CN102155086A - Method for pouring house grade level - Google Patents

Method for pouring house grade level Download PDF

Info

Publication number
CN102155086A
CN102155086A CN 201110103492 CN201110103492A CN102155086A CN 102155086 A CN102155086 A CN 102155086A CN 201110103492 CN201110103492 CN 201110103492 CN 201110103492 A CN201110103492 A CN 201110103492A CN 102155086 A CN102155086 A CN 102155086A
Authority
CN
China
Prior art keywords
pouring
house
rule
cut
terrace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110103492
Other languages
Chinese (zh)
Inventor
张毓强
沈奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jushi Group Co Ltd
Original Assignee
Jushi Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jushi Group Co Ltd filed Critical Jushi Group Co Ltd
Priority to CN 201110103492 priority Critical patent/CN102155086A/en
Publication of CN102155086A publication Critical patent/CN102155086A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a control method for preventing a factory grade level from cracking. The method comprises the step of: dividing the factory grade level into blocks for pouring, wherein the area of each block is less than or equal to 6*8 square meters; during pouring, benzene plates or foaming plates with the thickness of 8 to 10 millimeters are vertically arranged in a connected gap between every two adjacent blocks, on the edge of the wall and at the periphery of a column; and the height of each of the benzene plates or the foaming plates is 8 to 10 millimeters lower than the thickness of the grade level. The method has the advantages that: the benzene plates are arranged on the edge of the wall and at the periphery of the column; when the foundation of a house main structure is subjected to differential settlement, the adjacent grade levels and the peripheral wall surface are not influenced mutually due to the partition of the benzene plates, so the damage to the grade level is reduced greatly during the differential settlement,, and cracks due to a temperature difference between the indoor and the outdoor can be prevented; moreover, steel bars arranged at the periphery of the column enhance the integrity of the sides of the column; and after the pouring of the grade level is finished, the periphery of the grade level is subjected to lancing and caulked joint to reduce inclined cracks on the sides of the column effectively.

Description

A kind of house terrace pouring procedure
(1) technical field
The present invention relates to construction techniques, relate in particular to a kind of house terrace pouring procedure.
(2) background technology
After the floor construction in existing house is finished, the contraction change of concrete self and variations in temperature and cause the cracking of terrace surface, particularly, the structure pillar under the effect of differential settlement, produce to the terrace active force, this active force can make the diagonal crack that produces around the pillar.
For fear of the terrace surface cracking, existing job practices comprises the steps:
Integrated poured to house earth surface, form concrete floor;
After treating that described concrete floor reaches certain intensity, play the line of ink marker on the concrete floor surface;
Along described line of ink marker cutting concrete floor, form many joint-cuttings with cutting machine;
Manually joint-cutting is played glue with fluid sealant.
In the said method, owing to be after concrete floor reaches certain intensity, the cutting concrete, and joint-cutting is played glue handle, so, can avoid the terrace cracking to a certain extent, still, the weak point of this job practices is:
1, the terrace surface on wall limit or pillar limit can produce the crack;
2, joint-cutting is not straight;
3, play glue only in joint-cutting upper strata leakiness, glue comes off easily.
(3) summary of the invention
The object of the invention is to provide a kind of house method for constructing terrace, solves the problem of the concrete floor cracking on the existing house earth surface.
For addressing the above problem, the technical solution used in the present invention is:
House terrace pouring procedure comprises the steps: the ground in described house is divided into the polylith pouring area, and each pouring area is surrounded by many cut-off rules; The polylith pouring area that does not have common cut-off rule is poured into a mould, formed concrete floor; First demarcation strip is placed in side at the concrete floor that forms; The pouring area adjacent with first demarcation strip poured into a mould; Pour into a mould remaining pouring area on the house earth surface repeating step (2) to (4) or step (3) and (4), until all pouring areas of having built house earth surface.
Alternatively, described method also comprises elder generation at all pouring area upper framework terrace reinforcing bars, then, cuts off the corresponding terrace reinforcing bar in intersection point place with described cut-off rule.
Alternatively, the area of described pouring area should be not more than 6m * 8m.
Alternatively, described method also comprises: in the process of pouring area that intersects on cast and wall limit, house or the pouring area that intersects with the pillar limit, place second demarcation strip respectively on the wall limit or around pillar earlier, then cast and wall limit, house/or pouring area of intersecting of pillar limit, form concrete floor, then, also place first demarcation strip at the side of this concrete floor.
Alternatively, after placing second demarcation strip, the distributing bar around second demarcation strip is set also, and with distributing bar and the welding of terrace reinforcing bar.
Alternatively, the vertical height of described second demarcation strip is lower than described concrete floor vertical height 8~10mm, and the thickness of described first demarcation strip is 10mm.
Alternatively, the described first demarcation strip vertical height is lower than concrete floor vertical height 8~10mm, and the thickness of described first demarcation strip is 10mm.
Alternatively, the described polylith pouring area that does not have common cut-off rule is meant that described polylith pouring area does not have the cut-off rule of identical cut-off rule and described pouring area not have intersection point.
Alternatively, the described polylith pouring area that does not have common cut-off rule is meant that described polylith pouring area does not have the adjacent cut-off rule of identical cut-off rule and adjacent two pouring areas to intersect.
Alternatively, the described polylith pouring area that does not have common cut-off rule is meant that described polylith pouring area does not have identical cut-off rule, and in the described polylith pouring area, the cut-off rule of each pouring area and the cut-off rule of other pouring areas are non-intersect.
Beneficial effect of the present invention is mainly reflected in:
1, because the present invention places first demarcation strip in the side of the concrete floor that forms; The pouring area adjacent with first demarcation strip poured into a mould, like this, pour after all pouring areas of house earth surface, separated by first demarcation strip between the adjacent concrete floor, thereby, when a certain block concrete terrace causes the concrete floor face checking because of the contraction change of concrete self and variations in temperature, perhaps during the inhomogeneous decline of structure pillar, this block concrete terrace is little to the concrete floor influence of other pieces, thereby, reduce the phenomenon that the concrete floor cracking takes place to produce, because the compartmentation of this first demarcation strip, also can avoid the influence of indoor/outdoor temperature-difference to concrete floor, such as, the cracking that the temperature difference causes.In addition, the present invention pours into a mould the pouring area that does not have common cut-off rule, forms concrete floor, adopts in such a way and can pour into a mould the polylith pouring area simultaneously, is guaranteeing concrete floor indehiscent while of surface, and efficiency of construction is very high.Moreover, owing to be that first demarcation strip is set, also solved the not straight problem of joint-cutting between the adjacent concrete terrace.
2, the present invention includes the corresponding terrace reinforcing bar in intersection point place that cuts off with described cut-off rule, like this, not only guarantee the intensity of every block concrete terrace, and, concrete floor can wholely not connect or stride piece and connect, and active force is very little each other, is not easy to produce obvious crack.
3, because the area of each piece pouring area is not more than 6m * 8m, like this, can guarantee the planeness of whole concrete floor.Simultaneously, the area of concrete floor influence is also little.
4, the present invention all is provided with second demarcation strip and makes concrete floor and wall limit or pillar be separated by second demarcation strip between the metope all around around wall limit and pillar, so, when the main house body structure because during the differential settlement of ground, significantly reduced destruction, simultaneously anti-cracking role has also been played in the crack that indoor/outdoor temperature-difference caused concrete floor
5, because the vertical height of first demarcation strip or second demarcation strip is lower than described concrete floor vertical height 8~10mm, and the thickness of described first demarcation strip is 10mm, like this, can play the glue of 8~10mm at least, and it is closely knit to play glue, glue is not easy to come off.
(4) description of drawings
Fig. 1 is the schematic diagram that house earth surface is divided into the polylith pouring area;
Fig. 2 adopts first kind of mode to form the schematic diagram of concrete floor on pouring area shown in Figure 1;
Fig. 3 is the sectional view of the A-A line of a pouring area in Fig. 2;
Fig. 4 adopts the second way to form the schematic diagram of concrete floor on pouring area shown in Figure 1.
(5) specific embodiment
By describing technology contents of the present invention, structural feature in detail, reached purpose and effect, below, in conjunction with the specific embodiment and cooperate diagram to be illustrated.
See also Fig. 1, when implementing technical scheme of the present invention, at first, the ground 1 in described house is divided into polylith pouring area 2, in this step, different according to the area on ground and shape, the mode difference of division.No matter adopt any mode, all to divide described ground 1 about equally based on attractive in appearance and area each piece, such as, after the area of each piece pouring area 2 of reasonable computation, mode by snap the line is divided into polylith pouring area 2 with the ground 1 in described house, pouring area 2 is surrounded by many cut-off rules 21, such as, the pouring area 2 of first row, first row shown in Figure 2 is surrounded by four cut-off rules 21.Among the present invention, cut-off rule 21 should be interpreted as line segment, also can be understood as the part that cut-off rule 21 is snap the line, cut-off rule 21 such as pouring area 2 right sides of the cut-off rule 21 on pouring area 2 right sides of, the cut-off rule 21 on pouring area 2 right sides that are positioned at first row first row among Fig. 1 (right side with the right side of drawing as the reference benchmark), second row, first row and the third line first row is formed a snap the line.According to the mode difference of dividing, the shape of pouring area 2 is inequality, such as, the shape of pouring area 2 can be circular, square and other polygons, and each piece pouring area 2 is squares in the present embodiment.When the ground 1 in house was divided, the area of each piece pouring area 2 should be controlled in the scope that is not more than 6m * 8m, and area can not be greater than the follow-up explanation of the reason of 6m * 8m.
See also Fig. 2 and in conjunction with Fig. 1, after ground 1 is divided into polylith pouring area 2, just can pour into a mould pouring area 2, in the present embodiment, pouring type and prior art are distinguished to some extent, the present invention pours into a mould the pouring area 2 that does not have common cut-off rule 21, described do not have common cut-off rule 21 and be meant that in the present embodiment described pouring area 2 does not have the cut-off rule 21 of identical cut-off rule 21 and these several pouring areas 2 not have intersection point, such as, among Fig. 2, the pouring area 2 of first row, first row, the tertial pouring area 2 of first row, the pouring area 2 and the tertial pouring area 2 of the third line of the third line first row just can be referred to as the described pouring area 2 that does not have common cut-off rule 21 of present embodiment.Certainly, adopt conventional method to pour into a mould to the concrete pouring of this pouring area 2, form concrete floor 3 after the cast, herein, the area of pouring area 2 is controlled at is not more than 6m * 8m and makes explanations, when the area of pouring area 2 during greater than 6m * 8m, the area that is formed on the concrete floor 3A on this pouring area 2 is also greater than 6m * 8m, and the present inventor finds, concrete floor under the situation of area greater than 6m * 8m, the bad control of the planeness of concrete floor, and, when cracking took place, the concrete floor of cracking was also big to the influence of other concrete floors, can aggravate the cracking of concrete floor 3.
Please continue to consult Fig. 2, after forming concrete floor 3, place first demarcation strip 4 in the side 31 of concrete floor 3A.At this moment, the side of described concrete floor 3A be meant concrete floor 3A except with the face of pouring area 2 contact and the face relative with pouring area 2 face, first demarcation strip 4 can be the benzene plate, can be cystosepiment also, is the benzene plate in the present embodiment.The mode that first demarcation strip 4 is bonded in the side of concrete floor 3A can be by glue first demarcation strip 4 to be attached on the concrete floor 3.
Please continue to consult Fig. 2 and in conjunction with Fig. 3, in the present embodiment, described first demarcation strip, 4 vertical height H are lower than concrete floor 3A vertical height 8~10mm, the thickness T of described first demarcation strip 4 is 10mm.
Please continue to consult Fig. 2 and in conjunction with Fig. 1, then, remaining pouring area 2 is poured into a mould on the ground 1 to the house, forming concrete floor 3B (only is for the ease of identification and reading, so, with concrete floor called after 3B herein), present embodiment is that the pouring area 2 adjacent with first demarcation strip 4 poured into a mould, concrete, the pouring area 2 of the first row secondary series, the pouring area 2 of first row the 4th row, the pouring area 2 that pouring area 2 is poured into a mould and the third line the 4th is listed as of the third line secondary series are poured into a mould, on these pouring areas 2, formed concrete floor 3B.Then, place first demarcation strip 4 in the side of concrete floor 3B, then, according to placing first demarcation strip 4 in the side that forms concrete floor, the pouring area 2 adjacent with first demarcation strip 4 poured into a mould this mode repeat, until pouring all pouring areas 2.
Please continue to consult Fig. 2, after all pouring areas 2 casting completes, the ground 1 in house is covered by concrete floor, at this moment, in order to make the better effects if of concrete floor, need maintain concrete floor, usually, adopt following method that the concrete floor that forms is maintained: cover film or wood chip on all concrete floors, and water seasoning 7-10 days.Before not reaching design strength, must not bearing article on the concrete floor.After concrete floor reaches setting intensity, according to snap the line position in advance concrete floor is cut, in this step, be lower than concrete floor 3 vertical heights 8~10mm owing to be provided with the vertical height of first demarcation strip 4 and first demarcation strip 4 between the adjacent concrete floor, like this, will form the slit between the adjacent concrete floor.Described herein concrete floor is cut, comprise the cutting concrete floor and expose first demarcation strip 4 between the adjacent concrete terrace, cleaning is positioned at the foreign material in slit, then, play special-purpose terrace glue 5 (as shown in Figure 3), make described terrace special glue 5 bury described slit, and guarantee that terrace special glue 5 fully contacts with first demarcation strip 4, it is closely knit to play terrace special glue 5 glue, and terrace special glue glue is not easy to come off.
By premises terrace pouring procedure as can be known, owing to be that the pouring area 2 that does not have common cut-off rule 21 is poured into a mould, form concrete floor, place first demarcation strip 4 in concrete floor 3A side then, so, after house earth surface 1 is poured, adjacent concrete floor is separated by first demarcation strip 4, thereby, when a certain block concrete terrace caused the concrete floor face checking because of the contraction change of concrete self and variations in temperature, this block concrete terrace was little to the concrete floor influence of other pieces, thereby, can not produce the phenomenon of concrete floor cracking, moreover, because the compartmentation of this first demarcation strip can also be avoided the influence of indoor/outdoor temperature-difference to concrete floor, such as, the cracking that the temperature difference causes.
Equally, from the foregoing description as can be known, owing to be to pour into a mould to not having common cut-off rule 21 several pouring areas, and the cut-off rule 21 of this pouring area of several 2 does not have intersection point, so, can pour into a mould polylith pouring area 2 simultaneously, with pouring area shown in Figure 22 is example, can pour into a mould the tertial pouring area 2 of pouring area 2, the first row of first row, first row earlier, it is to be noted, herein for this section beneficial effect described later is described, specially omit the step that first demarcation strip 4 is set, then, the pouring area of the cast first row secondary series, the pouring area of first row the 4th row, the pouring area of the second row secondary series, the pouring area of second row the 4th row, in such a manner, can divide multiple batches of cast house earth surface 1 and every batch can pour into a mould polylith pouring area 2 simultaneously, so this job practices is outside guaranteeing that adjacent concrete floor is separated by first demarcation strip 4, the efficient of cast improves greatly.
See also Fig. 4, Fig. 4 is the second embodiment of the present invention, the difference of this embodiment and first embodiment is, among this embodiment, the described polylith pouring area 2 that does not have common cut-off rule 21 is meant that described polylith pouring area 2 does not have the adjacent cut-off rule of identical cut-off rule 21 and adjacent two pouring areas 2 to intersect, such as, the pouring area 2 of first row, first row, the pouring area 2 and the tertial pouring area 2 of the third line of the second row secondary series do not have common cut-off rule 21 among Fig. 4, but the cut-off rule 21 of the pouring area 2 of first row the firstth row intersects at a point.Present embodiment is the pouring area 2 with said structure to be poured into a mould form concrete floor 3C, then, places first demarcation strip 4 in the side of concrete floor 3C.
Please continue to consult Fig. 4, then, remaining pouring area 2 is poured into a mould on the ground 1 to the house, also forms concrete floor 3D, concrete mode is: the pouring area that does not have common cut-off rule 21 2 to remaining pouring area 2 is poured into a mould, form concrete floor 3D, then, place first demarcation strip 4 in the side of the concrete floor 3D that forms, then, pour into a mould for first demarcation strip, 4 adjacent pouring areas 2, so repeat, until having built all pouring areas 2.
Aforesaid way is that first demarcation strip 4 is placed in repetition in the side of concrete floor, then, and the pouring area that cast is adjacent with first demarcation strip 4 and finish the cast of whole house earth surface 1, thereby, reach the technique effect identical with first embodiment.; present embodiment can also be done following variation; according to second embodiment (a) the polylith pouring area 2 that does not have common cut-off rule is poured into a mould; form concrete floor; then; (b) place first demarcation strip 4 in the side of concrete floor; (c) the cast pouring area adjacent with first demarcation strip 4; circulation step a builds to step c and with all pouring areas and finishes; it is to be noted; when remaining pouring area 2 satisfies the structure of step a definition, direct circulation step (b) and (c) finish the cast of whole house earth surface 1.
Behind the present embodiment casting complete, the effect that concrete floor had is identical with first embodiment, does not repeat them here.
In above-mentioned first embodiment or second embodiment, can handle the pouring area that intersects with pillar earlier, this mode is that concrete floor and the pillar after will building with second demarcation strip separates, other pouring type can adopt the described mode of first embodiment, also can adopt the described mode of second embodiment.Second demarcation strip can be the benzene plate, it also can be cystosepiment, its vertical height is lower than concrete floor vertical height 8~10mm that the cast back forms, and the thickness of described second demarcation strip is 10mm, and handling like this is to cause the concrete floor after building to ftracture for fear of factors such as pillar sedimentations.
Certainly, though above-mentioned be explanation to the processing of the pouring area that intersects with pillar, same, the pouring area that intersects with the wall limit also can adopt this mode to handle, then, other pouring area can adopt the described mode of first embodiment, also can adopt the mode of second embodiment.
In addition, active force is very little each other for the intensity that guarantees every block concrete terrace and concrete floor, be not easy to produce obvious crack, above-mentioned any one embodiment is before cast, can be on all pouring areas framework terrace reinforcing bar, still, connect in order to guarantee that concrete floor can wholely not connect or stride piece, the present invention need cut off the corresponding terrace reinforcing bar with the intersection point place of described cut-off rule, and then pours into a mould according to one of above-mentioned three embodiment.
Though above-mentioned three embodiment of the present invention are openly as above, be not that those skilled in the art can do a little change and retouching in not breaking away from creation thought of the present invention in order to qualification the present invention, still, still within protection scope of the present invention.

Claims (10)

1. a house terrace pouring procedure is characterized in that described method comprises the steps:
(1) ground with described house is divided into a plurality of pouring areas, and each pouring area is surrounded by many cut-off rules;
(2) a plurality of pouring areas that do not have common cut-off rule are poured into a mould, formed concrete floor;
(3) place first demarcation strip in the side of the concrete floor that forms;
(4) pouring area adjacent with first demarcation strip poured into a mould;
(5) pour into a mould remaining pouring area on the house earth surface repeating step (2) to (4) or step (3) and (4), until all pouring areas of having built house earth surface.
2. house as claimed in claim 1 terrace pouring procedure is characterized in that, described method also comprises elder generation at all pouring area upper framework terrace reinforcing bars, then, cuts off the corresponding terrace reinforcing bar in intersection point place with described cut-off rule.
3. house as claimed in claim 1 or 2 terrace pouring procedure is characterized in that the area of described pouring area is not more than 6m * 8m.
4. house as claimed in claim 2 terrace pouring procedure, it is characterized in that, described method also comprises: in the process of pouring area that intersects on cast and wall limit, house or the pouring area that intersects with the pillar limit, place second demarcation strip respectively on the wall limit or around pillar earlier, then cast and the crossing pouring area in wall limit, house or pillar limit, form concrete floor, then, also place first demarcation strip at the side of this concrete floor.
5. house as claimed in claim 4 terrace pouring procedure is characterized in that, after placing second demarcation strip, the distributing bar around second demarcation strip is set also, and with distributing bar and the welding of terrace reinforcing bar.
6. house as claimed in claim 4 terrace pouring procedure is characterized in that, the vertical height of described second demarcation strip is lower than described concrete floor vertical height 8~10mm, and the thickness of described second demarcation strip is 10mm.
7. house as claimed in claim 1 terrace pouring procedure is characterized in that, the described first demarcation strip vertical height is lower than concrete floor vertical height 8~10mm, and the thickness of described first demarcation strip is 10mm.
8. house as claimed in claim 1 terrace pouring procedure is characterized in that, the described a plurality of pouring areas that do not have common cut-off rule are meant that described a plurality of pouring area does not have the cut-off rule of identical cut-off rule and described pouring area not have intersection point.
9. house as claimed in claim 1 terrace pouring procedure, it is characterized in that, the described a plurality of pouring areas that do not have common cut-off rule are meant that described a plurality of pouring area does not have identical cut-off rule, and in described a plurality of pouring area, a cut-off rule of a cut-off rule of each pouring area and other pouring areas intersects.
10. house as claimed in claim 1 terrace pouring procedure, it is characterized in that, the described a plurality of pouring areas that do not have common cut-off rule are meant that described a plurality of pouring area does not have identical cut-off rule, and in described a plurality of pouring area, the cut-off rule of each pouring area and the cut-off rule of other pouring areas are non-intersect.
CN 201110103492 2011-04-25 2011-04-25 Method for pouring house grade level Pending CN102155086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110103492 CN102155086A (en) 2011-04-25 2011-04-25 Method for pouring house grade level

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110103492 CN102155086A (en) 2011-04-25 2011-04-25 Method for pouring house grade level

Publications (1)

Publication Number Publication Date
CN102155086A true CN102155086A (en) 2011-08-17

Family

ID=44436736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110103492 Pending CN102155086A (en) 2011-04-25 2011-04-25 Method for pouring house grade level

Country Status (1)

Country Link
CN (1) CN102155086A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535502A (en) * 2011-12-29 2012-07-04 中国一冶集团有限公司 Method for preventing settling and cracking of terrace with large area by utilizing combined prestressing concrete beams at region with soft soil layer
CN102561381A (en) * 2011-12-29 2012-07-11 中国一冶集团有限公司 Method for preventing settling and cracking of large-area terrace by using bonded prestressed concrete beams in soft soil layer region
CN103015680A (en) * 2011-09-21 2013-04-03 五冶集团上海有限公司 Manufacturing technology for terrace with wearing layer added with outside steel fiber reinforced concrete
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN108239904A (en) * 2016-12-26 2018-07-03 中冶天工集团天津有限公司 A kind of cement concrete crack resistence layer structure and construction method
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455054A (en) * 2003-05-08 2003-11-12 中国第二十冶金建设公司 Ordinary concrete block bunker-jump casting crack control method
CN101265749A (en) * 2008-04-29 2008-09-17 上海交通大学 Height adjustable type super flat floor divided seam protective formwork system
CN101307640A (en) * 2008-07-12 2008-11-19 中冶京唐建设有限公司 Garage abrasion-proof concrete pavement terrace crack control method
CN101476382A (en) * 2009-01-21 2009-07-08 中建五局第三建设有限公司 Construction method of angle steel angle bead dividing joint of large-area concrete floor
CN101748896A (en) * 2008-12-13 2010-06-23 广西建工集团第五建筑工程有限责任公司 Control device of flatness and elevation of cast-in-place concrete ground surface and method for construction
CN101761159A (en) * 2008-12-23 2010-06-30 贵阳铝镁设计研究院 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting
CN201521050U (en) * 2008-09-24 2010-07-07 贵阳铝镁设计研究院 Concrete anti-cracking floor structure of aluminium electrolysis workshop
CN101858089A (en) * 2010-05-29 2010-10-13 中国二十二冶集团有限公司 Method for controlling overlong and overlarge concrete cracks of foundation slab based on weathered rock
CN101886457A (en) * 2010-06-30 2010-11-17 中利建设集团有限公司 Method for constructing wear-resistant and crack-resistant hardened ground

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1455054A (en) * 2003-05-08 2003-11-12 中国第二十冶金建设公司 Ordinary concrete block bunker-jump casting crack control method
CN101265749A (en) * 2008-04-29 2008-09-17 上海交通大学 Height adjustable type super flat floor divided seam protective formwork system
CN101307640A (en) * 2008-07-12 2008-11-19 中冶京唐建设有限公司 Garage abrasion-proof concrete pavement terrace crack control method
CN201521050U (en) * 2008-09-24 2010-07-07 贵阳铝镁设计研究院 Concrete anti-cracking floor structure of aluminium electrolysis workshop
CN101748896A (en) * 2008-12-13 2010-06-23 广西建工集团第五建筑工程有限责任公司 Control device of flatness and elevation of cast-in-place concrete ground surface and method for construction
CN101761159A (en) * 2008-12-23 2010-06-30 贵阳铝镁设计研究院 Method for manufacturing aluminum electrolyzing workshop anti-cracking floor via combining heat resisting brick and integral concreting
CN101476382A (en) * 2009-01-21 2009-07-08 中建五局第三建设有限公司 Construction method of angle steel angle bead dividing joint of large-area concrete floor
CN101858089A (en) * 2010-05-29 2010-10-13 中国二十二冶集团有限公司 Method for controlling overlong and overlarge concrete cracks of foundation slab based on weathered rock
CN101886457A (en) * 2010-06-30 2010-11-17 中利建设集团有限公司 Method for constructing wear-resistant and crack-resistant hardened ground

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20091130 阮建鑫 工业厂房混凝土地坪裂缝控制的探讨 第35卷, 第33期 2 *
《科技资讯》 20081231 戴胜军 华晨金杯E2发动机厂房超大面积特殊地坪综合施工技术 , 第22期 2 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015680A (en) * 2011-09-21 2013-04-03 五冶集团上海有限公司 Manufacturing technology for terrace with wearing layer added with outside steel fiber reinforced concrete
CN102535502A (en) * 2011-12-29 2012-07-04 中国一冶集团有限公司 Method for preventing settling and cracking of terrace with large area by utilizing combined prestressing concrete beams at region with soft soil layer
CN102561381A (en) * 2011-12-29 2012-07-11 中国一冶集团有限公司 Method for preventing settling and cracking of large-area terrace by using bonded prestressed concrete beams in soft soil layer region
CN102535502B (en) * 2011-12-29 2014-05-07 中国一冶集团有限公司 Method for preventing settling and cracking of terrace with large area by utilizing combined prestressing concrete beams at region with soft soil layer
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN105350559B (en) * 2015-11-27 2017-12-15 中国一冶集团有限公司 A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN108239904A (en) * 2016-12-26 2018-07-03 中冶天工集团天津有限公司 A kind of cement concrete crack resistence layer structure and construction method
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure

Similar Documents

Publication Publication Date Title
CN102155086A (en) Method for pouring house grade level
CN203080705U (en) Concrete post-cast strip supporting top
US11359385B2 (en) Bathroom floor waterproofing system, method of manufacturing the same, and method of constructing the same
CN106088530A (en) Large area method for constructing terrace
ES2390685B1 (en) CONSTRUCTION SYSTEM.
CN110409617A (en) Zigzag double fastener plate node assembled H profile steel beam quadrate steel pipe column steel structure system
US1552077A (en) Block for building construction
US20020092249A1 (en) Partially prefabricated waffle slab
KR100949785B1 (en) Mold for manufacturing PC beam
US10329767B2 (en) Grid deck with shear-resisting plates
CN106836592B (en) Partially prefabricated assembled rear-superposed hollow floor
CN103422589A (en) Method for constructing masonry from concrete hollow blocks
CN106142301A (en) Template system shared by the prefabricated concrete component of a kind of batch
CN216194892U (en) Subway upper cover project construction elevator foundation structure
CN202689308U (en) Masonry body formed by concrete hollow blocks
CN211284414U (en) Slag hot-stewing pool for steel slag
CN206503259U (en) A kind of inner wall structure
CN206503260U (en) A kind of external wall structure
Evans Riverfront Revival
CN212053783U (en) Building external wall template reinforcing member
CN206205274U (en) A kind of waterproof reinforcing bar stirrup
CN203783135U (en) Hollow die shell for concrete constructional column of wall
CN204385755U (en) Foundation construction precast concrete form structure
CN213226791U (en) Side mold for producing prefabricated superposed plate
CN216360829U (en) Floor slab with double-layer structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110817