CN202705907U - Post-tensioning method pre-stressed girder horizontal girder moving system - Google Patents

Post-tensioning method pre-stressed girder horizontal girder moving system Download PDF

Info

Publication number
CN202705907U
CN202705907U CN 201220269135 CN201220269135U CN202705907U CN 202705907 U CN202705907 U CN 202705907U CN 201220269135 CN201220269135 CN 201220269135 CN 201220269135 U CN201220269135 U CN 201220269135U CN 202705907 U CN202705907 U CN 202705907U
Authority
CN
China
Prior art keywords
girder
steel
laterally
moving
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220269135
Other languages
Chinese (zh)
Inventor
张宝利
高德新
刘俊峰
马玖师
赵付昌
王光莲
郑奋光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN 201220269135 priority Critical patent/CN202705907U/en
Application granted granted Critical
Publication of CN202705907U publication Critical patent/CN202705907U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a post-tensioning method pre-stressed girder horizontal girder moving system and solves the problems that in the prior art, danger is increased due to the fact that a girder needs jacking up in moving of the girder, and production cycle of the girder is long due to repeated assembly and disassembly of a horizontal girder slide way. Two horizontal girder moving channels (12), a horizontal concrete steel rail pedestal (14) and horizontal girder moving steel rails (13) are arranged on a concrete bar-shaped foundation base (1) for making a girder, and the horizontal girder moving channels (12) are arranged on the back-and-forth horizontal direction in parallel mode. Horizontal girder moving sliding plates (15) and girder moving sleepers (16) are arranged on the horizontal girder moving steel rails (13) in moving mode. Pre-cast girders are arranged on the girder moving sleepers (16), and bottom die steel plates (5) on two ends of the concrete bar-shaped foundation base (1) for making the girder are respectively provided with a top girder preset opening (18). Pre-cast girder support base plates (20) are fixed on the top girder preset openings (18) through fixing bolts (19). Jacks (17) are arranged below the top girder preset openings (18). The post-tensioning method pre-stressed girder horizontal girder moving system is particularly suitable for being applied to girder making factories.

Description

Post tentioned prestressed concrete girder laterally moves the girder system system
Technical field
The present invention relates to a kind of when building railway line employed concrete Simple T-Girders move the device of beam operation.
Background technology
When bearing the rail channel construction task, generally be to build line at rail channel first to carry out the construction of bridge pier and roadbed, then with Bridge Erector prefabricated post tentioned prestressed concrete girder is erected on the ready-made bridge pier.Post tentioned prestressed concrete girder is generally finished in that beam making field is prefabricated, and prefabricated process mainly comprises beam processed and move two processes of beam, first prefabricated beam on beam making bench, then with the Liang Yiliang that makes to depositing the beam station.It is laterally to move beam by insert the rail mode under prefabricated beam that prior art is laterally moved the beam mode to the concrete Simple T-Girders, this beam mode of moving needs sufficiently high back timber height, and repeat the horizontal the way of moving the beam of installing/dismounting, exist and lengthened the production cycle, increase personnel's configuration, reduced the low problem of production efficiency.
Summary of the invention
The invention provides a kind of post tentioned prestressed concrete girder and laterally move girder system system, solved that prior art exists move beam the time danger that the back height need to be brought increase and repeat the technical problem that production cycle that the horizontal the way of moving the beam of installing/dismounting causes beam grows.
The present invention is by the above problem of following solution:
A kind of post tentioned prestressed concrete girder laterally moves the girder system system, comprise two beam concrete bar shaped pedestals processed that arrange at left and right sides longitudinal direction that are parallel to each other, on every beam concrete bar shaped pedestal processed, all be embedded with the fixedly pre-buried channel-section steel of steel work beam making bench, the horizontal long girder steel of the steel work beam making bench of horizontal direction and laterally short girder steel before and after the compartment of terrain is fixedly installed on pre-buried channel-section steel, laterally long girder steel and laterally short girder steel alternate intervals arrange, at horizontal long girder steel with laterally lack girder steel and be fixedly installed the many vertical square steel that arrange at left and right sides longitudinal direction that are parallel to each other, be fixedly installed the bottom die of precast beam steel plate at vertical square steel, on the two ends end face of the horizontal long girder steel of steel work beam making bench, all be movably set with the side form pad, be provided with the precast beam side form at the side form pad, beam concrete bar shaped pedestal processed be provided with two mutually parallel in front and back in a lateral direction laterally move the beam passage, in laterally moving the beam passage, be provided with horizontal concrete rail pedestal, laterally the height of concrete rail pedestal is identical with the height of beam concrete bar shaped pedestal processed, before and after laterally concrete rail pedestal is provided with in a lateral direction laterally move the joist steel rail, be movably set with and laterally move the beam slide plate laterally moving the joist steel rail, be provided with and move crown plate wood laterally moving the beam slide plate, be provided with precast beam moving crown plate wood, bed die steel plate at beam concrete bar shaped pedestal processed two ends is respectively arranged with a back timber reserved opening, set bolt is fixed on the precast beam holder base plate on the back timber reserved opening, is provided with jack below the back timber reserved opening.
Between the beam concrete bar shaped pedestal processed on the two parallel left and right sides longitudinal directions, be provided with steam-cured pipe, be provided with steam-cured pipe steam control valve at steam-cured pipe, between bed die steel plate and side form, be provided with sealing joint strip.
Steel work beam making bench of the present invention match with fixing the way of moving the beam use mode, that has improved beam moves the beam production technology, has saved the labour, has reduced cost of production, is particularly suitable for Liang Chang processed and uses.
Description of drawings
Fig. 1 is the structural representation of overlooking on the direction of the present invention;
Fig. 2 is the structural representation on the right apparent direction of the present invention;
Fig. 3 is the present invention's structural representation that the steel work beam making bench matches with fixing the way of moving the beam when moving beam.
The specific embodiment
A kind of post tentioned prestressed concrete girder laterally moves the girder system system, comprise two beam concrete bar shaped pedestals 1 processed that arrange at left and right sides longitudinal direction that are parallel to each other, on every beam concrete bar shaped pedestal 1 processed, all be embedded with the fixedly pre-buried channel-section steel 2 of steel work beam making bench, the horizontal long girder steel 3 of the steel work beam making bench of horizontal direction and laterally short girder steel 11 before and after the compartment of terrain is fixedly installed on pre-buried channel-section steel 2, laterally long girder steel 3 and laterally short girder steel 11 alternate intervals settings, at horizontal long girder steel 3 with laterally lack girder steel 11 and be fixedly installed the many vertical square steel 4 that arrange at left and right sides longitudinal direction that are parallel to each other, be fixedly installed bottom die of precast beam steel plate 5 at vertical square steel 4, on the two ends end face of the horizontal long girder steel 3 of steel work beam making bench, all be movably set with side form pad 6, be provided with precast beam side form 7 at side form pad 6, beam concrete bar shaped pedestal 1 processed be provided with two mutually parallel in front and back in a lateral direction laterally move beam passage 12, in laterally moving beam passage 12, be provided with horizontal concrete rail pedestal 14, laterally the height of concrete rail pedestal 14 is identical with the height of beam concrete bar shaped pedestal 1 processed, make whole Liang Chang accomplish basic barrier free accessibility, before and after laterally concrete rail pedestal 14 is provided with in a lateral direction laterally move joist steel rail 13, be movably set with and laterally move beam slide plate 15 laterally moving joist steel rail 13, be provided with and move crown plate wood 16 laterally moving beam slide plate 15, be provided with precast beam moving crown plate wood 16, bed die steel plate 5 at beam concrete bar shaped pedestal processed 1 two ends is respectively arranged with a back timber reserved opening 18, set bolt 19 is fixed on precast beam holder base plate 20 on the back timber reserved opening 18, is provided with jack 17 below back timber reserved opening 18.When moving beam, with two jack 17 with beam jack-up a little, after extracting cover plate out, to laterally move beam slide plate 15 and move crown plate wood 16 and be placed on and laterally move on the joist steel rail 13, the end face that moves crown plate wood 16 exceeds 10 decimeters than bottom die of precast beam steel plate 5, then fall two jack 17, beam is sitting in moves on the crown plate wood 16, beginning laterally moves beam.
Between the beam concrete bar shaped pedestal 1 processed on the two parallel left and right sides longitudinal directions, be provided with steam-cured pipe 8, be provided with steam-cured pipe steam control valve 10 at steam-cured pipe 8, between bed die steel plate 5 and side form 7, be provided with sealing joint strip 9.Be the beam humidification in the time of in the winter time, improve the quality of beam and the setting time of shortening beam.
According to beam field construction requirement, design the beam making bench arrangement form, straddle truck is walked the position of line and horizontal the way of moving the beam.According to beam field site condition, such as the rail height of the transverse and longitudinal gradient, use, back timber point height, deposit the composite factor analysis such as beam pedestal height and specify the way of moving the beam absolute altitude.At first first beam making bench basis and straddle truck are walked the line basis and built and finish, strict elevation control in the casting process, the height on beam making bench basis has determined the height of the way of moving the beam, has determined that also the straddle truck of crossing that whether can stride walks line.Because some will be fixed on the way of moving the beam on the beam making bench strip foundation, if the beam making bench basis is lower slightly, can also meet design requirement by increasing steel plate washer, if be higher than design elevation, dealing with will be pretty troublesome, and deviation is too large, and fixedly the way of moving the beam scheme will be failed.Next carries out the installation of steel work base frame mould, girder steel is pressed the layout design arrangement position accurately and the pre-buried channel-section steel welding of strip foundation, and prepares the movable die block position is reserved, and back timber is put the position reserve.Be fixed at last traversing beam slideway and straddle truck and walk the line rail, if normally put in place by design elevation control, install just very simply, only need to be placed in rail on the traversing beam slideway and straddle truck is walked on the line basis, passage embedded bar railway spike is fixed track.

Claims (2)

1. a post tentioned prestressed concrete girder laterally moves the girder system system, comprise two beam concrete bar shaped pedestals processed (1) that arrange at left and right sides longitudinal direction that are parallel to each other, on every beam concrete bar shaped pedestal processed (1), all be embedded with the fixedly pre-buried channel-section steel (2) of steel work beam making bench, it is characterized in that, horizontal long girder steel (3) and the laterally short girder steel (11) of the steel work beam making bench of horizontal direction before and after the upper compartment of terrain of pre-buried channel-section steel (2) is fixedly installed, laterally long girder steel (3) and laterally short girder steel (11) alternate intervals setting, at horizontal long girder steel (3) with laterally lack girder steel (11) and be fixedly installed the many vertical square steel (4) that arrange at left and right sides longitudinal direction that are parallel to each other, be fixedly installed bottom die of precast beam steel plate (5) at vertical square steel (4), on the two ends end face of the horizontal long girder steel (3) of steel work beam making bench, all be movably set with side form pad (6), be provided with precast beam side form (7) at side form pad (6), beam concrete bar shaped pedestal processed (1) be provided with two mutually parallel in front and back in a lateral direction laterally move beam passage (12), in laterally moving beam passage (12), be provided with horizontal concrete rail pedestal (14), laterally the height of concrete rail pedestal (14) is identical with the height of beam concrete bar shaped pedestal processed (1), before and after laterally concrete rail pedestal (14) is provided with in a lateral direction laterally move joist steel rail (13), be movably set with and laterally move beam slide plate (15) laterally moving joist steel rail (13), be provided with and move crown plate wood (16) laterally moving beam slide plate (15), be provided with precast beam moving crown plate wood (16), bed die steel plate (5) at beam concrete bar shaped pedestal processed (1) two ends is respectively arranged with a back timber reserved opening (18), set bolt (19) is fixed on precast beam holder base plate (20) on the back timber reserved opening (18), is provided with jack (17) in the below of back timber reserved opening (18).
2. a kind of post tentioned prestressed concrete girder according to claim 1 laterally moves the girder system system, it is characterized in that, between the beam concrete bar shaped pedestal processed (1) on the two parallel left and right sides longitudinal directions, be provided with steam-cured pipe (8), be provided with steam-cured pipe steam control valve (10) at steam-cured pipe (8), between bed die steel plate (5) and side form (7), be provided with sealing joint strip (9).
CN 201220269135 2012-06-08 2012-06-08 Post-tensioning method pre-stressed girder horizontal girder moving system Expired - Lifetime CN202705907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220269135 CN202705907U (en) 2012-06-08 2012-06-08 Post-tensioning method pre-stressed girder horizontal girder moving system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220269135 CN202705907U (en) 2012-06-08 2012-06-08 Post-tensioning method pre-stressed girder horizontal girder moving system

Publications (1)

Publication Number Publication Date
CN202705907U true CN202705907U (en) 2013-01-30

Family

ID=47586225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220269135 Expired - Lifetime CN202705907U (en) 2012-06-08 2012-06-08 Post-tensioning method pre-stressed girder horizontal girder moving system

Country Status (1)

Country Link
CN (1) CN202705907U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110509424A (en) * 2019-08-23 2019-11-29 中铁六局集团有限公司 Two-orbit trolley laterally moves beam construction
CN112229440A (en) * 2020-09-04 2021-01-15 中铁大桥局集团有限公司 Precast beam field self-induction monitoring system and method
CN114506804A (en) * 2022-01-24 2022-05-17 吴贵发 Simple beam moving method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110509424A (en) * 2019-08-23 2019-11-29 中铁六局集团有限公司 Two-orbit trolley laterally moves beam construction
CN110509424B (en) * 2019-08-23 2021-11-05 中铁六局集团有限公司 Construction method for transversely moving beams by double-track trolley
CN112229440A (en) * 2020-09-04 2021-01-15 中铁大桥局集团有限公司 Precast beam field self-induction monitoring system and method
CN112229440B (en) * 2020-09-04 2022-06-17 中铁大桥局集团有限公司 Precast beam field self-induction monitoring system and method
CN114506804A (en) * 2022-01-24 2022-05-17 吴贵发 Simple beam moving method

Similar Documents

Publication Publication Date Title
CN111926720B (en) Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN106087757B (en) A high position in box beam erection falls beam construction method
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN106541489B (en) Bridge deck prefabricated formwork system
CN103774558A (en) Automatic travelling type moveable formwork used in bridge construction
CN202705907U (en) Post-tensioning method pre-stressed girder horizontal girder moving system
CN107060823A (en) Tunnel anchorage section two serves as a contrast concrete construction without dismounting chassis
CN113370384A (en) Fixed hydraulic template moving trolley tool and T-beam prefabricating construction process
CN204325821U (en) Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction
CN107988921A (en) Single-point continuous pushing construction method for overpass bridge over railway and highway
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN203741723U (en) Automatic traveling type movable formwork used for bridge construction
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN203654200U (en) No. 0 block support for box girder of river-crossing prestressed concrete continuous beam bridge
CN205955185U (en) Mould is hung in subway station tread wind channel special use
CN102677624A (en) U-shaped aqueduct simulation testing device and method
CN205839594U (en) Over-and-under type construction system that bridge superstructure construction used
CN112240111A (en) Subway prefabricated assembly column type inspection pit structure and construction method
CN115748449A (en) Construction method of shaped steel die special-shaped flower trough cast-in-place concrete anti-collision guardrail
CN209177871U (en) Platform structure for memorial archway continuously hoisting
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN104060546A (en) Overall longitudinal movement construction method for cast-in-place support frame of box beam of continuous beam bridge
CN211714572U (en) Mould system hangs of big opening later stage shutoff of subway station medium plate
CN211229701U (en) Assembled maintenance stand column and train maintenance platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130130

CX01 Expiry of patent term