CN209177871U - Platform structure for memorial archway continuously hoisting - Google Patents

Platform structure for memorial archway continuously hoisting Download PDF

Info

Publication number
CN209177871U
CN209177871U CN201821755016.3U CN201821755016U CN209177871U CN 209177871 U CN209177871 U CN 209177871U CN 201821755016 U CN201821755016 U CN 201821755016U CN 209177871 U CN209177871 U CN 209177871U
Authority
CN
China
Prior art keywords
support stand
basis
roll change
hoisting
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821755016.3U
Other languages
Chinese (zh)
Inventor
黄轶
宋文智
李丽昆
余启洋
洪陈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201821755016.3U priority Critical patent/CN209177871U/en
Application granted granted Critical
Publication of CN209177871U publication Critical patent/CN209177871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Rolling (AREA)

Abstract

The utility model relates to hoisting mill housing fields, specifically a kind of platform structure for memorial archway continuously hoisting, basis is overhang including concrete roll change, it is characterized in that: further including the support stand being embedded in concrete roll change overhanging basis, the support stand is by support stand column, support stand stringer, support stand stringer reinforcing rib, support stand crossbeam constitute box-structure;It further include the subgrade case for being laid on concrete roll change overhanging basis top, the subgrade case constitutes slab structure by roadbed cabinet frame, subgrade case panel.This platform structure stability in the hoisting process of mill housing is good, and safety coefficient is high;Meanwhile this hoisting platform is able to bear large-tonnage truck crane and memorial archway the haulage vehicle normally travel on platform, so as to improve construction efficiency.

Description

Platform structure for memorial archway continuously hoisting
Technical field
The utility model relates to hoisting mill housing field, specifically a kind of platform structure for memorial archway continuously hoisting.
Background technique
80-120 tons of cold rolling five stand mill memorial archway weight, memorial archway lifting generally use driving lifting in workshop in place.But it is cold Sour Continuous mill train is rolled in addition to mill housing heavier-weight, remaining equipment and production coil of strip are within 30 tons.Line configuration row Vehicle is more 35 tons or 65 tons drivings, and separate unit driving is unable to satisfy hoisting mill housing, and general hoisting mill housing takes system Make shoulder pole girder and lift mill housing in place using 2 drivings, the method is limited by the influence of steel-structure factory building, installation progress of driving a vehicle It is larger, it can only could start hoisting mill housing after driving debugging operates normally, the rolling machine system installation time started is later, and Rolling machine system installation is engineering critical process, and the installation of milling train seat slurry plastic sheet, milling train bottom plate and rack adjustment time are longer.How In limited time duration, the milling train installation that starts as early as possible is always the problem in cold rolling acid tandem rolling engineering.
Summary of the invention
The purpose of the utility model is to overcome the deficiencies of existing milling train drop mill dress technology, provide a kind of efficient, safety The hoisting platform structure that can be used in continuously hoisting rolling mill housings.
In order to achieve the above object, the utility model is realized in this way:
A kind of platform structure for memorial archway continuously hoisting, including concrete roll change overhanging basis, further include be embedded in it is mixed Support stand in solidifying soil roll change overhanging basis, the support stand is by support stand column, support stand stringer, support stand Stringer reinforcing rib, support stand crossbeam constitute box-structure;It further include the roadbed for being laid on concrete roll change overhanging basis top Case, the subgrade case constitute slab structure by roadbed cabinet frame, subgrade case panel.
The platform structure for memorial archway continuously hoisting, concrete roll change overhanging basis are in U-shape, U-shaped opening two Side is respectively provided with the traversing basis of roll change and roll change basis, wherein is laid with levelling, roll change base using sleeper on the basis of roll change is traversing Plinth is cantilevered structure, uses sleeper to be laid at an upper portion thereof levelling, lower to carry out supporting using work roll changing overhanging base support.
This platform structure stability in the hoisting process of mill housing is good, and safety coefficient is high;Meanwhile this hoisting platform energy Large-tonnage truck crane and memorial archway the haulage vehicle normally travel on platform are born, enough so as to improve construction efficiency.
Detailed description of the invention
Fig. 1 is each block diagram of cold rolling five stand mill memorial archway hoisting platform.
Fig. 2 is hoisting platform braced frame and each block diagram of subgrade case.
Fig. 3 is cold rolling five stand mill roll change basis hoisting platform support construction arrangement schematic diagram.
Fig. 4 is that hoisting platform subgrade case is laid with arrangement schematic diagram.
Fig. 5 is that truck crane is located in hoisting platform upper rear leg strut fulcrum schematic diagram.
Fig. 6 is that truck crane is located in front leg strut fulcrum schematic diagram on hoisting platform.
Fig. 7 is that truck crane is located in schematic diagram on hoisting platform.
In figure: 1 support stand, 2 support stand columns, 3 support stand stringers, 4 support stand stringer reinforcing ribs, 5 Support stand crossbeam, 6 sleepers, 7 work roll changings overhang base support, 8 subgrade cases, 9 roadbed cabinet frames, 10 subgrade cases Panel, 11 support roller roll change bases, 12 work roll shifting device basics, 13 work roll changings basis, 14 300 tons of truck cranes Supporting leg, 15 500 tons of truck crane supporting legs.
Specific embodiment
The utility model is further illustrated below by way of specific embodiment.
A kind of realization specific implementation of its function of cold rolling five stand mill memorial archway hoisting platform comprises the steps of:
As shown in Figure 1, a kind of each component of cold rolling five stand mill memorial archway hoisting platform and schematic view of the mounting position, cold rolling five Machine frame rolling mill memorial archway hoisting platform is reinforced by support stand 1, support stand column 2, support stand stringer 3, support stand stringer Muscle 4, support stand crossbeam 5, sleeper 6, work roll changing overhang base support 7, subgrade case 8, roadbed cabinet frame 9, subgrade case face Plate 10 forms.Cold rolling five stand mill changing side basis is by support roller roll change basis 11, work roll shifting device basic 12, work Roller roll change basis 13 is constituted.Support stand 1, the shallower use of work roll shifting device basic 12 are made on support roller roll change basis 11 Sleeper 6 is laid with.Work roll changing basis 13 is overhanging concrete structure, and top is laid with using sleeper 6, and lower part overhangs concrete knot Structure carries out supporting using work roll changing overhanging base support 7.Basic plane roadbed paving case 8 forms hoisting platform.
As shown in Fig. 2, production support stand 1, wherein support stand column 2, support stand stringer 3 first weld together, Connection two panels stringer is installed again after the rack column 2 to be supported of support stand crossbeam 5,3 assembly of support stand stringer are in place.
Production subgrade case 8 as shown in Figure 2, determines subgrade case length dimension according to changing side key dimension, width is on 1m, road Base cabinet frame 9 is made using 16# channel steel, 0.5 meter of 1.5 meters of lower portion horizontal spacing, longitudinal pitch setting gusset, subgrade case face Plate 10 is laid on 9 upper and lower surface of roadbed cabinet frame using 12mm steel plate.
As shown in Figure 1, work roll changing overhanging base support 7 is installed, work roll changing basis 13 is overhanging concrete knot Structure, apart from 1.5 meters of foundation bottom, using 273mm steel pipe or 200mmH fashioned iron, 3 meters of spacing support one, use with basic gap Steel plate stoppers.
As shown in Figure 1, sleeper 6 is installed, work roll shifting device basic 12, work roll changing basic (13) are shallower, use On the basis of 200mm 1.2 meters of long ties of thickness are laid on.
As shown in figure 4, subgrade case 8 is laid with, 8 bottom of subgrade case and sleeper 6, support stand stringer (3), support stand crossbeam It is stoppered between 5 using steel plate and batten.
As shown in fig. 7, truck crane erect-position carries out hoisting mill housing, truck crane is located on hoisting platform by the position Fig. 5, For 300 tons of -500 tons of truck crane supporting leg horizontal spacings between 8m-10m, 300 tons of supporting legs 14 of truck crane are 300 tons of truck crane supporting leg positions It sets, 500 tons of supporting legs 15 of truck crane are 500 tons of truck crane leg locations.The position Fig. 5 truck crane rear support leg position, Fig. 6 is before truck crane Leg location.Hoisting platform supported underneath structure is checked after truck crane supporting leg stress, milling train can be started after each position pads by confirming Memorial archway lifting.

Claims (2)

1. a kind of platform structure for memorial archway continuously hoisting, including concrete roll change overhanging basis, it is characterized in that: further including embedding Enter the support stand in concrete roll change overhanging basis, the support stand is by support stand column, support stand stringer, branch Rack stringer reinforcing rib is supportted, support stand crossbeam constitutes box-structure;It further include being laid on concrete roll change overhanging basis top Subgrade case, for the subgrade case by roadbed cabinet frame, subgrade case panel constitutes slab structure.
2. the platform structure according to claim 1 for memorial archway continuously hoisting, it is characterized in that: concrete roll change overhangs base Plinth is in U-shape, and U-shaped opening two sides are respectively provided with the traversing basis of roll change and roll change basis, wherein use on the basis of roll change is traversing Sleeper laying is levelling, and roll change basis is cantilevered structure, uses sleeper to be laid at an upper portion thereof levelling, lower to be overhang using work roll changing Base support carries out supporting.
CN201821755016.3U 2018-10-29 2018-10-29 Platform structure for memorial archway continuously hoisting Active CN209177871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821755016.3U CN209177871U (en) 2018-10-29 2018-10-29 Platform structure for memorial archway continuously hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821755016.3U CN209177871U (en) 2018-10-29 2018-10-29 Platform structure for memorial archway continuously hoisting

Publications (1)

Publication Number Publication Date
CN209177871U true CN209177871U (en) 2019-07-30

Family

ID=67362306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821755016.3U Active CN209177871U (en) 2018-10-29 2018-10-29 Platform structure for memorial archway continuously hoisting

Country Status (1)

Country Link
CN (1) CN209177871U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111185456A (en) * 2020-02-09 2020-05-22 深圳市泰美瑞环保科技有限公司 Stabilization landfill method for fly ash chelate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111185456A (en) * 2020-02-09 2020-05-22 深圳市泰美瑞环保科技有限公司 Stabilization landfill method for fly ash chelate

Similar Documents

Publication Publication Date Title
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN108729354B (en) Downstream bridge movable formwork and construction method thereof
CN108330980A (en) The hidden rail sliding-mode structure of large area slope concrete and construction method
CN102926299A (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN103147370A (en) Device and method for replacing track slab of slab ballastless track
CN202945512U (en) Device for replacing plate-type ballastless track reinforced concrete base plate
CN107268348B (en) Subway column check pit construction method
CN107905114A (en) A kind of construction method of large span Successive interference cancellation
CN107988921B (en) A kind of cross-line bridge single-point successively incremeantal launching method construction method of overcrossing railway, highway
CN106930315B (en) A kind of moving tower crane foundation structure and construction method
CN209177871U (en) Platform structure for memorial archway continuously hoisting
CN205257790U (en) Fixed high -low leg handle portal crane
CN202830889U (en) Rail type slip form device
CN103382702B (en) A kind of support of cast-in-situ box girder and building method thereof
CN103967332B (en) The construction method of a kind of building site enclosing
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN210685373U (en) Trolley system suitable for concrete structure factory building construction
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN204139075U (en) A kind of semi girder cast-in-place construction spreading Hanging Basket
CN207862964U (en) A kind of land bearing platform construction system
CN202705907U (en) Post-tensioning method pre-stressed girder horizontal girder moving system
KR101250486B1 (en) Bridge railway ballasting construction method using temporary bent
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN212426772U (en) Suspended bracket system for cast-in-place bridge deck of steel plate composite beam
CN210621353U (en) Long-sleeper embedded type ballastless track bed slab reinforcing steel bar integral binding, hoisting and installing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant