CN101638920A - 一种承重墙上的洞口结构及在承重墙上开设洞口的方法 - Google Patents

一种承重墙上的洞口结构及在承重墙上开设洞口的方法 Download PDF

Info

Publication number
CN101638920A
CN101638920A CN200810303137A CN200810303137A CN101638920A CN 101638920 A CN101638920 A CN 101638920A CN 200810303137 A CN200810303137 A CN 200810303137A CN 200810303137 A CN200810303137 A CN 200810303137A CN 101638920 A CN101638920 A CN 101638920A
Authority
CN
China
Prior art keywords
bearing wall
hole
groove
steel member
load bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810303137A
Other languages
English (en)
Inventor
宋竞宁
吴长华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN200810303137A priority Critical patent/CN101638920A/zh
Publication of CN101638920A publication Critical patent/CN101638920A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明公开了一种承重墙上的洞口结构及在承重墙上开设洞口的方法,它包括承重墙体(1)和开设在承重墙体(1)上的洞口(2),在洞口(2)上边的承重墙体(1)上设有钢构件(3),钢构件(3)的两端分别位于洞口(2)上边两端的承重槽(4)内。本发明通过在需开设洞口的上方设置一个钢构件,钢构件的两端支撑在洞口上边两端的承重墙上,这样就可在不需拆掉墙体或卸掉墙上荷载的情况下,在墙体上开较大的洞口,并且能确保墙体强度和稳定性不受影响。

Description

一种承重墙上的洞口结构及在承重墙上开设洞口的方法
技术领域:
本发明涉及一种墙面上的洞口结构及其开洞的方法,特别涉及一种承重墙上的洞口结构及在承重墙上开设洞口的方法。
技术背景:
由于现阶段设备技术更新较快,导致许多工厂经常面对节能技改工程,如电解铝厂、氧化铝厂、海绵钛厂等。在进行节能技术改造时,为减少开支,一般均是利用现有的厂房和车间,在对现有的厂房和车间进行技改工程时常常会遇到在建筑物的墙上开较大的洞口,但由于工厂和车间的墙多是承重墙或自承重墙,其上有较大荷载,通常采用的方法均是卸载或拆除部份建筑,这就不但给生产带来很大不便甚至导致停产;而且卸载、安装或拆除建筑物还需花费大量的人力、物力和财力。
发明内容:
本发明要解决的技术问题是提供一种无需卸载、安装或拆除建筑物就可在开设大洞口的承重墙上的洞口结构及在承重墙上开设洞口的方法,可以克服现有技术的不足。
本发明的技术方案:承重墙上的洞口结构包括承重墙体1和开设在承重墙体1上的洞口2,在洞口2上边的承重墙体1上设有钢构件3,钢构件3的两端分别位于洞口2上边两端的承重槽4内。
钢构件3由两根型钢拼合构成。
在两根型钢上连接有联接钢板5。
承重槽4的深度L为150~500mm。
在承重墙上开洞口的方法,包括以下步骤:
a、根据洞口2的尺寸对应算出洞口2上方承重墙1的墙重及外加的荷载以确定钢构件3的规格,并且钢构件3由两根型钢拼合而成;
b、在洞口2上边对应的承重墙体1的一边凿出半墙厚的槽,槽两端均长出洞口150~500mm,槽的高度与所选钢构件3的高度相同;
c、将构成钢构件3的一根型钢嵌入b步骤开设的槽中;
d、在承重墙1的另一面开半墙厚的槽,其槽的长、宽和高与b步骤所开设的槽相同;
e、将另一根构成钢构件3的型钢嵌入d步骤所开设的槽中;
f、在承重墙1上开设洞口2。
开设好洞口2后,用联接钢板5将构成钢构件3的两根型钢焊接。
开设好洞口2后用砂浆将洞口2四边抹平。
在钢构件3与承重墙体1非接触的部位填充细石混凝土。
与现有技术比较,本发明通过在需开设洞口的上方设置一个钢构件,钢构件的两端支撑在洞口上边两端的承重墙上,这样就可在不需拆掉墙体或卸掉墙上荷载的情况下,在墙体上开较大的洞口,并且能确保墙体强度和稳定性不受影响;钢构件由两根型钢拼合而成,这样可满足先在承重墙体上凿出半墙厚的槽,放入一根构成钢构件的型钢,然后再在另一面墙体上开槽放入另一构成钢构件的型钢;确保在施工时墙体强度和稳定性不受影响;构成钢构件的在两根型钢通过联接钢板连接,这样可以提高钢构件的稳定性和强度;承担钢构件的承重槽深度在150mm到500mm之间,此数值通过技术人员计算和测试所的,能很好的确保钢构件所承担的负荷。同时由于本发明的实施可以不用拆掉墙体或卸掉墙上荷载,不但可以节约大量的人力、物力和财力,而且不会给给生产带来不便,影响正常生产。
附图说明:
图1为本发明的结构示意图;
图2为图1的A-A向视图。
具体实施方式:
实施例:本发明的整体结构如图1和图2所示,并结合附图对本发明的具体实施方式作进一步详细说明;
a、根据洞口2的尺寸对应算出洞口2上方承重墙1的墙重及外加的荷载选出钢构件3的规格,钢构件3由两根型钢拼合而成;b、在洞口2上边的承重墙体1上先凿出半墙厚的一个槽,槽的两端均长出洞口2150~500mm,槽的高度与所选钢构件3的高度相同;c、将构成钢构件3的一根型钢嵌入槽中,并将其上部与承重墙1顶紧,上翼缘与砖墙缝隙处用微膨胀砂浆填充,钢材的两端与承重墙1连接处用细石混凝土填实,d、待加固钢构件3的细石混凝土形成80%强度,在承重墙1的另一面开半墙厚的槽,其槽的长、宽和高与b步骤所开设的槽相同;e、用同样方法将另半块构成钢构件3的钢材嵌入d步骤开设的槽中并用细石混凝土填充,组成托梁,然后待细石混凝土形成80%强度后,可在承重墙体1上进行洞口2的开设,洞口2施工完后,用联接钢板5将构成钢构件3的两块钢板的下翼缘焊接在一起整体受力,最后将洞口2的边用砂浆抹平。
开设好洞口2后,钢构件3的两端分别位于洞口2上侧两边的承重槽4内,承重槽4的深度L即钢构件3两端长出洞口2的长度,范围为150~500mm,其优选值为150~300mm。

Claims (8)

1.一种承重墙上的洞口结构,它包括承重墙体(1)和开设在承重墙体(1)上的洞口(2),其特征在于:在洞口(2)上边的承重墙体(1)上设有钢构件(3),钢构件(3)的两端分别位于洞口(2)上边两端的承重槽(4)内。
2.根据权利要求1所述的承重墙上的洞口结构,其特征在于:钢构件(3)由两根型钢拼合构成。
3.根据权利要求2所述的承重墙上的洞口结构,其特征在于:在两根型钢上连接有联接钢板(5)。
4.根据权利要求2所述的承重墙上的洞口结构,其特征在于:承重槽(4)的深度L为150~500mm。
5.一种在承重墙上开洞口的方法,其特征在于:该方法包括以下步骤:
a、根据洞口(2)的尺寸对应算出洞口(2)上方承重墙(1)的墙重及外加的荷载以确定钢构件(3)的规格,并且钢构件(3)由两根型钢拼合而成;
b、在洞口(2)上边对应的承重墙体(1)的一边凿出半墙厚的槽,槽两端均长出洞口(2)150~500mm,槽的高度与所选钢构件(3)的高度相同;
c、将构成钢构件(3)的一根型钢嵌入b步骤开设的槽中;
d、在承重墙(1)的另一面开半墙厚的槽,其槽的长、宽和高与b步骤所开设的槽相同;
e、将另一根构成钢构件(3)的型钢嵌入d步骤所开设的槽中;
f、在承重墙(1)上开设洞口(2)。
6.根据权利要求5所述的在承重墙上开洞口的方法,其特征在于:开设好洞口(2)后,用联接钢板(5)将构成钢构件(3)的两根型钢焊接。
7.根据权利要求5或6所述的在承重墙上开洞口的方法,其特征在于:开设好洞口(2)后用膨胀砂浆将洞口(2)四边抹平。
8.根据权利要求5所述的在承重墙上开洞口的方法,其特征在于:在钢构件(3)与承重墙体(1)非接触的部位填充有细石混凝土。
CN200810303137A 2008-07-29 2008-07-29 一种承重墙上的洞口结构及在承重墙上开设洞口的方法 Pending CN101638920A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810303137A CN101638920A (zh) 2008-07-29 2008-07-29 一种承重墙上的洞口结构及在承重墙上开设洞口的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810303137A CN101638920A (zh) 2008-07-29 2008-07-29 一种承重墙上的洞口结构及在承重墙上开设洞口的方法

Publications (1)

Publication Number Publication Date
CN101638920A true CN101638920A (zh) 2010-02-03

Family

ID=41614078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810303137A Pending CN101638920A (zh) 2008-07-29 2008-07-29 一种承重墙上的洞口结构及在承重墙上开设洞口的方法

Country Status (1)

Country Link
CN (1) CN101638920A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839029A (zh) * 2010-05-07 2010-09-22 华太建设集团有限公司 自平衡式托承重墙开设洞口的方法
CN102383505A (zh) * 2011-11-23 2012-03-21 山东科技大学 承重墙体开设门窗洞口结构及其施工工艺
CN102434008A (zh) * 2010-09-29 2012-05-02 贵阳铝镁设计研究院有限公司 一种现浇砼板上开洞后的洞口加固方法
CN103470064A (zh) * 2012-06-07 2013-12-25 沈阳铝镁设计研究院有限公司 一种框架填充墙洞口加大的结构
CN103711327A (zh) * 2012-10-08 2014-04-09 中国石油化工集团公司 砌体承重墙下部拆除时的托梁加固方法
CN104278845A (zh) * 2014-05-26 2015-01-14 厦门建利设计装修有限公司 一种更换古建筑承重木窗的方法
CN104790684A (zh) * 2015-05-07 2015-07-22 山东建筑大学 采用外包角钢法的墙体开洞施工方法
CN111173304A (zh) * 2018-11-13 2020-05-19 杭州固力建筑工程有限公司 一种砖混结构房屋改造承重墙增设门洞加固方法
CN111395799A (zh) * 2020-03-25 2020-07-10 中国一冶集团有限公司 一种低扰动地下室连通口外墙高效拆除施工方法
CN112282408A (zh) * 2020-09-05 2021-01-29 中建二局基础设施建设投资有限公司 市政园林景观房屋老围护墙墙体加固结构及开洞方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839029A (zh) * 2010-05-07 2010-09-22 华太建设集团有限公司 自平衡式托承重墙开设洞口的方法
CN102434008A (zh) * 2010-09-29 2012-05-02 贵阳铝镁设计研究院有限公司 一种现浇砼板上开洞后的洞口加固方法
CN102434008B (zh) * 2010-09-29 2015-02-25 贵阳铝镁设计研究院有限公司 一种现浇砼板上开洞后的洞口加固方法
CN102383505A (zh) * 2011-11-23 2012-03-21 山东科技大学 承重墙体开设门窗洞口结构及其施工工艺
CN103470064A (zh) * 2012-06-07 2013-12-25 沈阳铝镁设计研究院有限公司 一种框架填充墙洞口加大的结构
CN103711327A (zh) * 2012-10-08 2014-04-09 中国石油化工集团公司 砌体承重墙下部拆除时的托梁加固方法
CN104278845A (zh) * 2014-05-26 2015-01-14 厦门建利设计装修有限公司 一种更换古建筑承重木窗的方法
CN104790684A (zh) * 2015-05-07 2015-07-22 山东建筑大学 采用外包角钢法的墙体开洞施工方法
CN104790684B (zh) * 2015-05-07 2017-01-11 山东建筑大学 采用外包角钢法的墙体开洞施工方法
CN111173304A (zh) * 2018-11-13 2020-05-19 杭州固力建筑工程有限公司 一种砖混结构房屋改造承重墙增设门洞加固方法
CN111395799A (zh) * 2020-03-25 2020-07-10 中国一冶集团有限公司 一种低扰动地下室连通口外墙高效拆除施工方法
CN112282408A (zh) * 2020-09-05 2021-01-29 中建二局基础设施建设投资有限公司 市政园林景观房屋老围护墙墙体加固结构及开洞方法

Similar Documents

Publication Publication Date Title
CN101638920A (zh) 一种承重墙上的洞口结构及在承重墙上开设洞口的方法
CN206769092U (zh) 半装配式轻钢—泡沫混凝土组合墙体
CN203768946U (zh) 装配式预制综合管廊
CN206467827U (zh) 一种装配式混凝土剪力墙
CN104912197A (zh) 一种钢管混凝土柱与外包u形钢混凝土组合梁连接节点
CN106894543A (zh) 半装配式轻钢—泡沫混凝土组合墙体及其使用方法
CN105019645B (zh) 逆作法中取土口处构建混凝土结构的模板系统及施工方法
CN206352348U (zh) 一种型钢混凝土板墙与型钢混凝土叠合楼板的连接结构
CN104947802A (zh) 一种钢管混凝土柱与外包u形钢混凝土组合梁连接节点
CN207277342U (zh) 用于建筑工程基础承台的拼装式预制混凝土模板
CN209779949U (zh) 一种预制装配式压型钢板混凝土剪力墙
CN210976619U (zh) 铝合金模板加固结构
CN213625546U (zh) 地下连续墙成槽用防鼓包装置
CN212957625U (zh) 一种预制砖胎膜
CN209798811U (zh) 一种预留钢筋的基坑内塔吊基础结构
CN206070540U (zh) 一种基坑可回收式混凝土支撑
CN210288797U (zh) 一种装配式混凝土剪力墙结构竖向设置夹层橡胶垫连接节点
CN206681491U (zh) 工地用可拆卸式拼装围墙
CN202745081U (zh) 大体积片石混凝土沉降缝模板体系
CN207813039U (zh) 一种混凝土地面分隔缝预成型组合工具
CN207526119U (zh) 一种定型化外墙模板的加固工具
CN201639249U (zh) 预制装配式电缆沟
CN214615513U (zh) 一种住宅排烟气道系统安装卸载接驳框
CN219637700U (zh) 一种水下承台施工模板结构
CN219081579U (zh) 一种检查井井壁的注浆模板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100203