CN101761159B - Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting - Google Patents

Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting Download PDF

Info

Publication number
CN101761159B
CN101761159B CN2008103064692A CN200810306469A CN101761159B CN 101761159 B CN101761159 B CN 101761159B CN 2008103064692 A CN2008103064692 A CN 2008103064692A CN 200810306469 A CN200810306469 A CN 200810306469A CN 101761159 B CN101761159 B CN 101761159B
Authority
CN
China
Prior art keywords
heat resisting
resisting brick
floor
surface layer
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008103064692A
Other languages
Chinese (zh)
Other versions
CN101761159A (en
Inventor
杨晓敏
高宇寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2008103064692A priority Critical patent/CN101761159B/en
Publication of CN101761159A publication Critical patent/CN101761159A/en
Application granted granted Critical
Publication of CN101761159B publication Critical patent/CN101761159B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

This invention relates to a method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting, wherein a reinforced concrete floor structural layer is prepared via the traditional way during manufacturing the floor of the aluminum electrolyzing workshop; an asphalt isolating layer with the thickness of not greater than 1.5 millimetres is paved on the reinforced concrete floor structural layer; the heat resisting brick with thickness of 60 to 80 millimetres are paved within 800 millimetres of the board side of the aluminum alloy electrolyzing groove via heat insulating mortar; a fine stone concrete face layer with the thickness of 60 to 80 millimetres is concreted on the asphalt isolating layer and out of the range of 800 millimetres to the board side of the aluminum electrolyzing groove. The method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting has the advantages that the heat resisting brick paved at the part terribly heated has the functions of heat resistance and free stretching; the integral face layer is hard to break at high temperature; the heat resisting stick having strength level not less than C35 can bear great load in production process; and the face layer and the floor structural layer comprise the condition of relatively free slipping.

Description

The method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick combines with monobloc cast
Technical field:
The present invention relates to the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that a kind of heat resisting brick combines with monobloc cast, belong to aluminium electrolysis shop concrete floor surface layer manufacture technology field.
Technical background:
Aluminium electroloysis belongs to the high-temperature metal smelting process, and the aluminum solutions temperature in the smelting equipment electrolytic cell is up to 960 ℃, in the production operation except the high temperature aluminum liquation frequently water clock on flooring; Also need change the conductive anode carbon rod in turn; Its discarded high temperature anode scrap epicranium is changed down, is shelved on the steel carriage of flooring to carry out the nature cooling, during like upset operation; High temperature anode scrap head is directly lost and is placed on the flooring; Therefore flooring even receive nearly 600 ℃ width of cloth and penetrate heat effect, the operation of the heavy car of two-maing ladle in addition, thus make the concrete floor surface layer of present use Large Area Cracking occur, fall piece.This not only influences production, also threatens the safe handling of load-bearing reinforced concrete floor structure.Therefore, the concrete floor structure of existing aluminium electrolysis shop still can not meet the needs of production.
Summary of the invention:
The objective of the invention is: a kind of simple in structure, with low cost, easy construction is provided and has more to adapt to the heat effect performance, can prevent or alleviate the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that the heat resisting brick of the rigidity flooring surface layer cracking that causes because of factors such as deck deflection deformation, immerge and temperature deformations combines with monobloc cast, to overcome the deficiency of prior art.
The present invention is achieved in that it comprises the aluminium electrolysis shop that is provided with aluminium cell; When making the flooring of aluminium electrolysis shop; Earlier produce the reinforced concrete floor deck, on the reinforced concrete floor deck, lay the pitch separation layer of one thickness≤1.5 millimeters thick then by traditional method, treat pitch separation layer drying after; In 800 millimeters scopes in frid limit of aluminium cell, with heat-resisting paving with mortar 60~80 millimeters thick heat resisting bricks; At 800 millimeters beyond the scope apart from the frid limit of aluminium cell, on the pitch separation layer, building one deck thickness is the pea gravel concreten surface layer of 60~80 millimeters thick then.
As stated above; After treating pitch separation layer drying, for result of use better, at 800 millimeters beyond the scope apart from the frid limit of aluminium cell; On the pitch separation layer, lay one deck reinforcing bar stratum reticulare earlier, on the reinforcing bar stratum reticulare, build the pea gravel concreten surface layer that a layer thickness is 60~80 millimeters thick then again.
When building the pea gravel concreten surface layer; The mode that employing is vibrated is built, behind the vibration compacting with smashing with smearing, and when building; The pea gravel concreten surface layer is separated into the pea gravel concreten surface layer of the rectangular block formula of 3~6m * 3~6m; Between the pea gravel concreten surface layer of per two adjacent rectangle piecemeals, be provided with width and be 15~20 millimeters straight joint, filling pitch flax silk in the seam of straight joint then, and have the top of pitch flax silk to put down straight joint with the bituminous grout embedding in filling.
The degree of depth of above-mentioned bituminous grout is 20~30 millimeters.
The pitch separation layer preferably adopts the bitumastic material to make.
The strength grade of above-mentioned pea gravel concreten surface layer should be not less than the C35 concrete.
Heat resisting brick can adopt concrete precast block to replace.
Owing to adopted technique scheme,,, under high temperature action, can reach following three kinds of physical and mechanical properties through the actual use proof of engineering by produced heat resisting brick and the compound anti-cracking floor of concrete of the inventive method.
1, heat resisting brick is paved in the most serious place that is heated, and not only heat-resisting but also can freely stretch, monolithic floor surface is not easy to crack under high temperature action;
2, strength grade is not less than C35, can bear the big load in the manufacturing process;
3, possesses the condition that is free to slide relatively between surface layer and the floor slab structure layer.
Therefore, the present invention compared with prior art has the following advantages:
1, owing to set up the bitumastic separation layer; Surface layer and deck are broken away from relatively; Can prevent the influence of facings such as deflection deformation of concrete structure layer and temperature deformation; Make both can be relatively movable, the mutual effect of constraint value of reason and cause the surface layer cracking not after being heated, this is to be different from the existing important crack control measures of ordinary concrete flooring;
2, concrete pavement is owing to be provided with piecemeal straight joint lattice, and forms independently fritter separate unit, its freely fringe conditions help freely stretching of small blocks itself, prevent to ftracture;
3, set up steel mesh reinforcement in the high-grade concrete surface layer, heat resisting brick is paved in the most serious place that is heated, and effectively solves concrete and meets problems such as heat cracking and exposure cracking, guarantees the stability of surface layer.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present invention;
Accompanying drawing 2 has additional the reinforcing bar stratum reticulare and paves heat resisting brick structure combining sketch map for the present invention.
Drawing reference numeral explanation: 1-reinforced concrete floor deck, 2-pitch separation layer, 3-pea gravel concreten surface layer, 4-pitch flax silk, 5-bituminous grout, 6-straight joint, 7-reinforcing bar stratum reticulare, 8-heat resisting brick, 9-aluminium cell.
The specific embodiment:
Embodiments of the invention 1: as shown in Figure 1; When making is provided with the flooring of aluminium electrolysis shop of aluminium cell 9; Earlier produce reinforced concrete floor deck 1 by traditional method; To water the reinforced concrete floor deck 1 of smashing also floating dry back load-bearing then and clean out, and on reinforced concrete floor deck 1, brush the pitch separation layer 2 of one thickness≤1.5 millimeters thick, pitch separation layer 2 can adopt the bitumastic material to make; After treating pitch separation layer 2 dryings; In 800 millimeters scopes in frid limit of aluminium cell 9, with heat-resisting paving with mortar 60~80 millimeters thick heat resisting bricks 8 (requiring for temperature condition is not very high occasion, and heat resisting brick 8 can adopt concrete precast block to replace); Then at 800 millimeters beyond the scope apart from the frid limit of aluminium cell 9; On pitch separation layer 2, building one deck thickness is the pea gravel concreten surface layer 3 of 60~80 millimeters thick; When building pea gravel concreten surface layer 3, the strength grade of its pea gravel concreten surface layer 3 should be less than the C35 concrete, and adopts behind the plate vibrator vibration compacting with smashing with smearing; When building; Pea gravel concreten surface layer 3 is separated into the pea gravel concreten surface layer 3 of the rectangle piecemeal of 3~6m * 3~6m, between the pea gravel concreten surface layer 3 of per two adjacent rectangle piecemeals, produces a width respectively and be 15~20 millimeters straight joint 6, then pitch flax silk 4 in the filling in the seam of straight joint 6; And at the top of plug pitch flax silk 4 with the flat straight joint 6 of bituminous grout 5 embeddings, and it is interior to make the degree of depth of bituminous grout be controlled at 20~30 millimeters scope.
Embodiments of the invention 2: as shown in Figure 2; When making is provided with the flooring of aluminium electrolysis shop of aluminium cell 9; Earlier produce reinforced concrete floor deck 1 by traditional method; To water the reinforced concrete floor deck 1 of smashing also floating dry back load-bearing then and clean out, and on reinforced concrete floor deck 1, brush the pitch separation layer 2 of one thickness≤1.5 millimeters thick, pitch separation layer 2 can adopt the bitumastic material; After treating pitch separation layer 2 dryings; In 800 millimeters scopes in frid limit of aluminium cell 9, with heat-resisting paving with mortar 60~80 millimeters thick heat resisting bricks 8 (requiring for temperature condition is not very high occasion, and heat resisting brick 8 can adopt concrete precast block to replace); Then at 800 millimeters beyond the scope apart from the frid limit of aluminium cell 9; On pitch separation layer 2, lay one deck reinforcing bar stratum reticulare 7; And make reinforcing bar stratum reticulare 7 exceed 10~15 millimeters on the surface of pitch separation layer 2; Reinforcing bar stratum reticulare 7 can adopt φ 4200 two-way concrete slab nets to make, and on reinforcing bar stratum reticulare 7, builds the pea gravel concreten surface layer 3 that a layer thickness is 60~80 millimeters thick then again; When building pea gravel concreten surface layer 3; The strength grade of its pea gravel concreten surface layer 3 should be less than the C35 concrete; And adopt the mode that plate vibrator vibrates to build; With smashing, when building, pea gravel concreten surface layer 3 is separated into the pea gravel concreten surface layer 3 of the rectangle piecemeal of 3~6m * 3~6m behind the vibration compacting with smearing; Between the pea gravel concreten surface layer 3 of per two adjacent rectangular block formulas, produce a width respectively and be 15~20 millimeters straight joint 6; Pitch flax silk 4 in the filling in the seam of straight joint 6 then, and at the top of plug pitch flax silk 4 with the flat straight joint 6 of bituminous grout 5 embeddings, and it is interior to make the degree of depth of bituminous grout be controlled at 20~30 millimeters scope.

Claims (6)

1. method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick combines with monobloc cast; Comprise the aluminium electrolysis shop that is provided with aluminium cell; It is characterized in that: when making the flooring of aluminium electrolysis shop; Earlier produce the reinforced concrete floor deck, on the reinforced concrete floor deck, lay the pitch separation layer of one thickness≤1.5 millimeters thick then by traditional method, treat pitch separation layer drying after; In 800 millimeters scopes in frid limit of aluminium cell, with heat-resisting paving with mortar 60~80 millimeters thick heat resisting bricks; At 800 millimeters beyond the scope apart from the frid limit of aluminium cell, on the pitch separation layer, building one deck thickness is the pea gravel concreten surface layer of 60~80 millimeters thick then; When building the pea gravel concreten surface layer; The mode that employing is vibrated is built, behind the vibration compacting with smashing with smearing, and when building; The pea gravel concreten surface layer is separated into the pea gravel concreten surface layer of the rectangular block formula of 3~6m * 3~6m; Between the pea gravel concreten surface layer of per two adjacent rectangle piecemeals, be provided with width and be 15~20 millimeters straight joint, filling pitch flax silk in the seam of straight joint then, and have the top of pitch flax silk to put down straight joint with the bituminous grout embedding in filling.
2. the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick according to claim 1 combines with monobloc cast; It is characterized in that: at 800 millimeters beyond the scope apart from the frid limit of aluminium cell; On the pitch separation layer, lay one deck reinforcing bar stratum reticulare earlier, on the reinforcing bar stratum reticulare, build the pea gravel concreten surface layer that a layer thickness is 60~80 millimeters thick then again.
3. the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick according to claim 1 combines with monobloc cast is characterized in that: the degree of depth of bituminous grout is 20~30 millimeters.
4. the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick according to claim 1 and 2 combines with monobloc cast is characterized in that: the pitch separation layer is for adopting the pitch separation layer of bitumastic material.
5. the method for manufacturing aluminum electrolyzing workshop anti-cracking floor that heat resisting brick according to claim 1 combines with monobloc cast is characterized in that: the strength grade of pea gravel concreten surface layer is not less than the C35 concrete.
6. the aluminum electrolyzing workshop anti-cracking floor that heat resisting brick according to claim 1 combines with monobloc cast
Preparation method is characterized in that: heat resisting brick adopts concrete precast block to replace.
CN2008103064692A 2008-12-23 2008-12-23 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting Expired - Fee Related CN101761159B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008103064692A CN101761159B (en) 2008-12-23 2008-12-23 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008103064692A CN101761159B (en) 2008-12-23 2008-12-23 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting

Publications (2)

Publication Number Publication Date
CN101761159A CN101761159A (en) 2010-06-30
CN101761159B true CN101761159B (en) 2012-07-04

Family

ID=42492529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008103064692A Expired - Fee Related CN101761159B (en) 2008-12-23 2008-12-23 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting

Country Status (1)

Country Link
CN (1) CN101761159B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102486037B (en) * 2010-12-01 2013-08-14 沈阳铝镁设计研究院有限公司 Corrosion-resisting floor deformation joint construction structure of magnesium electrolysis workshop and construction method
CN102155086A (en) * 2011-04-25 2011-08-17 巨石集团有限公司 Method for pouring house grade level

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20109205U1 (en) * 2001-06-01 2001-09-20 Zimmermann Hartmut Slab covering from covering slabs picked up on a laying base
DE10159340A1 (en) * 2000-12-05 2002-06-06 Akzo Nobel Nv Lightweight, two-layer floor composition contains filler binder based on calcium sulfate, cement, magnesium oxide, mastic asphalt and/or bitumen and is reinforced with fibers, fabric or metal
CN1730853A (en) * 2005-08-23 2006-02-08 贵阳铝镁设计研究院 Insulated floor laying method in aluminium electrolysis shop and its structure
CN1844607A (en) * 2005-04-08 2006-10-11 贵阳铝镁设计研究院 Workshop floor and ground treatment method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10159340A1 (en) * 2000-12-05 2002-06-06 Akzo Nobel Nv Lightweight, two-layer floor composition contains filler binder based on calcium sulfate, cement, magnesium oxide, mastic asphalt and/or bitumen and is reinforced with fibers, fabric or metal
DE20109205U1 (en) * 2001-06-01 2001-09-20 Zimmermann Hartmut Slab covering from covering slabs picked up on a laying base
CN1844607A (en) * 2005-04-08 2006-10-11 贵阳铝镁设计研究院 Workshop floor and ground treatment method
CN1730853A (en) * 2005-08-23 2006-02-08 贵阳铝镁设计研究院 Insulated floor laying method in aluminium electrolysis shop and its structure

Also Published As

Publication number Publication date
CN101761159A (en) 2010-06-30

Similar Documents

Publication Publication Date Title
US10273691B2 (en) Method of constructing a reinforced compound concrete beam containing demolished concrete lumps
CN105064543A (en) Formwork-free constructional column and construction method
CN103306501B (en) Energy-saving domestic architecture with cast-in-place industrial gypsum bearing wall and manufacturing method thereof
CN103509566A (en) Overhaul construction method of double chute position of dry quenching furnace
CN111764522A (en) Anti-leakage building floor post-cast strip structure and pouring method
CN105133487A (en) Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same
CN112177233A (en) Tenon-and-mortise hollow building block and building method thereof
CN101761159B (en) Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting
CN202610694U (en) Steel fiber light concrete and high-strength concrete overlaid pouring composite beam
CN215210504U (en) Ultrahigh-toughness concrete steel bridge deck pavement system based on shear keys
CN204626438U (en) One is pushed up flat-topped ridge board-like cavity raft foundation component
CN201330487Y (en) Aluminum electrolysis workshop crack control floor structure combining heat-resistant brick and integrally pouring
CN101684686B (en) Method for manufacturing anti-cracking concrete floor of aluminium electrolysis workshop
CN201329613Y (en) Horizontal slide template
CN201521050U (en) Concrete anti-cracking floor structure of aluminium electrolysis workshop
CN101806112B (en) Preparation method of cast-in-situ concrete hollow slab
CN114808691B (en) Directional fiber UHPC bridge deck plate in hogging moment area of steel-concrete composite beam and preparation and construction method
CN108018972A (en) Full precast floor slab and laminated floor slab combining structure, making and assembly method
CN108979150A (en) A kind of construction method of reinforced concrete girder slab
CN205035732U (en) Interim support of combined type bridge
CN204898942U (en) Exempt from formwork constructional column
CN102535471B (en) Secondary grouting method applied to space between bottom plate and foundation in installation work of mechanical equipment
CN105648474A (en) Energy-saved flow stabilization construction method of large prebaked tank
CN101451392B (en) Pouring and paving method of heat resisting and anti-cracking floor for aluminium electrolysis shop
CN215367372U (en) Light wallboard bed mould cushion cap structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110601

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110601

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Applicant after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Applicant before: Guiyang Aluminium and Magnesium Design Inst.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20141223

EXPY Termination of patent right or utility model