CN101673948A - 电力系统暂态稳定分析的n-2组合故障快速排序方法 - Google Patents

电力系统暂态稳定分析的n-2组合故障快速排序方法 Download PDF

Info

Publication number
CN101673948A
CN101673948A CN200910035953A CN200910035953A CN101673948A CN 101673948 A CN101673948 A CN 101673948A CN 200910035953 A CN200910035953 A CN 200910035953A CN 200910035953 A CN200910035953 A CN 200910035953A CN 101673948 A CN101673948 A CN 101673948A
Authority
CN
China
Prior art keywords
fault
transient stability
combined
power system
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910035953A
Other languages
English (en)
Inventor
徐泰山
薛禹胜
李碧君
鲍颜红
方勇杰
杨卫东
许剑冰
许立雄
崔晓丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Original Assignee
Nanjing NARI Group Corp
State Grid Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing NARI Group Corp, State Grid Electric Power Research Institute filed Critical Nanjing NARI Group Corp
Priority to CN200910035953A priority Critical patent/CN101673948A/zh
Publication of CN101673948A publication Critical patent/CN101673948A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明属于电力系统运行与控制领域,提出了一种电力系统暂态稳定分析的N-2组合故障快速排序方法,用于对电力系统任意组合的N-2故障按暂态稳定性的严重程度进行排序。本方法基于N-1故障的暂态稳定量化评估信息,结合第二个开断元件的功率变化对第一个故障元件的暂态稳定临界发电机群的功率灵敏度信息,计算出N-2组合故障的暂态稳定严重程度指标,来实现电力系统暂态稳定分析的N-2组合故障集的排序。本发明可以用于在电网运行方式及模型和参数确定的情况下,对大量的N-2组合故障按暂态稳定性的严重程度进行排序,从而只对排在前面的少量N-2组合故障进行详细的暂态稳定计算和分析,极大地提高任意N-2组合故障的暂态稳定详细计算和分析的效率。

Description

电力系统暂态稳定分析的N-2组合故障快速排序方法
技术领域
本发明属于电力系统运行与控制领域,更具体地说本发明涉及电力系统暂态稳定故障集排序技术,适用于对电力系统任意组合的N-2故障按暂态稳定性的严重程度进行排序。
背景技术
N-2故障通常是指电网中失去两个元件的故障。电力系统中元件众多,任意组合的N-2故障数目很大,若对每一个N-2组合故障都进行详细的暂态稳定计算和分析,工作量巨大。为此,需要从任意组合的N-2故障集中筛选出暂态稳定性相对严重的故障集,再对筛选出的N-2故障集进行详细的暂态稳定计算和分析,这就需要对N-2组合故障集进行快速排序。
现有的解决方法是电网计算分析人员针对电网的实际运行方式,凭经验设定少量的N-2组合故障,进行暂态稳定计算和分析,其可靠性与电网计算分析人员的经验是紧密相关的。因此,急需提出电力系统暂态稳定分析的N-2组合故障快速排序方法,降低N-2组合故障集的设置对电网计算分析人员经验的依赖程度。
发明内容
本发明提出了电力系统暂态稳定分析的N-2组合故障快速排序方法,其目的在于:在电网运行方式及模型和参数确定的情况下,对大量的N-2组合故障按暂态稳定性的严重程度进行排序,以便对N-2组合故障进行筛选,从而只对排在前面的少量N-2组合故障进行详细的暂态稳定计算和分析,代替对所有N-2组合故障的暂态稳定详细计算和分析,极大地提高任意N-2组合故障的暂态稳定详细计算和分析的效率。
本发明基于N-1故障的暂态稳定量化评估信息,结合第二个开断元件的功率变化对第一个故障元件的暂态稳定临界发电机群的功率灵敏度信息,计算出N-2组合故障的暂态稳定严重程度指标,来实现电力系统暂态稳定分析的N-2组合故障集的排序。
本发明所涉及的N-2组合故障为第一个元件的故障是故障发生后经过一段时间该元件跳开,第二元件故障为直接跳开的故障。
具体地说,本发明是采取以下的技术方案来实现的,包括下列步骤:
(1)根据电网运行方式及模型和参数,对一个N-1故障场景进行时域仿真,采用EEAC计算出该N-1故障的暂态稳定裕度及临界群中各台发电机的参与因子;
(2)在初始的电网运行方式上去除步骤(1)中的故障元件,直接生成新的运行方式;
(3)针对步骤(2)生成的N-1故障清除后的运行方式,采用潮流灵敏度分析方法计算出第二个开断元件的有功功率变化对第一个故障元件的暂态稳定临界群中各台发电机的有功功率灵敏度,即
Figure G2009100359530D00021
其中Pi为临界群中第i台发电机的有功功率,P为第二个开断元件的有功功率;
(4)采用公式
Figure G2009100359530D00022
计算出该N-2组合故障的暂态稳定严重程度指标,其中η为步骤(1)中计算出的N-1故障的暂态稳定裕度,L为该N-1故障的暂态稳定临界群发电机台数,Ci为临界群中第i台发电机的参与因子;
(5)重复步骤(3)和步骤(4),计算出该N-1故障的总共n-1个N-2组合故障的暂态稳定严重程度指标,其中n为设定的需要进行任意N-2组合故障集筛选的电网元件个数;
(6)重复步骤(1)至步骤(5),计算出m个N-1故障的总共m×(n-1)个N-2组合故障的暂态稳定严重程度指标,其中m为N-1故障总数;
(7)依据N-2组合故障的暂态稳定严重程度指标对所有的N-2组合故障进行由大到小的排序。
本发明提出的电力系统暂态稳定分析的N-2组合故障快速排序方法,可以用于在电网运行方式及模型和参数确定的情况下,对大量的N-2组合故障按暂态稳定性的严重程度进行排序,以便对N-2组合故障进行筛选,从而只对排在前面的少量N-2组合故障进行详细的暂态稳定计算和分析,代替对所有N-2组合故障的暂态稳定详细计算和分析,在确保不遗漏暂态稳定严重的N-2组合故障的前提下,极大地提高任意N-2组合故障的暂态稳定详细计算和分析的效率。
附图说明
图1为本发明方法的流程图。
具体实施方式
下面结合附图1,对本发明方法进行详细描述。
图1中步骤1描述的是N-1故障的暂态稳定量化分析,即根据电力系统运行方式及相应的模型与参数,采用基于时域仿真轨迹的EEAC方法计算出第k个N-1故障的暂态稳定裕度及临界群中各台发电机的参与因子,其中k表示N-1故障的序号;
图1中步骤2描述的是N-1故障清除后的运行方式生成,即在初始运行方式中去除步骤1中所分析的N-1故障元件,直接生成N-1故障后的运行方式;
图1中步骤3描述的是第二个开断元件的有功功率变化对第一个故障元件的暂态稳定临界群中各台发电机的有功功率灵敏度计算,即针对步骤2生成的N-1故障清除后的运行方式,采用潮流灵敏度分析方法计算出第二个开断元件j的有功功率变化对第一个故障元件的暂态稳定临界群中各台发电机的有功功率灵敏度,即
Figure G2009100359530D00041
其中Pi为临界群中第i台发电机的有功功率,Pj为第二个开断元件j的有功功率,j为N-2组合故障中的元件序号;
图1中步骤4描述的是N-2组合故障的暂态稳定严重程度指标计算,即采用公式
Figure G2009100359530D00042
计算出该N-2组合故障(即为第k个N-1故障与第j个元件的组合故障)的暂态稳定严重程度指标,其中ηk为步骤1中计算出的第k个N-1故障的暂态稳定裕度,L为该N-1故障的暂态稳定临界群发电机台数,Ci为临界群中第i台发电机的参与因子;
图1中步骤5描述的是针对步骤1中的N-1故障元件的N-2组合故障暂态稳定严重程度指标计算的循环,即重复步骤(3)和步骤(4),计算出该N-1故障的总共n-1个N-2组合故障的暂态稳定严重程度指标,其中n为设定的需要进行任意N-2组合故障集筛选的电网元件个数;
图1中步骤6描述的是针对m个N-1故障的N-2组合故障暂态稳定严重程度指标计算的循环,即重复步骤(1)至步骤(5),计算出m个N-1故障的总共m×(n-1)个N-2组合故障的暂态稳定严重程度指标;
图1中步骤7描述的是针对所有N-2组合故障的暂态稳定严重程度进行排序,即依据N-2组合故障的暂态稳定严重程度指标对所有的N-2组合故障进行由大到小的排序。

Claims (8)

1、电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,包括以下步骤:
(1)根据电网运行方式及模型和参数,对一个N-1故障场景进行时域仿真,采用暂态功角稳定量化分析理论和方法-扩展等面积准则(EEAC)计算出该N-1故障的暂态稳定裕度及临界群中各台发电机的参与因子;
(2)针对该N-1故障,生成该故障清除后的电网稳态运行方式;
(3)基于N-1故障清除后的运行方式,采用潮流灵敏度分析方法计算出第二个开断元件的有功功率变化对第一个故障元件的暂态稳定临界群中各台发电机的有功功率灵敏度;
(4)综合N-1故障的暂态稳定裕度、临界群中各台发电机的参与因子和第二个开断元件对临界群中各台发电机的有功功率灵敏度,计算出该N-2组合故障的暂态稳定严重程度指标;
(5)重复步骤(3)和步骤(4),直至该N-1故障的所有N-2组合故障的暂态稳定严重程度指标全部计算出来;
(6)重复步骤(1)至步骤(5),直至每个N-1故障的所有N-2组合故障的暂态稳定严重程度指标全部计算出来;
(7)依据N-2组合故障的暂态稳定严重程度指标对所有的N-2组合故障进行由大到小的排序。
2、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(1)采用EEAC进行N-1故障的暂态稳定量化分析,计算出N-1故障的暂态稳定裕度及临界群中各台发电机的参与因子。
3、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(2)的实现方法是在初始的电网运行方式上去除步骤(1)中的故障元件,直接生成新的运行方式。
4、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(3)的实现方法是针对步骤(2)生成的N-1故障清除后的运行方式,采用潮流灵敏度分析方法计算出第二个开断元件的有功功率变化对第一个故障元件的暂态稳定临界群中各台发电机的有功功率灵敏度,即其中Pi为临界群中第i台发电机的有功功率,P为第二个开断元件的有功功率。
5、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(4)的实现方法是采用公式
Figure A2009100359530003C2
计算出该N-2组合故障的暂态稳定严重程度指标,其中η为步骤(1)中计算出的N-1故障的暂态稳定裕度,L为该N-1故障的暂态稳定临界群发电机台数,Ci为临界群中第i台发电机的参与因子。
6、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(5)是重复步骤(3)和步骤(4),计算出该N-1故障的总共n-1个N-2组合故障的暂态稳定严重程度指标,其中n为设定的需要进行任意N-2组合故障集筛选的电网元件个数。
7、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(6)是重复步骤(1)至步骤(5),计算出m个N-1故障的总共m×(n-1)个N-2组合故障的暂态稳定严重程度指标,其中m为N-1故障总数。
8、根据权利要求1所述的电力系统暂态稳定分析的N-2组合故障快速排序方法,其特征在于,步骤(7)是按N-2组合故障的暂态稳定严重程度指标的大小进行排序。
CN200910035953A 2009-09-28 2009-09-28 电力系统暂态稳定分析的n-2组合故障快速排序方法 Pending CN101673948A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910035953A CN101673948A (zh) 2009-09-28 2009-09-28 电力系统暂态稳定分析的n-2组合故障快速排序方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910035953A CN101673948A (zh) 2009-09-28 2009-09-28 电力系统暂态稳定分析的n-2组合故障快速排序方法

Publications (1)

Publication Number Publication Date
CN101673948A true CN101673948A (zh) 2010-03-17

Family

ID=42021005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910035953A Pending CN101673948A (zh) 2009-09-28 2009-09-28 电力系统暂态稳定分析的n-2组合故障快速排序方法

Country Status (1)

Country Link
CN (1) CN101673948A (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807798A (zh) * 2010-04-20 2010-08-18 国网电力科学研究院 用于电力系统安全稳定在线分析的断面数据整合方法
CN101841155A (zh) * 2010-06-08 2010-09-22 国网电力科学研究院 用于电力系统暂态稳定分析的典型故障集识别方法
CN101895116A (zh) * 2010-07-16 2010-11-24 国电南瑞科技股份有限公司 基于分布因子的在线可用输电能力计算方法
CN101982917A (zh) * 2010-10-17 2011-03-02 华中电网有限公司 用于电网调度的可用输电能力的计算方法
CN102403717A (zh) * 2011-11-18 2012-04-04 中国南方电网有限责任公司 一种电力系统故障严重程度评价方法
CN102609575A (zh) * 2012-01-19 2012-07-25 浙江大学 一种基于隐式数值积分的电力系统暂态稳定仿真方法
CN103473708A (zh) * 2013-04-15 2013-12-25 南京南瑞集团公司 电力系统暂态安全稳定输电断面关联度指标快速计算方法
CN103559370A (zh) * 2013-11-19 2014-02-05 山东电力工程咨询院有限公司 电力系统n-2仿真分析过程自动化实现的系统及方法
CN103969536A (zh) * 2014-06-04 2014-08-06 贵州电力试验研究院 基于罗氏线圈数字仿真的互感器暂态特性测试系统及方法
CN104578048A (zh) * 2014-08-11 2015-04-29 国家电网公司 枚举组合相继故障集的暂态安全稳定在线快速评估方法
CN104578050A (zh) * 2014-10-29 2015-04-29 国家电网公司 一种电网暂态稳定强相关输电断面的识别方法
CN104578053A (zh) * 2015-01-09 2015-04-29 北京交通大学 基于受扰电压轨迹簇特征的电力系统暂态稳定性预测方法
CN105938174A (zh) * 2016-05-13 2016-09-14 云南电力调度控制中心 暂态功角稳定最严重的输电线路故障位置快速识别方法
CN107276072A (zh) * 2017-06-16 2017-10-20 东北电力大学 一种利用稳态信息定量评估电力系统暂态稳定裕度的方法
CN109167356A (zh) * 2018-10-16 2019-01-08 云南电网有限责任公司 一种n-2故障筛选方法
CN109638822A (zh) * 2018-12-19 2019-04-16 国电南瑞科技股份有限公司 计及暂态和静态约束的负荷恢复策略在线制定方法及系统
CN111416377A (zh) * 2020-03-16 2020-07-14 南方电网科学研究院有限责任公司 一种提高电网暂态稳定性的柔性直流控制方法及装置
CN112418555A (zh) * 2020-12-07 2021-02-26 国网湖南省电力有限公司 密集输电通道高风险故障集快速生成方法及系统
CN113541132A (zh) * 2021-07-21 2021-10-22 云南电网有限责任公司 一种用于交直流电网改造后的协调稳定控制方法

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101807798A (zh) * 2010-04-20 2010-08-18 国网电力科学研究院 用于电力系统安全稳定在线分析的断面数据整合方法
CN101807798B (zh) * 2010-04-20 2013-01-16 国网电力科学研究院 用于电力系统安全稳定在线分析的断面数据整合方法
CN101841155A (zh) * 2010-06-08 2010-09-22 国网电力科学研究院 用于电力系统暂态稳定分析的典型故障集识别方法
CN101841155B (zh) * 2010-06-08 2012-11-14 国网电力科学研究院 用于电力系统暂态稳定分析的典型故障集识别方法
CN101895116A (zh) * 2010-07-16 2010-11-24 国电南瑞科技股份有限公司 基于分布因子的在线可用输电能力计算方法
CN101895116B (zh) * 2010-07-16 2012-08-15 国电南瑞科技股份有限公司 基于分布因子的在线可用输电能力计算方法
CN101982917A (zh) * 2010-10-17 2011-03-02 华中电网有限公司 用于电网调度的可用输电能力的计算方法
CN101982917B (zh) * 2010-10-17 2013-03-27 华中电网有限公司 用于电网调度的可用输电能力的计算方法
CN102403717B (zh) * 2011-11-18 2014-05-07 中国南方电网有限责任公司 一种电力系统故障严重程度评价方法
CN102403717A (zh) * 2011-11-18 2012-04-04 中国南方电网有限责任公司 一种电力系统故障严重程度评价方法
CN102609575B (zh) * 2012-01-19 2013-12-04 浙江大学 一种基于隐式数值积分的电力系统暂态稳定仿真方法
CN102609575A (zh) * 2012-01-19 2012-07-25 浙江大学 一种基于隐式数值积分的电力系统暂态稳定仿真方法
CN103473708A (zh) * 2013-04-15 2013-12-25 南京南瑞集团公司 电力系统暂态安全稳定输电断面关联度指标快速计算方法
CN103473708B (zh) * 2013-04-15 2016-09-07 国家电网公司 电力系统暂态安全稳定输电断面关联度指标快速计算方法
CN103559370A (zh) * 2013-11-19 2014-02-05 山东电力工程咨询院有限公司 电力系统n-2仿真分析过程自动化实现的系统及方法
CN103559370B (zh) * 2013-11-19 2016-06-22 山东电力工程咨询院有限公司 电力系统n-2仿真分析过程自动化实现的系统及方法
CN103969536A (zh) * 2014-06-04 2014-08-06 贵州电力试验研究院 基于罗氏线圈数字仿真的互感器暂态特性测试系统及方法
CN103969536B (zh) * 2014-06-04 2016-06-22 贵州电力试验研究院 基于罗氏线圈数字仿真的互感器暂态特性测试方法
CN104578048A (zh) * 2014-08-11 2015-04-29 国家电网公司 枚举组合相继故障集的暂态安全稳定在线快速评估方法
CN104578048B (zh) * 2014-08-11 2017-01-25 国家电网公司 枚举组合相继故障集的暂态安全稳定在线快速评估方法
CN104578050A (zh) * 2014-10-29 2015-04-29 国家电网公司 一种电网暂态稳定强相关输电断面的识别方法
CN104578053A (zh) * 2015-01-09 2015-04-29 北京交通大学 基于受扰电压轨迹簇特征的电力系统暂态稳定性预测方法
CN105938174B (zh) * 2016-05-13 2018-11-30 云南电力调度控制中心 暂态功角稳定最严重的输电线路故障位置快速识别方法
CN105938174A (zh) * 2016-05-13 2016-09-14 云南电力调度控制中心 暂态功角稳定最严重的输电线路故障位置快速识别方法
CN107276072A (zh) * 2017-06-16 2017-10-20 东北电力大学 一种利用稳态信息定量评估电力系统暂态稳定裕度的方法
CN107276072B (zh) * 2017-06-16 2020-07-24 东北电力大学 一种利用稳态信息定量评估电力系统暂态稳定裕度的方法
CN109167356B (zh) * 2018-10-16 2022-03-18 云南电网有限责任公司 一种n-2故障筛选方法
CN109167356A (zh) * 2018-10-16 2019-01-08 云南电网有限责任公司 一种n-2故障筛选方法
CN109638822A (zh) * 2018-12-19 2019-04-16 国电南瑞科技股份有限公司 计及暂态和静态约束的负荷恢复策略在线制定方法及系统
CN109638822B (zh) * 2018-12-19 2022-04-05 国电南瑞科技股份有限公司 计及暂态和静态约束的负荷恢复策略在线制定方法及系统
CN111416377A (zh) * 2020-03-16 2020-07-14 南方电网科学研究院有限责任公司 一种提高电网暂态稳定性的柔性直流控制方法及装置
CN112418555A (zh) * 2020-12-07 2021-02-26 国网湖南省电力有限公司 密集输电通道高风险故障集快速生成方法及系统
CN113541132A (zh) * 2021-07-21 2021-10-22 云南电网有限责任公司 一种用于交直流电网改造后的协调稳定控制方法
CN113541132B (zh) * 2021-07-21 2022-11-01 云南电网有限责任公司 一种用于交直流电网改造后的协调稳定控制方法

Similar Documents

Publication Publication Date Title
CN101673948A (zh) 电力系统暂态稳定分析的n-2组合故障快速排序方法
CN107895176B (zh) 一种面向水电机群广域监测诊断的雾计算系统及方法
CN103020853B (zh) 一种短期交易计划安全校核的方法
CN104597354B (zh) 基于列车供电系统的弓网电弧的检测方法及系统
CN102324743A (zh) 电力系统在线暂态安全稳定评估预想故障筛选方法
CN107093895B (zh) 基于预想故障集自动筛选的在线暂态安全稳定评估方法
Iyer et al. A twofold Daubechies-wavelet-based module for fault detection and voltage regulation in SEIGs for distributed wind power generation
CN107516896B (zh) 一种基于决策树剪枝算法的负荷恢复方案生成方法
CN112952807B (zh) 考虑风电不确定性与需求响应的多目标优化调度方法
CN110689186B (zh) 基于风电出力随机性的配电网供电可靠性评估方法及系统
CN103401232A (zh) 电力系统暂态安全稳定在线紧急控制策略的集群计算方法
CN102170131B (zh) 基于并行计算模式的关联输电断面极限功率计算方法
CN106921177B (zh) 风力发电机组的低电压穿越控制方法、装置和仿真系统
CN109458305A (zh) 风速仪容错控制方法、装置及风电场控制器
CN102230948A (zh) 有源式高压直流开关振荡回路参数在线测量系统及其方法
CN101685481B (zh) 一种基于并行算法的计算在线输电裕度的方法
CN109921389B (zh) 一种直流微电网故障保护方法及系统
CN105356508B (zh) 基于psd-bpa的电网风电接入评价系统及其方法
CN109301842B (zh) 一种基于负阻尼贡献的风电场次同步振荡切除方法
CN105162104B (zh) 飞机电气负载统计和电源容量分析的方法和装置
CN104465233A (zh) 一种兼顾低压脱扣器电压暂降特性的配置方法
CN102025159B (zh) 一种静态电压稳定综合评价方法及系统
CN104734158B (zh) 一种模块化有源电力滤波器故障冗余无线控制方法
CN109683036A (zh) 一种用于数据中心的配电系统故障模拟方法及系统
CN109038902A (zh) 一种设备控制方法、绕组切换器和电机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100317