CN101586451A - 一种扶正装置 - Google Patents

一种扶正装置 Download PDF

Info

Publication number
CN101586451A
CN101586451A CNA2009100873295A CN200910087329A CN101586451A CN 101586451 A CN101586451 A CN 101586451A CN A2009100873295 A CNA2009100873295 A CN A2009100873295A CN 200910087329 A CN200910087329 A CN 200910087329A CN 101586451 A CN101586451 A CN 101586451A
Authority
CN
China
Prior art keywords
riser pipe
sleeve
stiffened panel
angle side
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100873295A
Other languages
English (en)
Other versions
CN101586451B (zh
Inventor
姜伟
刘书杰
杨进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China University of Petroleum Beijing
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China University of Petroleum Beijing
Priority to CN2009100873295A priority Critical patent/CN101586451B/zh
Publication of CN101586451A publication Critical patent/CN101586451A/zh
Application granted granted Critical
Publication of CN101586451B publication Critical patent/CN101586451B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种扶正装置,它包括一圆形套筒和多块相同的直角三角形加筋板,各加筋板上同一直角边间隔均匀地沿套筒轴向焊接在套筒外壁上;隔水导管贯穿并焊接在套筒上,加筋板上非焊接用的直角边与套筒端面截齐。本发明结构简单,导向性好,彻底解决了海上打桩过程中泥线以下隔水导管容易倾斜、弯曲等问题。

Description

一种扶正装置
技术领域
本发明涉及一种海上石油工程设备,尤其是一种用于扶正海上钻井隔水导管的扶正装置。
背景技术
对于海上钻井而言,隔水导管是必不可少的钻井设备,采用锤入法进行打桩时,由于隔水导管长细比较大,横向刚度较小,在泥线以下的部分很容易发生倾斜,这样就使得隔水导管不能够垂直插入泥土中,导致隔水导管受力不均,可能会给钻井施工带来困难。
发明内容
针对上述问题,本发明的目的是提供一种能够将隔水导管顺利地垂直插入泥土中的扶正装置。
为实现上述目的,本发明采取以下技术方案:一种扶正装置,其特征在于:它包括一圆形套筒和多块相同的直角三角形加筋板,各所述加筋板上同一直角边间隔均匀地沿所述套筒轴向焊接在所述套筒外壁上;隔水导管贯穿并焊接在所述套筒上,所述加筋板上非焊接用的直角边与所述套筒端面截齐。
所述加筋板上焊接用的直角边长度与所述套筒的高度相同,所述加筋板上非焊接用的直角边长度为所述隔水导管直径的1/3,所述加筋板的厚度与所述隔水导管壁厚相同;所述套筒的内径比隔水导管的外径大3~5mm。
与所述隔水导管焊接时所述加筋板上非焊接用的直角边朝上。
所述加筋板为8块。
本发明由于采取以上技术方案,其具有以下优点:1、本发明由于将多块三角形的加筋板间隔均匀地焊接在套筒的外壁上,加筋板上的一直角边沿套筒轴向焊接,再将加筋板上非焊接用的直角边所在的套筒端朝上,形成一上大下小结构,因此有效地提高了隔水导管的整体横向刚度,有利于隔水导管垂直入泥。2、本发明由于将隔水导管贯穿并焊接在套筒上,再将由隔水导管与本发明构成的整体垂直插入泥土中,并使得套筒的上端面位于泥线以下,这样加筋板与隔水导管周围的土体相互作用,起到了平衡、扶正和导向的作用,从而解决了海上打桩过程中泥线以下隔水导管容易倾斜、弯曲等问题。本发明结构简单,导向性好,彻底解决了海上打桩过程中泥线以下隔水导管容易倾斜、弯曲等问题。
附图说明
图1是本发明的结构示意图
图2为本发明中加筋板的俯视图
图3是本发明中加筋板的侧视图
图4为隔水导管插入本发明的结构示意图
具体实施方式
下面结合实施例,对本发明进行详细的描述。
如图1~3所示,本发明包括一圆形套筒1,套筒1的高度可以为0.3m,内径比隔水导管的外径大3~5mm,便于装配焊接施工。套筒1的外壁周缘间隔均匀地焊接有多块相同的加筋板2,加筋板2为具有一定厚度的直角三角形板,各加筋板2的同一直角边沿套筒1的轴向进行焊接,这样可以有效地提高隔水导管的整体横向刚度,利于隔水导管垂直插入泥土中。加筋板2上焊接用的直角边高度与套筒1的高度相同,加筋板2上非焊接用的直角边与套筒1端面截齐,且非焊接用的直角边长度可以为隔水导管直径的1/3,加筋板2的厚度不小于隔水导管壁厚,以保证加筋板2具有足够的刚度和强度。本实施例中,套筒1的内径、外径和高度均不限于上述具体长度,只要保证与实际使用的隔水导管内、外径相匹配即可,加筋板2数目为8块,但也不限于此。套筒1和加筋板2的材质与隔水导管相同,以保证本发明结构强度与隔水导管一致。
如图4所示,本发明使用时,将加筋板2上非焊接用的直角边朝上,本发明此时形成一上大下小倒三角形状结构。再将隔水导管3贯穿套筒1,并焊接在套筒1上,此时隔水导管3与本发明构成一整体。将由隔水导管3与本发明构成的整体锤入土体4中,并使得本发明的上端面位于泥线5以下,这样加筋板2与隔水导管3周围的土体4相互作用,起到了平衡、扶正和导向的作用,从而解决了海上打桩过程中泥线5以下隔水导管3容易倾斜、弯曲等问题。
上述各实施例中,套筒1与加筋板2不限于焊接,还可以采用一体成型等其它方式,对个别部件进行的改进和等同变换,不应排除在本发明的保护范围之外。

Claims (5)

1、一种扶正装置,其特征在于:它包括一圆形套筒和多块相同的直角三角形加筋板,各所述加筋板上同一直角边间隔均匀地沿所述套筒轴向焊接在所述套筒外壁上;隔水导管贯穿并焊接在所述套筒上,所述加筋板上非焊接用的直角边与所述套筒端面截齐。
2、如权利要求1所述的一种扶正装置,其特征在于:所述加筋板上焊接用的直角边长度与所述套筒的高度相同,所述加筋板上非焊接用的直角边长度为所述隔水导管直径的1/3,所述加筋板的厚度与所述隔水导管壁厚相同;所述套筒的内径比隔水导管的外径大3~5mm。
3、如权利要求2所述的一种扶正装置,其特征在于:与所述隔水导管焊接时所述加筋板上非焊接用的直角边朝上。
4、如权利要求1所述的一种扶正装置,其特征在于:与所述隔水导管焊接时所述加筋板上非焊接用的直角边朝上。
5、如权利要求1或2或3或4所述的一种扶正装置,其特征在于:所述加筋板为8块。
CN2009100873295A 2009-06-23 2009-06-23 一种扶正装置 Active CN101586451B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100873295A CN101586451B (zh) 2009-06-23 2009-06-23 一种扶正装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100873295A CN101586451B (zh) 2009-06-23 2009-06-23 一种扶正装置

Publications (2)

Publication Number Publication Date
CN101586451A true CN101586451A (zh) 2009-11-25
CN101586451B CN101586451B (zh) 2012-07-04

Family

ID=41370856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100873295A Active CN101586451B (zh) 2009-06-23 2009-06-23 一种扶正装置

Country Status (1)

Country Link
CN (1) CN101586451B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226378A (zh) * 2011-05-26 2011-10-26 中国石油大学(北京) 加强隔水导管组合结构及其施工方法
CN103225302A (zh) * 2013-05-07 2013-07-31 中国石油大学(北京) 一种用于海上隔水导管的六翼结构打桩帽
CN104060945A (zh) * 2014-06-19 2014-09-24 中国海洋石油总公司 一种用于隔水导管的内套管

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NZ188411A (en) * 1977-09-22 1982-03-16 S Kumagai Drain trap spaced plates
US4702325A (en) * 1984-10-04 1987-10-27 James Hipp Apparatus and method for driving casing or conductor pipe
JP4699304B2 (ja) * 2006-07-05 2011-06-08 システム計測株式会社 拡底バケット
CN201116450Y (zh) * 2007-11-08 2008-09-17 四川埃博石油工程技术有限公司 弹性螺旋减阻钢性扶正器
CN201437693U (zh) * 2009-06-23 2010-04-14 中国海洋石油总公司 一种扶正装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102226378A (zh) * 2011-05-26 2011-10-26 中国石油大学(北京) 加强隔水导管组合结构及其施工方法
CN103225302A (zh) * 2013-05-07 2013-07-31 中国石油大学(北京) 一种用于海上隔水导管的六翼结构打桩帽
CN103225302B (zh) * 2013-05-07 2015-05-27 中国石油大学(北京) 一种用于海上隔水导管的六翼结构打桩帽
CN104060945A (zh) * 2014-06-19 2014-09-24 中国海洋石油总公司 一种用于隔水导管的内套管

Also Published As

Publication number Publication date
CN101586451B (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
CN203625893U (zh) 嵌岩灌注桩
CN101586451B (zh) 一种扶正装置
CN103161155A (zh) 沉管压灌桩专用桩机及其使用方法和应用
CN204753628U (zh) 一种可周转的逆作法钢管柱调垂导向装置
CN201437693U (zh) 一种扶正装置
CN105155545B (zh) 一种在防渗墙槽段浇筑过程中使用固定导管装置进行导管固定的方法
CN103410529B (zh) 一种用于软弱围岩的隧道支撑拱脚加固结构及施工方法
CN206409743U (zh) 地下管线的钢管桩支撑结构
CN111101496A (zh) 基于附着式稳桩装置安装深水导管架的施工工艺
CN207110989U (zh) 一种新型钻孔灌注桩钻杆
CN106013096A (zh) 一种建筑基础施工方法
CN205999941U (zh) 一种地下连续墙墙段连接装置
CN202688990U (zh) 加固混凝土标号不足的钻孔灌注桩的钢混结构
JP2008025148A (ja) 鋼管、ソイルセメント大型複合杭
CN212052733U (zh) 一种建筑基础工程用的组合桩
CN204023579U (zh) 一种逆作法柱插筋工具架
CN103866763B (zh) 沉管压灌桩的做桩方法和专用装置及应用
CN209798812U (zh) 一种内外钢管桩组合的海上风电复合基础结构
CN208328908U (zh) 一种用于预制桩连接的接头装置
CN207700198U (zh) 一种超前支撑支护结构
CN202347528U (zh) 钢管插入式基础
CN206512724U (zh) 一种防坍塌成孔辅助工具
CN110670576A (zh) 建筑地基加固装置及方法
JP6615494B2 (ja) 土留部材の撤去方法
CN216041164U (zh) 一种钢管打设装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Institute

Patentee after: China University of Petroleum (Beijing)

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

Patentee before: China University of Petroleum (Beijing)

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: CNOOC research institute limited liability company

Patentee after: China Offshore Oil Group Co., Ltd.

Co-patentee after: China University of Petroleum (Beijing)

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee before: CNOOC Research Institute

Patentee before: China National Offshore Oil Corporation

Co-patentee before: China University of Petroleum (Beijing)

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210804

Address after: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee after: CNOOC RESEARCH INSTITUTE Co.,Ltd.

Address before: 100010 No. 25 North Main Street, Dongcheng District, Beijing, Chaoyangmen

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee before: CNOOC RESEARCH INSTITUTE Co.,Ltd.

Patentee before: China University of Petroleum (Beijing)