CN103867231A CN201410124639.0A CN201410124639A CN103867231A CN 103867231 A CN103867231 A CN 103867231A CN 201410124639 A CN201410124639 A CN 201410124639A CN 103867231 A CN103867231 A CN 103867231A
Authority
CN
China
Prior art keywords
ditch
steel bar
tunnel
cover plate
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410124639.0A
Other languages
Chinese (zh)
Inventor
张剑
孙炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201410124639.0A priority Critical patent/CN103867231A/en
Publication of CN103867231A publication Critical patent/CN103867231A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention relates to a tunnel ditch insulation structure. In a traditional tunnel drainage ditch, a double-layer cover plate insulation ditch is commonly used, insulation materials are added in the middle of the double-layer cover plate insulation ditch, the mode that angle steel is embedded on the side wall of the ditch and a cover plate is placed on the angle steel is used for mounting the second cover plate layer, construction difficulty is large, the cover plate can fall easily to plug the ditch for the reasons of breakages, size errors and the like, and water draining is not smooth. According to the tunnel ditch insulation structure, a reinforcing steel bar support with a U-shaped cross section is arranged above a ditch in a tunnel, the bottom face of the reinforcing steel bar support is higher than the water surface in the ditch, and the reinforcing steel bar support is filled with insulation materials. The top edge of the reinforcing steel bar support is bent to the two sides in the horizontal direction and is placed in ditch wall surface chisel grooves formed in the two sides of the top of the ditch, cement mortar is used for flattening the ditch wall surface chisel grooves, and a ditch cover plate covers the reinforcing steel bar support. The tunnel ditch insulation structure can achieve the insulation purpose of tunnel ditches in cold regions, and has the advantages of being simple in construction, convenient to replace, saving in investment and the like.

Description

Tunnel ditch insulation construction
Technical field
the invention belongs to tunnel traffic field of engineering technology, be specifically related to a kind of tunnel ditch insulation construction.
Background technology
China in northwest, Deng Han district, northeast built a large amount of construction of tunnel, two ends, tunnel in winter Portal Section temperature is lower, in cold, (the coldest monthly mean temperature is higher than-10 ℃, but lower than-3 ℃) and severe cold (the coldest monthly mean temperature is lower than-10 ℃) area, be easy to cause water freezing in gutter, and spread to ditch gradually, and then jeopardize traffic safety.How to adopt an effective measure, guarantee that tunnel internal drainage does not freeze to discharge smoothly, guarantee that traffic safety is to make technician pay close attention to and the problem of headache thereby avoid producing disease always.Traditional tunnel drainage ditch generally adopts double-layer cover plate heat preservation ditch, the middle heat insulating material that adds, the employing of installing of second layer cover plate is placed in the mode on angle steel at the pre-buried angle steel of ditch sidewall, cover plate, difficulty of construction is large, cover plate, due to reasons such as breakage, scale errors, is easy to drop and stops up ditch, causes impeded drainage, water in ditch is more easily frozen, and form disease.
Summary of the invention
The object of this invention is to provide a kind of tunnel ditch insulation construction of safer, better heat preservation.
The technical solution adopted in the present invention is:
Tunnel ditch insulation construction, is characterized in that:
Top, ditch in tunnel arranges the Steel bar rack that cross section is U-shaped, and Steel bar rack bottom surface, higher than water surface elevation in ditch, is filled with heat insulating material in Steel bar rack;
Steel bar rack apical margin bends to both lateral sides, is placed in the ditch wall surface raggle that both sides, top, ditch arrange, and adopts cement mortar floating, and ditch cover plate is put up in top.
Steel bar rack is to be intersected and pricked the network that side forms by reinforcing bar, and segmentation prefabricating, arranges along ditch longitudinal separation.
Heat insulating material is polyurethane thermal insulation board or cystosepiment, multilayer segmentation prefabricating, and every joint longitudinal length is greater than the longitudinal pitch of Steel bar rack, and single-unit heat insulating material is placed on two longitudinally adjacent joint Steel bar racks.
The present invention has the following advantages:
Fabrication and installation of the present invention are convenient, reinforcing bar is bent into definite shape, ditch sidewall raggle, settle at a certain distance Steel bar rack, on it, place again the chemical such as rectangle, strip heat insulating material, thereby reach the object of tunnel in cold area ditch insulation, there is the plurality of advantages such as construction is simple, replacing is convenient, investment saving.
Accompanying drawing explanation
Fig. 1 is cross section of the present invention.
Fig. 2 is Steel bar rack figure of the present invention.
In figure, the raggle of 1-ditch wall surface, 2-Steel bar rack, 3-heat insulating material, 4-ditch cover plate, 5-cable channel, 7-ditch.
The specific embodiment
Below in conjunction with the specific embodiment, the present invention will be described in detail.
A kind of tunnel ditch insulation construction the present invention relates to, longitudinally arranges along ditch, and 6 tops, ditch in tunnel arrange the Steel bar rack 2 that cross section is U-shaped, and Steel bar rack 2 bottom surfaces, higher than the interior water surface elevation in ditch 6, are filled with heat insulating material 3 in Steel bar rack 2.Steel bar rack 2 apical margins bend to both lateral sides, be placed in the ditch wall surface raggle 1 that 6 both sides, top, ditch arrange, employing cement mortar is floating, ditch cover plate 4 is put up in top, form a kind of form that arranges at tunnel in cold area heat preservation ditch, on the basis of improving difficulty of construction, reach the effect that does not affect insulation.
Steel bar rack 2 is to be intersected and pricked the network that side forms by reinforcing bar, and segmentation prefabricating, along ditch 6 longitudinal separation settings.Heat insulating material 3 is polyurethane thermal insulation board or cystosepiment, multilayer segmentation prefabricating, and every joint longitudinal length is greater than the longitudinal pitch of Steel bar rack 2, and single-unit heat insulating material 3 is placed on two longitudinally adjacent joint Steel bar racks 2.
It is cited that content of the present invention is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solution of the present invention by reading manual of the present invention, is claim of the present invention and contains.

Claims (3)

1. tunnel ditch insulation construction, is characterized in that:
Top, ditch (6) in tunnel arranges the Steel bar rack that cross section is U-shaped (2), and Steel bar rack (2) bottom surface, higher than the interior water surface elevation in ditch (6), is filled with heat insulating material (3) in Steel bar rack (2);
Steel bar rack (2) apical margin bends to both lateral sides, is placed in the ditch wall surface raggle (1) that both sides, top, ditch (6) arrange, and adopts cement mortar floating, and ditch cover plate (4) is put up in top.
2. tunnel ditch insulation construction according to claim 1, is characterized in that:
Steel bar rack (2) is to be intersected and pricked the network that side forms, segmentation prefabricating, (6) longitudinal separation setting along ditch by reinforcing bar.
3. tunnel ditch insulation construction according to claim 2, is characterized in that:
Heat insulating material (3) is polyurethane thermal insulation board or cystosepiment, multilayer segmentation prefabricating, and every joint longitudinal length is greater than the longitudinal pitch of Steel bar rack (2), and single-unit heat insulating material (3) is placed on two longitudinally adjacent joint Steel bar racks (2).
CN201410124639.0A 2014-03-31 2014-03-31 Tunnel ditch insulation structure Pending CN103867231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410124639.0A CN103867231A (en) 2014-03-31 2014-03-31 Tunnel ditch insulation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410124639.0A CN103867231A (en) 2014-03-31 2014-03-31 Tunnel ditch insulation structure

Publications (1)

Publication Number Publication Date
CN103867231A true CN103867231A (en) 2014-06-18

Family

ID=50906192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410124639.0A Pending CN103867231A (en) 2014-03-31 2014-03-31 Tunnel ditch insulation structure

Country Status (1)

Country Link
CN (1) CN103867231A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612721A (en) * 2015-01-04 2015-05-13 西南交通大学 Deep buried central gutterway inspection well structure for cold region tunnel
CN104632278A (en) * 2015-02-04 2015-05-20 中国铁道科学研究院铁道建筑研究所 Cover plate for tunnel ditch and cover plate component including the same
CN105065061A (en) * 2015-07-15 2015-11-18 中铁工程设计咨询集团有限公司 Heat insulation drainage ditch used at two sides inside tunnel
CN105822348A (en) * 2016-05-05 2016-08-03 中铁第勘察设计院集团有限公司 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure
CN110821515A (en) * 2019-09-30 2020-02-21 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN111305898A (en) * 2020-03-31 2020-06-19 铁科创恒新材料科技有限公司 Prefabricated heat preservation component for cold region tunnel side ditch
CN111365071A (en) * 2020-04-10 2020-07-03 中铁二院工程集团有限责任公司 Cold region tunnel ditch heat preservation system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2125610U (en) * 1992-06-12 1992-12-23 何蜀光 Refuse collecting frame for water escape canal
JPH05340200A (en) * 1992-06-08 1993-12-21 Miyasaka Rubber Kk Drainage construction of leakage of water in tunnel and seal member used therefor
JP2005220580A (en) * 2004-02-04 2005-08-18 Nippon Doren Kogyo Kk Water-conveyance device
CN202108542U (en) * 2011-06-22 2012-01-11 中铁二院工程集团有限责任公司 Heat preservation ditch structure of railway tunnel
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN202560320U (en) * 2012-05-02 2012-11-28 中铁十一局集团第五工程有限公司 Frost-damage preventing drainage system for tunnels
CN202690131U (en) * 2012-05-28 2013-01-23 中交第一公路勘察设计研究院有限公司 Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN203822371U (en) * 2014-03-31 2014-09-10 中铁第一勘察设计院集团有限公司 Heat-insulation structure for ditchof tunnel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05340200A (en) * 1992-06-08 1993-12-21 Miyasaka Rubber Kk Drainage construction of leakage of water in tunnel and seal member used therefor
CN2125610U (en) * 1992-06-12 1992-12-23 何蜀光 Refuse collecting frame for water escape canal
JP2005220580A (en) * 2004-02-04 2005-08-18 Nippon Doren Kogyo Kk Water-conveyance device
CN202108542U (en) * 2011-06-22 2012-01-11 中铁二院工程集团有限责任公司 Heat preservation ditch structure of railway tunnel
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN202560320U (en) * 2012-05-02 2012-11-28 中铁十一局集团第五工程有限公司 Frost-damage preventing drainage system for tunnels
CN202690131U (en) * 2012-05-28 2013-01-23 中交第一公路勘察设计研究院有限公司 Tunnel water discharging system penetrating through long-lasting frozen soil areas and non-frozen soil areas
CN203822371U (en) * 2014-03-31 2014-09-10 中铁第一勘察设计院集团有限公司 Heat-insulation structure for ditchof tunnel

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612721A (en) * 2015-01-04 2015-05-13 西南交通大学 Deep buried central gutterway inspection well structure for cold region tunnel
CN104632278A (en) * 2015-02-04 2015-05-20 中国铁道科学研究院铁道建筑研究所 Cover plate for tunnel ditch and cover plate component including the same
CN105065061A (en) * 2015-07-15 2015-11-18 中铁工程设计咨询集团有限公司 Heat insulation drainage ditch used at two sides inside tunnel
CN105822348A (en) * 2016-05-05 2016-08-03 中铁第勘察设计院集团有限公司 In-tunnel prefabricated cable tube and prefabricated water drainage pipe structure
CN110821515A (en) * 2019-09-30 2020-02-21 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN110821515B (en) * 2019-09-30 2021-04-02 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN111305898A (en) * 2020-03-31 2020-06-19 铁科创恒新材料科技有限公司 Prefabricated heat preservation component for cold region tunnel side ditch
CN111365071A (en) * 2020-04-10 2020-07-03 中铁二院工程集团有限责任公司 Cold region tunnel ditch heat preservation system

Similar Documents

Publication Publication Date Title
CN103867231A (en) Tunnel ditch insulation structure
CN103790182B (en) A kind of hydraulic engineering vertical water stopping structure and manufacture thereof and construction method
CN103774699B (en) Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same
CN203361206U (en) Basement advanced water-stop post-cast strip construction structure
CN202108542U (en) Heat preservation ditch structure of railway tunnel
CN202706351U (en) Heat insulation waterproof roof
CN107905388A (en) A kind of waterproof method of precast concrete exterior wall cladding
CN203822371U (en) Heat-insulation structure for ditchof tunnel
CN203499130U (en) Drainage device for accumulated water in roof
CN214144434U (en) Steel division strip structure
CN204511514U (en) A kind of cold district anti-freeze type tunnel drainage groove structure
CN203701453U (en) Double-layered rolling iron roof gutter
CN105604251A (en) Assembling type parapet wall and construction method thereof
CN217128772U (en) Inverted roof drainage structure
CN107503765B (en) Tunnel in cold area inverted arch earth-filling method
CN202250107U (en) Tunneling anti-freezing structure in seasonally frozen ground district
CN202689053U (en) Water proof structure of basement expansion joint
CN106481008B (en) A kind of China Democratic National Construction Association's building construction
CN204960973U (en) High -efficient heat preservation inspection shaft
CN202787726U (en) Anti-leakage roof drainage gutter
CN201709182U (en) Greenhouse gutter
CN204780562U (en) It has just constructed aqueduct list case single chamber case roof beam in succession to become case variable cross section
CN203856141U (en) Exhaust construction structure of roof sloping layer
CN202596006U (en) Special-shaped combined building block
CN203256819U (en) Waterproof structure of basement deformation joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140618