CN201896317U - Construction device for complex soil sinking open caisson by undrained dredging - Google Patents

Construction device for complex soil sinking open caisson by undrained dredging Download PDF

Info

Publication number
CN201896317U
CN201896317U CN2010206751247U CN201020675124U CN201896317U CN 201896317 U CN201896317 U CN 201896317U CN 2010206751247 U CN2010206751247 U CN 2010206751247U CN 201020675124 U CN201020675124 U CN 201020675124U CN 201896317 U CN201896317 U CN 201896317U
Authority
CN
China
Prior art keywords
pipe
dredging
mud
open caisson
undrained
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206751247U
Other languages
Chinese (zh)
Inventor
刘文革
陈绍炳
范家海
邓殿才
童宏伟
金关峰
陈玉燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG HUANYU CONSTRUCTION GROUP
Original Assignee
ZHEJIANG HUANYU CONSTRUCTION GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG HUANYU CONSTRUCTION GROUP filed Critical ZHEJIANG HUANYU CONSTRUCTION GROUP
Priority to CN2010206751247U priority Critical patent/CN201896317U/en
Application granted granted Critical
Publication of CN201896317U publication Critical patent/CN201896317U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a construction device for a complex soil sinking open caisson by undrained dredging and belongs to the technical field of open caisson construction. The construction device comprises a U-shaped pipe arranged in a prefabricated casing pipe, wherein one end of the U-shaped pipe is connected with a high-pressure water pump through a high-pressure water inlet pipe; the other end of the U-shaped pipe is connected with a mud discharging pipe; the lower end of the U-shaped pipe, which is connected with the side of the high-pressure water inlet pipe, is connected with a hydraulic mud flushing machine; the lower end of the U-shaped pipe, which is connected with the side of the mud discharging pipe, is connected with a hydraulic mud absorbing machine with a mud absorbing pipe; a frame base beam is arranged on the inner wall at the lower end of the prefabricated casing pipe; the hydraulic mud flushing machine and the hydraulic mud absorbing machine are fixed on the frame base beam; and the high-pressure water pump is arranged outside the prefabricated casing pipe. The construction device has high construction speed and high safety coefficient; and the influence of the construction on complex construction sites, adjacent houses, underground structures and other barriers can be reduced.

Description

The construction equipment of complicated soil property sinking open caisson by undrained dredging
Technical field
The utility model discloses a kind of construction equipment of complicated soil property sinking open caisson by undrained dredging, belongs to the open caisson construction technical field.
Background technology
Along with the rapid growth of Chinese national economy, the urban infrastructure construction develop rapidly, the application of open caisson in the supporting pipe network of municipal sewage treatment is increasing.Existing drainage sink open caisson construction has the influence of obstructions such as house, underground structure big to construction plant complexity, vicinity, and safety factor is low, and speed of application is slow.
Summary of the invention
In order to address the above problem, it is a kind of little to the surrounding building influence that the utility model provides, the construction equipment of the complicated soil property sinking open caisson by undrained dredging that speed of application is fast and safety factor is high.
For achieving the above object, the technical scheme that the utility model adopted is:
A kind of construction equipment of complicated soil property sinking open caisson by undrained dredging, comprise the U type pipe that is installed in the prefabricated lining pipe, one end of U type pipe connects high-pressure hydraulic pump by high-pressure intake pipe, the other end of U type pipe connects mud pipe, the lower end that U type pipe connects the high-pressure intake pipe side is connected with waterpower towards the mud machine, the lower end that U type pipe connects the mud pipe side is connected with the waterpower suction dredge of being with dredging tube, wherein the lower end inwall of prefabricated lining pipe is equipped with the framework bottom girder, waterpower is fixed on this framework bottom girder towards mud machine and waterpower suction dredge, and high-pressure hydraulic pump is installed in the outside of prefabricated lining pipe.
As the further setting of such scheme, described waterpower is provided with two towards the mud machine, is installed in the two ends, the left and right sides of framework bottom girder respectively.Waterpower can arbitrarily be adjusted towards the angle of mud machine.
The inwall bottom of described prefabricated lining pipe is outer bell mouth expanding.
The lower end inwall of described prefabricated lining pipe offers a pair of storage tank, and both ends, the left and right sides cooperation of framework bottom girder is installed in this storage tank.
The construction equipment of the complicated soil property sinking open caisson by undrained dredging of the utility model can reduce construction to construction plant complexity, the contiguous influence that obstructions such as house, underground structure are arranged.This construction equipment is mainly penetrated brush towards mud to the soil body towards mud machine (giant) by waterpower in water, finish spoil disposal work simultaneously, thereby makes well sinking arrive design elevation.The utility model simple structure, not fragile is repaired easily, and easy to operate, labour intensity is low, and speed of application is fast, safety factor is high.
The construction equipment of the complicated soil property sinking open caisson by undrained dredging of the utility model be applicable in the big sandy gravel stratum of serious quicksand stratum and water percolating capacity and use, and underground water can't be got rid of or a large amount of draining meeting influences the safety of nearby buildings and the situation of production.
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the structural representation of the utility model preferred embodiment.
The specific embodiment
As shown in Figure 1, the construction equipment of the complicated soil property sinking open caisson by undrained dredging of the utility model, comprise the U type pipe 9 that is installed in the prefabricated lining pipe 4, one end of U type pipe 9 connects high-pressure hydraulic pump 1 by high-pressure intake pipe 2, the other end of U type pipe 9 connects mud pipe 3, the lower end that U type pipe 9 connects high-pressure intake pipe 2 sides is connected with waterpower towards mud machine 10, and the lower end that U type pipe 9 connects mud pipe 3 sides is connected with the waterpower suction dredge 8 of band dredging tube 7.The lower end inwall of prefabricated lining pipe 4 is equipped with framework bottom girder 6, and waterpower is fixed on this framework bottom girder 6 towards mud machine 10 and waterpower suction dredge 8, and high-pressure hydraulic pump 1 is installed in the outside of prefabricated lining pipe 4.
As preferred setting, waterpower is provided with two towards mud machine 10, is installed in the two ends, the left and right sides of framework bottom girder 6 respectively.The inwall bottom of prefabricated lining pipe 4 is outer bell mouth expanding.The lower end inwall of prefabricated lining pipe 4 offers a pair of storage tank 5, and both ends, the left and right sides cooperation of framework bottom girder 6 is installed in this storage tank 5.
During the utility model work, high-pressure hydraulic pump 1 is sent into waterpower is washed away the cutting soil layer towards mud machine 10 action with water by high-pressure intake pipe 2.Simultaneously, some water under high pressure is discharged through U type pipe 9 other ends, in the process of discharge, drives waterpower suction dredge 8 and by dredging tube 7 mud is together discharged via mud pipe 3.
The foregoing description only is used to the inventive concept of the present utility model of explaining, but not to the qualification of the utility model rights protection, allly utilizes this design that the utility model is carried out the change of unsubstantiality, all should fall into protection domain of the present utility model.

Claims (4)

1. the construction equipment of a complicated soil property sinking open caisson by undrained dredging, it is characterized in that: comprise the U type pipe that is installed in the prefabricated lining pipe, one end of U type pipe connects high-pressure hydraulic pump by high-pressure intake pipe, the other end of U type pipe connects mud pipe, the lower end that U type pipe connects the high-pressure intake pipe side is connected with waterpower towards the mud machine, the lower end that U type pipe connects the mud pipe side is connected with the waterpower suction dredge of being with dredging tube, wherein the lower end inwall of prefabricated lining pipe is equipped with the framework bottom girder, waterpower is fixed on this framework bottom girder towards mud machine and waterpower suction dredge, and high-pressure hydraulic pump is installed in the outside of prefabricated lining pipe.
2. the construction equipment of complicated soil property sinking open caisson by undrained dredging as claimed in claim 1 is characterized in that: described waterpower is provided with two towards the mud machine, is installed in the two ends, the left and right sides of framework bottom girder respectively.
3. the construction equipment of complicated soil property sinking open caisson by undrained dredging as claimed in claim 1 is characterized in that: the inwall bottom of described prefabricated lining pipe is outer bell mouth expanding.
4. the construction equipment of complicated soil property sinking open caisson by undrained dredging as claimed in claim 1 is characterized in that: the lower end inwall of described prefabricated lining pipe offers a pair of storage tank, and both ends, the left and right sides cooperation of framework bottom girder is installed in this storage tank.
CN2010206751247U 2010-12-23 2010-12-23 Construction device for complex soil sinking open caisson by undrained dredging Expired - Fee Related CN201896317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206751247U CN201896317U (en) 2010-12-23 2010-12-23 Construction device for complex soil sinking open caisson by undrained dredging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206751247U CN201896317U (en) 2010-12-23 2010-12-23 Construction device for complex soil sinking open caisson by undrained dredging

Publications (1)

Publication Number Publication Date
CN201896317U true CN201896317U (en) 2011-07-13

Family

ID=44254230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206751247U Expired - Fee Related CN201896317U (en) 2010-12-23 2010-12-23 Construction device for complex soil sinking open caisson by undrained dredging

Country Status (1)

Country Link
CN (1) CN201896317U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817387A (en) * 2012-08-10 2012-12-12 中铁大桥局集团第六工程有限公司 Water circulation system
CN104314092A (en) * 2014-10-30 2015-01-28 中交四航局第三工程有限公司 Open caisson construction method based on substitution method
CN107119703A (en) * 2017-05-10 2017-09-01 刘丽娟 A kind of water conservancy rushes heavy well construction equipment
CN109372000A (en) * 2018-11-20 2019-02-22 中交第二航务工程局有限公司 Native stage apparatus is efficiently taken under complex geological condition sinking well water
CN111411640A (en) * 2020-04-07 2020-07-14 王伟 Construction device for complex soil non-drainage sinking open caisson
CN113846664A (en) * 2021-08-05 2021-12-28 上海市基础工程集团有限公司 Continuous soil-taking and sinking machine for non-drainage open caisson

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817387A (en) * 2012-08-10 2012-12-12 中铁大桥局集团第六工程有限公司 Water circulation system
CN104314092A (en) * 2014-10-30 2015-01-28 中交四航局第三工程有限公司 Open caisson construction method based on substitution method
CN107119703A (en) * 2017-05-10 2017-09-01 刘丽娟 A kind of water conservancy rushes heavy well construction equipment
CN109372000A (en) * 2018-11-20 2019-02-22 中交第二航务工程局有限公司 Native stage apparatus is efficiently taken under complex geological condition sinking well water
CN111411640A (en) * 2020-04-07 2020-07-14 王伟 Construction device for complex soil non-drainage sinking open caisson
CN113846664A (en) * 2021-08-05 2021-12-28 上海市基础工程集团有限公司 Continuous soil-taking and sinking machine for non-drainage open caisson
CN113846664B (en) * 2021-08-05 2023-03-10 上海市基础工程集团有限公司 Continuous soil-taking and sinking machine for non-drainage open caisson

Similar Documents

Publication Publication Date Title
CN101798939B (en) Maintainable tunnel drainage system
CN100516380C (en) Method for lowering water by combining phreatic water in footing groove with artesian aquifer - well stratifications
CN100480475C (en) Controllable one-well lamina precipitation construction method
CN201896317U (en) Construction device for complex soil sinking open caisson by undrained dredging
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN111733839A (en) A method for strengthening the receiving end of the water-rich sand layer of the shield deep-buried close to the excavation foundation pit
CN101575859B (en) Anti-seepage Joint of Underground Diaphragm Wall and Its Construction Method
CN201538975U (en) Underground Diaphragm Wall Anti-seepage Joint
CN111851508A (en) It is suitable for the structure of high-pressure circular deep foundation pit of water-rich sand egg layer and its construction method
CN105544696B (en) A kind of domatic rush infiltration method that dams of Mountain Area water and soil conservation
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN207143981U (en) 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure
CN208934002U (en) a retaining wall structure
CN209179010U (en) A kind of municipal pipeline crosses the building enclosure of foundation pit
CN110409420A (en) Meet the diaphram wall that pitted surface has precipitation function concurrently
CN105569063A (en) Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure
CN209620125U (en) A kind of underground structure blind drainage system
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN101709582A (en) Protection method for reducing soil extrusion in construction of prefabricated piles
CN110185051A (en) Deep narrow excavation water discharge method
CN206308700U (en) A kind of Traffic Engineering Construction slope protection device
CN215630021U (en) Highway bridge construction foundation ditch protector

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110713

Termination date: 20151223

EXPY Termination of patent right or utility model