CN101615361B - Method for designing dispatcher training architecture based on service drive - Google Patents

Method for designing dispatcher training architecture based on service drive Download PDF

Info

Publication number
CN101615361B
CN101615361B CN200810039392A CN200810039392A CN101615361B CN 101615361 B CN101615361 B CN 101615361B CN 200810039392 A CN200810039392 A CN 200810039392A CN 200810039392 A CN200810039392 A CN 200810039392A CN 101615361 B CN101615361 B CN 101615361B
Authority
CN
China
Prior art keywords
business
subclass
yardman
training
dispatcher training
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200810039392A
Other languages
Chinese (zh)
Other versions
CN101615361A (en
Inventor
李昌
杨晓玲
张卫红
章良栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sunrise Power Technology Co., Ltd.
Original Assignee
SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER AUTOMATION CO Ltd filed Critical SHANGHAI SUNRISE POWER AUTOMATION CO Ltd
Priority to CN200810039392A priority Critical patent/CN101615361B/en
Publication of CN101615361A publication Critical patent/CN101615361A/en
Application granted granted Critical
Publication of CN101615361B publication Critical patent/CN101615361B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for designing a dispatcher training architecture based on service drive, which relates to the technical field of automatic simulation trainings and aims to solve the technical problems dispatcher training. The method comprises the following flows: 1) establishing a complete service set S=[S1, S2, S, ...]; 2) splitting the service set S1; 3) performing completeness test on the S set until the S set can normally describe the routine works of dispatchers and process forecast power network accidents; 4) performing sequential identification on each subset P; 5) performing redundancy check on a plurality of subsets P, and eliminating the redundant subset Pj; 6) performing aggregation on the plurality of the subsets P in the step 5) to form a proper subset based on the service S; 7) performing platform-independence design on each vector of the subsets P in the step 6); and 8) combining each subset P and performing sequentialization to obtain a new service. The method has the characteristics of the capability of solving the difficulties caused by variable requirements and varied local procedures of the prior training, complete design and easy training maintenance.

Description

Dispatcher training architecture design method based on business-driven
Technical field
The present invention relates to electric system automatic simulation training technique, particularly relate to a kind of realization technology of dispatcher training of the dispatching center that is used for electric system.
Background technology
Dispatcher's training simulation system (Dispatcher Training Simulator; Be called for short DTS) be Digital Simulation and the training system that a cover is applicable to power scheduling, robotization, mode and operational management; It adopts The present computer technology, and the algorithm that utilization is ripe is through setting up the mathematical model of practical power systems; Simulation scheduler routine personnel to the operation of various device and fault after to the processing of various situation; And for, accident normal at electrical network, recovery control give training system call person down, the high-speed decision ability when normal consistency ability and the accident of training them, raising yardman's the operation level and the technical ability of analyzing and processing fault; Raising reduces the influence of accident to the processing quality of accident.DTS can the assist mode operations staff formulate the safe method of operation simultaneously, improves the antijamming capability of electrical network.
At present, the dispatcher training great majority are adopted object-oriented, to each training process of each training module; All carry out proprietary description; From the yardman, through the daily work of yardman, daily affairs are carried out flow scheme design; This design can be satisfied the demand of dispatcher training preferably, and the row that is prone to directly perceived.
In actual engineering application engineering, each regional schedule regulation differs, the demand experience changeable, the yardman of function is varied, and causes that the description of training module is had region, do not possess completeness.Design iterations occurred, function repeats but different the description is arranged, and causes maintenance release numerous, and difficult management is difficult to realize efficiently training, and this also is a life cycle weak point of developing the dispatcher training system at present, and upgrading is frequent, the reason of bad adaptability.
Summary of the invention
To the defective that exists in the above-mentioned prior art; Technical matters to be solved by this invention provides and a kind ofly can solve that changeable, the local rules of present training requirement differ and the difficulty that causes; Design completely, training safeguard to be easy to the dispatcher training architecture design method based on business-driven.
In order to solve the problems of the technologies described above, a kind of dispatcher training architecture design method based on business-driven provided by the present invention is characterized in that concrete realization flow is following:
1) sets up complete services sets S={S 1, S 2, S 3, derive from yardman's routine work and contingent power grid accident;
2) to services sets S 1Split, splitting foundation is the electrical specification of grid equipment, but not the scheduling operation rules of electrical network, the subclass of fractionation is P={P 1, P 2, P 3, P is the business unit set;
3) the S collection is carried out the completeness test, correctly describe yardman's routine work up to the S energy collecting and handle with the anticipation power grid accident;
4) each subclass P is carried out the succession sign, this sign can be described the action of professional S, and possesses completeness and nonredundancy;
5) a plurality of subclass P are carried out the redundancy verification, reject redundant subclass Pj;
6) to 5) a plurality of subclass P carry out polymerization, form proper subclass based on professional S;
7) to 6) each vector of subclass P carry out platform independence design;
8) make up each subclass P, orderization obtains new business.
Further, said business is meant some affairs in 1. yardman's routine work, comprehensive action; 2. the power grid accident that possibly run into of yardman.
Further, said business unit is meant the decomposition step in the business, is an orderly subclass in business.
Further, said professional loose couplings refers to that business realization can be an isomery, with platform independence, and concerning that right and wrong are strong and connect between the business.
Further, said business unit loose couplings refers to that the realization of business unit can be an isomery, and with platform independence, concerning that right and wrong are strong and connect between the unit is orderly but form when professional.
Further, said driving is meant carries out abstract description to yardman's routine matter and possible power grid accident, possesses completeness and succession.
Proposition provided by the invention is based on the dispatcher training architecture design method of business-driven, and this method core is to shield concrete application platform, shields concrete function and realizes; And be summed up as all work the realization of a business unit; Yardman's routine work is the set of concrete affairs, and each gathers the business of corresponding this paper, the business unit of the corresponding this paper of each affairs; Each yardman's activity; All be the proper subclass of affairs collection, each activity step all is the affairs subclass.The expression way of proper subclass employing flow process, yardman's activity just can well be described.Can adopt the interface mode of standard to realize to each business unit.Therefore, adopt this dispatcher training mode, just shielded concrete function and realized, bring great convenience, strengthened the convenience of system maintenance, improved the life cycle of software, protected user's software investment to system design based on business.
Compare other dispatcher training methods for designing, following advantage arranged based on the business-driven method:
1), portable strong based on the method for designing and the platform independence of business-driven
2) professional completeness realizes that by the business unit completeness new business need not revised business unit, only is the subset set of business unit.
3) adopt method for designing can shield implementation procedure fully, realize loose couplings, be convenient to isomery based on business-driven
4) this method is easy to use, greatly reduces the work of maintenance personnel amount, convenient utilization, popularization
Design based on business-driven has realized the loose couplings between a kind of business; Shield concrete platform, and implementation procedure, business unit utilized to greatest extent; Making business reach aggregate maximum, is the embodiment that electric power scheduling automatization system The Automation Design level improves.The present invention simultaneously is based on the business-driven method, and it adopts mode and application irrelevant, has realized the cross-platform application of system, supports the operating system platform of UNIX, the various family releases of WINDOWS.
Description of drawings
Fig. 1 is the business realizing process flow diagram of the embodiment of the invention based on the design of business-driven;
Fig. 2 is the design loose couplings graph of a relation of the embodiment of the invention based on business-driven;
Fig. 3 is that embodiment of the invention business unit is formed new business relations figure.
Embodiment
Below in conjunction with description of drawings embodiments of the invention are described in further detail, but present embodiment is not limited to the present invention, every employing analog structure of the present invention and similar variation thereof all should be listed protection scope of the present invention in.
By Fig. 1-shown in Figure 3, a kind of dispatcher training architecture design method based on business-driven that the embodiment of the invention provided is characterized in the realization flow of architecture design method: 1), and design services sets S={S 1, S 2, S 3, services sets can be yardman's routine work, the anticipation power grid accident.The services sets of setting up is wanted the ability convenient search, and complete as far as possible, to improve the accommodation of business unit, deposits S in database;
2), split yardman's routine work S iThe subclass P of each fractionation i={ P 1, P 2, P 3, P iBelong to S i, P kDeposit database in, set up S iWith P iCorresponding relation;
3), continue to split electrical network forecast accident S kThe subclass P of each fractionation k={ P 1, P 2, P 3, P kBelong to S k, P iDeposit database in, set up S kWith P kCorresponding relation;
4), completeness test, second and third step complete services sets S that tries one's best is saved in the database repeatedly;
5), each subclass P is carried out the succession sign, to each professional S iS k, its subclass is by succession, and this sign can be described the action of professional S, and possesses completeness and nonredundancy;
6), all subclass P are carried out polymerization, reject redundant subclass, and revise professional S iS kSubclass, the subclass P that comprises after guarantee revising iP kEffectively;
7), to subclass P iP kEach vector { P 1, P 2, P 3Carrying out the platform independence design, the element of vector can be an isomery, service-oriented, cross-platform;
8), to new professional Snew, select subclass P to carry out polymerization, orderization obtains new services sets S.
Said business is meant some affairs in 1. yardman's routine work, comprehensive action; 2. the power grid accident that possibly run into of yardman.
Said business unit is meant the decomposition step in the business, is an orderly subclass in business.
Said professional loose couplings refers to that business realization can be an isomery, with platform independence, and concerning that right and wrong are strong and connect between the business.
Said business unit loose couplings refers to that the realization of business unit can be an isomery, and with platform independence, concerning that right and wrong are strong and connect between the unit is orderly but form when professional.
Said driving is meant carries out abstract description to yardman's routine matter and possible power grid accident, possesses completeness and succession.

Claims (4)

1. dispatcher training architecture design method based on business-driven is characterized in that concrete realization flow is following:
1) sets up complete services sets S={S i, S k, derive from yardman's routine work S iWith electrical network forecast accident S k
2) to professional S i, S kSplit, splitting foundation is the electrical specification of grid equipment, but not the scheduling operation rules of electrical network, the subclass of fractionation is P={P i, P k, P wherein i={ P I1, P I2, P I3, Pk={P K1, P K2, P K3, P is the set of business unit;
3) services sets S is carried out the completeness test, can correctly describe yardman's routine work and electrical network forecast accident up to services sets S and handle;
4) each subclass P is carried out the succession sign, this sign can be described the action of services sets S, and possesses completeness and nonredundancy;
5) all subclass P are carried out polymerization, reject redundant subclass, and revise professional S i, S kSubclass, the subclass P that comprises after guarantee revising is effective;
6) each vector to the subclass P that comprises after the said modification carries out the platform independence design;
7) to new professional Snew, select subclass P to carry out polymerization, orderization obtains new services sets S.
2. the dispatcher training architecture design method based on business-driven according to claim 1 is characterized in that said business is meant some affairs in 1. yardman's routine work, comprehensive action; 2. the power grid accident that possibly run into of yardman.
3. the dispatcher training architecture design method based on business-driven according to claim 1 is characterized in that said business unit is meant the decomposition step in the business, is an orderly subclass in business.
4. the dispatcher training architecture design method based on business-driven according to claim 1 is characterized in that, said driving is meant carries out abstract description to yardman's routine matter and possible power grid accident, possesses completeness and succession.
CN200810039392A 2008-06-23 2008-06-23 Method for designing dispatcher training architecture based on service drive Expired - Fee Related CN101615361B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810039392A CN101615361B (en) 2008-06-23 2008-06-23 Method for designing dispatcher training architecture based on service drive

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810039392A CN101615361B (en) 2008-06-23 2008-06-23 Method for designing dispatcher training architecture based on service drive

Publications (2)

Publication Number Publication Date
CN101615361A CN101615361A (en) 2009-12-30
CN101615361B true CN101615361B (en) 2012-08-29

Family

ID=41494981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810039392A Expired - Fee Related CN101615361B (en) 2008-06-23 2008-06-23 Method for designing dispatcher training architecture based on service drive

Country Status (1)

Country Link
CN (1) CN101615361B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102945628B (en) * 2011-12-23 2014-09-24 江西省电力公司信息通信中心 Accident consequence information acquiring method, device and training system
CN104318833B (en) * 2012-10-30 2016-08-24 江苏省电力公司常州供电公司 The method of work of power network schedule automation experience system
CN103970872B (en) * 2014-05-13 2017-02-15 上海新炬网络信息技术有限公司 Multi-level data processing method based on service aperture

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5554031A (en) * 1995-04-20 1996-09-10 Retina Systems, Inc. Training system for reporting 911 emergencies
CN1752958A (en) * 2004-09-26 2006-03-29 福建省电力试验研究院 Evaluation system of electrical network operation state and dispatch decision system
CN101055990A (en) * 2007-05-11 2007-10-17 清华大学 United accident-prevention rehearse method for provincial and city power system
CN101098069A (en) * 2007-06-13 2008-01-02 苏州工业园区慧思敦软件有限公司 Electric power scheduling simulation system electric network display process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5554031A (en) * 1995-04-20 1996-09-10 Retina Systems, Inc. Training system for reporting 911 emergencies
CN1752958A (en) * 2004-09-26 2006-03-29 福建省电力试验研究院 Evaluation system of electrical network operation state and dispatch decision system
CN101055990A (en) * 2007-05-11 2007-10-17 清华大学 United accident-prevention rehearse method for provincial and city power system
CN101098069A (en) * 2007-06-13 2008-01-02 苏州工业园区慧思敦软件有限公司 Electric power scheduling simulation system electric network display process

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
卢国良
孙燕萍
张宣江
张宣江;卢国良;孙燕萍;杨静;张建勋;金焱.华北电力调度数据网网络设计与应用.《继电器》.2008,第36卷(第2期),49-53. *
张建勋
杨静
金焱.华北电力调度数据网网络设计与应用.《继电器》.2008,第36卷(第2期),49-53.

Also Published As

Publication number Publication date
CN101615361A (en) 2009-12-30

Similar Documents

Publication Publication Date Title
CN103488138B (en) Generate the method and system that scheduling makes operation order item by item
CN103578039B (en) A kind of power networks risk prewarning analysis system
CN201947061U (en) Distribution network dispatching intelligent anti-mistake and real-time management system
CN102324788A (en) Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN104252646A (en) Method for automatically formulating daily power grid maintenance plans
CN103199521A (en) Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
CN103729734A (en) Distribution network intelligent operation ticket issuing system
CN105186686B (en) A kind of dispatching of power netwoks intelligent error preventing policy system based on full mesh topology
CN106374458A (en) Intelligent analysis method for identifying unreasonable power-failure management
CN101615361B (en) Method for designing dispatcher training architecture based on service drive
CN108898239A (en) A kind of site selection method for distribution transformer based on data analysis
CN113537921A (en) Intelligent safety anti-error check system and anti-error check system thereof
CN110378585A (en) Electric network fault disposes calculating task layout call method, system and storage medium
CN111340257B (en) Optimization method and system for maintenance plan of power transmission equipment based on risk analysis
CN109842121B (en) Multi-stage multi-region cooperative control load reduction online simulation modeling method and system
CN102169343A (en) Programmed remote operation system and method of grid centralized monitoring center
CN106651113A (en) Dispatcher operation risk evaluation method based on advanced N-1 analysis
CN101847865A (en) Electric network relay protection and fault analysis system
CN105977971A (en) Power failure analysis method based on single line diagram of distribution network GIS power grid
CN109102170A (en) Device model title modification method, device and storage medium based on OMS
CN109190941A (en) A kind of automatic risk-assessment method of grid operation mode
CN201682276U (en) Relay protection and fault analysis system for power grid
CN103559370A (en) System and method for realizing automation of N-2 simulation analysis process of electric power system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130228

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130228

Address after: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Patentee after: Shanghai Sunrise Power Technology Co., Ltd.

Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301

Patentee before: Shanghai Sunrise Power Automation Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120829

Termination date: 20170623

CF01 Termination of patent right due to non-payment of annual fee