- Prior art keywords
- construction formwork
- construction
- manufacture craft
- splicing
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention provides a manufacturing process of light building templates. The manufacturing process is characterized by comprising the steps of blanking of the building templates, molding die setting of the building templates, through-wall bolt hole drilling of the building templates, and splicing and assembling of the building templates. The manufacturing process of the light building templates has the advantages of being simple and few in step, and saving time, labor and cost.
Description
Technical field
The present invention relates to a kind of manufacture craft of template, relate in particular to a kind of manufacture craft of light construction template.
Background technology
The template of using in existing building operations, mostly adopt wooden form or steel form, steel form is than wooden form long service life, high efficiency, meet state basic policy and save the requirement of Wood Energy, but existing large steel moulding plate adopts the standard sections manufactures such as general steel plate and rectangular tube, material thickness is larger, therefore has template heavier, uses inconvenient shortcoming.
Summary of the invention
Technical problem to be solved by this invention be to provide a kind ofly have that technique is simple, step is few, save time, the manufacture craft of the light construction template of laborsaving, cost-saving advantage.
For solving the problems of the technologies described above, the invention provides a kind of manufacture craft of light construction template, it is characterized in that, its step of the manufacture craft of described light construction template is as follows:
1) blanking of construction formwork;
2) loose tool of construction formwork is set;
3) construction formwork drills wall screw hole;
4) splicing and assembling construction formwork.
Further, the blanking of described construction formwork is to put full size full-page proof well according to construction formwork design drawing, and check and correction size, then carries out standard jig, according to standard jig line blanking.
Further, the described loose tool that construction formwork is set must be arranged on solid smooth place, and wants levelling to proofread and correct.
Further, described construction formwork drills wall screw hole and adopts electric drill to get out through-wall bolt hole, accurate for guaranteeing position, first with small diameter drill bit, makes position, hole, then uses the reaming of major diameter drill bit.
Further, described splicing and assembling construction formwork are by steel plate and skeleton splicing and assembling on two loose tools respectively, the steps include: first will to pass through the construction formwork cutting, and its flat side should be placed on edge joint position, after splicing, carefully check appearance and size, guarantee four jiaos upright, check errorless temporarily fix with spot welding afterwards, during skeleton assembling, first put cross rib, after put perpendicular rib, after welding, skeleton is hung on steel plate, then welds.
The beneficial effect that the present invention brings is:
The manufacture craft of light construction template of the present invention has advantages of that technique is simple, step is few, saves time, laborsaving, cost-saving.
The specific embodiment
With regard to concrete case study on implementation, process of the present invention is described below.
Embodiment 1:
A manufacture craft for light construction template, its step of the manufacture craft of described light construction template is as follows: 1, the blanking of construction formwork, 2, the loose tool of construction formwork is set, 3, construction formwork drills wall screw hole, 4, splicing and assembling construction formwork, the blanking of described construction formwork is to put full size full-page proof well according to construction formwork design drawing, check and correction size, then carry out standard jig, according to standard jig line blanking, the described loose tool that construction formwork is set must be arranged on solid smooth place, and want levelling to proofread and correct, described construction formwork drills wall screw hole and adopts electric drill to get out through-wall bolt hole, accurate for guaranteeing position, first with small diameter drill bit, make position, hole, then use the reaming of major diameter drill bit, described splicing and assembling construction formwork are by steel plate and skeleton splicing and assembling on two loose tools respectively, the steps include: first by the construction formwork through cutting, its flat side should be placed on edge joint position, after splicing, carefully check appearance and size, guarantee four jiaos of Founders, check errorless temporarily fix with spot welding afterwards, during skeleton assembling, first put cross rib, after put perpendicular rib, after welding, skeleton is hung on steel plate, weld again.
In sum, the manufacture craft of light construction template of the present invention have advantages of that technique is simple, step is few, save time, laborsaving, cost-saving.
The above; it is only one of the specific embodiment of the present invention; but protection scope of the present invention is not limited to this; any those of ordinary skill in the art are in the disclosed technical scope of the present invention; the variation that can expect without creative work or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.
Claims (5)
1. a manufacture craft for light construction template, is characterized in that, its step of the manufacture craft of described light construction template is as follows:
1) blanking of construction formwork;
2) loose tool of construction formwork is set;
3) construction formwork drills wall screw hole;
4) splicing and assembling construction formwork.
2. the manufacture craft of a kind of light construction template according to claim 1, it is characterized in that, the blanking of described construction formwork is to put full size full-page proof well according to construction formwork design drawing, check and correction size, then carry out standard jig, according to standard jig line blanking.
3. the manufacture craft of a kind of light construction template according to claim 1, is characterized in that, the described loose tool that construction formwork is set must be arranged on solid smooth place, and wants levelling to proofread and correct.
4. the manufacture craft of a kind of light construction template according to claim 1, it is characterized in that, described construction formwork drills wall screw hole and adopts electric drill to get out through-wall bolt hole, accurate for guaranteeing position, first with small diameter drill bit, make position, hole, then use the reaming of major diameter drill bit.
5. the manufacture craft of a kind of light construction template according to claim 1, it is characterized in that, described splicing and assembling construction formwork are by steel plate and skeleton splicing and assembling on two loose tools respectively, the steps include: first by the construction formwork through cutting, its flat side should be placed on edge joint position, after splicing, carefully check appearance and size, guarantee four jiaos of Founders, check errorless temporarily fix with spot welding afterwards, in skeleton when assembling,, first put cross rib, after put perpendicular rib, after welding, skeleton is hung on steel plate, then weld.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410386096.XA CN104153567A (en) | 2014-08-07 | 2014-08-07 | Manufacturing process of light building templates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410386096.XA CN104153567A (en) | 2014-08-07 | 2014-08-07 | Manufacturing process of light building templates |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104153567A true CN104153567A (en) | 2014-11-19 |
Family
ID=51879181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410386096.XA Pending CN104153567A (en) | 2014-08-07 | 2014-08-07 | Manufacturing process of light building templates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153567A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070082315A (en) * | 2006-02-16 | 2007-08-21 | 주식회사 알루폼스코리아 | A manufacturing method and a product of a reinforced frame for aluminum mold |
CN103481022A (en) * | 2013-08-20 | 2014-01-01 | 合肥万众交通工程有限公司 | Manufacturing method of pier column template |
-
2014
- 2014-08-07 CN CN201410386096.XA patent/CN104153567A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070082315A (en) * | 2006-02-16 | 2007-08-21 | 주식회사 알루폼스코리아 | A manufacturing method and a product of a reinforced frame for aluminum mold |
CN103481022A (en) * | 2013-08-20 | 2014-01-01 | 合肥万众交通工程有限公司 | Manufacturing method of pier column template |
Non-Patent Citations (1)
Title |
---|
徐伟等: "《高层建筑施工》", 31 August 2004, 武汉理工大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202627475U (en) | Scaffold wall connecting member | |
CN205394052U (en) | Drilling fixture of steel -structure connecting plate | |
CN104722799A (en) | Drilling device and positioning assembly | |
CN204402039U (en) | A kind of aluminum alloy mould plate system exterior wall straightening board member | |
CN204402030U (en) | A kind of oval door opening concrete wall template | |
CN104153567A (en) | Manufacturing process of light building templates | |
CN204402014U (en) | A kind of aluminum alloy mould plate system back cord | |
CN204552104U (en) | A kind of flooring aluminum alloy building template form removal instrument | |
CN104084621A (en) | Drilling template | |
CN204413464U (en) | A kind of box-shaped column assembly device | |
CN210507154U (en) | Concrete splicing formwork for road and bridge construction | |
CN204402017U (en) | A kind of aluminum alloy mould plate system corner component | |
CN203160251U (en) | Connecting device for joints of steel and wood templates | |
CN204531388U (en) | End socket molding plate fixed structure | |
CN105736015A (en) | Tunnel lining trolley with replaceable side templates | |
CN206016250U (en) | A kind of unit assemble type toilet flange erecting device | |
CN204139576U (en) | For the external scaffolding drawknot structure of preset assembling plate | |
CN204531387U (en) | Shear wall end socket formwork reinforcement structure | |
CN103835503A (en) | NALC novel wall construction process | |
CN204309062U (en) | With the plate fitment transverse slat punching jig of vertical roll adjustment assembly | |
CN204728462U (en) | Concrete post docks dry type syndeton with concrete post | |
CN203527033U (en) | Multi-hole tubular product machining tool | |
CN210848481U (en) | Drilling tool | |
CN202787958U (en) | Post-construction side shear wall mode plate for tower settlement joint | |
CN204402013U (en) | A kind of half open form aluminium alloys assembled formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141119 |