CN1373276A - Process for installing and detaching combined steel shutterings of bridge pier - Google Patents

Process for installing and detaching combined steel shutterings of bridge pier Download PDF

Info

Publication number
CN1373276A
CN1373276A CN 02108917 CN02108917A CN1373276A CN 1373276 A CN1373276 A CN 1373276A CN 02108917 CN02108917 CN 02108917 CN 02108917 A CN02108917 A CN 02108917A CN 1373276 A CN1373276 A CN 1373276A
Authority
CN
China
Prior art keywords
semicircle
steel formwork
bridge pier
steel
overall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 02108917
Other languages
Chinese (zh)
Inventor
刘文彦
王冶
胡晶波
赵连生
冯晓丽
王太平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ROAD AND BRIDGE ENGINEERING Co Ltd DAQING OIL FIELD
Original Assignee
ROAD AND BRIDGE ENGINEERING Co Ltd DAQING OIL FIELD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROAD AND BRIDGE ENGINEERING Co Ltd DAQING OIL FIELD filed Critical ROAD AND BRIDGE ENGINEERING Co Ltd DAQING OIL FIELD
Priority to CN 02108917 priority Critical patent/CN1373276A/en
Publication of CN1373276A publication Critical patent/CN1373276A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A process for installing and detaching the combined steel shutterings of bridge pier is characterized by that the semi-circular steel shuttering is combined on the ground and then lifted and fixed, the bridge pier is then cast with concrete, and the steel shuttering is finally detached and lifted onto ground. Its advantages are high construction speed and high appearance quality.

Description

Process for installing and detaching combined steel shutterings of bridge pier
(1) technical field:
The present invention relates to a kind of process in bridge engineering field, belong to process for installing and detaching combined steel shutterings of bridge pier.
(2) background technology:
Bridge pier column is an important step in the bridge construction, and bridge pier column construction at present is manually to set up well word scaffold (reinforcing cage) mostly, manually a section splicing from lower to upper of semicircle template is installed then; Pier stud build finish after, again with semicircle template a section from top to bottom the dismounting.Construction speed is slow, a large amount of labor intensive, furthermore owing in the template reinforcing cage is arranged, can't polish in the template interface place, thereby make the reinforced concrete post surface of building out that the template interface vestige be arranged, and influences presentation quality.
(3) summary of the invention:
Technical problem to be solved by this invention is the problem of the slow and labor intensive of bridge pier column construction speed.
Adoptable technical scheme is: this process for installing and detaching combined steel shutterings of bridge pier, comprise combined steel formwork, carry out according to following steps, a. docks each semicircle combined steel formwork according to the pier stud design height on the ground, is combined into Overall Steel Formwork with bolt; B. the step of Overall Steel Formwork interface is tied; C. use crane that above-mentioned Overall Steel Formwork is sling, fixed; D water cement concrete pouring pier stud; E. the people opens the bolt that is connected and fixed with Overall Steel Formwork from top to down from the semicircle interface and forms the semicircle steel form of two monoblocks on the workbench that crane is sling; F. hang out the semicircle steel form of two monoblocks at twice with crane, then again with the synthetic Overall Steel Formwork of the semicircle template group of two monoblocks; When g. carrying out the construction of next bridge pier column, repeat above-mentioned b~f and get final product.
Therefore this beneficial effect of the invention is: since the steel form of this process using be on ground to being connected into Overall Steel Formwork, reduced manpower and expended; Moreover steel form once lifts fixing, and construction speed is fast, moreover the two whole semicircle steel forms that unload need not be fixing to each steel form butt joint, and only need get final product accelerating construction progress to the butt joint of two halves circular steel template; And behind the butt joint steel form, interface is tied, guaranteed construction back presentation quality.
(4) description of drawings:
Fig. 1 is the front view of the present invention when installing;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the front view that the present invention tears when back open;
Fig. 4 is the left view of Fig. 3.
The 1-bolt, the 2-combined steel formwork.
(5) specific embodiment:
The present invention is further illustrated below in conjunction with accompanying drawing:
This process for installing and detaching combined steel shutterings of bridge pier comprises combined steel formwork 2, carries out according to following steps:
A. as shown in Figure 1, according to the pier stud design height each semicircle combined steel formwork 2 is docked on the ground, become Overall Steel Formwork (seeing shown in the accompanying drawing 2) with bolt 1 fixed combination, avoid manually a section splicing from lower to upper of semicircle template being installed while constructing, reduced labour cost, time saving and energy saving.
B. Overall Steel Formwork is tied the step of interface with the hand grinding tool machine; There is the template interface vestige on the reinforced concrete post surface of avoiding building out and influences presentation quality.
C. use crane that above-mentioned Overall Steel Formwork is sling, fixed; A large amount of manpower splicing steel forms have been saved in once success, and progress is fast.
D. water cement concrete pouring pier stud waits to reach certain intensity.
E. the people opens the bolt (seeing shown in the accompanying drawing 3) that is connected and fixed with Overall Steel Formwork from top to down from the semicircle interface and forms the semicircle steel form (seeing shown in the accompanying drawing 4) of two monoblocks on the workbench that crane is sling; Saved manpower greatly, construction speed is also accelerated greatly, and construction quality reaches assurance.
F. hang out the semicircle steel form of two monoblocks at twice with crane and be placed on underground, then again with the synthetic Overall Steel Formwork of the semicircle template group of two monoblocks shown in the accompanying drawing 4, do not need each steel form butt joint fixing, accelerating construction progress.
G. when carrying out the construction of next bridge pier column, as long as repeat above-mentioned b~f.
The progress of as seen this bridge pier column construction is that people like soon, has saved manpower greatly, and construction speed and quality also improve greatly, suitable promoting the use of.

Claims (1)

1, a kind of process for installing and detaching combined steel shutterings of bridge pier comprises combined steel formwork (2), it is characterized in that: carry out according to following steps,
A. according to the pier stud design height each semicircle combined steel formwork (2) is docked on the ground, become Overall Steel Formwork with bolt (1) fixed combination;
B. the step of Overall Steel Formwork interface is tied;
C. use crane that above-mentioned Overall Steel Formwork is sling, fixed;
D. water cement concrete pouring pier stud;
E. the people opens the bolt that is connected and fixed with Overall Steel Formwork from top to down from the semicircle interface and forms the semicircle steel form of two monoblocks on the workbench that crane is sling;
F. hang out the semicircle steel form of two monoblocks at twice with crane, then again with the synthetic Overall Steel Formwork of the semicircle template group of two monoblocks;
When g. carrying out the construction of next bridge pier column, repeat above-mentioned b~f and get final product.
CN 02108917 2002-04-04 2002-04-04 Process for installing and detaching combined steel shutterings of bridge pier Pending CN1373276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02108917 CN1373276A (en) 2002-04-04 2002-04-04 Process for installing and detaching combined steel shutterings of bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02108917 CN1373276A (en) 2002-04-04 2002-04-04 Process for installing and detaching combined steel shutterings of bridge pier

Publications (1)

Publication Number Publication Date
CN1373276A true CN1373276A (en) 2002-10-09

Family

ID=4740406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02108917 Pending CN1373276A (en) 2002-04-04 2002-04-04 Process for installing and detaching combined steel shutterings of bridge pier

Country Status (1)

Country Link
CN (1) CN1373276A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101733643B (en) * 2009-12-17 2012-07-04 中铁三局集团有限公司 Method for manufacturing steel pattern plate of taper-end concrete pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101733643B (en) * 2009-12-17 2012-07-04 中铁三局集团有限公司 Method for manufacturing steel pattern plate of taper-end concrete pier

Similar Documents

Publication Publication Date Title
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN102787560B (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN111535579A (en) Construction method for support-free mold hanging tool for horizontal post-pouring belt
CN103088844A (en) Reinforced concrete inspection well whole prefabricated hoisting construction method
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN108868194B (en) Chimney dismantling device and chimney dismantling method
CN212613640U (en) Improved generation building scaffold frame of encorbelmenting
CN203795311U (en) Multi-leg high pier and slip form construction device
CN205636498U (en) Wet seam construction equipment
CN1373276A (en) Process for installing and detaching combined steel shutterings of bridge pier
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN203613464U (en) Slip form construction cargo transportation device
CN202926332U (en) Whole-circle integral upside down hanging formwork
CN213710401U (en) Can dismantle bottom plate support of steel bar quilting frame building carrier plate
CN210659227U (en) Exterior wall formwork system free of external scaffold
CN113339003A (en) Construction method of tunnel integrated arch sheathing trolley
CN211313370U (en) Intelligent integrated high-rise building machine
CN210658058U (en) Hanging basket for constructing cast-in-situ diaphragm plate joint of precast beam bridge
CN208415925U (en) A kind of PVC column-form
CN203613461U (en) Slip form construction lifting system
CN203188612U (en) Beam frame type building template system
CN111424554A (en) Construction method for suspended formwork of seascape trestle
CN105507160B (en) Method of operation platform for movable-type bailey beams for construction of cast-in-place box beams
CN218145284U (en) Panel structure is with exempting from rings of cutting
CN103669219A (en) Simultaneous slip-form construction device of multi-limb high pier

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication