CN110378585A - Electric network fault disposes calculating task layout call method, system and storage medium - Google Patents

Electric network fault disposes calculating task layout call method, system and storage medium Download PDF

Info

Publication number
CN110378585A
CN110378585A CN201910611302.5A CN201910611302A CN110378585A CN 110378585 A CN110378585 A CN 110378585A CN 201910611302 A CN201910611302 A CN 201910611302A CN 110378585 A CN110378585 A CN 110378585A
Authority
CN
China
Prior art keywords
electric network
network fault
failure
disposition
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910611302.5A
Other languages
Chinese (zh)
Other versions
CN110378585B (en
Inventor
王波
朱炳铨
李非非
陆廷骧
闪鑫
戴则梅
黄胜
徐奇锋
郑义明
余飞翔
刘栋
谈振宁
吴自博
陈钰洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
NARI Group Corp
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, NARI Group Corp, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910611302.5A priority Critical patent/CN110378585B/en
Publication of CN110378585A publication Critical patent/CN110378585A/en
Application granted granted Critical
Publication of CN110378585B publication Critical patent/CN110378585B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses electric network fault disposition calculating task layout call method, system and storage mediums, this method is matched and is extracted to associate device object corresponding with faulty equipment disposition main points in power grid accident Response project, index scene first, then in conjunction with the physical fault result of electric network fault inline diagnosis, On-line matching obtains the associated failure of faulty equipment and disposes tuple chain information collection, by layout and the calculating task for calling associate device to correspond to index scene, the automatic calculating of realization faulty equipment association disposition information is analyzed to be shown with concentration.It can make up for it the deficiency of existing failure method of disposal using the present invention, it can fast and efficiently be positioned automatically according to accident handling prediction scheme content, obtain fault correlation equipment and its operating index state, largely reduce the operation element amount consulted prediction scheme text information, frequently search calculated result artificial at present, intelligent auxiliary dispatching personnel carry out failure disposition, improve electric network fault disposal efficiency.

Description

Electric network fault disposes calculating task layout call method, system and storage medium
Technical field
The present invention relates to electric power network technique fields, and in particular to electric network fault disposes calculating task layout call method, system And storage medium.
Background technique:
With the fast development of extra-high voltage alternating current-direct current large capacity transmission technology and new energy, China's power grid scale will be abnormal huge Greatly, grid operation mode complex results in regulation business complexity and is significantly increased, to operation of power networks control and accident treatment More stringent requirements are proposed.At present in grid collapses, when more great failure, management and running personnel are past Toward the processing and control for needing to carry out electric network fault based on the accident handling prediction scheme pre-established.And fault countermeasure is usually non- The text data of structuring, management and running personnel need to consult fault countermeasure manually when failure occurs, in conjunction with the correlation in prediction scheme It is required that and compare the real time data in dispatch automated system carry out failure disposition, failure disposition intelligent level it is lower, Especially occur extra-high voltage direct-current it is high-power lose, equipment successive failure caused by extreme natural calamity tripping when, alert it is various, Information dispersion, it is inconvenient the problems such as it is very prominent, increase scheduling failure disposition difficulty and pressure.
Summary of the invention
The purpose of the present invention is to provide electric network faults to dispose calculating task layout call method, system and storage medium, Electric network fault disposition associate device object and its operating index state can be more fast and efficiently provided, largely Reduce the operation element amount consulted prediction scheme text information, frequently search calculated result artificial at present, intelligent auxiliary dispatching personnel into The disposition of row failure, improves electric network fault disposal efficiency.
In order to achieve the above object, the present invention adopts the following technical scheme that realization:
In a first aspect, providing electric network fault disposes calculating task layout call method, described method includes following steps:
Construct electric network fault Response project terminological dictionary;
Failure disposition tuple chain information is obtained according to electric network fault Response project terminological dictionary;
Physical fault, which is obtained, according to physical fault equipment disposes tuple chain information collection;
Tuple chain information collection, which is disposed, by physical fault obtains associate device operating index status data;
Associate device operating index status data is summarized and shown.
With reference to first aspect, the further electric network fault Response project terminological dictionary includes plant stand name, implementor name, area Domain name, index scene, the plant stand name include power plant, substation's name set;The implementor name includes that power grid is all kinds of main Electrical equipment name set;The area-name includes major regulatory zone name set;The index scene is power grid fortune The set of row main indicator, including trend, voltage, frequency, power output, load.
With reference to first aspect, the acquisition methods of the further failure disposition tuple chain information include the following steps:
Based on electric network fault Response project terminological dictionary, wanted in electric network fault Response project text with faulty equipment disposition The corresponding associate device object of point, index scene are matched and are extracted;
Information is disposed to failure after extraction according to the tuple chain structure form of " faulty equipment-index scene-associate device " It is stored, obtains failure disposition tuple chain information.
With reference to first aspect, the acquisition methods of the further failure disposition tuple chain information collection include the following steps:
Physical fault equipment is obtained by electric network fault inline diagnosis identification function;
" faulty equipment " element in matching failure disposition tuple chain information one by one;
Obtain the faulty disposition tuple chain information collection of institute comprising physical fault equipment.
With reference to first aspect, the acquisition methods of the further related operating index status data include the following steps:
To physical fault dispose tuple chain information collection, according to index scene involved in tuple chain information collection, automatically from Simultaneously layout related computing tasks sequence is extracted in all calculating tasks;
Using tuple chain information integrate involved in fault correlation equipment call corresponding calculating task sequence as calculating parameter, count Calculation obtains the related operating index status data of associate device.
With reference to first aspect, the further analysis result carries out summarizing displaying, the content of the displaying by interface Including being worth after value, index scene failure before current failure equipment, disposition associate device, index scene type, index scene failure, Index scene changes amount, index scene changes percentage, index scene limit value, index scene state.
Second aspect provides electric network fault disposition calculating task layout calling system, the system comprises:
Finish message module: for arranging to the information of typing, electric network fault Response project terminological dictionary is constructed;
First processing module: for according to electric network fault Response project terminological dictionary, matching to be disposed with electric network fault is extracted Relevant information in prediction scheme text forms failure and disposes first ancestral's chain information;
Second processing module: physical fault disposition tuple chain information collection is obtained for carrying out processing to physical fault equipment;
Third processing module: for concentrating the data being related to extract, appoint physical fault disposition tuple chain information Business layout and calling are to obtain associate device operating index status data;
Data memory module: for store the disposition information of the failure after electric network fault Response project terminological dictionary, extraction with And associate device correlation operating index status data;
Data obtaining module: for obtaining electric network fault Response project terminological dictionary, power grid accident Response project text, electricity Net on-line fault diagnosis recognition result and fault correlation equipment operating data;
Data display module: for showing analysis result.
The third aspect provides electric network fault disposition calculating task layout calling device, including
Data receiving terminal: for receiving data;
Data processing terminal: it is used to analyze the received data and is handled;
Video data terminal: for data to be shown to treated.Fourth aspect provides electric network fault disposition meter Calculation task layout calling system, including processor and storage medium;
The storage medium is for storing instruction;
The processor is for the step of being operated according to described instruction to execute any one of first aspect the method.
5th aspect, provides a kind of computer readable storage medium, is stored thereon with computer program, feature exists In when the program is executed by processor the step of any one of realization first aspect the method.
The present invention has the advantages that this method can overcome the shortcomings of art methods, it can be pre- automatically according to accident Case content fast and efficiently positions, obtains fault correlation device object and its operating index state, largely reduces mesh Preceding artificial access prediction scheme text information, the operation element amount for frequently searching calculated result, intelligent auxiliary dispatching personnel carry out failure Disposition improves electric network fault disposal efficiency.
Detailed description of the invention
Fig. 1 is flow diagram of the invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
As shown in Figure 1, electric network fault disposition calculating task layout call method, system and storage medium, including following step It is rapid:
Step 1: building electric network fault Response project terminological dictionary.It specifically includes that plant stand name, implementor name, area-name, refer to Mark scene etc..Wherein, plant stand name includes power plant, substation's name set;Implementor name includes that power grid is all kinds of main primary electrical Device name set;Area-name includes major regulatory zone name set;Index scene is the set of operation of power networks main indicator, Including trend, voltage, frequency, power output, load.Such as:
Plant stand name={ " A plant stand ", " B plant stand ", " C plant stand " ... };
Implementor name=" A route ", " B route " ..., " A-bus ", " B bus " ..., " A unit ", " B unit " ...;
Area-name={ " area A ", " area B ", " area C " ... };
Index scene=" trend ", " voltage ", " power output ", " load " ....
Step 2: disposing main points phase with faulty equipment in power grid accident Response project according to accident prediction terminological dictionary Corresponding associate device object, index scene are matched and are extracted, and according to " faulty equipment-index scene-associate device " Tuple chain structure form to after extraction failure disposition information store, obtain failure disposition tuple chain information.
Such as: A line fault is related to by the A line fault in prediction scheme after being extracted by the matching of terminological dictionary Disposal facility object, index scene form failure and dispose tuple chain information, such as " A route-trend-B route ", " A route-voltage- C bus ", " A route-power output-D unit ".
Step 3: the physical fault equipment identified according to electric network fault inline diagnosis, matches failure one by one and disposes tuple " faulty equipment " element in chain information obtains the faulty disposition tuple chain information collection of institute comprising physical fault equipment.
Such as: " A route " failure haveing for electric network fault inline diagnosis disposes tuple chain letter by On-line matching failure " faulty equipment " element in breath obtains the relevant faulty disposition tuple chain information of institute of A line fault, such as " A route-trend- B route ", " A route-voltage-C bus ", " A route-power output-D unit ".
Step 4: tuple chain information collection is disposed according to the faulty equipment relevant fault that On-line matching obtains, according to tuple chain Index scene involved in information collection, automatically from all calculating tasks extract and layout related computing tasks sequence, and with Associate device is calculating parameter to call corresponding calculating task sequence, and the related operating index status number of associate device is calculated According to.
Such as: tuple chain information collection is disposed according to the A line fault that On-line matching obtains, it is can analyze out and relates generally to " trend, voltage, power output " three index scenes, while the associate device being related to mainly has " B route, C bus, D unit ".Cause This extracts " tidal current analysis ", " electricity to the calculating task of this A line fault from all calculating tasks that system provides automatically Pressure analysis ", " unit output analysis " these three calculating tasks, carry out the layout of analytical sequence, are then to calculate with associate device Parameter calls corresponding calculating task sequence, is finally calculated the related operating index status data of associate device.
Summarize Step 5: the correlation analysis result obtained by calculating task automatic editing and calling is collected, leads to It crosses unified interface and concentrates displaying.Show content specifically include that current failure equipment, disposition associate device, index scene type, It is worth before index scene failure, value, index scene changes amount, index scene changes percentage, index scene after index scene failure Limit value, index scene state (such as: out-of-limit, heavy duty) etc..
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Therefore, embodiment disclosed above, in all respects are merely illustrative, not the only.Institute Have within the scope of the present invention or is included in the invention in the change being equal in the scope of the present invention.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.

Claims (10)

1. electric network fault disposes calculating task layout call method, which is characterized in that described method includes following steps:
Construct electric network fault Response project terminological dictionary;
Failure disposition tuple chain information is obtained according to electric network fault Response project terminological dictionary;
It obtains physical fault according to physical fault equipment and failure disposition tuple chain information and disposes tuple chain information collection;
Tuple chain information collection, which is disposed, by physical fault obtains associate device operating index status data;
Associate device operating index status data is summarized and shown.
2. electric network fault according to claim 1 disposes calculating task layout call method, it is characterised in that: the power grid Failure handling program terminological dictionary includes at least one of following: plant stand name;Implementor name;Area-name;Index scene;
Wherein the plant stand name includes power plant or substation's name set;
The implementor name includes an all kinds of main electrical equipment name sets of power grid;
The area-name includes major regulatory zone name set;
The index scene is the set of operation of power networks main indicator, including at least one of following: trend, frequency, goes out voltage Power, load.
3. electric network fault according to claim 1 disposes calculating task layout call method, it is characterised in that: the failure The acquisition methods of disposition tuple chain information include the following steps:
Based on electric network fault Response project terminological dictionary, main points phase is disposed with faulty equipment in electric network fault Response project text Corresponding associate device object, index scene are matched and are extracted;
Failure disposition information after extraction is carried out according to the tuple chain structure form of " faulty equipment-index scene-associate device " Storage obtains failure disposition tuple chain information.
4. electric network fault according to claim 1 disposes calculating task layout call method, it is characterised in that: the reality The acquisition methods of failure disposition tuple chain information collection include the following steps:
Obtain physical fault equipment;
Physical fault equipment is matched one by one with failure disposition tuple chain information;
It obtains physical fault and disposes tuple chain information collection.
5. electric network fault according to claim 1 disposes calculating task layout call method, it is characterised in that: the association The acquisition methods of equipment operating index status data include the following steps:
Tuple chain information collection is disposed to physical fault, according to index scene involved in tuple chain information collection, from all calculating Simultaneously layout related computing tasks sequence is extracted in task;
Using tuple chain information integrate involved in fault correlation equipment call corresponding calculating task sequence as calculating parameter, calculate To the related operating index status data of associate device.
6. electric network fault according to claim 1 disposes calculating task layout call method, it is characterised in that: the analysis As a result it carries out summarizing displaying by interface, wherein the content of the displaying includes at least one of following: current failure equipment, place Set before associate device, index scene type, index scene failure value, index scene changes amount, index after value, index scene failure Scene changes percentage, index scene limit value, index scene state.
7. electric network fault disposes calculating task layout calling system, it is characterised in that: the system comprises:
Finish message module: for arranging to the information of typing, electric network fault Response project terminological dictionary is constructed;
First processing module: for according to electric network fault Response project terminological dictionary, matching and extraction electric network fault Response project Relevant information in text forms failure and disposes first ancestral's chain information;
Second processing module: physical fault disposition tuple chain information collection is obtained for carrying out processing to physical fault equipment;
Third processing module: for physical fault disposition tuple chain information concentrates the data being related to extract, task is compiled Row and calling are to obtain associate device operating index status data;
Data memory module: for storing the disposition information of the failure after electric network fault Response project terminological dictionary, extraction and pass Join equipment correlation operating index status data;
Data obtaining module: for obtaining electric network fault Response project terminological dictionary, power grid accident Response project text, power grid event Hinder inline diagnosis recognition result and fault correlation equipment operating data;
Data display module: for showing analysis result.
8. electric network fault disposes calculating task layout calling device, it is characterised in that: including
Data receiving terminal: for receiving data;
Data processing terminal: it is used to analyze the received data and is handled;
Video data terminal: for data to be shown to treated.
9. electric network fault disposes calculating task layout calling system, which is characterized in that including processor and storage medium;
The storage medium is for storing instruction;
The processor is used to be operated according to described instruction to execute any one of according to claim 1~6 the method Step.
10. computer readable storage medium is stored thereon with computer program, which is characterized in that the program is executed by processor The step of any one of Shi Shixian claim 1~6 the method.
CN201910611302.5A 2019-07-08 2019-07-08 Power grid fault handling calculation task arrangement calling method, system and storage medium Active CN110378585B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910611302.5A CN110378585B (en) 2019-07-08 2019-07-08 Power grid fault handling calculation task arrangement calling method, system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910611302.5A CN110378585B (en) 2019-07-08 2019-07-08 Power grid fault handling calculation task arrangement calling method, system and storage medium

Publications (2)

Publication Number Publication Date
CN110378585A true CN110378585A (en) 2019-10-25
CN110378585B CN110378585B (en) 2022-09-02

Family

ID=68252369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910611302.5A Active CN110378585B (en) 2019-07-08 2019-07-08 Power grid fault handling calculation task arrangement calling method, system and storage medium

Country Status (1)

Country Link
CN (1) CN110378585B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111522997A (en) * 2020-03-12 2020-08-11 国电南瑞南京控制系统有限公司 Plan compiling and alarm pushing system and method based on model and file service
CN111552804A (en) * 2020-04-08 2020-08-18 国电南瑞科技股份有限公司 Knowledge graph construction method of power grid fault handling plan
CN113283704A (en) * 2021-04-23 2021-08-20 内蒙古电力(集团)有限责任公司乌兰察布电业局 Intelligent power grid fault handling system and method based on knowledge graph

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514516A (en) * 2013-09-27 2014-01-15 国家电网公司 Method for obtaining power grid device failure information based on calculation of multi-source redundant information
CN106384210A (en) * 2016-10-28 2017-02-08 贵州电网有限责任公司贵阳供电局 Power transmission and transformation equipment maintenance priority ordering method based on maintenance risk premium
CN107992597A (en) * 2017-12-13 2018-05-04 国网山东省电力公司电力科学研究院 A kind of text structure method towards electric network fault case
CN109726246A (en) * 2018-12-13 2019-05-07 贵州电网有限责任公司 One kind being associated with reason retrogressive method with visual power grid accident based on data mining

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514516A (en) * 2013-09-27 2014-01-15 国家电网公司 Method for obtaining power grid device failure information based on calculation of multi-source redundant information
CN106384210A (en) * 2016-10-28 2017-02-08 贵州电网有限责任公司贵阳供电局 Power transmission and transformation equipment maintenance priority ordering method based on maintenance risk premium
CN107992597A (en) * 2017-12-13 2018-05-04 国网山东省电力公司电力科学研究院 A kind of text structure method towards electric network fault case
CN109726246A (en) * 2018-12-13 2019-05-07 贵州电网有限责任公司 One kind being associated with reason retrogressive method with visual power grid accident based on data mining

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111522997A (en) * 2020-03-12 2020-08-11 国电南瑞南京控制系统有限公司 Plan compiling and alarm pushing system and method based on model and file service
CN111552804A (en) * 2020-04-08 2020-08-18 国电南瑞科技股份有限公司 Knowledge graph construction method of power grid fault handling plan
CN111552804B (en) * 2020-04-08 2022-09-02 国电南瑞科技股份有限公司 Knowledge graph construction method of power grid fault handling plan
CN113283704A (en) * 2021-04-23 2021-08-20 内蒙古电力(集团)有限责任公司乌兰察布电业局 Intelligent power grid fault handling system and method based on knowledge graph
CN113283704B (en) * 2021-04-23 2024-05-14 内蒙古电力(集团)有限责任公司乌兰察布电业局 Intelligent power grid fault handling system and method based on knowledge graph

Also Published As

Publication number Publication date
CN110378585B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN111985653B (en) Power grid fault knowledge recommendation and knowledge management system and method based on knowledge graph
CN110378585A (en) Electric network fault disposes calculating task layout call method, system and storage medium
CN109501834A (en) A kind of point machine failure prediction method and device
CN103729557A (en) Static N-X batch processing method on basis of PSD-BPA
CN104616092A (en) Distributed log analysis based distributed mode handling method
CN103326467A (en) Protection action report implementation method based on information protection main station device recorded information
CN104091289A (en) Large-scale power distribution network N-1 rapid verification method based on wiring mode rules
CN104407577A (en) Intelligent check anti-maloperation method based on real-time trend
CN111931318B (en) Power supply path analysis method and system based on graph calculation
CN110703179A (en) Voltage and current metering exception handling method based on knowledge base
CN103679557B (en) Power system operating mode data management system based on C/S framework and its implementation
CN110968703B (en) Method and system for constructing abnormal metering point knowledge base based on LSTM end-to-end extraction algorithm
CN115170344A (en) Intelligent processing method and device, medium and equipment for operation events of regulation and control system
CN112381497A (en) Intelligent repeated auditing method and system for work ticket
CN112383044A (en) Power grid model comparison method and device based on hierarchical topological structure
CN103106341A (en) Method and system capable of intelligently analyzing direct current protection accident
CN103001318B (en) A kind of based on 61850 the anti-implementation method of intelligent transformer substation topology five
CN103390035A (en) Intelligent warning signal type matching method based on regular expressions
CN111639839A (en) Micro-service-based power grid fault analysis method and system
CN116108203A (en) Method, system, storage medium and equipment for constructing power grid panoramic dispatching knowledge graph and managing power grid equipment
CN106022950B (en) Power distribution network secondary equipment type identification method and system
CN115481964A (en) Intelligent ticket forming method and device
CN112001588A (en) Accident event online pre-judging method and device based on N-1 state
CN110955521A (en) Power distribution network wide area distributed type sinking calculation system and method based on big data
CN109767062A (en) A kind of dynamic creation method of power grid task disposal method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant