CN103481022A - Manufacturing method of pier column template - Google Patents

Manufacturing method of pier column template Download PDF

Info

Publication number
CN103481022A
CN103481022A CN201310364335.7A CN201310364335A CN103481022A CN 103481022 A CN103481022 A CN 103481022A CN 201310364335 A CN201310364335 A CN 201310364335A CN 103481022 A CN103481022 A CN 103481022A
Authority
CN
China
Prior art keywords
weld
welding
cutting
carry out
manufacturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310364335.7A
Other languages
Chinese (zh)
Other versions
CN103481022B (en
Inventor
魏振伟
王明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI WANZHONG TRAFFIC ENGINEERING Co Ltd
Original Assignee
HEFEI WANZHONG TRAFFIC ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI WANZHONG TRAFFIC ENGINEERING Co Ltd filed Critical HEFEI WANZHONG TRAFFIC ENGINEERING Co Ltd
Priority to CN201310364335.7A priority Critical patent/CN103481022B/en
Publication of CN103481022A publication Critical patent/CN103481022A/en
Application granted granted Critical
Publication of CN103481022B publication Critical patent/CN103481022B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a manufacturing method of a pier column template. The manufacturing method comprises the following steps: lofting and marking; cutting; correcting parts; assembling components; welding the template; performing weld inspection; spray coating. Compared with the manufacturing methods of other pier column templates, the manufacturing method has the advantages that the manufacturing method is simplified, the strength and the precision of the pier column template are effectively improved through rational material selection, cutting, assembly, welding and coating, the problems such as large deadweight, low repeated utilization rate, difficulty in disassembly, large labor intensity of operators and low construction quality existing in the conventional steel template are reduced to a great extent, and the cast pier column has a concise, attractive and elegant contour and has the characteristics of capability of saving the amount of the material and convenience in construction.

Description

A kind of Pier Formwork manufacture method
Technical field
The present invention relates to the bridge construction construction field, relate in particular to a kind of Pier Formwork manufacture method.
Background technology
Bridge pier generally means the intermediate support structure thing in the multispan bridge.It produces vertical force, horizontal force and moment of flexure except bearing superstructure, also bears wind-force, flowing water pressure, and the impact of contingent seismic force, ice pressure, ship and drift.Columnar pier is the bridge pier pattern extensively adopted in current highway bridge.It is simple and direct, lucid and lively, attractive in appearance that it has lines, not only saves material quantity but also have the characteristics of easy construction, is specially adapted to Urban Bridge and viaduct that bridge width is larger.Columnar pier generally can be divided into the forms such as only post, twin columns and multicolumn, it can be wide according to bridge needs and geomorphological features condition any combination, columnar pier is comprised of cushion cap, pillar pier shaft and bent cap, for superstructure, is large cantilever box section, pier shaft can be directly and beam join.
Along with the develop rapidly of China's capital construction, present urban architecture structure not only only considers that it uses function and security, the another key factor that has become Architectural Structure Design attractive in appearance.In recent years, for this frame bridge, people more and more are discontented with and are enough to front square-folded pier stud outward appearance, because the curved surface pier stud has rational stress and novel outward appearance, therefore more and more are subject to people's favor.
Summary of the invention
The technical problem to be solved in the present invention be to provide a kind of simple in structure, lines are simple and direct, elegant in appearance can recycling, the novel Pier Formwork manufacture method of easy accessibility, reduction workmen's labour intensity.
For achieving the above object, the technology used in the present invention solution is: a kind of Pier Formwork manufacture method, comprise setting-out and number material, cutting, part rectification, parts spelling, template welding, weld inspection and the application of spraying paint, and specifically comprise the following steps successively.
Described setting-out and number material, welding allowance for shrinkage when setting-out and number material should be reserved making and installation and cutting, He Xi limit, plane limit allowance, should check the trade mark, specification, the quality of steel material before number material, when finding that the steel material is not straight and have the dirts such as erosion rust, paint to affect quality, material again number after should correcting, clearing up, number material appearance and size permissible variation is ± 1mm, shaped steel line of cut and edge-perpendicular degree permissible variation are ± 2.0mm, number the material before sheet material must flatten processing, check material, the clout after blanking must the brushing mark simultaneously.
Described cutting, the cutting of the main parts size of Pier Formwork (as flange) will adopt accurate cutting (as numerical control, surface trimming), and hand cut only is suitable for the part that the cutting back edge still needs machining; The edge of mechanical shearing blanking should be neatly, without defects such as burr, anti-mouths, plate shearing deviation length and width degree is ± 2.0mm; The permissible variation that cuts rear accessory size should meet: automatic, semi-automatic be cut into ± 2.0mm, hand cut is ± 2.0mm.
Described part is corrected, and mainly adopts mechanical gagging or heat straightening, and when its main stressed part cold-working is crooked, after the cold-working bending, part edge must not crack, the steel material surface after gagging do not have obvious indenture and other damages, otherwise still need to carry out shaping; While adopting heat to rectify, heat is rectified temperature and should be controlled and be manufactured on 600~800 ℃, forbids burning, and after correcting, the part temperature is answered Slow cooling, is down to before room temperature, must not hammering part steel, forbid water quenching.
Described parts spelling must carry out on special-purpose platform or in fetal membrane, and the spelling location-plate should be set on platform or moulding bed, to guarantee the position of parts; Described parts spelling is sequentially: connecting flange → circular arc panel → seam → rib, the steel member after spelling is qualified, should stamp at the regulation position numbering mark.
Described template welding; adopt the welding manners commonly used such as CO2 gas shielded arc welding and manual electric arc welding; should check again whether cracking of the cleaning quality on surface, position to be welded and tack welding weld seam before welding;=welding condition should be debugged in advance on unofficial workpiece, checks the equipment used, full weld between rib; flange and panel full weld; the weldering height is 6mm, and the welding of rib and panel 15%, weld the high 5mm of being.
Described weld inspection, at first carry out visual examination of weld, and all weld seams all should carry out 100% visual examination after weld seam is cooling, face of weld should be evenly, smoothly, non-wrinkle, interruption and incompletely filling, and be connected gently with base metal, forbid that crackle is arranged, the defect such as incomplete fusion; Secondly overlap or too high weld seam, adopt the method for grinder buffing that unnecessary weld metal is ground off, and then the defects such as face of weld pit, undercut or weld size deficiency, first clean out face of weld, then carry out repair welding; Last excessive pore, slag inclusion, incomplete fusion, defects i.e.cracks, adopt the method for carbon arc air gouging and grinder buffing that defective weld seam is removed, then repair welding.
The described application of spraying paint, at first carry out surface-treated quality examination and cleaning (dust, grease, moisture) before application, can carry out application after qualified; Secondly coating requires smoothly, even, and paint film is without bubble, wrinkle, without serious sagging, come off, the defects such as pin hole, crackle, holiday, the finish paint color is consistent with colorimetric card; Then during application, Tu Fuliang is 200g/m 2, the layer of lacquer film thickness is 40 μ m, with mixed earth contact-making surface, can not spray paint.
The present invention has following beneficial effect in sum: the present invention with respect to the simplification of other Pier Formwork manufacture method, effectively improve intensity and the precision of Pier Formwork by its rational selection, cutting, spelling, welding and application, reduced to a great extent traditional steel form exist from great, repeat usage is low, dismounting is difficult, operator's labour intensity is large, and the problem such as construction quality is not high, the pier stud lines that make it build out are simple and direct, elegant in appearance.
figure of description
The easy structure figure that Fig. 1 is plate plane degree in the present invention;
Fig. 2 is the crooked easy structure figure of sheet material sabre shape in the present invention;
Fig. 3 is the perpendicularity easy structure figure of the channel-section steel edge of a wing to web in the present invention;
Fig. 4 is the easy structure figure that does Size of welds deviation in invention.
The specific embodiment
A kind of Pier Formwork manufacture method, comprise setting-out and number material, cutting, part rectification, parts spelling, template welding, weld inspection and the application of spraying paint.
(1) described setting-out and number material:
A. setting-out and number material should strictly be undertaken by drawing and technological requirement, and the permissible variation that model, sample bar, batten are made should meet the regulation of following table.
Table 1, model, sample bar, batten are made permissible variation
Sequence number Project Permissible variation (mm)
1 Two adjacent centerline hole distances ±0.5
2 Diagonal, two edges of boards hole centre distances ±1.0
[0024]?
3 The lateral separation of center, hole Yu Kong group center line 0.5
4 Width, length +0+1.0
5 Arbitrfary point deviation on curve ruler 1.0
B. shaped steel line of cut and should be ± 2.0mm of edge-perpendicular degree permissible variation.
C. for complex-shaped parts and components, be difficult for definite size in drawing, determine after should proofreading by setting-out.
The allowance such as welding allowance for shrinkage when d. setting-out and number material should be reserved making and installation and cutting, He Xi limit, plane limit.
E. number should check the trade mark, specification, the quality of steel material before the material, when finding that the steel material is not straight and have the dirts such as erosion rust, paint to affect quality, number expect again after should correcting, clearing up; Number material appearance and size permissible variation is ± 1mm.
F. before number material, sheet material must flatten processing, checks material simultaneously.
G. the clout after blanking must the brushing mark.
(2) described cutting:
A. the main parts size of template: the cutting of flange adopts accurate cutting, (as numerical control, surface trimming.) hand cut only applicable cutting back edge still need the part of machining.
B. the edge of mechanical shearing blanking should be neatly, without defects such as burr, anti-mouth, misruns, and meet following shearing deviation requirement: plate width length and width: ± 2.0mm
C. accurate (numerical control, automatically) cut edge surface quality should meet the regulation of following table.
D. the permissible variation that cuts rear accessory size should meet the following requirements:
Automatically, semi-automatic gas cutting: ± 2.0mm
Manual oxygen cutting: ± 2.0mm
E. carry out mach gas cutting parts for technological requirement, its dimensional discrepancy is carried out by size dated on technology file or drawing again.Perhaps adopt milling tolerance+0.5mm.
Table 2, the surface quality requirement of accurate cut edge
Figure DEST_PATH_GDA0000403965920000051
Annotate: t is steel plate thickness
(3) described part is corrected:
When a. main stressed part cold-working is crooked, after the cold-working bending, part edge must not crack.
B. part adopts machinery to correct or heat straightening, and the permissible variation after rectification should meet the regulation of following table.
Table 3, part is corrected permissible variation
Figure DEST_PATH_GDA0000403965920000052
C. do not have obvious indenture and other damages of the steel material surface after gagging, otherwise still need to carry out shaping.While adopting heat to rectify, heat is rectified temperature and should be controlled and be manufactured on 600~800 ℃, forbids burning, and after correcting, the part temperature is answered Slow cooling, is down to before room temperature, must not hammering part steel, forbid water quenching.
(4) described parts spelling:
A. the making work of Pier Formwork must be carried out on special-purpose platform or in fetal membrane, and the spelling location-plate should be set on platform or moulding bed, to guarantee the position of parts.The molded order of making of pier: connecting flange → circular arc panel → seam → rib, the steel member after spelling is qualified, should stamp at the regulation position numbering mark.
B. the fan-shaped full-page proof that the pier shaft frustum of a cone is emitted, geometric error is 1 millimeter; The diagonal error is 1 millimeter; The fan-shaped of a frustum is divided into two, then with intermittent weld, is welded into integral body and carries out round as a ball (two difference round as a ball also can).Fanning strip is round as a ball first to be stepped on behind limit round as a ball again to the arc edges of boards.。
C. the manufacture of connecting flange in two steps: first by drawing, put the allowance segmentation blanking of 5~10 millimeters, then be welded into integral body and processed.In the processing rear flange, circular error is 1 millimeter.
D. the upper and lower connecting flange of installing respectively at the finished product frustum according to drawing, the flange inner circle of take is carried out school circle (flange must be finished center line before installing) as basic circle.
E. the connecting flange of pier body formwork upper-lower section must be made on same drilling die, after paired gusset piece connection holes connection is errorless, can be welded on template.
F. the frustum qualified rear installation seam that formalizes on flange, emit the line of cross rib position by the figure paper size, and the location rib carries out again the school circle, and seam must tightly must not seamed and faulting of slab ends.
G. the frustum of school after good, just can carry out the welding of rib.Before welding, rib and rib, rib and panel etc. need closely connected.
H. should strictly grasp the arc of arc plate before spelling, the deviation≤1mm of arbitrfary point on curve ruler.Plane template will be guaranteed the flatness after the member spelling.
I. the foozle of template: the linearity of template: L * 0.5 ‰, L≤8m, maximum is no more than 3mm, and L>8m maximum is no more than 5mm..The flatness of template: L * 1 ‰, maximum is no more than 3mm.Two template abutment joint≤1mm, faulting of slab ends<1mm.One piece die plates is wide, long :+0~+ 1mm.
(5) described template welding:
A. welding method: the present invention adopts the welding methods commonly used such as CO2 gas shielded arc welding and manual electric arc welding.
B. the use of welding material: the manual welding welding rod, all should carry out drying and processing before use.Welding wire should keep clean, and before weldering, should remove the greasy dirt on welding wire.
C. general technology requires:
1, should check the cleaning quality on surface, position to be welded and tack welding weld seam cracking before welding whether, if undesirable, it is qualified should to be trimmed to.
2, welding condition should be debugged in advance on unofficial workpiece, checks the equipment used, and guarantees fully to meet technological requirement.
3, full weld between rib, flange and panel full weld, weld high 6 millimeters; The weldering of rib and panel 15%, weld high 5 millimeters.
(6) described weld inspection:
A. visual examination of weld: all weld seams all should carry out 100% visual examination after weld seam is cooling.Face of weld should be evenly, smoothly, non-wrinkle, interruption and incompletely filling, and be connected gently with base metal; Forbid that crackle is arranged, the defect such as incomplete fusion.
Weld shape and permissible variation in dimension are as shown in the table.
Table 4, weld shape and permissible variation in dimension
Unit: mm
Figure DEST_PATH_GDA0000403965920000071
B. overlap or too high weld seam, adopt the method for grinder buffing that unnecessary weld metal is ground off.
C. the defects such as face of weld pit, undercut or weld size deficiency, first clean out face of weld, then carry out repair welding.
D. excessive pore, slag inclusion, incomplete fusion, defects i.e.cracks, adopt the method for carbon arc air gouging and grinder buffing that defective weld seam is removed, then repair welding.
E. weld crack must ascertain the reason before reprocessing, and formulates corresponding precautionary measures.
After all defective Weld Seam Repairations, must again check.
(7) the described application of spraying paint, at first carry out surface-treated quality examination and cleaning (dust, grease, moisture) before application, can carry out application after qualified; Secondly coating requires smoothly, even, and paint film is without bubble, wrinkle, without serious sagging, come off, the defects such as pin hole, crackle, holiday, the finish paint color is consistent with colorimetric card; Then during application, Tu Fuliang is 200g/m 2, the layer of lacquer film thickness is 40 μ m, with mixed earth contact-making surface, can not spray paint.
Finally it should be noted that: above embodiment is only in order to illustrate the present invention and unrestricted technical scheme described in the invention; Therefore, although this specification has been described in detail the present invention with reference to each above-mentioned embodiment,, those of ordinary skill in the art should be appreciated that still and can modify or be equal to replacement the present invention; And all do not break away from technical scheme and the improvement thereof of invention spirit and scope, it all should be encompassed in the middle of claim scope of the present invention.

Claims (1)

1. a Pier Formwork manufacture method, comprise setting-out and number material, cutting, part rectification, parts spelling, template welding, weld inspection and the application of spraying paint, and it is characterized in that being, specifically comprises the following steps successively:
(1) described setting-out and number material, welding allowance for shrinkage when setting-out and number material should be reserved making and installation and cutting, He Xi limit, plane limit allowance, should check the trade mark, specification, the quality of steel material before number material, when finding that the steel material is not straight and have the dirts such as erosion rust, paint to affect quality, material again number after should correcting, clearing up, number material appearance and size permissible variation is ± 1mm, shaped steel line of cut and edge-perpendicular degree permissible variation are ± 2.0mm, number the material before sheet material must flatten processing, check material, the clout after blanking must the brushing mark simultaneously;
(2) described cutting, the cutting of the main parts size of Pier Formwork (as flange) will adopt accurate cutting (as numerical control, surface trimming), hand cut only is suitable for the part that the cutting back edge still needs machining, the edge of mechanical shearing blanking should be neatly, without defects such as burr, anti-mouths, plate is sheared deviation length and width degree, the permissible variation that cuts rear accessory size should meet: automatic, semi-automatic be cut into ± 2.0mm, and hand cut is ± 2.0mm;
(3) described part is corrected, and mainly adopts mechanical gagging or heat straightening, when its main stressed part cold-working is crooked, after the cold-working bending, part edge must not crack, steel material surface after gagging do not have obvious indenture and other damages, otherwise still need to carry out shaping, while adopting heat to rectify, the strong temperature of heat should be controlled and be manufactured on 600~800 ℃, forbid burning, after correcting, the part temperature is answered Slow cooling, is down to before room temperature, must not hammering part steel, forbid water quenching;
(4) described parts spelling must carry out on special-purpose platform or in fetal membrane, and the spelling location-plate should be set on platform or moulding bed, to guarantee the position of parts; Described parts spelling is sequentially: connecting flange → circular arc panel → seam → rib, and the steel member after spelling is qualified, should stamp at the regulation position numbering mark;
(5) described template welding, adopt the welding manners commonly used such as CO2 gas shielded arc welding and manual electric arc welding, should check again whether cracking of the cleaning quality on surface, position to be welded and tack welding weld seam before welding, welding condition should be debugged in advance on unofficial workpiece, checks the equipment used, full weld between rib, flange and panel full weld, the weldering height is 6mm, and the welding of rib and panel 15%, weld the high 5mm of being;
(6) described weld inspection, at first carry out visual examination of weld, all weld seams all should carry out 100% visual examination after weld seam is cooling, face of weld should be even, smoothly, non-wrinkle, interruption and incompletely filling, and be connected gently with base metal, forbidding has crackle, the defects such as incomplete fusion, next overlap or too high weld seam, adopt the method for grinder buffing that unnecessary weld metal is ground off, then face of weld pit, the defects such as undercut or weld size deficiency, first face of weld is cleaned out, carry out again repair welding, last excessive pore, slag inclusion, incomplete fusion, defects i.e.cracks, adopt the method for carbon arc air gouging and grinder buffing that defective weld seam is removed, then repair welding,
(7) the described application of spraying paint, at first carry out surface-treated quality examination and cleaning (dust, grease, moisture) before application, can carry out application after qualified, secondly coating requires smooth, even, paint film is without bubble, wrinkle, without serious sagging, come off, the defects such as pin hole, crackle, holiday, the finish paint color is consistent with colorimetric card, then during application, Tu Fuliang is 200
Figure 310278DEST_PATH_IMAGE001
, the layer of lacquer film thickness is 40 μ m, with mixed earth contact-making surface, can not spray paint.
CN201310364335.7A 2013-08-20 2013-08-20 A kind of Pier Formwork manufacture method Active CN103481022B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310364335.7A CN103481022B (en) 2013-08-20 2013-08-20 A kind of Pier Formwork manufacture method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310364335.7A CN103481022B (en) 2013-08-20 2013-08-20 A kind of Pier Formwork manufacture method

Publications (2)

Publication Number Publication Date
CN103481022A true CN103481022A (en) 2014-01-01
CN103481022B CN103481022B (en) 2015-07-29

Family

ID=49821801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310364335.7A Active CN103481022B (en) 2013-08-20 2013-08-20 A kind of Pier Formwork manufacture method

Country Status (1)

Country Link
CN (1) CN103481022B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153567A (en) * 2014-08-07 2014-11-19 镇江洋溢汽车部件有限公司 Manufacturing process of light building templates
CN105414896A (en) * 2015-12-09 2016-03-23 青岛齐星铁塔有限公司 Blanking machining technique for welding platform angle iron frame
CN107700355A (en) * 2017-07-21 2018-02-16 南通振华重型装备制造有限公司 A kind of bridge steel form bed die manufacture craft
CN110369955A (en) * 2019-07-24 2019-10-25 重庆交通建设(集团)有限责任公司 Steel-structure box girder optimizes manufacturing process
CN114227999A (en) * 2021-12-29 2022-03-25 郭林华 Manufacturing method of blow mold of household massage chair
CN115255823A (en) * 2022-07-27 2022-11-01 中铁二十五局集团第二工程有限公司 Steel beam top plate unit manufacturing process
CN115255823B (en) * 2022-07-27 2024-05-03 中铁二十五局集团第二工程有限公司 Manufacturing process of steel beam roof plate unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5333421A (en) * 1993-07-09 1994-08-02 Mckenna John T Housing unit
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process
CN101733643A (en) * 2009-12-17 2010-06-16 中铁三局集团有限公司 Method for manufacturing steel pattern plate of taper-end concrete pier
CN101862942A (en) * 2010-06-25 2010-10-20 鞍山东方钢结构有限公司 Production process method of pipe whip restraint steel structure of main power house of nuclear power station conventional island
CN102465600A (en) * 2010-11-17 2012-05-23 五冶集团上海有限公司 Method for manufacturing steel structure framework of benzene hydrogenation main device in benzene hydrogenation engineering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5333421A (en) * 1993-07-09 1994-08-02 Mckenna John T Housing unit
CN101451397A (en) * 2007-12-05 2009-06-10 中冶天工建设有限公司 Steel structure modularization construction process
CN101733643A (en) * 2009-12-17 2010-06-16 中铁三局集团有限公司 Method for manufacturing steel pattern plate of taper-end concrete pier
CN101862942A (en) * 2010-06-25 2010-10-20 鞍山东方钢结构有限公司 Production process method of pipe whip restraint steel structure of main power house of nuclear power station conventional island
CN102465600A (en) * 2010-11-17 2012-05-23 五冶集团上海有限公司 Method for manufacturing steel structure framework of benzene hydrogenation main device in benzene hydrogenation engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
史幼广等: "怀洪新河特大桥墩柱模板设计", 《华东公路》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153567A (en) * 2014-08-07 2014-11-19 镇江洋溢汽车部件有限公司 Manufacturing process of light building templates
CN105414896A (en) * 2015-12-09 2016-03-23 青岛齐星铁塔有限公司 Blanking machining technique for welding platform angle iron frame
CN107700355A (en) * 2017-07-21 2018-02-16 南通振华重型装备制造有限公司 A kind of bridge steel form bed die manufacture craft
CN107700355B (en) * 2017-07-21 2019-05-07 南通振华重型装备制造有限公司 A kind of bridge steel form bed die manufacture craft
CN110369955A (en) * 2019-07-24 2019-10-25 重庆交通建设(集团)有限责任公司 Steel-structure box girder optimizes manufacturing process
CN114227999A (en) * 2021-12-29 2022-03-25 郭林华 Manufacturing method of blow mold of household massage chair
CN115255823A (en) * 2022-07-27 2022-11-01 中铁二十五局集团第二工程有限公司 Steel beam top plate unit manufacturing process
CN115255823B (en) * 2022-07-27 2024-05-03 中铁二十五局集团第二工程有限公司 Manufacturing process of steel beam roof plate unit

Also Published As

Publication number Publication date
CN103481022B (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN103481022A (en) Manufacturing method of pier column template
CN103321296B (en) Annular double-layer truss and manufacture method thereof
CN102407921B (en) Mounting method for sectional inversely hung rudder arm
CN102874379B (en) Manufacture method of offshore riprap leveling ship
CN103934693B (en) The processing technology of box-structure post/beam shaping
CN103184766B (en) Large steel structure and manufacturing method thereof
CN102848091B (en) Ship double bottom block assembly welding technology
CN101745718A (en) Method for welding thin steel plate
CN107498269B (en) A kind of large-scale ship reception chamber manufacturing method suitable for dry type ship compartment room
CN107199437B (en) A kind of steel anchor beam segment preparation method
CN105081683A (en) Machining technology of straight-seam steel reel pipe
CN103785998A (en) Manufacturing method of inclined electroslag welding component shaped like Chinese character &#39;ri&#39;
CN104695624A (en) Large-cross-section box column and processing technology thereof
CN202913339U (en) Wind mouth block structure for steel box girder
CN103510714A (en) Welding and construction method for cross-shaped steel pillar
CN105171342A (en) Making and forming method for model of siphon type water outlet passage of large pump station
CN112453661A (en) Welding manufacturing method for controlling thermal deformation of cross-shaped steel column
CN103920974B (en) A kind of Large Steel floorings and manufacture method
CN103321324A (en) Truss nodal region super-thick steel plate wall and building method thereof
CN103321325A (en) Giant combined L-shaped box-type thick plate shearing wall column and construction method thereof
CN111805174B (en) Manufacturing and assembling method of large closed cold accumulation tank
CN104028875B (en) Aluminum electrolytic cell manufacturing method
CN203383353U (en) Super-thick steel plate wall in truss joint area
CN116275909A (en) Manufacturing method of heavy round square variable diameter node
CN203383396U (en) Multi-connection and large-section combined box-type thick plate side column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Manufacturing method of pier column template

Effective date of registration: 20190222

Granted publication date: 20150729

Pledgee: The Bank of Hangzhou Limited by Share Ltd Hefei Baohe branch

Pledgor: Hefei Wanzhong Traffic Engineering Co., Ltd.

Registration number: 2019340000109

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220418

Granted publication date: 20150729

Pledgee: The Bank of Hangzhou Limited by Share Ltd. Hefei Baohe branch

Pledgor: HEFEI WANZHONG TRAFFIC ENGINEERING Co.,Ltd.

Registration number: 2019340000109