CN101733643A CN200910227853A CN200910227853A CN101733643A CN 101733643 A CN101733643 A CN 101733643A CN 200910227853 A CN200910227853 A CN 200910227853A CN 200910227853 A CN200910227853 A CN 200910227853A CN 101733643 A CN101733643 A CN 101733643A
Authority
CN
China
Prior art keywords
plate
taper
template
conical end
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910227853A
Other languages
Chinese (zh)
Other versions
CN101733643B (en
Inventor
张振宇
张文德
李建光
任克平
王志伟
刘长仁
张瑜
常桂爽
高峰
刘红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN 200910227853 priority Critical patent/CN101733643B/en
Publication of CN101733643A publication Critical patent/CN101733643A/en
Application granted granted Critical
Publication of CN101733643B publication Critical patent/CN101733643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a method for manufacturing a steel pattern plate of a taper-end concrete pier. The method comprises the following steps: calculating circular arc points based on design parameters and marking on a plate, using a flame cutting machine to adjust the curvature radius of the track at the marked cutting points and fixing the track, then cutting the taper-end preliminarily-cut plate into fan-shaped pattern plates, welding the fan-shaped pattern plates two by two to obtain two semi-taper pattern plates, and welding and shaping the straight rectangular plate and the semi-taper pattern plates to obtain a sectional pattern plate. By using the method for making a steel pattern plate of a taper-end concrete pier and a simple tool, a large taper-end steel pattern plate, which can only be finished under specified conditions, can be manufactured and finished under primitive conditions on the construction site; and the pattern plate can be conveniently installed, tightly affixed and quickly erected, thereby ensuring construction quality and speed and completely meeting the construction requirements of piers of such big special shapes. Besides, the pattern plate has the advantages of low manufacturing cost, simple process and significant construction cost saving.

Description

A kind of preparation method of steel pattern plate of taper-end concrete pier
Technical field
The present invention relates to a kind of preparation method of building concrete Bridge Pier Construction template, be specially the preparation method of a kind of taper concrete pier job site steel form.
Background technology
In engineering constructions such as railway, highway, run into various large-scale or super-huge concrete pier engineerings at present through regular meeting.The conical end shape is all adopted in many bridge pier designs, and promptly bridge pier diminishes in the cross section from bottom to top gradually, and bridge pier cross section both sides are straight line, and two ends are circular shape.Under the prior art condition, this Bridge Pier Construction is to make steel form earlier, will cast after the on-the-spot assembling welding of steel form then again.The common practice is to be transported to on-the-spot assembling after the base makes steel form by special equipment, because job locations such as railway, highway often are positioned at mountain area or the very inconvenient area of traffic, and the steel form that is used to water bridge pier is bulky, its cost of transportation is very high, usually need build the road that is fit to large-scale haulage vehicle, therefore, bring huge budgetary request.The job site can't be transported to steel form due to limited conditions in the area that particularly has at all.In the case must the field fabrication steel form.But because conical end steel form design section is shaped as arc, and vertically is coniform, if no special equipment at all can't be by the design moulding.The possible alternative that adopts is that nodal method is made this type of steel form at present, promptly on sheet material, select some points according to the template general shape, from each node sheet material is rolled over certain angle then, be made into the substitute of pyramid type steel form, the degree of agreement of this steel form and bridge pier design shape is low, is difficult to realize modernized high-level high-speed railway and highway construction requirement.
Summary of the invention
The present invention is directed to the deficiency that above-mentioned prior art exists, proposed a kind of preparation method of steel pattern plate of taper-end concrete pier, solved the large-scale punching block of present field fabrication and had the low problem of accuracy.
The preparation method of a kind of steel pattern plate of taper-end concrete pier of the present invention comprises following processing step:
A, determine segmentation template maximum height, calculate the straightway and the conical end size of each segmentation template and finish blanking for the first time according to bridge pier height and given material plate size, straightway rectangular slab and four conical end are just cut out plate;
B, just cut out board size and bridge pier calculation of design parameters conical end according to conical end and just cut out cut point on the plate;
C, just cut out unwrapping wire on the plate in conical end, determine coordinate line, coordinate round dot and four end points of cutting plate with theodolite;
D, coordinate round dot and the coordinate line determined according to step c unwrapping wire calculate gained cut point numerical value with step b and are labeled in conical end and just cut out on the plate;
E, adopt flame cutting machine to adjust the radius of curvature of track and track is fixed, cut conical end then and just cut out plate and get the flat back die template according to the cut point of steps d mark;
F, with flat back die template roll-forming and weld in twos two half-conical templates;
G, with straightway rectangular slab and half-conical template welding fabrication, obtain a segmentation template;
H, according to the bridge pier design parameter, make the segmentation template of bridge pier differing heights position according to above-mentioned a-g step, assembling is used piecemeal in bridge pier pouring process.
The preparation method of a kind of steel pattern plate of taper-end concrete pier of the present invention, can utilize simple tool under the simple and crude at the construction field (site) condition, the large-scale conical end steel form that completes and just can finish under given conditions originally, this template simple installation, closely connected property is good, formwork erection is fast, has guaranteed construction quality and speed, can satisfy the building requirements of this large-scale special shape bridge pier fully.Its cost of manufacture is low, and technology is simple, can save a large amount of construction costs.
Description of drawings
Fig. 1 is a segmentation template front view
Fig. 2 is that the A of Fig. 1 is to view
Fig. 3 is that the B of Fig. 1 is to view
Fig. 4 is a quadrant awl Side Template expanded view
Fig. 5 is theodolite unwrapping wire figure
1-rectangular slab 2-half-conical template among the figure
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described in detail.
With reference to the preparation method of accompanying drawing a kind of steel pattern plate of taper-end concrete pier of the present invention, at be that a kind of super-huge and two ends are the employed template of bridge pier of cone shape.Fig. 1-3 is depicted as a segmentation template of this bridge pier, and its profile is cone structure as shown in Figure 1 and Figure 2.In conjunction with shown in Figure 3, the two ends of this bridge pier are cone-shaped structure.Water the used steel form of whole bridge pier and be made of some joint segmentation templates, the height of each segmentation template is by given steel roll bending material width decision.Structure as Figure 1-3, the stage casing of template is made of rectangular slab, the template two ends are half (1/2) conical end, make for convenience, each end branch is made up of two quadrants awl ends, is made two quadrants awl ends during making respectively, be welded into the half-conical end then.
The concrete example of making:
Device therefor comprises 1 of veneer reeling machine, 1 in theodolite, 1 in drilling machine, 1 of toolroom miling machine, 1 of shaped steel cutting machine, 3 of oxyacetylene cutting machines, 3 of A.C. welders, CO 21 of 2,2 tons gantry crane of gas shielded welding machine, 2 on making platform.
Making total height is the bottom one joint segmentation template of 42 meters bridge piers.The high 1200.5mm of this segmentation template; Long 11600mm goes to the bottom; The long 11531.4mm of upper base; According to designing requirement, rectangle template 1 is by 4600mm * 1200.5mm totally 2 formations, and each is welded conical end radius 3500mm by 2 quadrants awl Side Templates two ends circular cone Side Template.It is as follows wherein to make quadrant awl Side Template process:
(1) determines panel size
Fig. 4 is given
Figure G2009102278538D0000041
Conical end template expanded view, plate is wide for deciding roll bending width 1260mm.
Length: L=AA`+30mm
Know according to design parameter:
OA=122637mm
α=2.57035°
AB=1200.5mm is identical with the rectangle template width
: L=AA`+30mm
Figure G2009102278538D0000042
Figure G2009102278538D0000044
Draw required opening plate and be of a size of 1260mm * 5531mm
(2) determine coordinate points on the circular arc
The equation that draws circular arc AA` and circular arc BB` according to Fig. 4 is respectively:
x 2+y 2=R 1 2????R 1=122637mm
x 2+y 2=R 2 2????R 2=121436.5mm
Because of radius of a circle is too big, on-the-spot processing can't accurately mark full-page proof and the cutting stock of circular arc AA` and circular arc BB`.Simultaneously the circular arc of each joint segmentation template is inequality again, so take translation X-axis upwards promptly X-axis to be moved to the position of string AA` chord BB` respectively.Equation under being must make new advances.
(y 1+a 1) 2+x 2=R 1 2...........(1)???a 1=OD=122606.5
(y 2+a 2) 2+x 2=R 2 2...........(2)???a 2=OG`=121406
Obtain coordinate on circular arc AA` and the circular arc BB` by equation (1) and (2) by given X value.
??X ??-275 ??-240 ??-200 ??-160 ??-120 ??-80 ??-40 ??0 ??40 ??80 ??120 ??160 ??200 ??240 ??275
??y 1 ??0.75 ??1.47 ??2.06 ??2.5 ??2.84 ??3.03 ??3.1 ??3.03 ??2.84 ??2.5 ??2.06 ??1.47 ??0.75
??y 2 Slightly ??3.05 Slightly
(2) unwrapping wire
According to design parameter:
AA`=5501mm
BB`=5447mm
Two string distance: b=a 1-a 2
=122606.5-121406
=1200.5mm
In order to emit datum line accurately, adopt theodolite unwrapping wire (being that string AA`, BB` chord are apart from DG`).
As shown in Figure 5, in dull and stereotyped abcd, get mid point E, the E` line of ab and cd, get a G` on the 1cm center line of cd sideline, the good theodolite of frame is looked down and is aimed at the G` point, the leveling theodolite and aim at EE` after, get DG`=1200.5mm, about dial 90 ° at angle and make BG` and G`B` respectively and measure
Figure G2009102278538D0000051
With the AA` that draws of method similarly, make
Figure G2009102278538D0000052
Connect AB and A`B`, finish unwrapping wire.
Measure the distance of diagonal AB` and BA` then, check the degree of accuracy of unwrapping wire, error is not more than 1mm.
(3) line fixed point
(X-axis under the new system, i.e. AA` and BB`) is fixed through unwrapping wire for the string of a musical instrument among Fig. 5, origin of coordinates O 1And O 2(being D and G` point) is fixed.To go up the coordinate figure given of table then and demarcate on sheet material, because of above-mentioned coordinate points is point on circular arc AA` and the BB`, the line of these points is circular arc AA` and circular arc BB`.
(4) fixed point blanking
AB and A`B` are straightway among Fig. 5, and with the direct cutting stock of semiautomatic flame cutting machine, but circular arc AA` and circular arc BB` adopt the cutting of manual oxycetylene can't suitable the carrying out of smooth circle, adopt a homemade arc plate cutting device to cut for this reason.This arc plate cutting device is made of a semi-automatic flame gas cutting mill and an adjustable curvature track.
Described adjustable curvature track is a strip angle bar, the bottom surface of this angle bar is bolted on the section of track by adjusting, the vertical plane top of angle bar is semi-automatic flame gas cutting mill walking track, semi-automatic flame gas cutting mill is placed on the track, the adjustment track makes the point on the cutting head centering arc, and in the time of point of every centering is the bolt of trapped orbit corresponding site, treat that all putting centering finishes after, the curvature of trapped orbit and circular arc curvature are identical.The check cutting head of subsequently semi-automatic flame gas cutting mill being walked is in orbit gone up the error of each point with circle and is adjusted, and all alignment error is not more than 0.5 millimeter, opens semi-automatic flame gas cutting mill excision forming then, through after the assay was approved, and can the roll bending moulding.
(5) assembly welding:
After rolling into taper, be placed in the anchor clamps by chord length location up and down cutting into fanning strip, make its projection, again the circle that processes is strengthened helping (out-of-roundness is less than 0.5 millimeter) all by the operation assembly welding, finish whole welding by operation by special hilllock electric welder.
With conical end template and rectangle template welding, promptly obtain a complete segmentation template at last.

Claims (1)

1. the preparation method of a steel pattern plate of taper-end concrete pier comprises following processing step:
A, determine segmentation template maximum height, calculate the straightway and the conical end size of each segmentation template and finish blanking for the first time according to bridge pier height and given material plate size, straightway rectangular slab and four conical end are just cut out plate;
B, just cut out board size and bridge pier calculation of design parameters conical end according to conical end and just cut out cut point on the plate;
C, just cut out unwrapping wire on the plate in conical end, determine coordinate line, coordinate round dot and four end points of cutting plate with theodolite;
D, coordinate round dot and the coordinate line determined according to step c unwrapping wire calculate gained cut point numerical value with step b and are labeled in conical end and just cut out on the plate;
E, adopt flame cutting machine to adjust the radius of curvature of track and track is fixed, cut conical end then and just cut out plate and get the flat back die template according to the cut point of steps d mark;
F, with flat back die template roll-forming and weld in twos two half-conical templates;
G, with straightway rectangular slab and half-conical template welding fabrication, obtain a segmentation template;
H, according to the bridge pier design parameter, make the segmentation template of bridge pier differing heights position according to above-mentioned a-g step, assembling is used piecemeal in bridge pier pouring process.
CN 200910227853 2009-12-17 2009-12-17 Method for manufacturing steel pattern plate of taper-end concrete pier Active CN101733643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910227853 CN101733643B (en) 2009-12-17 2009-12-17 Method for manufacturing steel pattern plate of taper-end concrete pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910227853 CN101733643B (en) 2009-12-17 2009-12-17 Method for manufacturing steel pattern plate of taper-end concrete pier

Publications (2)

Publication Number Publication Date
CN101733643A true CN101733643A (en) 2010-06-16
CN101733643B CN101733643B (en) 2012-07-04

Family

ID=42457950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910227853 Active CN101733643B (en) 2009-12-17 2009-12-17 Method for manufacturing steel pattern plate of taper-end concrete pier

Country Status (1)

Country Link
CN (1) CN101733643B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409620A (en) * 2011-11-17 2012-04-11 中铁十五局集团有限公司 Pier casting mould
CN102513417A (en) * 2011-10-31 2012-06-27 武汉一冶钢结构有限责任公司 Rolling method of right cone frustum shell bodies
CN103481022A (en) * 2013-08-20 2014-01-01 合肥万众交通工程有限公司 Manufacturing method of pier column template

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1373276A (en) * 2002-04-04 2002-10-09 大庆油田路桥工程有限责任公司 Process for installing and detaching combined steel shutterings of bridge pier
CN101225640A (en) * 2008-01-30 2008-07-23 中铁十三局集团有限公司 Diameter-adjustable sheet steel form for bridge abutments
CN201301556Y (en) * 2008-11-03 2009-09-02 江苏江中集团有限公司 Cylindrical steel mould

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513417A (en) * 2011-10-31 2012-06-27 武汉一冶钢结构有限责任公司 Rolling method of right cone frustum shell bodies
CN102513417B (en) * 2011-10-31 2013-08-28 武汉一冶钢结构有限责任公司 Rolling method of right cone frustum shell bodies
CN102409620A (en) * 2011-11-17 2012-04-11 中铁十五局集团有限公司 Pier casting mould
CN103481022A (en) * 2013-08-20 2014-01-01 合肥万众交通工程有限公司 Manufacturing method of pier column template
CN103481022B (en) * 2013-08-20 2015-07-29 合肥万众交通工程有限公司 A kind of Pier Formwork manufacture method

Also Published As

Publication number Publication date
CN101733643B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN103806660B (en) Structural Steel Reinforced Concrete beam-column joint construction method
CN102345377B (en) Method for making spatial multi-curved-surface as-cast finish concrete stay in place formwork by using plywood
CN106120561B (en) A kind of cast-in-situ box girder template construct installation method
CN105755915A (en) Construction method for CRTS III plate type ballastless track bed plate
CN110409799B (en) Wind tunnel fair-faced concrete construction process
CN105332510A (en) Construction method of complicated beam column joint core area
CN103195247B (en) Saddle-shaped hyperboloidal concrete slab construction method
CN104775612B (en) Three-dimensional twisted rotation inclined reinforcing bar concrete frame structure template and its construction method
CN115162182B (en) Cantilever type steel box girder high-precision cable hoisting construction method
CN113718631A (en) Steel bridge hyperbolic paraboloid thin plate dense rib plate unit and manufacturing method thereof
CN101733643B (en) Method for manufacturing steel pattern plate of taper-end concrete pier
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN107491619A (en) A kind of old project steel construction that changes based on BIM technology positions construction method for hanging
CN103425841A (en) Method and system for generating construction-method instruction of straddle type monorail traffic multi-system girder bridge
CN202247907U (en) Supporting structure of urban track traffic super-large section cut-and-cover section tunnel
CN108708292A (en) A kind of I-shaped steel reinforced concrete combination beam concrete folding constructing device and construction method
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN105089276B (en) A kind of construction method of the large area concrete plate of application floor elevation control instrument
CN205205680U (en) Cast -in -place arched bridge member formula support steel arc distribution beam construction
CN108425321A (en) A kind of installation method of Novel variable-section bridge linear controller
CN104196150B (en) A kind of steel plate shear force wall and making method thereof
CN112222779A (en) Template manufacturing process
CN104526852A (en) Manufacturing method of beam bottom splicing steel die of T-shaped prefabricated beam
CN204081140U (en) A kind of slab L shape steel plate shear force wall post

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant