CN101781994A - Method for mounting mine chute lining plate - Google Patents

Method for mounting mine chute lining plate Download PDF

Info

Publication number
CN101781994A
CN101781994A CN200910212403A CN200910212403A CN101781994A CN 101781994 A CN101781994 A CN 101781994A CN 200910212403 A CN200910212403 A CN 200910212403A CN 200910212403 A CN200910212403 A CN 200910212403A CN 101781994 A CN101781994 A CN 101781994A
Authority
CN
China
Prior art keywords
rail
chute
top board
steel
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910212403A
Other languages
Chinese (zh)
Inventor
钱乔国
杨益明
刘建
曹月琴
魏家村
王荣贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN200910212403A priority Critical patent/CN101781994A/en
Publication of CN101781994A publication Critical patent/CN101781994A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a mine facility, in particular to a method for mounting mine chute lining steel rails and belongs to the technical field of underground mine equipment. The method comprises the steps of: welding a pre-buried steel plate with anchor bars and steel rails, binding the welded pre-buried steel plate and the steel rails together with a template of a chute top plate to form a bottom die; tying steel bars and pouring concrete on the chute top plate; and synchronously performing the steel rail installation and the construction of the chute top plate structural. The method solves the problems that the operation is inconvenient due to the narrow operation and the installation quality and safety are difficulty ensured. Meanwhile, the construction processes are implemented fluently and incessantly, so the safety problem caused by the cross operation of different work is solved, the construction period is shortened, the project quality and construction safety are guaranteed and the production efficiency is improved.

Description

Method for mounting mine chute lining plate
Technical field
The present invention relates to a kind of mine facility, be specifically related to a kind of mounting method of ore chute inner lining steel rail, belong to the colliery technical field of underground.
Background technology
Elevator on the headframe of colliery is promoted to ground with the ore of underground mining, is put in the drop shaft by the ore chute, and the conveyor below drop shaft transports again.Chute is for connecting the slanted channel of ground headframe and underground drop shaft, be reinforced concrete structure, interior periphery is provided with to reducing ore bump and the inner lining steel rail member that rubs, and drop shaft belongs to the ore deposit and builds engineering, and drop shaft inside is provided with to reducing the high manganese steel lining plate member of ore bump and friction.In work progress, the drop shaft bottom is finished by ore deposit 5 constructions of founding the team, and the only remaining preliminary shaft part that is connected with chute is when carrying out the structure construction of the preliminary shaft of drop shaft and chute, at the chute inwall steel plate used of pre-buried welded rails all around.After concrete structure reached the intensity of design, stripping and support system thereof directly were welded in rail on the pre-embedded steel slab again.The chute inclination angle is for being 45 °, headroom is of a size of 3.7 * 2.9 meters, need the rail length of welding to be generally about 10 meters, 24 kilograms/meter, the so heavy and long member of installation on the work plane of narrow and small and inclination, lifting, in place, temporary fixed and installation, operating personnel must face upward the head operation when top board rail was installed, labor strength is big, and also there is potential safety hazard in the rail welding difficult quality guarantee.
Summary of the invention
The objective of the invention is for overcoming above-mentioned the deficiencies in the prior art part, a kind of ore chute inner lining steel rail mounting method is provided, earlier will be good with the pre-embedded steel slab and the rail welding of dowel, with the template of chute top board together as bed die, tie up reinforcing bar, build chute top board concrete, rail is installed with the construction of chute top board structure and is carried out simultaneously.Solve invar rail installation exercise narrow space and caused not convenient, installation quality of operation and safety to be difficult for the assurance problem.Construction simultaneously makes the procedure connection compactness, has reduced the safety problem that different professional cross-operation bring, and has saved the duration, has guaranteed workmanship and construction safety, has improved production efficiency.
The present invention realizes with following technical scheme: a kind of ore chute inner lining steel rail mounting method is characterized in that: carry out as follows:
(a) earlier will with the pre-embedded steel slab of dowel and rail welding is good and the template of chute top board together as bed die, tie up reinforcing bar, build the top board concrete of chute, rail is installed with the construction of chute top board structure and is carried out simultaneously;
(b) after the underplate concrete of chute is finished, on base plate, set up the roof plate template bracing frame, highly be rail height of top board soffit decline, earlier on the roof plate template bracing frame, settle rail, then rail and band dowel steel plate are welded, adopt plank and iron wire to hang mould between the rail, form the top board bed die jointly;
(c) treat that concrete roof reaches design strength, remove the bracing frame under the top board, rail just has been fixed on the top board firmly.
(d) there is liner plate the both sides of drop shaft, and chock is arranged at the bottom of chute roof plate template bracing frame.
Advantage of the present invention is: this method is installed rail with the construction of chute top board structure and is carried out simultaneously, solved invar rail installation exercise narrow space and cause that operation is not convenient, installation quality and safety is difficult for the assurance problem.Procedure connection compactness when constructing has simultaneously reduced the safety problem that different professional cross-operation bring, and has saved the duration, has guaranteed workmanship and construction safety, has improved production efficiency.
Description of drawings
Below in conjunction with drawings and Examples the present invention is described in further detail:
Accompanying drawing is drop shaft of the present invention, chute structural representation:
Among the figure: 1, rail, 2, embedded board, 3, dowel, 4, thin plank, 5, the roof plate template bracing frame, 6, chock, 7, liner plate, 8, chute, 9, drop shaft.
The specific embodiment
As shown in the figure: a kind of ore chute inner lining steel rail mounting method, carry out as follows:
(a) earlier will with the pre-embedded steel slab 2 of dowel 3 and rail 1 welds and the template of chute top board together as bed die, tie up reinforcing bar, build the top board concrete of chute 8, rail is installed with the construction of chute top board structure and is carried out simultaneously;
(b) after the underplate concrete of chute 8 is finished, on base plate, set up roof plate template and support 5, highly be rail height of top board soffit decline, on roof plate template bracing frame 5, settle rail 1 earlier, then rail and band dowel steel plate are welded, adopt plank and iron wire to hang mould between the rail, form the top board bed die jointly;
(c) treat that concrete roof reaches design strength, remove the bracing frame under the top board, rail just has been fixed on the top board firmly.
(d) there is liner plate 7 both sides of drop shaft 9, and chock 6 is arranged at the bottom of chute roof plate template bracing frame.

Claims (1)

1. ore chute inner lining steel rail mounting method is characterized in that: carry out as follows:
(a) earlier will with the pre-embedded steel slab (2) of dowel (4) and rail (1) welds and the template of chute top board together as bed die, tie up reinforcing bar, the build chute top board concrete of (8), rail is installed with the construction of chute top board structure and is carried out simultaneously;
(b) after the underplate concrete of chute (8) is finished, on base plate, set up roof plate template and support (5), highly be rail height of top board soffit decline, go up at roof plate template bracing frame (5) earlier and settle rail (1), then rail and band dowel steel plate are welded, adopt plank and iron wire to hang mould between the rail, form the top board bed die jointly;
(c) treat that concrete roof reaches design strength, remove the bracing frame under the top board, rail just has been fixed on the top board firmly.
(d) there is liner plate (7) both sides of drop shaft (9), and chock (6) is arranged at the bottom of chute roof plate template bracing frame.
CN200910212403A 2009-11-03 2009-11-03 Method for mounting mine chute lining plate Pending CN101781994A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910212403A CN101781994A (en) 2009-11-03 2009-11-03 Method for mounting mine chute lining plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910212403A CN101781994A (en) 2009-11-03 2009-11-03 Method for mounting mine chute lining plate

Publications (1)

Publication Number Publication Date
CN101781994A true CN101781994A (en) 2010-07-21

Family

ID=42522138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910212403A Pending CN101781994A (en) 2009-11-03 2009-11-03 Method for mounting mine chute lining plate

Country Status (1)

Country Link
CN (1) CN101781994A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104589487A (en) * 2015-01-09 2015-05-06 攀钢集团矿业有限公司 Repair method for ore slurry chute
CN106948819A (en) * 2017-05-09 2017-07-14 长春黄金研究院 A kind of shrinkage and breast method for slipping formula ore chute ore removal certainly
CN107044283A (en) * 2017-06-23 2017-08-15 长春黄金研究院 A kind of inclined orebody stoping method and ore chute

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104589487A (en) * 2015-01-09 2015-05-06 攀钢集团矿业有限公司 Repair method for ore slurry chute
CN106948819A (en) * 2017-05-09 2017-07-14 长春黄金研究院 A kind of shrinkage and breast method for slipping formula ore chute ore removal certainly
CN107044283A (en) * 2017-06-23 2017-08-15 长春黄金研究院 A kind of inclined orebody stoping method and ore chute
CN107044283B (en) * 2017-06-23 2019-03-05 长春黄金研究院 A kind of inclined orebody stoping method and ore chute

Similar Documents

Publication Publication Date Title
CN100572011C (en) Post-tensioned method prestressed concrete box beam whole opening prefabricated construction method
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN201908664U (en) Movable trestle bridge invert form board trolley
CN103899335B (en) Synchronize tunneling operation system and the method for inverted arch synchronization lining
CN102528927A (en) Production line precast beam construction method
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN104533456A (en) Super-large section chamber reinforced concrete modelling construction method
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN103556578A (en) Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN109404010B (en) Aluminum tunnel mold system and operation method thereof
CN101781994A (en) Method for mounting mine chute lining plate
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN113152493B (en) Panel pouring slip form construction system and construction method
CN203795311U (en) Multi-leg high pier and slip form construction device
CN107882578B (en) A kind of reinforced concrete lined tunnel single stope dual stage vehicle lining cutting continuous placing technology
CN203006873U (en) Hanging scaffold used for installation and construction operation of cooling walls in blast furnace
CN109797657A (en) Cast-in-situ bridge falsework system device and bridge cast-in-situ construction method
CN202359511U (en) Subway tunnel ditch and track bed one-time pouring formwork structure
CN205895266U (en) Subway secretly digs station integral platform truck station room layer bracket template system of two linings
CN202053373U (en) Precast beam tensioning flat cart for precast yard
CN213235079U (en) Concrete formwork supporting structure for underground excavation tunnel deformation joint post-cast strip
CN210850737U (en) Precast beam quick detach type line production steel form
CN209177871U (en) Platform structure for memorial archway continuously hoisting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100721