CN204325821U - Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction - Google Patents

Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction Download PDF

Info

Publication number
CN204325821U
CN204325821U CN201420785414.5U CN201420785414U CN204325821U CN 204325821 U CN204325821 U CN 204325821U CN 201420785414 U CN201420785414 U CN 201420785414U CN 204325821 U CN204325821 U CN 204325821U
Authority
CN
China
Prior art keywords
continuous
vierendeel girder
support rail
vierendeel
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420785414.5U
Other languages
Chinese (zh)
Inventor
郭建湖
李小和
王勇刚
谢瑞丰
黄国良
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201420785414.5U priority Critical patent/CN204325821U/en
Application granted granted Critical
Publication of CN204325821U publication Critical patent/CN204325821U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses that low speed magnetic suspension in one is low puts circuit continuous frame formula support rail girder construction, comprise reinforced concrete floor, the section of track, many rows sleeper pedestal, RC Continuous Vierendeel girder top board, multiple RC Continuous Vierendeel girder frame post, the outside of RC Continuous Vierendeel girder left roof and the outside of the right top board of RC Continuous Vierendeel girder are equipped with water conservancy diversion rail bearing, multiple reinforced concrete beams arranged along line direction is connected with between the inner side of RC Continuous Vierendeel girder left roof and the inner side of the right top board of RC Continuous Vierendeel girder, longitudinally arch is formed between adjacent two RC Continuous Vierendeel girder left frame columns, also longitudinally arch is formed between the right frame post of adjacent two RC Continuous Vierendeel girders.The utility model good stability, intensity is high, construction and easy to maintenance, and cable can extend there through support rail beam, without the need to pre-buried raceway in basis geotechnological under support rail beam.

Description

Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction
Technical field
The utility model relates to that medium-and low-speed maglev traffic is low puts line construction technical field, to refer in one that low speed magnetic suspension is low particularly and puts circuit continuous frame formula support rail girder construction.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and current achievement in research both domestic and external is less, and the circuit minority especially of operation is opened in the whole world.In March, 2005 Japan is only had to build middle low speed magnetic suspension railway comercial operation line-the East Hillside Line of opening and middle low speed magnetic suspension railway business operating line that in June, 2014, Korea S opened at present.And the middle low speed magnetic suspension traffic of China only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, there is no the circuit formally put into effect.
The low circuit of putting of medium-and low-speed maglev traffic engineering is made up of roadbed under sleeper, support rail beam and support rail beam, and the support rail beam of supporting track is arranged on by the roadbed that earth structure is formed.For in the existing research of magnetic floating traffic engineering, more to the research of bridge rail beam, as all there is the rail beam of complete web the both sides such as prestressed reinforced concrete case beam, U-shaped beam, i beam.And it is little for low research of putting circuit support rail beam, existing research focuses mostly in buttress supporting construction, and as " routine conductive maglev pier bearing structure of train design search ", (article is numbered: 1006-2106 (2006) 07-0041-05).
Existing bridge rail beam is that frame stands between two bridge piers, by simply supported beam or Continuous beam design, is satisfied distortion and stability requirement, and its physical dimension is general very large, obviously can not be directly used in low putting on circuit.Existing bridge rail beam mostly is both sides and has the structures such as the case beam of complete web, U-shaped beam, i beam, the advantages such as the rail beam of this several structure, all has good stability, and rigidity is large.Low wiring board support rail of putting also makes the structures such as case beam, U-shaped beam, i beam with reference to bridge rail beam, is placed on the road bed of ground composition, then aobvious outward appearance is heavy, also unsightly; In addition, the space between web is very little, and personnel cannot carry out inspection and maintenance operation to it, and in two-wire location, and between line, water can not transverse in-line, must online between gutter is set.
Existing buttress type support rail beam, sleeper pedestal is arranged on buttress top, is born the load of track structure transmission by buttress, strengthens the stable of structure by the longitudinal and transverse binder at its top.Buttress type support rail beam has portable construction, and in two-wire location, between line, water can the advantage such as transverse in-line, but also there is following problem:
1, because sleeper pedestal is arranged on buttress top, thus, the sectional dimension of buttress, can not be less than sleeper pedestal.The position of buttress must be determined according to sleeper position, requires that construction control precision is high, and especially at 3 in Curve Segment, the construction positioning difficulty of buttress is larger.
2, for increasing the rigidity of buttress and the ability of resistance to deformation, prop up socle and be often provided with longitudinal and transverse binder, for saving engineering quantity, the sectional dimension of these longitudinal and transverse binders is less than the sectional dimension of buttress more, in construction, is difficult to make integral mold plate, buttress and longitudinal and transverse binder carry out monobloc cast, need first construct buttress more longitudinal and transverse binder of constructing, working procedure is many.
3, by the buttress type support rail beam of beam on elastic foundation design, top buttress is arranged on the armored concrete slab under it mostly, and its integral rigidity is little, and in lifting, transportation, structure is yielding, prefabrication mode should not be adopted to construct, answer field cast-in-place to construct.
Utility model content
The purpose of this utility model will provide that low speed magnetic suspension in one is low puts circuit continuous frame formula support rail girder construction exactly, this structural stability is good, intensity is high, construction and easy to maintenance, longitudinally adopt continuous frame girder construction, support rail beam inner hollow, cable can extend there through support rail beam, without the need to pre-buried raceway in basis geotechnological under support rail beam, simplify construction process, avoid the hidden danger of quality that pre-buried pipeline brings in geotechnological basis.
For realizing this object, middle low speed magnetic suspension designed by the utility model is low puts circuit continuous frame formula support rail girder construction, it comprises reinforced concrete floor, the section of track, along many rows sleeper pedestal that line direction is arranged, it also comprises RC Continuous Vierendeel girder left roof, the right top board of RC Continuous Vierendeel girder, the multiple RC Continuous Vierendeel girder left frame columns on reinforced concrete floor are equidistantly arranged in along line direction, the right frame post of multiple RC Continuous Vierendeel girders on reinforced concrete floor is equidistantly arranged in along line direction, the outside of described RC Continuous Vierendeel girder left roof and the outside of the right top board of RC Continuous Vierendeel girder are equipped with water conservancy diversion rail bearing, multiple reinforced concrete beams arranged along line direction is connected with between the inner side of described RC Continuous Vierendeel girder left roof and the inner side of the right top board of RC Continuous Vierendeel girder, longitudinally arch is formed between adjacent two RC Continuous Vierendeel girder left frame columns, also longitudinally arch is formed between the right frame post of adjacent two RC Continuous Vierendeel girders, RC Continuous Vierendeel girder left roof and the right top board of RC Continuous Vierendeel girder are all connected the section of track by corresponding sleeper pedestal.
The beneficial effects of the utility model:
1, structural meterials of the present utility model adopts steel concrete, can meet the requirement of Maglev Project structural stability, intensity, distortion.
2, physical dimension of the present utility model is little, compares box, I shape and buttress type support rail beam, and continuous frame shape project organization is dexterous, good looking appearance, and concrete amount is few, and cost is economized.
3, the utility model compares conventional box support rail beam, and continuous frame shape project organization also has the following advantages:
1. by adjustment frame column dimension, can effectively control and regulate the deflection deformation of rail level under upper load effect.
2. due to frame post independently arrange, superstructure connected by continuous frame end face, circuit longitudinal restraint is less, the secondary stresses of structure along circuit longitudinal direction under the impacts such as mobile load, temperature effect, shrinkage and creep significantly reduces, and the ride comfort of rail level is better than box support rail beam.
4, longitudinally adopt continuous print frame beam structure on continuous frame support rail beam base plate, integral mold plate prefabrication can be adopted, also can field cast-in-place construction, avoid conventional support rail beam and to construct loaded down with trivial details shortcoming.
5, sleeper pedestal is arranged in continuous frame structure end face, strict to buttress position limitation unlike buttress type structure, positioning control accuracy is high, and also reduce sleeper pedestal positioning difficulty, construction control is more convenient.
6, rectangle continuous frame back plate is adopted, be more suitable for the layout of rectangle sleeper pedestal, the sectional dimension of frame post presses structural requirement design, dexterousr, economical, sleeper pedestal size Control can not be subject to, also solve 3 in Curve Segment curved beam song when doing, sleeper pedestal Positioning Precision Control difficulty problem simultaneously.
7, longitudinally adopt continuous frame girder construction, be convenient to attendant and carry out inspection and maintenance from both sides to structure surfaces externally and internally.
8, longitudinally continuous frame girder construction is adopted, support rail beam inner hollow, cable can extend there through support rail beam, without the need to pre-buried raceway in basis geotechnological under support rail beam, both simplify construction process, it also avoid the hidden danger of quality that pre-buried pipeline brings in geotechnological basis.
9, two-wire location continuous frame support rail beam is placed on earthen structure roadbed, base plate thickness scope is backfilled, outward-dipping weathering is made in backfill face, support rail beam inner hollow, between line, water is laterally directly discharged outside roadbed by framework hole, without the need to arranging between line collecting well between gutter and line, avoid the hidden danger of quality that shaping roadbed secondary excavation brings.
Accompanying drawing explanation
Fig. 1 is cross-sectional configuration schematic diagram of the present utility model;
Fig. 2 is the Facad structure schematic diagram of support rail beam of the present utility model;
Fig. 3 is continuous frame formula support rail girder construction schematic diagram of the present utility model.
Wherein, 1.1-RC Continuous Vierendeel girder left frame column, 1.2-RC Continuous Vierendeel girder right frame post, 1.3-RC Continuous Vierendeel girder left roof, the right top board of 1.4-RC Continuous Vierendeel girder, 2-reinforced concrete floor, 3-reinforced concrete beams, 4-base plate backfill end face line, 5-water conservancy diversion rail bearing, 6-many row's sleeper pedestals, 7-section of track, 8-longitudinally arch.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
Middle low speed magnetic suspension is as shown in Figures 1 to 3 low puts circuit continuous frame formula support rail girder construction, it comprises reinforced concrete floor 2, the section of track 7, along many rows sleeper pedestal 6 that line direction is arranged, it also comprises RC Continuous Vierendeel girder left roof 1.3, the right top board 1.4 of RC Continuous Vierendeel girder, the multiple RC Continuous Vierendeel girder left frame columns 1.1 on reinforced concrete floor 2 are equidistantly arranged in along line direction, the right frame post 1.2 of multiple RC Continuous Vierendeel girders on reinforced concrete floor 2 is equidistantly arranged in along line direction, the outside of described RC Continuous Vierendeel girder left roof 1.3 and the outside of the right top board 1.4 of RC Continuous Vierendeel girder are equipped with water conservancy diversion rail bearing 5, multiple reinforced concrete beams 3 arranged along line direction is connected with between the inner side of described RC Continuous Vierendeel girder left roof 1.3 and the inner side of the right top board of RC Continuous Vierendeel girder 1.4, longitudinally arch 8 is formed between adjacent two RC Continuous Vierendeel girder left frame columns 1.1, also longitudinally arch 8 is formed between the right frame post 1.2 of adjacent two RC Continuous Vierendeel girders, RC Continuous Vierendeel girder left roof 1.3 and the right top board 1.4 of RC Continuous Vierendeel girder are all connected the section of track 7 by corresponding sleeper pedestal 6.Reinforced concrete beams 3 plays a part to increase support rail beam lateral stiffness and stability.
In technique scheme, described each reinforced concrete beams 3 is between the right frame post 1.2 of corresponding RC Continuous Vierendeel girder and RC Continuous Vierendeel girder left frame column 1.1
In technique scheme, 1 ~ 3, interval longitudinally arch 8 layout between adjacent two reinforced concrete beams 3.
In technique scheme, the cross section of described reinforced concrete floor 2 is rectangle.
In technique scheme, align one by one in the shrinkage joint of described RC Continuous Vierendeel girder left roof 1.3 and the right top board 1.4 of RC Continuous Vierendeel girder and the section of track 7.
In technique scheme, the distance at two shrinkage joint adjacent in described RC Continuous Vierendeel girder left roof 1.3 be in the section of track 7 adjacent two pitchs of sleepers from integral multiple.
In technique scheme, distance between adjacent two RC Continuous Vierendeel girder left frame columns 1.1 and the distance between the right frame post 1.2 of adjacent two RC Continuous Vierendeel girders are generally doubly single or twice sleeper pitch, RC Continuous Vierendeel girder left roof 1.3 and corresponding RC Continuous Vierendeel girder left frame column 1.1, and the right top board of RC Continuous Vierendeel girder 1.4 adopts 45 ° of chamfered with corresponding RC Continuous Vierendeel girder right frame post 1.2 junction.Sleeper pedestal 6 symmetry is arranged on continuous frame structure roof end face, and water conservancy diversion rail bearing 5 is arranged on top board sidewall.
In technique scheme, described reinforced concrete floor 2, RC Continuous Vierendeel girder left roof 1.3, the right top board of RC Continuous Vierendeel girder 1.4, all RC Continuous Vierendeel girder left frame columns 1.1, all RC Continuous Vierendeel girder right frame posts 1.2 and all reinforced concrete beams 3 form integral reinforced concrete structure.
In technique scheme, described RC Continuous Vierendeel girder left roof 1.3 and the right top board 1.4 of RC Continuous Vierendeel girder are rectangle top board, and the long limit of this rectangle top board is line direction.
After the upper load such as train, track reaches reinforced concrete floor 2 by continuous frame formula support rail beam, then reach roadbed under beam.Because this support rail girder construction top is continuous frame structure, the longitudinal cross-section size of frame post can be less than the size of sleeper pedestal, makes structure dexterousr; And sleeper pedestal is arranged, also, positioning control accuracy strict unlike the restriction of buttress type structure requires high, and construction control is more convenient.This structure can adopt integral mold plate field cast-in-place or place prefabricated, working procedure is simple, construction precision is easy to control; This structure is longitudinally continuous frame girder construction, inside configuration hollow, water transverse in-line between the line of favourable two-wire location, without the need to arranging between line collecting well between gutter and line, avoids the hidden danger of quality that shaping roadbed secondary excavation brings.
The low construction method of putting circuit continuous frame formula support rail girder construction of above-mentioned middle low speed magnetic suspension, it comprises the steps:
Step 1: by adopting prefabrication system in the shaping or factory of integral mold plate one-time-concreting after design colligation good reinforcing bar, make the continuous frame formula support rail beam that RC Continuous Vierendeel girder left roof 1.3, the right top board of RC Continuous Vierendeel girder 1.4, all RC Continuous Vierendeel girder left frame columns 1.1 and the right frame post 1.2 of all RC Continuous Vierendeel girders are linked to be, before building, carry out location and the installation of built-in fitting;
Step 2: water conservancy diversion rail bearing 5, when constructing continuous frame formula support rail beam, adopts pre-buried mode to construct; Sleeper pedestal 6 is linked to be entirety by steel bar overall binding and continuous frame formula support rail beam, when constructing continuous frame formula support rail beam, arrange the reinforcing bar that sleeper pedestal 6 is connected with continuous frame formula support rail beam in advance, after continuous frame formula support rail beam is built and reached desired strength, then build sleeper pedestal 6;
Step 3: construct well at sleeper pedestal 6 and responder is arranged in corresponding reinforced concrete beams 3, pre-buried connecting reinforcement form can be taked to construct when responder is installed, also can later stage perforating install;
Step 4: built described reinforced concrete floor 2, RC Continuous Vierendeel girder left roof 1.3, the right top board 1.4 of RC Continuous Vierendeel girder, all RC Continuous Vierendeel girder left frame columns 1.1, all RC Continuous Vierendeel girder right frame posts 1.2 and the concrete of all reinforced concrete beams 3, and maintenance reaches stripping after design strength on schedule, then reinforced concrete floor 2 thickness range is backfilled, outward-dipping weathering is made in backfill face, namely define that middle low speed magnetic suspension traffic engineering is low puts circuit continuous frame formula support rail girder construction.
In technique scheme, continuous frame formula support rail beam, be longitudinally two continuous print frame beam structures, compare box or I shape support rail beam, good looking appearance, concrete amount is few, can adopt integral mold plate prefabrication, also can construct by field cast-in-place; Compare buttress type support rail beam, sleeper pedestal symmetry is arranged on continuous frame end face, and its frame column section can be less than sleeper pedestal size, meets rigidity and deformation requirements.Longitudinal continuous frame girder construction, inner hollow, is beneficial to attendant and carries out inspection and maintenance from both sides to structure surfaces externally and internally.
Two-wire location continuous frame formula support rail beam is placed on earthen structure roadbed, base plate thickness scope is backfilled, outward-dipping weathering is made in backfill face, support rail beam inner hollow, between line, water is laterally directly discharged outside roadbed by framework, without the need to arranging between line collecting well between gutter and line, avoid the hidden danger of quality that shaping roadbed secondary excavation brings.
The content that this manual is not described in detail belongs to the known prior art of professional and technical personnel in the field.

Claims (8)

1. low speed magnetic suspension is low in one kind puts circuit continuous frame formula support rail girder construction, it comprises reinforced concrete floor (2), the section of track (7), along many rows sleeper pedestal (6) that line direction is arranged, it is characterized in that: it also comprises RC Continuous Vierendeel girder left roof (1.3), the right top board of RC Continuous Vierendeel girder (1.4), the multiple RC Continuous Vierendeel girder left frame columns (1.1) on reinforced concrete floor (2) are equidistantly arranged in along line direction, along the right frame post (1.2) of multiple RC Continuous Vierendeel girders that line direction is equidistantly arranged on reinforced concrete floor (2), the outside of described RC Continuous Vierendeel girder left roof (1.3) and the outside of the right top board of RC Continuous Vierendeel girder (1.4) are equipped with water conservancy diversion rail bearing (5), multiple reinforced concrete beams (3) arranged along line direction is connected with between the inner side of described RC Continuous Vierendeel girder left roof (1.3) and the inner side of the right top board of RC Continuous Vierendeel girder (1.4), longitudinally arch (8) is formed between adjacent two RC Continuous Vierendeel girder left frame columns (1.1), also longitudinally arch (8) is formed between the right frame post (1.2) of adjacent two RC Continuous Vierendeel girders, RC Continuous Vierendeel girder left roof (1.3) and the right top board of RC Continuous Vierendeel girder (1.4) are all connected the section of track (7) by corresponding sleeper pedestal (6).
2. middle low speed magnetic suspension according to claim 1 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: described each reinforced concrete beams (3) is positioned between the right frame post (1.2) of corresponding RC Continuous Vierendeel girder and RC Continuous Vierendeel girder left frame column (1.1).
3. middle low speed magnetic suspension according to claim 2 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: 1 ~ 3, interval longitudinally arch (8) layout between adjacent two reinforced concrete beams (3).
4. middle low speed magnetic suspension according to claim 2 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: the cross section of described reinforced concrete floor (2) is rectangle.
5. middle low speed magnetic suspension according to claim 1 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: align one by one in the shrinkage joint of described RC Continuous Vierendeel girder left roof (1.3) and the right top board of RC Continuous Vierendeel girder (1.4) and the section of track (7).
6. middle low speed magnetic suspension according to claim 5 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: the distance at two shrinkage joint adjacent in described RC Continuous Vierendeel girder left roof (1.3) be in the section of track (7) adjacent two pitchs of sleepers from integral multiple.
7. middle low speed magnetic suspension according to claim 1 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: described reinforced concrete floor (2), RC Continuous Vierendeel girder left roof (1.3), the right top board of RC Continuous Vierendeel girder (1.4), all RC Continuous Vierendeel girder left frame columns (1.1), all RC Continuous Vierendeel girder right frames post (1.2) and all reinforced concrete beams (3) composition integral reinforced concrete structure.
8. middle low speed magnetic suspension according to claim 1 is low puts circuit continuous frame formula support rail girder construction, it is characterized in that: described RC Continuous Vierendeel girder left roof (1.3) and the right top board of RC Continuous Vierendeel girder (1.4) are rectangle top board, the long limit of this rectangle top board is line direction.
CN201420785414.5U 2014-12-11 2014-12-11 Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction Withdrawn - After Issue CN204325821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420785414.5U CN204325821U (en) 2014-12-11 2014-12-11 Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420785414.5U CN204325821U (en) 2014-12-11 2014-12-11 Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction

Publications (1)

Publication Number Publication Date
CN204325821U true CN204325821U (en) 2015-05-13

Family

ID=53162197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420785414.5U Withdrawn - After Issue CN204325821U (en) 2014-12-11 2014-12-11 Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction

Country Status (1)

Country Link
CN (1) CN204325821U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method
CN105401493A (en) * 2015-12-08 2016-03-16 成都科创佳思科技有限公司 Frame type rail bearing beam structure
CN104867393B (en) * 2015-05-21 2017-05-24 浙江大学 Magnetic suspension balance beam experiment device
CN108342937A (en) * 2018-03-14 2018-07-31 安徽省交通控股集团有限公司 A kind of prefabricated pier, the floated tubular Crossing brace connection structure of plate
CN108374316A (en) * 2018-02-07 2018-08-07 湖南省交通规划勘察设计院有限公司 Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480810A (en) * 2014-12-11 2015-04-01 中铁第四勘察设计院集团有限公司 Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method
CN104480810B (en) * 2014-12-11 2016-05-04 中铁第四勘察设计院集团有限公司 Low circuit continuous frame formula support rail girder construction and the construction method thereof of putting of middle low speed magnetic suspension
CN104867393B (en) * 2015-05-21 2017-05-24 浙江大学 Magnetic suspension balance beam experiment device
CN105401493A (en) * 2015-12-08 2016-03-16 成都科创佳思科技有限公司 Frame type rail bearing beam structure
CN108374316A (en) * 2018-02-07 2018-08-07 湖南省交通规划勘察设计院有限公司 Medium-and low-speed maglev traffic combination beam element, medium-and low-speed maglev traffic combination beam, rail system and construction method
CN108342937A (en) * 2018-03-14 2018-07-31 安徽省交通控股集团有限公司 A kind of prefabricated pier, the floated tubular Crossing brace connection structure of plate
CN108342937B (en) * 2018-03-14 2024-03-01 安徽省交通控股集团有限公司 Prefabricated pier and plate suspension type cylindrical shear support connection structure

Similar Documents

Publication Publication Date Title
CN104480810A (en) Medium-and-low speed magnetic levitation railway low route continuous framework type bearing rail beam structure and construction method
CN104480803A (en) Medium-and-low speed magnetic levitation railway low route continuous arched supporting rail beam structure and construction method
CN204325821U (en) Middle low speed magnetic suspension is low puts circuit continuous frame formula support rail girder construction
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN204356595U (en) Medium-and low-speed maglev railway is low puts circuit continuous arch support rail girder construction
US9222225B2 (en) Pre-stressed concrete track slab of slab-type ballast-less track
CN102888815B (en) The pouring construction method of a kind of wide-angle V-type pier and 0# block case beam
CN103321151B (en) Long span continuous box girder spanning existing railway stand construction method
CN103485279A (en) Wet joint for straddle type monorail traffic
CN102979041A (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN106049201A (en) Medium and low speed maglev traffic engineering low line solid bearing-trail beam structure and construction method thereof
CN110792028B (en) Construction method of cable-stayed bridge without back cables
CN111502347A (en) Three-layer single-column assembled elevated station for rail transit
CN109868726A (en) A kind of prefabricated assembled cylindricality bridge pier and its construction method
CN111074707A (en) Bridge and tunnel co-construction structure and construction method thereof
CN203559311U (en) Steel bar truss sleeper
CN102677624A (en) U-shaped aqueduct simulation testing device and method
CN211947744U (en) Bridge and tunnel co-construction structure of bidirectional travelling crane
CN111119905A (en) Reserved support pile structure system for post-construction engineering crossing subway station and construction method thereof
CN205893830U (en) Low solid formula support rail girder construction of circuit of putting of well low -speed maglev traffic engineering
CN206157489U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation framing type support rail girder construction
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN213417435U (en) Embedded prefabricated longitudinal sleeper and longitudinal integral ballast bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150513

Effective date of abandoning: 20160504

C25 Abandonment of patent right or utility model to avoid double patenting