Summary of the invention:
The objective of the invention is: a kind of simple in structure, with low cost, easy construction is provided and has the preparation method that adapts to the heat effect performance and can prevent or alleviate the anti-cracking concrete floor of aluminium electrolysis workshop of the rigidity flooring surface layer cracking that causes because of factors such as deck deflection deformation, immerge and temperature deformations, to overcome the deficiency of prior art.
The present invention is achieved in that and produces the reinforced concrete floor deck by traditional method earlier; The pitch separation layer of laying depth≤1.5 millimeters thick on the reinforced concrete floor deck then; After treating pitch separation layer drying, on the pitch separation layer, building thickness is the pea gravel concreten surface layer of 60~80 millimeters thick.
As stated above, treat pitch separation layer drying after, better for result of use, also can on the pitch separation layer, lay the steel mesh reinforcement layer, on the reinforcing bar stratum reticulare, build the pea gravel concreten surface layer that thickness is 60~80 millimeters thick then again.
When building the pea gravel concreten surface layer; The mode that employing is vibrated is built, behind the vibration compacting with smashing with smearing, and when building; The pea gravel concreten surface layer is separated into the pea gravel concreten surface layer of the rectangle piecemeal of 3~6m * 3~6m; Between the pea gravel concreten surface layer of per two adjacent rectangle piecemeals, be provided with width and be 15~20 millimeters straight joint, filling pitch flax silk in the seam of straight joint then, and put down straight joint with the bituminous grout embedding at the top of plug pitch flax silk.
The degree of depth of bituminous grout is 20~30 millimeters.
The pitch separation layer preferably adopts the bitumastic material to make.
The strength grade of pea gravel concreten surface layer is not less than the C35 concrete.
Owing to adopted technique scheme,,, under high temperature action, can reach following three kinds of physical and mechanical properties through the actual use proof of engineering by the produced anti-cracking concrete floor of the inventive method.
1, not easy to crack under high temperature action;
2, strength grade is not less than C35, can bear the big load in the manufacturing process;
3, possesses the condition that is free to slide relatively between surface layer and the floor slab structure layer.
Therefore, the present invention compared with prior art has the following advantages:
1, owing to set up the bitumastic separation layer; Surface layer and deck are broken away from relatively; Can prevent the influence of facings such as deflection deformation of concrete structure layer and temperature deformation; Make both can be relatively movable, the mutual effect of constraint value of reason and cause the surface layer cracking not after being heated, this is to be different from the existing important crack control measures of ordinary concrete flooring;
2, concrete pavement is owing to be provided with piecemeal straight joint lattice, and forms independently fritter separate unit, its freely fringe conditions help freely stretching of small blocks itself, prevent to ftracture;
3, set up steel mesh reinforcement in the high-grade concrete surface layer, effectively solve concrete and meet problems such as heat cracking and exposure cracking, guarantee the stability of surface layer.
The specific embodiment:
Embodiments of the invention 1: as shown in Figure 1; Earlier produce reinforced concrete floor deck 1, will water the reinforced concrete floor deck 1 of smashing also floating dry back load-bearing then and clean out, on reinforced concrete floor deck 1, brush the pitch separation layer 2 of one thickness≤1.5 millimeters thick by traditional method; Pitch separation layer 2 can adopt the bitumastic material; After treating pitch separation layer 2 dryings, on pitch separation layer 2, building one deck thickness is the pea gravel concreten surface layer 3 of 60~80 millimeters thick, when building pea gravel concreten surface layer 3; The strength grade of its pea gravel concreten surface layer 3 should be less than the C35 concrete; And adopt behind the plate vibrator vibration compacting with smashing with smearing, when building, pea gravel concreten surface layer 3 is separated into the pea gravel concreten surface layer 3 of the rectangle piecemeal of 3~6m * 3~6m; Between the pea gravel concreten surface layer 3 of per two adjacent rectangle sectional types, produce a width respectively and be 15~20 millimeters straight joint 6; Pitch flax silk 4 in the filling in the seam of straight joint 6 then, with the flat straight joint 6 of bituminous grout 5 embeddings, and the degree of depth of controlling bituminous grout is 20~30 millimeters at the top of plug pitch flax silk 4.
Embodiments of the invention 2: as shown in Figure 2; Earlier produce reinforced concrete floor deck 1 by traditional method; To water the reinforced concrete floor deck 1 of smashing also floating dry back load-bearing then cleans out; On reinforced concrete floor deck 1, brush the pitch separation layer 2 of one thickness≤1.5 millimeters thick, pitch separation layer 2 can adopt the bitumastic material, treat pitch separation layer 2 dryings after; On pitch separation layer 2, lay one deck reinforcing bar stratum reticulare 7; And making 10~15 millimeters on the surface of reinforcing bar stratum reticulare 7 high pitch separation layers 2, reinforcing bar stratum reticulare 7 can adopt φ 4200 two-way concrete slab nets to make, and on reinforcing bar stratum reticulare 7, builds the pea gravel concreten surface layer 3 that a layer thickness is 60~80 millimeters thick then again; When building pea gravel concreten surface layer 3; The strength grade of its pea gravel concreten surface layer 3 should be less than the C35 concrete; And adopt behind the plate vibrator vibration compacting with smashing with smearing, when building, pea gravel concreten surface layer 3 is separated into the pea gravel concreten surface layer 3 of the rectangle piecemeal of 3~6m * 3~6m; Between the pea gravel concreten surface layer 3 of per two adjacent rectangle piecemeals, produce a width respectively and be 15~20 millimeters straight joint 6; Pitch flax silk 4 in the filling in the seam of straight joint 6 then, with the flat straight joint 6 of bituminous grout 5 embeddings, and the degree of depth of controlling bituminous grout is 20~30 millimeters at the top of plug pitch flax silk 4.