structure in tunnel, it is characterised in that:
Inside tunnel-liner arch springing, inverted arch fill be arranged side by side prefabricated cable tube and prefabricated drain pipe laterally outside, cross section is circle;
Outside prefabricated drain pipe, tube wall is provided with osculum, is provided with aqueduct in tunnel surrounding, and aqueduct inserts in osculum.
The caliber of prefabricated drain pipe is more than prefabricated cable tube, and prefabricated drain pipe is positioned at outside prefabricated cable tube.
Between inverted arch filling lateral ends and tunnel-liner arch springing, space, prefabricated cable tube and prefabricated drain pipe are set and are positioned at this space.
Prefabricated cable tube and prefabricated drain pipe are longitudinally made up of the splicing of more piece prefabricated tube coupling along tunnel, and joint is provided with inspection shaft.
The invention have the advantages that
1, the prefabricated pipe cost used is significantly lower than ditch cable trench concrete amount, cost-effective, reduces cost;
2, prefabricated pipe is directly laid, and eliminates the work such as construction furrow bank concrete, prefabricated cover plate, greatly facilitates construction, accelerating construction progress;
3, it is easy to check, change, the most easily finds that water outlet french drain is the most unimpeded, it is simple to maintenance, it is to avoid during operation, the phenomenons such as ditch results in blockage fallen into by cover plate;
4, the most antifreeze, pipe easily takes antifreezing measures, has superiority very much in severe cold area, it is to avoid ditch furrow bank breakage causes Common Diseases such as leaking, and cable tube fire protecting performance is good;
5, water pipe diameter can select flexibly according to water yield, exchange, and saves space, can reduce whole tunnel cross-section.
Accompanying drawing explanation
Fig. 1 is present configuration figure.
In figure, 1-inverted arch is filled, 2-prefabricated cable tube, the prefabricated drain pipe of 3-, 4-aqueduct.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention will be described in detail.
Prefabricated cable tube and prefabricated drain structure in a kind of tunnel that the present invention relates to, inside tunnel-liner arch springing, inverted arch fills and 1 is arranged side by side prefabricated cable tube 2 and prefabricated drain pipe 3 laterally outside.Inverted arch is filled and is arranged space between 1 lateral ends and tunnel-liner arch springing, and prefabricated cable tube 2 and prefabricated drain pipe 3 are positioned at this space.The caliber of prefabricated drain pipe 3 is more than prefabricated cable tube 2, and prefabricated drain pipe 3 is positioned at outside prefabricated cable tube 2.Prefabricated drain pipe 3 caliber can be adjusted flexibly according to water yield, and the caliber of prefabricated cable tube 2 is adjusted flexibly according to the number of cables passed through tunnel.Outside prefabricated drain pipe 3, tube wall is provided with osculum, is provided with aqueduct 4 in tunnel surrounding, and aqueduct 4 inserts in osculum.
Prefabricated cable tube 2 and prefabricated drain pipe 3 are longitudinally made up of the splicing of more piece prefabricated tube coupling, and joint is provided with inspection shaft.
The present invention replaces traditional ditch cable trench set-up mode with small one and large one two concrete prefabricated pipes, and in terms of cost Control, difficulty of construction and later maintenance, the most relatively prior art has obvious advantage.
Present disclosure is not limited to cited by embodiment, and the conversion of any equivalence that technical solution of the present invention is taked by those of ordinary skill in the art by reading description of the invention, the claim being the present invention is contained.

Claims (4)

1. prefabricated cable tube and prefabricated drain structure in tunnel, it is characterised in that:
Inside tunnel-liner arch springing, inverted arch fill (1) be arranged side by side prefabricated cable tube (2) and prefabricated drain pipe (3) laterally outside, cross section is circle;
Prefabricated drain pipe (3) outside tube wall is provided with osculum, is provided with aqueduct (4) in tunnel surrounding, and aqueduct (4) inserts in osculum.
Prefabricated cable tube and prefabricated drain structure in tunnel the most according to claim 1, it is characterised in that:
The caliber of prefabricated drain pipe (3) is more than prefabricated cable tube (2), and prefabricated drain pipe (3) is positioned at prefabricated cable tube (2) outside.
Prefabricated cable tube and prefabricated drain structure in tunnel the most according to claim 1, it is characterised in that:
Between inverted arch filling (1) lateral ends and tunnel-liner arch springing, space, prefabricated cable tube (2) and prefabricated drain pipe (3) are set and are positioned at this space.
Prefabricated cable tube and prefabricated drain structure in tunnel the most according to claim 1, it is characterised in that:
Prefabricated cable tube (2) and prefabricated drain pipe (3) are longitudinally made up of the splicing of more piece prefabricated tube coupling along tunnel, and joint is provided with inspection shaft.
CN201610291423.2A 2016-05-05 2016-05-05 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure Pending CN105822348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610291423.2A CN105822348A (en) 2016-05-05 2016-05-05 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610291423.2A CN105822348A (en) 2016-05-05 2016-05-05 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure

Publications (1)

Publication Number Publication Date
CN105822348A true CN105822348A (en) 2016-08-03

Family

ID=56529068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610291423.2A Pending CN105822348A (en) 2016-05-05 2016-05-05 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure

Country Status (1)

Country Link
CN (1) CN105822348A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973147A (en) * 2019-03-08 2019-07-05 中铁十九局集团第三工程有限公司 A kind of vcehicular tunnel drainage groove applies method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020068810A (en) * 2001-02-23 2002-08-28 주식회사유신코퍼레이션 System pumpingout side a partition for tunnel
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN103867231A (en) * 2014-03-31 2014-06-18 中铁第一勘察设计院集团有限公司 Tunnel ditch insulation structure
CN104806272A (en) * 2015-04-15 2015-07-29 西安科技大学 Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof
CN205618199U (en) * 2016-05-05 2016-10-05 中铁第一勘察设计院集团有限公司 Prefabricated cable pipe and prefabricated drain pipe structure in tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020068810A (en) * 2001-02-23 2002-08-28 주식회사유신코퍼레이션 System pumpingout side a partition for tunnel
CN101798939A (en) * 2010-03-17 2010-08-11 中铁隧道勘测设计院有限公司 Maintainable tunnel drainage system
CN103867231A (en) * 2014-03-31 2014-06-18 中铁第一勘察设计院集团有限公司 Tunnel ditch insulation structure
CN104806272A (en) * 2015-04-15 2015-07-29 西安科技大学 Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof
CN205618199U (en) * 2016-05-05 2016-10-05 中铁第一勘察设计院集团有限公司 Prefabricated cable pipe and prefabricated drain pipe structure in tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973147A (en) * 2019-03-08 2019-07-05 中铁十九局集团第三工程有限公司 A kind of vcehicular tunnel drainage groove applies method

Similar Documents

Publication Publication Date Title
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN103184747B (en) Method and structure for leakage seepage prevention construction for two-walls-in-one structure of deep-underground engineering
CN206386134U (en) A kind of Underground Subway Station guarded drainage construction
CN206874310U (en) One kind is applied to high pressure water enrichment tunnel decompression drainage arrangement
CN204716291U (en) Dewatering installation is drawn in tunnel pressure release
CN101798939A (en) Maintainable tunnel drainage system
CN104879164A (en) Tunnel annular drain structure
CN206530363U (en) One kind can the outer drainage system of maintenance type railway tunnel bottom structure
CN111911168B (en) Construction method of shallow-buried underground excavation large-span tunnel and permanent support system
CN205618199U (en) Prefabricated cable pipe and prefabricated drain pipe structure in tunnel
CN206554042U (en) A kind of lining waterproof structure of seepage tunnel
CN204511513U (en) A kind of tunnel drainage blind pipe syndeton
CN105822348A (en) In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure
CN108571342A (en) A kind of Middle Wall of Multi-Arch Highway Tunnel top waterproof/drainage structure and its construction method
CN104846935B (en) Head-tank treating seepage remodeling method
CN105019941B (en) Composite, water-drain blind pipe can be safeguarded
CN208073510U (en) A kind of shield tunnel liner construction of the assembled prefabricated secondary lining section of jurisdiction in arch
CN209619870U (en) Box culvert is used in a kind of transformation of underground piping
CN114483170A (en) Stope filling roof connecting structure and method
CN209557844U (en) Jacking construction method reinforced concrete sewer pipe
CN204023526U (en) A kind of discharge structure that reduces embedded penstock external water pressure
CN102536268A (en) Buried type high-pressure water channel or tunnel seepage-resistant lining structure
CN204677232U (en) The outer discharge structure of a kind of large underground hole lining cutting
CN101021155A (en) Tunnel double-lining protection draining structure
CN209430248U (en) A kind of buried Central drain discharge structure of novel tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160803

RJ01 Rejection of invention patent application after publication