CN101767365B - Production method of concrete grouting compound heat-insulating building block - Google Patents

Production method of concrete grouting compound heat-insulating building block Download PDF

Info

Publication number
CN101767365B
CN101767365B CN2010100182798A CN201010018279A CN101767365B CN 101767365 B CN101767365 B CN 101767365B CN 2010100182798 A CN2010100182798 A CN 2010100182798A CN 201010018279 A CN201010018279 A CN 201010018279A CN 101767365 B CN101767365 B CN 101767365B
Authority
CN
China
Prior art keywords
district
progressively
send
maintenance
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010100182798A
Other languages
Chinese (zh)
Other versions
CN101767365A (en
Inventor
田萍
乔玉华
张辉
秦立群
杜文平
潘文正
宦建军
范进桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU WEI'AO HEAVY INDUSTRY MACHINE Co Ltd
YANGZHOU WEIAO HEAVY INDUSTRY MACHINERY Co Ltd
Original Assignee
YANGZHOU WEI'AO HEAVY INDUSTRY MACHINE Co Ltd
YANGZHOU WEIAO HEAVY INDUSTRY MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANGZHOU WEI'AO HEAVY INDUSTRY MACHINE Co Ltd, YANGZHOU WEIAO HEAVY INDUSTRY MACHINERY Co Ltd filed Critical YANGZHOU WEI'AO HEAVY INDUSTRY MACHINE Co Ltd
Priority to CN2010100182798A priority Critical patent/CN101767365B/en
Publication of CN101767365A publication Critical patent/CN101767365A/en
Application granted granted Critical
Publication of CN101767365B publication Critical patent/CN101767365B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The invention discloses a production method of a concrete grouting compound heat-insulating building block, which belongs to the field of building material machines and comprises a material preparation part, a forming part, a roundabout type transfer curing part, a grouting part and a stacking part, wherein the material preparation part is used for evenly stirring raw materials of building blocks and conveying the stirred raw materials to the forming part; the forming part is used for forming hollow building blocks by a building block forming machine and placing the hollow building blocks on a support plate; the hollow building blocks enter the roundabout type transfer curing part and are cured while being transferred; in the process of transferring and curing, the grouting part is used for grouting the hollow building blocks, so that the hollow building blocks become heat-insulating building blocks; and the cured compound heat-insulating building blocks are stacked into piles by the stacking part. By using the method, the transferring and the curing are combined into a whole, the curing is carried out in the process of the transferring, the transferring is carried out in the process of curing, any idle stroke does not exist and the production efficiency is greatly improved. In addition, in the curing process, the hollow building blocks can be grouted, so that the filling of a heat-insulating material can be finished in the production line and the manual operation can be avoided.

Description

The production method of concrete grouting compound heat-insulating building block
Technical field
The present invention relates to a kind of production method of concrete segment, particularly a kind of production method of concrete grouting compound heat-insulating building block.
Background technology
Under the main trend of energy-conservation, reduction of discharging, environmental protection, the requirement of building energy conservation is stood in the breach, that various types of composite thermal-insulating walls are expediting the emergence of is heat insulation accordingly, the appearance of the energy saving building material of insulation, and concrete grouting compound heat-insulating building block is exactly a class wherein.
In the production process of concrete segment, transhipment and maintenance separate, and behind the block forming, need be transported to maintenance in the cell-type curing kilns with kiln car at present.Also there is following defective in the production method of this concrete segment:
1, curing kilns are the cell-type curing kilns, kiln car transport distance, the floor space of whole production line is big, and the delivery of goods height is very high to the stability and the delivery rate request of kiln car operation more than 4.5m, has restricted the raising of production efficiency.
2, transhipment not only causes the damaged and more lost motion of building block easily, and frequent turnover kiln scatters and disappears the heat in the curing kilns in a large number, is unfavorable for energy savings.
3, can only produce the walling unit of single aggregate, or be the bearing building block of heavy aggregate, its heat insulation effect is bad, or is the insulation blocks of lightweight aggregate, and its weight capacity is too poor.At the composite block of can load-bearing having heat insulation effect again that China Xia Redong cryogenic region needs, then can't produce from conventional production lines.Therefore, composite heat insulation block forms by the manual insulation material of clogging in the building block cavity entirely at present, and production efficiency is low, the cost height, and the quality instability is generally promoted difficulty.
Summary of the invention
Big problem that the floor space that separately causes for transhipment and maintenance in the solution prior art is big, production efficiency is low and energy scatters and disappears, the invention provides a kind of production method of concrete grouting compound heat-insulating building block, be implemented in maintenance in the transhipment, in maintenance, transport, and can on production line, the cavity cast to building block be incubated slurries.
For solving above technical problem, the production method of concrete grouting compound heat-insulating building block provided by the present invention, in turn include the following steps: the Ministry of worker gets the raw materials ready, the moulding Ministry of worker, the winding type transhipment maintenance Ministry of worker, the slip casting Ministry of worker and the piling Ministry of worker, get the raw materials ready and be delivered to the moulding Ministry of worker after the Ministry of worker stirs the raw material of building block, the moulding Ministry of worker by block machine with the building-block moulding, and be placed on the supporting plate, enter the winding type transhipment maintenance Ministry of worker then, in transhipment, carry out maintenance, in the transhipment maintenance processes, the slip casting Ministry of worker carries out slip casting to building-block, makes it to become insulation blocks, and the composite heat insulation block that maintenance is good is in heaps by piling Ministry of worker piling.
With respect to prior art, the present invention has obtained following beneficial effect: on one side building block is advanced in the winding type transhipment maintenance Ministry of worker, Yi Bian maintenance, when leaving the winding type transhipment maintenance Ministry of worker, the maintenance of building block is finished; And in maintenance processes, the slip casting Ministry of worker carries out slip casting to building-block, makes the operation of cast insulation slurries be able to finish on production line, has avoided adopting manual operations; In transhipment and maintenance processes, there is not any lost motion, improved production efficiency greatly.
As of the present invention preferred, the described winding type transhipment maintenance Ministry of worker comprises the ferry device of rising progressively the maintenance district, falling progressively the maintenance district and connecting two maintenance districts, the maintenance district of rising progressively comprise into kiln roll send platform, the district's odd-level pusher of rising progressively, ferry-boat Lift-slab machine, the district of rising progressively roll send nursing frame, Lift-slab machine, the district's even level pusher of rising progressively; Fall progressively that the maintenance district comprises that the plate machine falls in ferry-boat, the district's even level pusher that falls progressively, the district of falling progressively roll and send nursing frame, fall the plate machine, district's odd-level pusher, kiln discharge conveyer fall progressively; The supporting plate that is loaded with building block from advance kiln roll send platform by a plate then a plate push the district of rising progressively and roll the bottom that send nursing frame; After arriving the other end, it is promoted to the second layer, promotes it by the district's even level pusher of rising progressively again and roll along the district of rising progressively and send the second layer of nursing frame to return by Lift-slab machine; Arrive kiln and roll and send the platform place one rear flank, be promoted to the 3rd layer by the ferry-boat Lift-slab machine again, the district's odd-level pusher that continues to be risen progressively promotes it and rolls along the district of rising progressively and send the 3rd floor of nursing frame to return once more, so comes and goes until top; The top layer of plate machine by ferry device supporting plate is fallen to ferry-boat from the top layer ferry-boat of ferry-boat Lift-slab machine; The district's even level pusher promotion supporting plate that falls progressively rolls along the district of falling progressively and send the top layer of nursing frame to advance, and by falling the plate machine supporting plate is reduced to one deck down at opposite side, and the district's odd-level pusher that fallen progressively again pushes back, and like this coming and going until bottom exported supporting plate by the kiln discharge conveyer; The reverse advanced in unison of supporting plate on odd-level and the even level; In the transport process, totally four pushers in two ends advance simultaneously, return simultaneously; The crane that ferry-boat Lift-slab machine, ferry-boat are fallen plate machine, Lift-slab machine and fallen the plate machine rises simultaneously or descends.
As a further improvement on the present invention, described periphery of rising progressively the maintenance district and the maintenance district of falling progressively is sealed, and maintenance is provided with steam nozzle in the district.The district is closed with maintenance, feeds the curing time that steam can shorten building block.
As present invention further optimization, the supporting plate that is loaded with building block rolls in the district of rising progressively and send nursing frame and to roll the running of sending on the nursing frame curing time of holding concurrently be 8~10 hours in the district of falling progressively.
As present invention further optimization, the supporting plate that is loaded with building block rolls in the district of rising progressively and send nursing frame and to roll the movement velocity of sending on the nursing frame be 0.05m/s~0.1m/s in the district of falling progressively.
As present invention further optimization, roll to send nursing frame and fall progressively to distinguish to roll and send nursing frame to be 12 floor in the described district of rising progressively.
As another kind of improvement the of the present invention, the described slip casting Ministry of worker comprises following operation: after slurry was got the raw materials ready, the slurry mixer stirred it, and to the slip casting machine supercharging, slip casting machine is injected into slurry to be arranged in and rolls the cavity that send the building block on the nursing frame by grouting pump.
As present invention further optimization, the slip casting position of the described slip casting Ministry of worker is positioned at the district of rising progressively and rolls the top layer that send nursing frame.After the transhipment maintenance of building block product about through 4~5 hours, arrival is risen progressively to distinguish and is rolled the top layer that send nursing frame, had certain concrete curing fastness, at this moment in the cavity of building block product, quantitatively injected the insulation slurries and fill up cavity, and then continue transporting the process of maintenance.
Description of drawings
Fig. 1 is the process chart of the production method of concrete grouting compound heat-insulating building block of the present invention.
Fig. 2 is the process chart of the winding type transhipment maintenance Ministry of worker.
The schematic diagram of Fig. 3 supporting plate and building block.
Fig. 4 falls progressively to distinguish the structural representation of even level pusher.
Structural representation when Fig. 5 is in initial position for Lift-slab machine.
Structural representation when Fig. 6 is in the final position for Lift-slab machine.
Fig. 7 is the left view of Fig. 6.
Fig. 8 is the structural representation of ferry-boat Lift-slab machine.
Fig. 9 is the left view of Fig. 8.
Figure 10 is that into kiln rolls the assembled state schematic diagram that send platform, rises progressively district's odd-level pusher and ferry-boat Lift-slab machine.
Figure 11 rises progressively to distinguish to roll the structural representation that send nursing frame.
Figure 12 is the left view of Figure 11.
Figure 13 is the partial enlarged drawing of rolling stock among Figure 12.
Figure 14 is the assembled state schematic diagram of Lift-slab machine with the district's even level pusher of rising progressively.
Figure 15 is for the plate machine falls in ferry-boat, the assembled state schematic diagram of fall progressively district's even level pusher and kiln discharge conveyer.
Among the figure: the A maintenance district of rising progressively, the B maintenance district of falling progressively, the a supporting plate, the b building block, 1 advances kiln rolls and send platform, 2 rise progressively distinguishes the odd-level pusher, 3 ferry-boat Lift-slab machines, 301 hoist cylinders, 302 overbanking oil cylinders, 303 Lift-slab machine frames, 304 connecting rods, 305 Movable brackets, 306 overbankings are supported, 307 analog brackets, 308 cranes, 309 crane guide rails, 310 crane rollers, 311 ferry devices, roll and send nursing frame in 4 districts of rising progressively, 401 columns, 402 carrying channel-section steels, 403 rolling stocks, the 403a rolling bearing, the 403b bearing pin, 5 Lift-slab machines, 501 hoist cylinders, 502 overbanking oil cylinders, 503 Lift-slab machine frames, 504 connecting rods, 505 Movable brackets, 506 overbankings are supported, 507 analog brackets, 508 cranes, 509 crane guide rails, 510 crane rollers, 6 rise progressively distinguishes the even level pusher, 7 ferry devices, the plate machine falls in 8 ferry-boats, 9 fall progressively distinguishes the even level pusher, 901 pusher frames, 902 advance oil cylinder, 903 advance frames, 904 pusher rollers, 905 pusher guide rails, 906 push rods, roll and send nursing frame in 10 districts of falling progressively, 11 fall the plate machine, 12 fall progressively distinguishes the odd-level pusher, 13 kiln discharge conveyers.
The specific embodiment
As shown in Figure 1, the technological process of the production method of concrete grouting compound heat-insulating building block of the present invention comprise the steps: the to get the raw materials ready Ministry of worker, the moulding Ministry of worker, the winding type transhipment maintenance Ministry of worker, the slip casting Ministry of worker and the piling Ministry of worker.Get the raw materials ready and be delivered to the moulding Ministry of worker after the Ministry of worker stirs the raw material of building block, the moulding Ministry of worker by block machine with the building-block moulding and be contained on the supporting plate, enter the winding type transhipment maintenance Ministry of worker then, in transhipment, carry out maintenance, in transport process, the slip casting Ministry of worker carries out slip casting to building-block, makes it to become insulation blocks, and the insulation blocks that maintenance is good is in heaps by piling Ministry of worker piling.
In the Ministry of worker that gets the raw materials ready, loading machine is sent into proportioning machine with aggregate from the aggregate stockyard, sends into concrete mixer after the proportioning machine batching; Conveying worm is sent the cement in the cement bin simultaneously, after weighing, also send into concrete mixer, concrete mixer adds the water stirring with cement and aggregate, adopt consistometer monitoring amount of water, after stirring, blank is sent to block machine by the concrete belt conveyor, and block machine is with block forming, and place on the supporting plate, be sent to the winding type transhipment maintenance Ministry of worker by block conveyor.After maintenance was finished, the plate seperator pushed away supporting plate with building block, earlier after row's piece machine, stacking machine with segment palletizing, are sent the workshop by the stacking conveyer with the building block stacking then.Empty supporting plate after the machine cleaning is returned in the supporting plate cleaning, is sent to block machine and enters next circulation again by pallet conveyor.
The slip casting Ministry of worker comprises following operation: after slurry was got the raw materials ready, the slurry mixer stirred it, and to the slip casting machine supercharging, slip casting machine is injected into slurry the cavity of the building block that is arranged in the winding type transhipment maintenance Ministry of worker by grouting pump.
Figure 2 shows that the technological process of the winding type transhipment maintenance Ministry of worker, this Ministry of worker comprises the ferry device 7 of rising progressively maintenance district A, falling progressively maintenance district B and connecting two maintenance districts, the maintenance district of rising progressively comprise into kiln roll send platform, the district's odd-level pusher of rising progressively, ferry-boat Lift-slab machine, the district of rising progressively roll send nursing frame, Lift-slab machine, the district's even level pusher of rising progressively; Fall progressively that the maintenance district comprises that the plate machine falls in ferry-boat, the district's even level pusher that falls progressively, the district of falling progressively roll and send nursing frame, fall the plate machine, district's odd-level pusher, kiln discharge conveyer fall progressively; The supporting plate that is loaded with building block from advance kiln roll send platform by a plate then a plate push the district of rising progressively and roll the bottom that send nursing frame; After arriving the other end, it is promoted to the second layer, promotes it by the district's even level pusher of rising progressively again and roll along the district of rising progressively and send the second layer of nursing frame to return by Lift-slab machine; Arrive kiln and roll and send the platform place one rear flank, be promoted to the 3rd layer by the ferry-boat Lift-slab machine again, the district's odd-level pusher that continues to be risen progressively promotes it and rolls along the district of rising progressively and send the 3rd floor of nursing frame to return once more, so comes and goes until top; The top layer of plate machine by ferry device supporting plate is fallen to ferry-boat from the top layer ferry-boat of ferry-boat Lift-slab machine; The district's even level pusher promotion supporting plate that falls progressively rolls along the district of falling progressively and send the top layer of nursing frame to advance, and by falling the plate machine supporting plate is reduced to one deck down at opposite side, and the district's odd-level pusher that fallen progressively again pushes back, and like this coming and going until bottom exported supporting plate by the kiln discharge conveyer.
Fig. 3 is positioned at view on the supporting plate for building block, and supporting plate is dull and stereotyped, and its rear and front end is provided with flanging, and when being convenient to advance, a plate heads on a plate.Flanging is not established in the left and right sides, is convenient to the building block finished product and is pushed away supporting plate.
Fig. 4 falls progressively to distinguish the structural representation of even level pusher 9, and setting up Floor 12 with maintenance is example.The district's even level pusher 9 that falls progressively comprises pusher frame 901, advances oil cylinder 902, advance frame 903, pusher roller 904, pusher guide rail 905 and push rod 906.Pusher frame 901 fixes on the ground, and it is reciprocating along pusher guide rail 905 to advance oil cylinder 902 can promote advance frame 903, and asking of cylinder bracket and pusher guide rail 905 is provided with pusher roller 904 to guarantee that motion flexibly.Advance frame 903 is provided with and rolls that to send nursing frame second, four, six, eight, ten, Floor 12 be 2F, 4F, 6F, 8F, the corresponding push rod 906 of 10F, 12F.When advancing oil cylinder 902 to drive advance frames 903 to travel forward, be arranged in supporting plate on 2F, 4F, 6F, 8F, 10F, the 12F and be pushed into the district of falling progressively and roll corresponding each floor that send nursing frame 10.
The structure of district's odd-level pusher 2, rise progressively the district's even level pusher 6 and the district's odd-level pusher 12 that falls progressively of rising progressively is similar with the district's even level pusher 9 that falls progressively.3F, 5F, 7F, 9F, the 11F floor that send nursing frame 4 rolled in the push rod correspondence of district's odd-level pusher 2 of wherein the rising progressively district of rising progressively; 2F, 4F, 6F, 8F, 10F, the 12F floor that send nursing frame 4 rolled in the push rod correspondence of district's even level pusher 6 of the rising progressively district of rising progressively; 1F, 3F, 5F, 7F, 9F, the 11F floor that send nursing frame 10 rolled in the push rod correspondence of district's odd-level pusher 12 of the falling progressively district of falling progressively.
As Fig. 5, Figure 6 and Figure 7, Lift-slab machine 5 comprises Lift-slab machine frame 503 and crane 508, and crane 508 is along with hoist cylinder 501 is flexible, and Lift-slab machine frame 503 inherences move up and down.Flexible for guaranteeing lifting action, Lift-slab machine frame 503 is provided with crane guide rail 509, and relevant position, crane 508 side is provided with crane roller 510.Roll the corresponding position of the odd-level that send nursing frame 4 with the district of rising progressively in the Lift-slab machine 5 and be respectively equipped with analog bracket 507, promptly 1F, 3F, 5F, 7F, 9F, 11F layer are analog bracket; Roll the corresponding position of the even level that send nursing frame 4 with the district of rising progressively and be respectively equipped with Movable bracket 505, promptly 2F, 4F, 6F, 8F, 10F, 12F layer are Movable bracket.Each layer Movable bracket 505 is connected with the overbanking angled with it respectively and supports 506, and both are hinged on the crane 508 jointly, and the other end of each overbanking support 506 is hinged with connecting rod 504 respectively, and overbanking oil cylinder 502 links to each other with connecting rod 504.
Figure 5 shows that Lift-slab machine 5 is in initial position, 2F, 4F, 6F, 8F, 10F, 12F layer are vacant, and the supporting plate a that is loaded with building block b is arranged on the analog bracket of 1F, 3F, 5F, 7F, 9F, 11F layer.At first overbanking oil cylinder 502 drivening rods 504 move downward, and connecting rod 504 drives each overbanking support 506 and clockwise rotates 90 °, thereby makes each layer Movable bracket 505 also clockwise rotate 90 °, conceals in the frame of crane 508.This moment, Movable bracket 505 was unlikely to be suspended to down the supporting plate of one deck when moving down when hoist cylinder 501 drive cranes 508 integral body.After crane 508 arrives low level, overbanking oil cylinder 502 drivening rods 504 move upward, connecting rod 504 drives each overbanking support 506 and rotates counterclockwise 90 °, thereby making each layer Movable bracket 505 also rotate counterclockwise 90 ° resets, what show among Fig. 5 is, to low level, each Movable bracket 505 has resetted crane 508 down, prepares the supporting plate of last layer is promoted to last layer.
Figure 6 shows that Lift-slab machine 5 has been in the final position, promptly from the position of Fig. 5, hoist cylinder 501 drives crane 508 integral body and moves up, and in this process, each layer Movable bracket 505 takes the supporting plate on the corresponding analog bracket 507 to last layer, finishes the lift slab action.
The structure of falling plate machine 11 is similar to Lift-slab machine 5, just the latter's sequence of movement is turned around, promptly vacant on the analog bracket, the supporting plate of the building block of being loaded with is arranged on the Movable bracket, hoist cylinder takes crane to the next, and the supporting plate that building block will be housed simultaneously is placed into down on one deck analog bracket.
As Fig. 8 and shown in Figure 9, ferry-boat Lift-slab machine 3 comprises Lift-slab machine frame 303 and crane 308, and crane 308 is along with hoist cylinder 301 is flexible, and Lift-slab machine frame 303 inherences move up and down.Flexible for guaranteeing lifting action, Lift-slab machine frame 303 is provided with crane guide rail 309, and relevant position, crane 308 side is provided with crane roller 310.Roll the corresponding position of the even level that send nursing frame 4 with the district of rising progressively in the ferry-boat Lift-slab machine 3 and be respectively equipped with analog bracket 307, promptly 2F, 4F, 6F, 8F, 10F, 12F layer are analog bracket; Roll the corresponding position of the odd-level that send nursing frame 4 with the district of rising progressively and be respectively equipped with Movable bracket 305, promptly 1F, 3F, 5F, 7F, 9F, 11F layer are Movable bracket.Each layer Movable bracket 305 is connected with the overbanking angled with it respectively and supports 306, and both are hinged on the crane 308 jointly, and the other end of each overbanking support 306 is hinged with connecting rod 304 respectively, and overbanking oil cylinder 302 links to each other with connecting rod 304.The lift slab operating principle of ferry-boat Lift-slab machine 3 is similar to Lift-slab machine 5.
The top layer of ferry-boat Lift-slab machine 3 is provided with ferry device 311, in order to the supporting plate ferry-boat is fallen the top layer of plate machine 8 to ferry-boat.The structural similarity that plate machine 8 and ferry-boat Lift-slab machine 3 fall in ferry-boat just turns the latter's sequence of movement around, and promptly adjustable shelf takes down the supporting plate of last layer to one deck.
Figure 10 is that into kiln rolls the assembled state schematic diagram that send platform 1, rises progressively district's odd-level pusher 2 and ferry-boat Lift-slab machine 3.Advance the bottom that kiln rolls the output that send platform 1 and ferry-boat Lift-slab machine 3 and dock, the district's odd-level pusher 2 of rising progressively rolls and send on the platform 1 across advancing kiln, and its push rod is corresponding with 3F, 5F, 7F, 9F, the 11F layer of the Lift-slab machine 3 of ferrying respectively.
Figure 11 and Figure 12 shows that rolls and send nursing frame 4 at the district of rising progressively, rising progressively to distinguish to roll send nursing frame 4 to establish a column 401 at length direction every about 2 meters, short transverse is established one deck carrying channel-section steel 402 every 280 millimeters, establish Floor 12 altogether, every 200 millimeters rolling stock 403 is installed on the length direction of every layer of carrying channel-section steel 402, as shown in figure 13, rolling stock 403 is fixed on the carrying channel-section steel 402 by bearing pin 403b by rolling bearing 403a.
Figure 14 is the assembled state schematic diagram of Lift-slab machine 5 with the district's even level pusher 6 of rising progressively, and 2F, 4F, 6F, 8F, 10F, the 12F floor with Lift-slab machine 5 is corresponding respectively for the push rod of the district's even level pusher 6 of rising progressively.
Figure 15 is for plate machine 8 falls in ferry-boat, the assembled state schematic diagram of fall progressively district's even level pusher 9 and kiln discharge conveyer 13, kiln discharge conveyer 13 is corresponding with the bottom that plate machine 8 falls in ferry-boat, so that in time will be loaded with the supporting plate output of building block, fall progressively district's even level pusher 9 on kiln discharge conveyer 13, and to fall 2F, 4F, 6F, 8F, 10F, the 12F layer of plate machine 8 corresponding with ferry-boat respectively for its push rod.
In the work, the supporting plate a that is loaded with building block b from advance kiln roll send platform 1 by a plate then a plate push the district of rising progressively and roll the bottom that send nursing frame 4; After arriving the other end, it is promoted to the second layer, promotes it by the district's even level pusher 6 of rising progressively again and roll along the district of rising progressively and send the second layer of nursing frame 4 to return by Lift-slab machine 5; Arrive kiln and roll and send platform 1 place one rear flank, be promoted to the 3rd layer by ferry-boat Lift-slab machine 3 again, the district's odd-level pusher 2 that continues to be risen progressively promotes it and rolls along the district of rising progressively and send the 3rd floor of nursing frame 4 to return once more, so comes and goes until top; The top layer of plate machine 8 by ferry device 7 supporting plate a is fallen to ferry-boat from the top layer ferry-boat of ferry-boat Lift-slab machine 3; District's even level pusher 9 promotion supporting plates that fall progressively roll along the district of falling progressively and send the top layer of nursing frame 10 to advance, by falling plate machine 11 supporting plate is reduced to one deck down at opposite side, the district's odd-level pusher 12 that fallen progressively again pushes back, and so comes and goes until bottom, by kiln discharge conveyer 13 supporting plate is exported.Rise progressively to distinguish to roll to send nursing frame 4 and fall progressively to distinguish and roll the integral multiple that the total length that send nursing frame 10 is necessary for supporting plate a length, each Machinef or hoisting plates synchronization action, each pusher synchronization action is pushing away a plate to guarantee supporting plate one plate.
In addition to the implementation, the present invention can also have other embodiments, as takes fuel heat supply maintenance, solar energy curing or both and usefulness.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of requirement of the present invention.

Claims (8)

1. the production method of a concrete grouting compound heat-insulating building block, it is characterized in that, this production method in turn includes the following steps: the Ministry of worker gets the raw materials ready, the moulding Ministry of worker, the winding type transhipment maintenance Ministry of worker, the slip casting Ministry of worker and the piling Ministry of worker, get the raw materials ready and be delivered to the moulding Ministry of worker after the Ministry of worker stirs the raw material of building block, the moulding Ministry of worker by block machine with the building-block moulding, and be placed on the supporting plate, enter the winding type transhipment maintenance Ministry of worker then, in transhipment, carry out maintenance, in the transhipment maintenance processes, the slip casting Ministry of worker carries out slip casting to building-block, makes it to become insulation blocks, and the composite heat insulation block that maintenance is good is in heaps by piling Ministry of worker piling.
2. the production method of concrete grouting compound heat-insulating building block according to claim 1, it is characterized in that, the described winding type transhipment maintenance Ministry of worker comprises the ferry device of rising progressively the maintenance district, falling progressively the maintenance district and connecting two maintenance districts, the maintenance district of rising progressively comprise into kiln roll send platform, the district's odd-level pusher of rising progressively, ferry-boat Lift-slab machine, the district of rising progressively roll send nursing frame, Lift-slab machine, the district's even level pusher of rising progressively; Fall progressively that the maintenance district comprises that the plate machine falls in ferry-boat, the district's even level pusher that falls progressively, the district of falling progressively roll and send nursing frame, fall the plate machine, district's odd-level pusher, kiln discharge conveyer fall progressively; The supporting plate that is loaded with building block from advance kiln roll send platform by a plate then a plate push the district of rising progressively and roll the bottom that send nursing frame; After arriving the other end, it is promoted to the second layer, promotes it by the district's even level pusher of rising progressively again and roll along the district of rising progressively and send the second layer of nursing frame to return by Lift-slab machine; Arrive kiln and roll and send the platform place one rear flank, be promoted to the 3rd layer by the ferry-boat Lift-slab machine again, the district's odd-level pusher that continues to be risen progressively promotes it and rolls along the district of rising progressively and send the 3rd floor of nursing frame to return once more, so comes and goes until top; The top layer of plate machine by ferry device supporting plate is fallen to ferry-boat from the top layer ferry-boat of ferry-boat Lift-slab machine; The district's even level pusher promotion supporting plate that falls progressively rolls along the district of falling progressively and send the top layer of nursing frame to advance, and by falling the plate machine supporting plate is reduced to one deck down at opposite side, and the district's odd-level pusher that fallen progressively again pushes back, and like this coming and going until bottom exported supporting plate by the kiln discharge conveyer.
3. the production method of concrete grouting compound heat-insulating building block according to claim 2 is characterized in that, described periphery of rising progressively the maintenance district and the maintenance district of falling progressively is sealed, and maintenance is provided with steam nozzle in the district.
4. the production method of concrete grouting compound heat-insulating building block according to claim 2 is characterized in that, the supporting plate that is loaded with building block rolls in the district of rising progressively and send nursing frame and to roll the running of sending on the nursing frame curing time of holding concurrently be 8~10 hours in the district of falling progressively.
5. the production method of concrete grouting compound heat-insulating building block according to claim 2 is characterized in that, the supporting plate that is loaded with building block rolls in the district of rising progressively and send nursing frame and to roll the movement velocity of sending on the nursing frame be 0.05m/s~0.1m/s in the district of falling progressively.
6. the production method of concrete grouting compound heat-insulating building block according to claim 2 is characterized in that, roll to send nursing frame and fall progressively to distinguish to roll and send nursing frame to be 12 floor in the described district of rising progressively.
7. the production method of concrete grouting compound heat-insulating building block according to claim 1 and 2, it is characterized in that, the described slip casting Ministry of worker comprises following operation: after slurry is got the raw materials ready, the slurry mixer stirs it, to the slip casting machine supercharging, slip casting machine is injected into slurry to be arranged in and rolls the cavity that send the building block on the nursing frame by grouting pump.
8. the production method of concrete grouting compound heat-insulating building block according to claim 5 is characterized in that, the slip casting position of the described slip casting Ministry of worker is positioned at the district of rising progressively and rolls the top layer that send nursing frame.
CN2010100182798A 2010-01-22 2010-01-22 Production method of concrete grouting compound heat-insulating building block Expired - Fee Related CN101767365B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010100182798A CN101767365B (en) 2010-01-22 2010-01-22 Production method of concrete grouting compound heat-insulating building block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010100182798A CN101767365B (en) 2010-01-22 2010-01-22 Production method of concrete grouting compound heat-insulating building block

Publications (2)

Publication Number Publication Date
CN101767365A CN101767365A (en) 2010-07-07
CN101767365B true CN101767365B (en) 2011-09-28

Family

ID=42500538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010100182798A Expired - Fee Related CN101767365B (en) 2010-01-22 2010-01-22 Production method of concrete grouting compound heat-insulating building block

Country Status (1)

Country Link
CN (1) CN101767365B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102632548B (en) * 2012-04-24 2015-07-08 绿建科技集团新型建材高技术有限公司 Production method of foam slurry core-filled building block capable of being quickly condensed under steam-curing-free condition
CN102673965A (en) * 2012-04-24 2012-09-19 贵州博典建材化工科技有限公司 Tail portion ferry trolley used in automatic production line of heat preservation building blocks
CN102632541A (en) * 2012-04-24 2012-08-15 贵州博典建材化工科技有限公司 Method for carrying out foam slurry core filling in chemical foaming manner
CN102672798A (en) * 2012-04-24 2012-09-19 贵州博典建材化工科技有限公司 Simple production method for foam slurry core-filled building blocks
CN102672815B (en) * 2012-04-24 2014-07-09 贵州博典建材化工科技有限公司 Production method of foam slurry core-filling building blocks free of steaming
CN103128848B (en) * 2013-03-02 2015-06-10 河南华泰建材开发有限公司 Production line for self-heat-insulation building blocks for walls
CN103434005A (en) * 2013-09-10 2013-12-11 乔明云 Special-purpose grouting machine of self-insulated building block
CN103507154A (en) * 2013-10-15 2014-01-15 泉州市三联机械制造有限公司 Automatic production line of U-shaped reinforced concrete water tanks
CN103586966B (en) * 2013-10-24 2015-11-18 唐宽余 A kind of production method for fly ash building block and production system thereof
CN103660024B (en) * 2013-11-20 2015-12-09 山东乾元泽孚科技股份有限公司 Non-evaporating pressure Self-insulation wall plate integrated production line
CN104669430B (en) * 2015-02-12 2017-11-07 彭传森 PC wallboard production systems
CN104742243A (en) * 2015-02-14 2015-07-01 绿建科技集团新型建材高技术有限公司 Automatic production method for foam slurry core filling building block
CN104723451A (en) * 2015-02-14 2015-06-24 绿建科技集团新型建材高技术有限公司 Full-automatic production method for building blocks with foam slurry filling cores
CN104722749B (en) * 2015-03-19 2017-03-22 常熟市金成机械有限公司 Automatic production line for casting blank mould
CN106276266A (en) * 2016-11-05 2017-01-04 黄河科技学院 A kind of intelligent heat insulation building block ferry-boat collects and palletizing apparatus
CN115401778A (en) * 2022-09-14 2022-11-29 北京榆构有限公司 Maintenance equipment and method for processing concrete prefabricated part

Also Published As

Publication number Publication date
CN101767365A (en) 2010-07-07

Similar Documents

Publication Publication Date Title
CN101767365B (en) Production method of concrete grouting compound heat-insulating building block
CN102555052B (en) Production line for self-insulation building blocks
CN110480221B (en) Longitudinal short bar feeding and bar distributing device and method during welding of reinforcing bar meshes
CN203391088U (en) Laminated foam wallboard production line
CN102632548B (en) Production method of foam slurry core-filled building block capable of being quickly condensed under steam-curing-free condition
CN102672815B (en) Production method of foam slurry core-filling building blocks free of steaming
CN207129679U (en) Bagged material is dialled from formula unstacker
CN104290954B (en) A kind of square brick is packed production line automatically
CN102672796B (en) Semi-automatic production method of foam slurry core-filling building blocks
CN101767369B (en) Circuitous transit curing kiln
CN201808132U (en) Transferring and curing kiln of concrete building blocks
CN112917665A (en) High-efficient precast concrete component production water line
CN102555053A (en) Porous foaming concrete block production line
CN106241399A (en) A kind of warming plate palletizing system and destacking feeding system
CN102632546A (en) Stage-by-stage maintenance method in automatic production process of foam slurry core filling building blocks
CN102672813A (en) Staging maintaining method of rapid hardening foam slurry core filling block in automatic production process
US20100136156A1 (en) Plant for production of concrete
CN103770210B (en) Semi-automatic curing line of laying bricks
CN211194285U (en) Concrete prefabricated section processing equipment
CN205294338U (en) Automatic distributing device of bulk material warehouse all standing formula
CN211282753U (en) Pallet circulation system for bricklaying splitting production line
CN203579861U (en) Semi-automatic bricking maintenance line
CN102642793B (en) Baking-free green brick loading and unloading and transporting device matched with fork lift truck
CN201660293U (en) Automatic loading and unloading machine for raw bricks in kiln
CN211346308U (en) Automatic stacking device for discharged materials of zirconium core sintering tunnel kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20130122

CF01 Termination of patent right due to non-payment of annual fee