CN101719668A - 一种计及安全约束和网损修正的节能发电调度方法 - Google Patents

一种计及安全约束和网损修正的节能发电调度方法 Download PDF

Info

Publication number
CN101719668A
CN101719668A CN200910191706A CN200910191706A CN101719668A CN 101719668 A CN101719668 A CN 101719668A CN 200910191706 A CN200910191706 A CN 200910191706A CN 200910191706 A CN200910191706 A CN 200910191706A CN 101719668 A CN101719668 A CN 101719668A
Authority
CN
China
Prior art keywords
theta
delta
generator
consumption
branch road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910191706A
Other languages
English (en)
Inventor
熊小伏
孙斌
林成
陈星田
赵维兴
秦志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU ELECTRIC POWER SCHEDULING COMMUNICATIONS OFFICE
Chongqing University
Original Assignee
GUIZHOU ELECTRIC POWER SCHEDULING COMMUNICATIONS OFFICE
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU ELECTRIC POWER SCHEDULING COMMUNICATIONS OFFICE, Chongqing University filed Critical GUIZHOU ELECTRIC POWER SCHEDULING COMMUNICATIONS OFFICE
Priority to CN200910191706A priority Critical patent/CN101719668A/zh
Publication of CN101719668A publication Critical patent/CN101719668A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明属于电力系统调度自动化技术领域,特别是涉及电力系统中的一种计及安全约束和网损修正的节能发电调度方法,该方法包括以下步骤:a.首先提出以全系统总煤耗最小为目标函数的网损修正和经济调度的数学模型,其数学模为:
Figure 200910191706.X_AB_0
;b.将节能调度数学模型转换成
Figure 200910191706.X_AB_1
后获取优化后的发电计划;c.将节能调度的约束条件线性化;d.节能调度模型的求解,并根据模型求解结果,调节相应自动发电控制机组的煤耗。本发明可使发电煤耗得到明显降低,对提高经济增长和效益,减少环境污染,保障经济持续、快速增长具有重要作用。

Description

一种计及安全约束和网损修正的节能发电调度方法
技术领域
本发明属于电力系统调度自动化技术领域,特别是涉及电力系统中的一种计及安全约束和网损修正的节能发电调度的一种新方法。
技术背景
节能减排是缓解能源供应矛盾和环境制约矛盾的重要措施,也是提高经济增长和效益的一个重要途径。电力系统调度的节能工作主要涉及两个方面,即火电厂的降低煤耗以及输电网络的降低损耗。在实施节能发电调度工作时,各机组发电计划的改变必然伴随网络潮流分布的改变,潮流的改变将引起网路损耗的变化。传统的网络损耗最小的优化调度目标可能与节约一次能源的目标相冲突,因此使煤耗和网损综合最小将是节能调度的一个重要研究方向,研究一种计及安全约束和网损修正的节能发电调度方法,将有效地实现系统安全运行和经济控制中的协调问题。现有的经济调度方法一般不考虑网络损耗,通常用不精确的B-系数法计算网络损耗,无法进行计及网络损耗的优化计算。此外,现有的经济调度方法一般不考虑线路安全约束,得到的经济功率分配方案一般不切合实际运行中的经济调度。
发明内容
针对现有技术存在的上述不足,本发明的目的是提供一种计及安全约束和网损修正的节能发电调度方法,该方法可使发电煤耗得到明显降低,对提高经济增长和效益,减少环境污染,保障经济持续、快速增长具有重要作用。
本发明的目的通过以下技术方案实现:一种计及安全约束和网损修正的节能发电调度方法,包括如下步骤:
a.首先将网络损耗折算为标准煤耗后,建立以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,并求解出满足安全约束的全网煤耗最小的发电计划,以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,其数学模型可表达为:
min F = Σ i = 1 N F i ( P Gi ) + γ P L - - - ( 1 )
发电机耗量特性的数学表达为:
Fi(P0 Gi)=aPGi 2+bPGi+c                    (2)
约束条件:
Σ i ∈ NG P Gi = Σ k ∈ ND P Dk + P L - - - ( 3 )
PGimin≤PGi≤PGimax  i∈N                 (4)
|Pij|≤Pijmax    ij∈ NT                  (5)
其中:
式(3)是系统有功平衡等式约束;
式(4)是发电机组的有功出力约束;
式(5)是线路安全约束;
其中:
Figure G200910191706XD00021
系统所有发电机组的总煤耗;
Figure G200910191706XD00022
系统总负荷;
PL:网络损耗;
γ:有功损耗折算成煤耗的换算系数;
PGi:发电机母线i的实际出力;
PGimin:发电机母线i的最小出力;
PGimax:发电机母线i的最大出力;
Pij:支路ij上的潮流;
Pijmax:支路ij的约束条件;
b.将节能调度数学模型转换成后min F = 1 2 X T QX + G T X + C 获取优化后的发电计划,将发电机耗量函数式(2)带入优化目标函数式(1)中:
min F = Σ i = 1 N [ a i P Gi 2 + b i P Gi + c i ] + γ P L = Σ i = 1 N + 1 [ a i P Gi 2 + b i P Gi + c i ]
其中:aN+1=0    bN+1=r  cN+1=0    PG(N+1)=PL
由式min F = 1 2 X T QX + G T X + C 得出:
X T = P G T = [ P G 1 , P G 2 , · · · , P GN , P G ( N + 1 ) ]
X = P G = P G 1 P G 2 · · · P GN P G ( N + 1 )
Figure G200910191706XD00028
GT=[b1,b2…,bN,bN+1] C=[c1,c2…,cN,cN+1]
c.将节能调度的约束条件线性化
[1]有功平衡等式约束线性化
因为在给定时间内负荷是常数,通过下面的方法将有功平衡等式约束线性化,即
Σ i ∈ NG ( 1 - ∂ P L ∂ P Gi ) | P Gi 0 Δ P Gi = 0 - - - ( 6 )
[2]支路功率约束线性化
支路有功可表示为
P ij = V i 2 g ij - V i V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 7 )
其中
Pij:支路ij始端有功功率;
Vi:节点i的节点电压;
θij:支路ij始末两端相角差;
bij:支路ij的电纳;
gij:支路ij的电导;
通过线性化方程(7)得
Δ P ij = - V i 0 V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij ) - - - ( 8 )
对于高压网络,支路ij始末两端相角差θij非常小,因此有如下近似:
sin θ ij ≅ 0 - - - ( 9 )
cos θ ij ≅ 1 - - - ( 10 )
另外,假设电压为1.0p.u.且支路电阻远大于电抗,则
g ij = R ij R ij 2 + X ij 2 ≈ 0 - - - ( 11 )
b ij = - X ij R ij 2 + X ij 2 ≈ - X ij X ij 2 ≈ - 1 X ij - - - ( 12 )
将(9)-(12)代入(10)得
Δ P ij = - b ij Δ θ ij = - b ij ( Δ θ i - Δ θ j ) = Δ θ i - Δ θ j X ij - - - ( 13 )
方程(13)可表达成矩阵形式,即
ΔPb=B′Δθ            (14)
其中矩阵B′的元素为
B ′ ij = b ij = - 1 X ij - - - ( 15 )
B ′ ii = - Σ j = 1 j ≠ i n b ij - - - ( 16 )
节点注入方程为:
P Gi - P Di = V i Σ j = 1 n V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 17 )
将式(17)线性化
Δ P Gi = V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij )
= V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 + b ij cos θ ij 0 ) Δ θ ij - - - ( 18 )
方程式(18)可表达成矩阵形式,即
ΔPG=HΔθ                (19)
方程(19)表达了发电机有功输出增量与节电电压相角增量的关系;
根据方程(14)和方程(19)可得支路有功功率增量与发电机有功输出增量的线性关系,即
ΔPb=B′Δθ=B′H-1ΔPG=DΔPG    (20)
其中
D=B′H-1                           (21)
称为支路有功功率对发电机有功输出的线性灵敏度;
因此,线性化的支路功率约束为
|DΔPG|≤ΔPbmax            (22)
ΔPbmax的元素ΔPijmax可由下式计算
Δ P ij max = P ij max - P ij 0 - - - ( 23 )
d.节能调度模型的求解;
根据上述模型求解结果,调节相应发电控制机组的煤耗。
进一步,所述数学模型:
min F = 1 2 X T QX + G T X + C - - - ( 24 )
s.t.    AX=B             (25)
        X≥0
计算步骤为:
b1选择初始点X1
b2计算A1:=AX1
b3计算Δ:=B-AX1
b4取最大值Δmax:=max|Δi|
b5如果Δmax<ε转到b10.否则继续计算
b6计算
Figure G200910191706XD00046
b7 R:=min{Ui}
b8 如果R+1≥0,X1:=X1×(1+U)
转到b3,  否则继续计算
b9 计算QB:=-1/R,X1:=X1*(1+QB*U)
转到b3
b10 计算Dk:=diag[X1,X2,.......,Xn]
b11 计算Bk:=ADk
b12 计算
dp k : = [ B k T ( B k B k T ) - 1 B k ] D k [ QX k + G ]
b13 计算
β 1 : = - 1 γ , γ<0;
β1:=106,γ≥0
where r = min [ dp j k ]
b14 计算
β 2 : = ( dp k ) T ( dp k ) W , if W>0;
β2:=106,if W≤0
where W=(Dkdpk)TQ(Dkdpk)
b15
Xk+1:=Xk+α(βDkdpk),
whereβ=min[β1,β2];
α(<0)is a var iable step.
进行下次迭代计算,直到收敛条件满足dpk<ε。
本发明在模型求解中可利用改进的内点法原理进行求解,其求解过程如下:
一般的内点法很大程度上依赖于初始点的选择,如果初始点选择不理想,内点法计算可能不收验;另外,一般的内点法主要采用的是线性模型,其计算步骤也是基于线性模型推导而成的。这也使得一般内点法计算的精确度不可能很高。为此,本发明对内点法求进行改进。基本思路是:一要提高优化计算的精确度,为此,将节能调度的数学模型转换成二次模型,而非一般内点法采用的线性模型;二是克服一般内点法依赖于初始点选择的情况,使改进内点法不受初始点选择的约束,即在任意选择的初始点情况下都可得到优化解。对节能调度的优化来说,即使初始发电计划不理想或不能满足约束,也都可用本方法获得优化解。
相比现有技术,本发明具有如下优点:
1、本发明将网络损耗折算为标准煤耗后(网损修正),建立以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,并求解出满足安全约束的全网煤耗最小的发电计划,以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,并根据上述节能调度模型求解结果,调节相应自动发电控制机组,可使发电煤耗得到明显降低,对提高经济增长和效益,减少环境污染,保障经济持续、快速增长具有重要作用。
2、本发明通过采集电网中各个发电机组节点的EMS系统的数据,在任意选择的初始点情况下都可得到优化解,提高优化计算的精确度;对节能调度的优化来说,即使初始发电计划不理想或不能满足约束,也都可用本方法获得优化。
附图说明
图1为本发明提供计及安全约束和网损修正的节能发电调度流程图。
图2为本发明提供的数据采集流程图。
图3为IEEE30节点的系统结构图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明。
一种计及安全约束和网损修正的节能发电调度方法,包括如下步骤(见图1和图2):
a.首先将网络损耗折算为标准煤耗后(网损修正),建立以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,并求解出满足安全约束的全网煤耗最小的发电计划,以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,其数学模型可表达为:
min F = Σ i = 1 N F i ( P Gi ) + γ P L - - - ( 1 )
发电机耗量特性的数学表达为:
Fi(P0 Gi)=aPGi 2+bPGi+c                      (2)
约束条件:
Σ i ∈ NG P Gi = Σ k ∈ ND P Dk + P L - - - ( 3 )
PGimin≤PGi≤PGimax      i∈N      (4)
|Pij|≤Pijmax       ij∈NT         (5)
其中:
式(3)是系统有功平衡等式约束;
式(4)是发电机组的有功出力约束;
式(5)是线路安全约束;
其中:
Figure G200910191706XD00064
系统所有发电机组的总煤耗;
系统总负荷
PL:网络损耗;
γ:有功损耗折算成煤耗的换算系数;
PGi:发电机母线i的实际出力;
PGimin:发电机母线i的最小出力;
PGimax:发电机母线i的最大出力;
Pij:支路ij上的潮流;
Pijmax:支路ij的约束条件;
b.将节能调度数学模型转换成后min F = 1 2 X T QX + G T X + C 获取优化后的发电计划,将发电机耗量函数式(2)带入优化目标函数式(1)中:
min F = Σ i = 1 N [ a i P Gi 2 + b i P Gi + c i ] + γ P L = Σ i = 1 N + 1 [ a i P Gi 2 + b i P Gi + c i ]
其中:aN+1=0    bN+1=r   cN+1=0    PG(N+1)=PL
由式min F = 1 2 X T QX + G T X + C 得出:
X T = P G T = [ P G 1 , P G 2 , · · · , P GN , P G ( N + 1 ) ]
X = P G = P G 1 P G 2 · · · P GN P G ( N + 1 )
Figure G200910191706XD00077
GT=[b1,b2…,bN,bN+1]    C=[c1,c2…,cN,cN+1]
c.将节能调度的约束条件线性化
[1]有功平衡等式约束线性化
因为在给定时间内负荷是常数,通过下面的方法将有功平衡等式约束线性化,即
Σ i ∈ NG ( 1 - ∂ P L ∂ P Gi ) | P Gi 0 Δ P Gi = 0 - - - ( 6 )
[2]支路功率约束线性化
支路有功可表示为
P ij = V i 2 g ij - V i V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 7 )
其中
Pij:支路ij始端有功功率;
Vi:节点i的节点电压;
θij:支路ij始末两端相角差;
bij:支路ij的电纳;
gij:支路ij的电导;
通过线性化方程(7)得
Δ P ij = - V i 0 V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij ) - - - ( 8 )
对于高压网络,支路ij始末两端相角差θij非常小,因此有如下近似:
sin θ ij ≅ 0 - - - ( 9 )
cos θ ij ≅ 1 - - - ( 10 )
另外,假设电压为1.0p.u.且支路电阻远大于电抗,则
g ij = R ij R ij 2 + X ij 2 ≈ 0 - - - ( 11 )
b ij = - X ij R ij 2 + X ij 2 ≈ - X ij X ij 2 ≈ - 1 X ij - - - ( 12 )
将(9)-(12)代入(10)得
Δ P ij = - b ij Δ θ ij = - b ij ( Δ θ i - Δ θ j ) = Δ θ i - Δ θ j X ij - - - ( 13 )
方程(13)可表达成矩阵形式,即
ΔPb=B′Δθ           (14)
其中矩阵B′的元素为
B ′ ij = b ij = - 1 X ij - - - ( 15 )
B ′ ii = - Σ j = 1 j ≠ i n b ij - - - ( 16 )
节点注入方程为:
P Gi - P Di = V i Σ j = 1 n V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 17 )
将式(17)线性化
Δ P Gi = V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij )
= V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 + b ij cos θ ij 0 ) Δ θ ij - - - ( 18 )
方程式(18)可表达成矩阵形式,即
ΔPG=HΔθ             (19)
方程(19)表达了发电机有功输出增量与节电电压相角增量的关系。矩阵H也可用式(9)-(11)进行简化。
根据方程(14)和方程(19)可得支路有功功率增量与发电机有功输出增量的线性关系,即
ΔPb=B′Δθ=B′H-1ΔPG=DΔPG           (20)
其中
D=B′H-1                                  (21)
称为支路有功功率对发电机有功输出的线性灵敏度。
因此,线性化的支路功率约束为
|DΔPG|≤ΔPbmax                           (22)
ΔPbmax的元素ΔPijmax可由下式计算
Δ P ij max = P ij max - P ij 0 - - - ( 23 )
d.节能调度模型的求解;
根据上述节能调度模型求解结果,调节相应自动发电控制机组的煤耗。
本发明改进后内点法的数学模型是:
min F = 1 2 X T QX + G T X + C - - - ( 24 )
s.t.    AX=B                (25)
        X≥0
计算步骤为:
b1选择初始点X1
b2计算A1:=AX1
b3计算Δ:=B-AX1
b4取最大值Δmax:=max|Δi|
b5如果Δmax<ε转到b10.否则继续计算
b6计算
Figure G200910191706XD00093
b7 R:=min{Ui}
b8如果R+1≥0,X1:=X1×(1+U)
转到b3,否则继续计算
b9计算QB:=-1/R,X1:=X1*(1+QB*U)
转到b3
b10计算Dk:=diag[X1,X2,.......,Xn]
b11计算Bk:=ADk
b12计算
dp k : = [ B k T ( B k B k T ) - 1 B k ] D k [ QX k + G ]
b13计算
β 1 : = - 1 γ , γ<0;
β1:=106,γ≥0
where r = min [ dp j k ]
b14  计算
β 2 : = ( dp k ) T ( dp k ) W , if W>0;
β2:=106,if W≤0
where W=(Dkdpk)TQ(Dkdpk)
b15
Xk+1:=Xk+α(βDkdpk),
where β=min[β1,β2];
α(<0)is a var iable step.
进行下次迭代计算,直到收敛条件满足dpk<ε。
本实施例1
参见图3,以IEEE 30节点系统为例,对本发明建立的模型进行检验。30节点系统包括5个发电机单元,21个负荷,41条传输线/变压器。
发电机的耗量函数为二次曲线,函数表达式为:
F 1 = a i P Gi 2 + b i P Gi + c i
耗量参数数据由表1所示,网损修正前后的节能发电调度方法的计算结果对比见表2和表3。
表1 IEEE 30节点系统发电机耗量函数
  发电机节点.  a  b  c
    1  0.00984  0.33500  0.00000
    2  0.00834  0.22500  0.00000
    5  0.00850  0.18500  0.00000
    11  0.00884  0.13500  0.00000
    13  0.00834  0.22500  0.00000
表2 IEEE 30节点系统发电计划
    发电机节点   网损修正前的机组发电计划(MW) 网损修正后机组发电计划(MW)
    1     54.645     51.305
    2     59.480     60.330
    5     60.570     61.440
    11     57.370     58.190
    13     59.480     60.190
表3 IEEE 30节点系统总耗量计算结果
    阶段 网损修正前 网损修正后
    系统总损耗(MW) 4.120 4.030
    系统总煤耗(吨) 216.686 215.906
表2则分别列出了网损修正前后的发电计划,表3列出了网损修正前后独立的系统总网损和系统耗量。
输入参数:
节能调度所需的系统基本模型和相关参数:
1)系统基本参数
a.支路参数
IFROM,ITO,R,X,B,TAP,SMAX,SMAXC,TAPMAX,TAPMIN
说明:
IFROM-支路始端节点号,
ITO-支路末端节点号
R-支路电阻
X-支路电抗
B-线路充电功率(1/2)
TAP-变压器支路变比
SMAX-支路最大功率输出约束
SMAXC-支路故障最大功率输出约束
TAPMAX-变压器支路最大变比
TAPMIN-变压器支路最小变比
IEEE30实例:(参照附图3)
IFROM,  ITO,    R,       X,       B,      TAP,    SMAX,SMAXC,TAPMAX,TAPMIN
1        2        .01920    .05750    .0264    0.000    130.00   130.00  0.00    0.00
1        3        .04520    .18520    .0204    0.000    100.00   100.00  0.00    0.00
2        4        .05700    .17370    .0184    0.000    72.00    72.00   0.00    0.00
3        4        .01320    .03790    .0042    0.000    100.00   100.00  0.00    0.00
2        5        .04720    .19830    .0209    0.000    130.00   130.00  0.00    0.00
2        6        .05810    .17630    .0187    0.000    100.00   100.00  0.00    0.00
4        6        .01190    .04140    .0045    0.000    105.00   105.00  0.00    0.00
5        7        .04600    .11600    .0102    0.000    130.00   130.00  0.00    0.00
6        7        .02670    .08200    .0085    0.000    130.00   130.00  0.00    0.00
6        8        .01200    .04200    .0045    0.000    45.00    55.00   0.00    0.00
9        6        .00000    .20800    .0000    1.000    65.00    65.00   1.10    0.90
10       6        .00000    .55600    .0000    0.999    65.00    65.00   1.10    0.90
9        11       .00000    .20800    .0000    0.000    65.00    65.00   0.00    0.00
9        10       .00000    .11000    .0000    0.000    65.00    65.00   0.00    0.00
12       4        .00000    .25600    .0000    1.010    65.00    65.00   1.10    0.90
12       13       .00000    .14000    .0000    0.000    130.00   130.00  0.00    0.00
12       14       .12310    .25590    .0000    0.000    65.00    65.00   0.00    0.00
12       15       .06620    .13040    .0000    0.000    45.00    55.00   0.00    0.00
12       16       .09450    .19870    .0000    0.000    65.00    65.00   0.00    0.00
14       15       .22100    .19970    .0000    0.000    32.00    32.00   0.00    0.00
16       17       .08240    .19230    .0000    0.000    32.00    32.00   0.00    0.00
15       18       .10730    .21850    .0000    0.000    32.00    32.00   0.00    0.00
18       19       .06390    .12920    .0000    0.000    32.00    32.00   0.00    0.00
19       20       .03400    .06800    .0000    0.000    32.00    32.00   0.00    0.00
10       20       .09360    .20900    .0000    0.000    12.00    16.00   0.00    0.00
10       17       .03240    .08450    .0000    0.000    32.00    32.00   0.00    0.00
10       21       .03480    .07490    .0000    0.000    32.00    32.00   0.00    0.00
10       22       .07270    .14990    .0000    0.000    32.00    32.00   0.00    0.00
21       22       .01160    .02360    .0000    0.000    32.00    32.00   0.00    0.00
15       23       .10000    .20200    .0000    0.000    32.00    32.00   0.00    0.00
22       24       .11500    .17900    .0000    0.000    32.00    32.00   0.00    0.00
23       24       .13200    .27000    .0000    0.000    32.00    32.00   0.00    0.00
24       25       .18850    .32920    .0000    0.000    32.00    32.00   0.00    0.00
25       26       .25440    .38000    .0000    0.000    32.00    32.00   0.00    0.00
25       27       .10930    .20870    .0000    0.000    32.00    32.00   0.00    0.00
27       28       .00000    .39600    .0000    0.999    65.00    65.00   1.10    0.90
27       29       .21980    .41530    .0000    0.000    32.00    32.00   0.00    0.00
27       30       .32020    .60270    .0000    0.000    12.00    19.00   0.00    0.00
29       30       .23990    .45330    .0000    0.000    32.00    32.00   0.00    0.00
8        28       .06360    .20000    .0214    0.000    65.00    65.00   0.00    0.00
6        28       .01690    .05990    .0065    0.000    65.00    65.00   0.00    0.00
b.节点参数:
BUSTYP,IBUS,PGEN,QGEN,PLOAD,QLOAD,PMAX1,PMIN1,QMAX1,QMIN1,VOLT,ANGLE,Vnup,Vnlo,Vcup,Vclo,Qgcup,Qgclo,Ownregn
说明:
BUSTYP-节点类型
IBUS-节点号
PGEN-发电机有功出力
QGEN-发电机无功出力
PLOAD-节点有功负荷
QLOAD-节点无功负荷
PMAX-发电机有功最大出力
PMIN-发电机有功最小出力
QMAX-发电机无功最大出力
QMIN-发电机无功最小出力
VOLT-节点初始电压
ANGLE-节点初始电压相角
Vnup-节点电压上限
Vnlo-节点电压下限:
Vcup-节点故障电压上限
Vclo-节点故障电压下限
Qgcup-发电机故障无功最大出力
Qgclo-发电机故障无功最小出力
Ownregn-节点所在区
IEEE30实例:(参照附图3)
BUSTYP,IBUS,PGEN,QGEN,PLOAD,QLOAD,PMAX1,PMIN1,QMAX1,QMIN1,VOLT,ANGLE,Vnup,Vnlo,Vcup,Vclo,Qgcup,Qgclo,Ownregn
3       1      51.31    0.0    0.00    0.00  2000.   0.999.0    -99.0    1.050   0.0     1.05
0.90    1.05   0.90     999.00 -99.0   1
2       2      59.48    0.0    21.7    12.7  1600.   0. 60.0    -40.0    1.040    0.0    1.05
0.90    1.05   0.90     60.00  -40.0   1
1       3      0.00     0.0    2.40    1.20  0.00    0. 0.00    0.00     1.000    0.0    1.05
0.90    1.05   0.90     0.00   0.00    1
1       4      0.00     0.0    7.60    1.60  0.00    0. 0.00    0.00     1.000    0.0    1.05
0.90    1.05   0.90     0.00   0.00    1
2       5      60.57    0.0    94.20   19.0  1700.   0. 80.0    -40.0    1.020    0.0    1.05
0.90    1.05   0.90     90.00  -40.0   1
1       6      0.00     0.0    0.00    0.00  0.00    0. 0.00    0.00     1.000    0.0    1.05
0.90    1.05   0.90     0.00   0.00    1
1       7      0.00     0.0    22.80   10.9  0.00    0. 0.00    0.00     1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       8       0.00    0.0     30.00   30.0    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       9       0.00    0.0     0.00    0.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       10      0.00    0.0     5.80    2.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
2       11      57.37   0.0     0.00    0.00    1600.   0.    40.0    -6.0    1.030    0.0    1.05
0.90    1.05    0.90    40.00   -6.0    1
1       12      0.00    0.0     11.20   7.5     0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
2       13      59.32   0.0     0.00    0.00    1600.   0.    50.0    -10.0   1.030    0.0    1.05
0.90    1.05    0.90    50.00   -10.0   1
1       14      0.00    0.0     6.20    1.60    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       15      0.00    0.0     8.20    2.50    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       16      0.00    0.0     3.50    1.80    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       17      0.00    0.0     9.00    5.80    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       18      0.00    0.0     3.20    0.90    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       19      0.00    0.0     9.50    3.40    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       20      0.00    0.0     2.20    0.70    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       21      0.00    0.0     17.50   11.2    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       22      0.00    0.0     0.00    0.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       23      0.00    0.0     3.20    1.60    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       24      0.00    0.0     8.70    6.70    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       25      0.00    0.0     0.00    0.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       26      0.00    0.0     3.50    2.30    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       27      0.00    0.0     0.00    0.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05    0.90    0.00    0.00    1
1       28      0.00    0.0     0.00    0.00    0.00    0.    0.00    0.00    1.000    0.0    1.05
0.90    1.05   0.90   0.00  0.00   1
1       29     0.00   0.0   2.40   0.90  0.00  0.  0.00   0.00  1.000   0.0   1.05
0.90    1.05   0.90   0.00  0.00   1
1       30     0.00   0.0   10.60  1.90  0.00  0.  0.00   0.00  1.000   0.0   1.05
0.90    1.05   0.90   0.00  0.00   1
2)经济调度参数
PGNO,ALPHA,BETA,GAMMA,PGMIN,PGMAX,AGCSTATUS,PGCTG,PGGRC
说明:
PGNO-发电机节点号
ALPHA-发电机(厂)煤耗曲线常数项
BETA-发电机(厂)煤耗曲线一次项
GAMMA-发电机(厂)煤耗曲线二次项
PGMIN-发电机有功最小出力
PGMAX-发电机有功最大出力
AGCSTATUS-发电机AGC状态:
AGCSTATUS=1,表示AGC状态,即可调机组
AGCSTATUS=0,表示非AGC状态,即不可调机组
PGCTG-发电机停运或故障检修状态:
PGCTG=1,表示发电机投入运行
PGCTG=0,表示发电机停运或故障检修
PGGRC-发电机爬坡速度
IEEE30实例:(参照附图3)
PGNO,ALPHA, BETA,  GAMMA,  PGMIN,PGMAX, AGCSTATUS,PGCTG,PGGRC
1     0.00000 0.33500 0.00984  20.000 200.000 1          0      20.0
2     0.00000 0.22500 0.00834  20.000 160.000 1          0      10.0
5     0.00000 0.18500 0.00850  10.000 55.000  1          0      5.0
11    0.00000 0.13500 0.00884  10.000 60.000  1          0      2.0
13    0.00000 0.22500 0.00834  20.000 160.000 1          0      2.0
3)系统总负荷和发电机参数:
a.发电机(厂)给定发电计划参数:
TIME,PGNO,PG,AGCST,UNCTGST,V0
说明:
TIME-时间段
PGNO-发电机节点号
PG-给定发电计划
AGCST-本时间段发电机AGC状态
AGCST=1,表示AGC状态,即可调机组
AGCST=0,表示非AGC状态,即不可调机组
UNCTGST-本时间段发电机停运或故障检修状态
UNCTGST=1,表示发电机投入运行
UNCTGST=0,表示发电机停运或故障检修
V0-本时间段发电机电压
IEEE30实例:(参照附图3)
TIME,PGNO,PG,AGCST,UNCTGST,V0
1     1     54.645 1    1    1.03
1     2     59.480 1    1    1.00
1     5     60.570 1    1    1.00
1     11    57.370 1    1    1.00
1     13    59.480 1    1    1.00
b.系统总负荷参数
TIME,TotalLoad
说明:
TIME-时间段
TotalLoad-本时间段系统总负荷
IEEE30实例:(参照附图3)
TIME,TotalLoad
1    223.200
由表3可知系统总网损和煤耗量网损修正后比网损修正前要低。网损降低2.18%,系统煤耗之和则降低了0.36%。

Claims (2)

1.一种计及安全约束和网损修正的节能发电调度方法,包括如下步骤:
a.首先将网络损耗折算为标准煤耗后,建立以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,并求解出满足安全约束的全网煤耗最小的发电计划,以全系统总煤耗最小为目标函数的网损修正和经济调度数学模型,其数学模型可表达为:
min F = Σ i = 1 N F i ( P Gi ) + γ P L - - - ( 1 )
发电机耗量特性的数学表达为:
Fi(PGi)=aiPGi 2+biPGi+ci    (2)
其中:
ai:发电机耗量特性曲线的二次项
bi:发电机耗量特性曲线的一次项
ci:发电机耗量特性曲线的常数项
约束条件:
Σ i ∈ NG P Gi = Σ k ∈ ND P Dk + P L - - - ( 3 )
PGimin≤PGi≤PGimax  i∈N    (4)
|Pij|≤Pijmax  ij∈NT    (5)
其中:
式(3)是系统有功平衡等式约束;
式(4)是发电机组的有功出力约束;
式(5)是线路安全约束;
Figure F200910191706XC00013
系统所有发电机组的总煤耗;
Figure F200910191706XC00014
系统总负荷;
PL:网络损耗;
γ:有功损耗折算成煤耗的换算系数;
PGi:发电机母线i的实际出力;
PGimin:发电机母线i的最小出力;
PGimax:发电机母线i的最大出力;
Pij:支路ij上的潮流;
Pijmax:支路ij的约束条件;
b.将节能调度数学模型转换成后 min F = 1 2 X T QX + G T X + C 获取优化后的发电计划,将发电机耗量函数式(2)带入优化目标函数式(1)中:
min F = Σ i = 1 N [ a i P Gi 2 + b i P Gi + c i ] + γ P L = Σ i = 1 N + 1 [ a i P Gi 2 + b i P Gi + c i ]
其中:aN+1=0 bN+1=r cN+1=0 PG(N+1)=PL
由式 min F = 1 2 X T QX + G T X + C 得出:
X T = P G T = [ P G 1 , P G 2 , . . . , P GN , P G ( N + 1 ) ]
X = P G = P G 1 P G 2 · · · P GN P G ( N + 1 )
GT=[b1,b2…,bN,bN+1]  C=[c1,c2…,cN,cN+1]
c.将节能调度的约束条件线性化
[1]有功平衡等式约束线性化
因为在给定时间内负荷是常数,通过下面的方法将有功平衡等式约束线性化,即
Σ i ∈ NG ( 1 - ∂ P L ∂ P Gi ) | P Gi 0 Δ P Gi = 0 - - - ( 6 )
[2]支路功率约束线性化
支路有功可表示为
P ij = V i 2 g ij - V i V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 7 )
其中
Pij:支路ij始端有功功率;
Vi:节点i的节点电压;
θij:支路ij始末两端相角差;
bij:支路ij的电纳;
gij:支路ij的电导;
通过线性化方程(7)得
Δ P ij = - V i 0 V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij ) - - - ( 8 )
对于高压网络,支路ij始末两端相角差θij非常小,因此有如下近似:
sin θ ij ≅ 0 - - - ( 9 )
cos θ ij ≅ 1 - - - ( 10 )
另外,假设电压为1.0p.u.且支路电阻远大于电抗,则
g ij = R ij R ij 2 + X ij 2 ≈ 0 - - - ( 11 )
b ij = - X ij R ij 2 + X ij 2 ≈ - X ij X ij 2 ≈ - 1 X ij - - - ( 12 )
将(9)-(12)代入(10)得
Δ P ij = - b ij Δ θ ij = - b ij ( Δ θ i - Δ θ j ) = Δ θ i - Δ θ j X ij - - - ( 13 )
方程(13)可表达成矩阵形式,即
ΔPb=B′Δθ    (14)
其中矩阵B′的元素为
B ′ ij = b ij = - 1 X ij - - - ( 15 )
B ′ ii = - Σ j ≠ i j = 1 n b ij - - - ( 16 )
节点注入方程为:
P Gi - P Di = V i Σ j = 1 n V j ( g ij cos θ ij + b ij sin θ ij ) - - - ( 17 )
将式(17)线性化
Δ P Gi = V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 Δ θ ij + b ij cos θ ij 0 Δ θ ij )
= V i 0 Σ j = 1 n V j 0 ( - g ij sin θ ij 0 + b ij cos θ ij 0 ) Δ θ ij - - - ( 18 )
方程式(18)可表达成矩阵形式,即
ΔPG=HΔθ(19)
方程(19)表达了发电机有功输出增量与节电电压相角增量的关系;
根据方程(14)和方程(19)可得支路有功功率增量与发电机有功输出增量的线性关系,即
ΔPb=B′Δθ=B′H-1ΔPG=DΔPG    (20)
其中
D=B′H-1    (21)
称为支路有功功率对发电机有功输出的线性灵敏度;
因此,线性化的支路功率约束为
|DΔPG|≤ΔPbmax    (22)
ΔPbmax的元素ΔPijmax可由下式计算
Δ P ij max = P ij max - P ij 0 - - - ( 23 )
d. 节能调度模型的求解;
根据上述模型求解结果,调节相应发电控制机组的煤耗。
2.根据权利要求1所述的计及安全约束和网损修正的节能发电调度方法,其特征在于,所述数学模型:
min F = 1 2 X T QX + G T X + C - - - ( 24 )
s.t.AX=B    (25)
X≥0
计算步骤为:
b1选择初始点X1
b2计算A1:=AX1
b3计算Δ:=B-AX1
b4取最大值Δmax:=max|Δi|
b5如果Δmax<ε转到b10.否则继续计算
b6计算
b7R:=min{Ui}
b8如果R+1≥0,X1:=X1×(1+U)
转到b3,否则继续计算
b9计算QB:=-1/R,X1:=X1*(1+QB*U)
转到b3
b10计算Dk:=diag[X1,X2,.......,Xn]
b11计算Bk:=ADk
b12计算
dp k : = [ B k T ( B k B k T ) - 1 B k ] D k [ QX k + G ]
b13计算
β 1 : = - 1 γ , γ<0;
β1:=106,γ≥0
where r = min [ dp j k ]
b14计算
β 2 : = ( dp k ) T ( dp k ) W , if W>0;
β2:=106,if W≤0
where W=(Dkdpk)TQ(Dkdpk)
b15
Xk+1:=Xk+α(βDkdpk),
whereβ=min[β1,β2];
α(<0)is a var iable step.
进行下次迭代计算,直到收敛条件满足dpk<ε。
CN200910191706A 2009-12-03 2009-12-03 一种计及安全约束和网损修正的节能发电调度方法 Pending CN101719668A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910191706A CN101719668A (zh) 2009-12-03 2009-12-03 一种计及安全约束和网损修正的节能发电调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910191706A CN101719668A (zh) 2009-12-03 2009-12-03 一种计及安全约束和网损修正的节能发电调度方法

Publications (1)

Publication Number Publication Date
CN101719668A true CN101719668A (zh) 2010-06-02

Family

ID=42434201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910191706A Pending CN101719668A (zh) 2009-12-03 2009-12-03 一种计及安全约束和网损修正的节能发电调度方法

Country Status (1)

Country Link
CN (1) CN101719668A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983573A (zh) * 2012-11-09 2013-03-20 天津大学 基于安全域的安全约束经济调度方法
CN103474989A (zh) * 2013-09-13 2013-12-25 国家电网公司 一种基于灵敏度分析的网络重构方法
CN103825306A (zh) * 2014-03-18 2014-05-28 国网新疆电力公司 发电机调度控制方法
CN104682392A (zh) * 2014-12-04 2015-06-03 重庆大学 计及线路安全约束的省网agc机组动态优化调度方法
CN107563779A (zh) * 2016-06-30 2018-01-09 中国电力科学研究院 一种节点边际电价求解方法
CN107766994A (zh) * 2017-12-04 2018-03-06 长沙理工大学 一种共享自行车调度方法与调度系统

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
J.A.MOMOH等: "Improved Interior Point Method for OPF problems", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
林成等: "安全约束条件下煤耗及网损综合最优的计算方法研究", 《贵州省电机工程学会2007年优秀论文集》 *
王功涛: "电力市场条件下基于模式识别和逐次线性规划技术的安全约束调度研究", 《中国博士学位论文全文数据库工程科技II辑,2003年第2期》 *
王庭飞等: "节能发电调度技术研究及实践与效果分析", 《南方电网技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102983573A (zh) * 2012-11-09 2013-03-20 天津大学 基于安全域的安全约束经济调度方法
CN103474989A (zh) * 2013-09-13 2013-12-25 国家电网公司 一种基于灵敏度分析的网络重构方法
CN103825306A (zh) * 2014-03-18 2014-05-28 国网新疆电力公司 发电机调度控制方法
CN104682392A (zh) * 2014-12-04 2015-06-03 重庆大学 计及线路安全约束的省网agc机组动态优化调度方法
CN104682392B (zh) * 2014-12-04 2017-02-01 重庆大学 计及线路安全约束的省网agc机组动态优化调度方法
CN107563779A (zh) * 2016-06-30 2018-01-09 中国电力科学研究院 一种节点边际电价求解方法
CN107563779B (zh) * 2016-06-30 2020-08-28 中国电力科学研究院 一种节点边际电价求解方法
CN107766994A (zh) * 2017-12-04 2018-03-06 长沙理工大学 一种共享自行车调度方法与调度系统

Similar Documents

Publication Publication Date Title
CN101710702B (zh) 实现电力系统动态节能调度的方法
CN102969722B (zh) 风电场无功电压控制方法
CN101521388B (zh) 风电场集流器系统损耗最优化
CN101281637B (zh) 基于超平面形式安全域边界的电力系统优化潮流方法
CN101719668A (zh) 一种计及安全约束和网损修正的节能发电调度方法
AU2018101070A4 (en) Automatic voltage control method, device and system for wind farm
CN102709918B (zh) 基于avc系统的电网关口无功功率控制方法
CN109409705B (zh) 一种区域综合能源系统的多目标优化调度方法
CN105226665A (zh) 通过自动厂站协调控制降低母线电压日波动率的方法
CN103545848A (zh) 光伏电站群有功功率协调控制方法
CN104269855B (zh) 一种适应多种能源接入的站点无功电压快速调节方法
CN110829473A (zh) 考虑功率四象限输出的配电网储能优化配置方法及系统
CN111952958A (zh) 一种考虑控制模式转换的配电网柔性软开关优化配置方法
CN107994618A (zh) 配电网级光储集群的有功功率调度方法和配电网测控设备
CN105470978A (zh) 一种静止无功补偿装置成组协调控制方法
CN202178583U (zh) 一种风电场无功功率控制系统
CN111768036B (zh) 一种综合能源配电系统与上级电网交互运行的功率优化方法
Li et al. Micro-grid resource allocation based on multi-objective optimization in cloud platform
CN107294105A (zh) 分布式光伏集群无通信条件下的动态调压控制方法
CN204615408U (zh) 一种风电场输出功率控制系统
CN104538984B (zh) 一种考虑风电消纳的需求响应方案制定方法
CN110994695A (zh) 配电网的日内优化调度方法和系统
CN106849111B (zh) 一种基于光伏逆变器调相的串供线路调压方法
CN109615193A (zh) 一种考虑光伏与混合储能的综合能源系统规划方法
CN107086586A (zh) 基于双馈风机无功发生能力的风电场群的无功补偿方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100602