CN101573511B - 蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法 - Google Patents

蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法 Download PDF

Info

Publication number
CN101573511B
CN101573511B CN2007800492663A CN200780049266A CN101573511B CN 101573511 B CN101573511 B CN 101573511B CN 2007800492663 A CN2007800492663 A CN 2007800492663A CN 200780049266 A CN200780049266 A CN 200780049266A CN 101573511 B CN101573511 B CN 101573511B
Authority
CN
China
Prior art keywords
steam
generating equipment
steam generating
electricity consumption
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007800492663A
Other languages
English (en)
Other versions
CN101573511A (zh
Inventor
S·格洛斯
M·霍耶
E·-W·普菲特津杰
N·皮帕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of CN101573511A publication Critical patent/CN101573511A/zh
Application granted granted Critical
Publication of CN101573511B publication Critical patent/CN101573511B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

本发明涉及一种在蒸汽发电设备(10)的起速期间、也特别是在蒸汽发电设备(10)的空转期间用于提高蒸汽发电设备(10)、特别是具有中间过热装置(38)的蒸汽发电设备(10)的高压汽轮机(14)的蒸汽质量流的方法,其中在和供电电网同步之前给蒸汽发电设备(10)的发电机(20)接入至少一个用电消耗器(46)。此外,本发明还涉及一种蒸汽发电设备(10),它具有发电机(20)、高压汽轮机(14)和至少一个用电消耗器(46),这个用电消耗器在蒸汽发电设备(10)的起速阶段,也特别是在蒸汽发电设备的空转期间可以接入到发电机(20),以便在发电机(20)和供电电网同步之前提高高压汽轮机(14)的蒸汽质量流。

Description

蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法
技术领域
本发明涉及一种对于蒸汽发电设备,特别是具有中间过热装置的蒸汽发电设备,在蒸汽发电设备的起速阶段期间,特别是也在蒸汽发电设备的空转期间,用于提高高压汽轮机的蒸汽质量流的方法。
背景技术
在起动或者起速化石燃烧的发电设备时,首先将发电设备的锅炉运行到最小载荷(通常是30到40%)。其中,在这个起速阶段中所产生的新蒸汽在(所谓的)旁通运行中首先流经汽轮机。对于具有中间过热装置的设备,新蒸汽被导引通过高压旁通站,并冲洗到较低温度水平,然后被引入到中间过热装置的冷支路中。离开中间过热装置的热支路的蒸汽被导引通过中压旁通站,并且在借助冲洗水冷却后引入到冷凝器中。在这种情况中通过中间过热装置中的高压力水平(通常大约为20-30巴),保证了经受烟气的中间过热管道的有效冷却。
如果从上述这种旁通运行出发,将蒸汽发电设备的高压涡轮加速到额定转速,则中间过热装置的冷支路中的高压会在高压涡轮的出口处导致这样的温度,即特别是在热起动时,这种温度明显地高于额定载荷运行时的温度。其原因是在小质量流时,在高压涡轮中温度降低小或者通风小。不可能根据转速调节来提高这种空转质量流,因为涡轮发电机系统还不能给电网输出功率。在这个阶段涡轮只产生轴承和发电机的消耗功率。这个消耗功率按照设备大小通常在2至5MW的范围内。只有在和电网同步之后,这个功率才能提高。
在同步前出现的高温要求高压涡轮的排汽区域和中间过热装置的冷支路的管路必须能承受提高的温度,特别是也能承受在起动和停车时的强烈交变的温度。这在当前通过在构造涡轮和中间过热装置的冷支路的管路中采用成本比较有利的材料是可能的。然而为了在将来的设备中在热起动时将当前的通常的大约565℃的新蒸汽温度和随之出现的高压排汽的大约最大500℃的排汽温度提高到最高大约为700℃,以及将随之出现的排汽温度为大约580℃到600℃时,要求也在高压涡轮排汽区域和中间过热装置的冷支路中使用明显更加昂贵的材料,特别是10%的铬钢。
其它已公开的方案追求的目标是使用合适的冷却。因此例如在过去也曾经使用过所谓的起动管路。这种管路在起动时将高压排汽室直接和冷凝器连接起来。在这种情况中将膨胀曲线延长,并且阻止在高压涡轮中通风,其做法是降低起动和空转运行时的高压排汽压力。然而为此需要附加的比较大的管路和水冲洗装置。此外也公开寻求其他起动方案。例如已公开将烟气通过锅炉盖导引通过中间过热装置管道。因此这些中间过热装置管道不必进行冷却,并且凭借中间过热装置的冷支路的很低的压力就可起动汽轮机。在另一已公开的起动方案中,高压涡轮首先是抽真空地一起运行,在和电网同步后才接通高压涡轮。
总体看上述冷却方案和起动方案以及使用耐高温的材料是耗费很大且成本高的,因此,为了降低在电网同步前出现的高温需要对这些方案加以改进。
发明内容
本发明的任务是提供一种方法,采用这种方法可无大的耗费和尽可能成本有利地降低在和电网同步前在蒸汽发电设备的起速阶段所出现的高温。
根据本发明这个任务采用本文开头所述的用于在蒸汽发电设备的起速阶段,特别是在空转期间提高蒸汽发电设备的高压汽轮机的蒸汽质量流的方法得以完成,其中,所述蒸汽发电设备特别是具有中间过热装置,在此方法中,使所述蒸汽发电设备的发电机在和供电电网同步之前接入至少一个用电消耗器。
借助根据本发明的方法,在带电侧人为地提高空转功率,随之而来地也在和供电电网同步之前相应地提高蒸汽质量流。这样,根据本发明,特别是具有提高的蒸汽质量流的蒸汽发电设备的高压涡轮可产生更高的功率,使发电机提前地被激励,并且还在电网同步之前就给发电机接入用电消耗器。这种电产生的功率输送到优选呈电阻的形式的用电消耗器。这些用电消耗器必须相应地进行冷却。随着本发明的方法而出现的提高的质量流在和电网同步之前引起特别是在空转时使高压涡轮较少地通风,并且因此即使新蒸汽温度很高时,也可用成本更为有利的材料来构造排汽区域和中间过热装置的冷支路的管路,这特别是因为在空转和额定载荷运行之间的温差不再是那么大。
在根据本发明的方法的一种有利的改进方案中,将优选呈电阻的形式的用电消耗器设置在蒸汽发电设备的供水箱中,以对用电消耗器进行冷却。这种做法之所以有利,是因为在此必须将比较凉地流入的冷凝水逐渐加热到用于除气时所需的通常为5到10巴压力时的饱和蒸汽温度。这样就不必过多地从中间过热装置的冷支路中提取蒸汽质量流,并且有更大量的质量流供冷却中间过热管道使用。可利用随之产生的能量,这样最后可达到节省燃料。
在根据本发明的方法另一有利的改进方案中,将用电消耗器设置在蒸汽发电设备的冷凝器的冷凝集水箱中。将用电消耗器设置在冷凝器的冷凝集水箱中(热井)对冷凝器的热功率没有影响,因为质量流通过相应的中压旁通站相应地下降了。代替地,也可通过将用电消耗器设置在蒸汽发电设备的冷却水中达到对用电消耗器的冷却,其中,为了进行冷却既可以采用主冷却水,也可以使用辅助冷却水。
此外,本发明还涉及一种可执行根据本发明的方法的蒸汽发电设备。这种蒸汽发电设备具有发电机、高压汽轮机和至少一个用电消耗器。在蒸汽发电设备起速阶段期间,这个用电消耗器可接入到发电机上,用于在发电机和供电电网同步之前提高高压汽轮机的蒸汽质量流。这个用电消耗器优选设置在蒸汽发电设备的供水箱中、蒸汽发电设备的冷凝器的冷凝集水箱中或者蒸汽发电设备的冷却水中。
附图说明
下面借助附图对根据本发明的蒸汽发电设备的实施例进行更加详细的说明,其中,图1示出根据本发明的蒸汽发电设备的结构。
具体实施方式
图1简图示出根据本发明的蒸汽发电设备的结构。其中,这个蒸汽发电设备10包括锅炉12、高压涡轮14、中压涡轮16、低压涡轮18、发电机20、具有集水箱24的冷凝器22、具有除气器的供水箱26、新蒸汽管路28和辅助管路30。
在起动或者起速蒸汽发电设备10时,首先将锅炉12运行到最小载荷(通常为30-40%),其中,所产生的蒸汽通常首先导引经过高压涡轮14(旁通运行)。在这种情况中,所述旁通运行是通过关闭设置在高压涡轮14的蒸汽流入区域中的快速关闭阀32或者调节阀34实现的,其中,新蒸汽导引通过高压旁通站36,并且被冲洗到较低的温度水平,然后被输送到中间过热装置38,确切地说首先是输送到中间过热装置的冷支路40。离开了中间过热装置的热支路42的蒸汽导引通过中压旁通站44,并且借助喷射水冷却后被引入到冷凝器22中。在这种情况中,通过中间过热装置38中的高压水平(通常大约为20-30巴),保证了经受烟气的中间过热装置管道的有效冷却。
现在从这个旁通运行中出来,在打开快速关闭阀32或者调节阀34之后,将高压涡轮14加速到额定转速,这样,在中间过热装置的冷支路40中的高压力在高压涡轮14的出口处导致这样的温度,即该温度特别是在热起动时明显地高于额定转速时的温度。其原因是在小的蒸汽质量流时,高压涡轮14中的温度降低较小或者通风较小。不可能根据转速调节来提高这种空转质量流,因为涡轮发电机系统还没有给电网输出功率。只有当和电网同步之后功率才能提高,并且因此质量流才能提高,然而在这种情况中,蒸汽和涡轮部件之间的温差不允许太大。这对于高压涡轮14的排汽区域和中间过热装置的冷支路40来说意味着它们要经受急剧增高的和强烈交变的温度。这种温度在构造高压涡轮14的排汽区域和中间过热装置的冷支路40时在必要时要求使用昂贵的材料。
特别是为了能放弃使用昂贵的耐高温材料根据本发明将至少一个呈电阻46的形式的用电消耗器接通到发电机20上(请参见图1中的虚线)。电阻46为了进行冷却,根据本发明可以设置在供水箱26中、冷凝集水箱24或者冷却水中。如果根据本发明在发电机20和供电电网同步之前提早地激励发电机20,这样则可以接通一个或多个电阻46。这样,在同步之前就已人为地提高了带电侧的空转功率,并且随之也相应地提高了蒸汽质量流。这种做法有如下优点,即特别是在高压涡轮14中空转时的膨胀曲线得到延长,或者蒸汽通风较少,并且也因此即使在新蒸汽温度很高的情况下,也能以成本有利的材料构造排汽区域和中间过热装置的冷支路40的管路,这特别是因为在空转和额定载荷运行之间的温差不再是那么大了。
当将电阻46设置在供水箱26中时,已对中间过热装置38的管道进行了更加强烈的冷却了,因为为了保证除气,只需从中间过热装置的冷支路40将很少蒸汽经辅助管路30抽到供水箱26中。
在空转时通过高压涡轮14的更大的质量流导致焓值更加剧烈地下降,并且因此导致更低的高压排汽温度。在例如将空转功率从5MW提高到15MW的情况下(假设:新蒸汽温度为700℃,中间过热装置的冷支路40中的压力为20巴),高压排汽温度从580℃降低到510℃。

Claims (8)

1.用于在蒸汽发电设备(10)的起速阶段期间提高蒸汽发电设备(10)的高压汽轮机(14)的蒸汽质量流的方法,在此方法中,给所述蒸汽发电设备(10)的发电机(20)在和供电电网同步之前接入至少一个用电消耗器(46)。
2.按照权利要求1所述的方法,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的供水箱(26)中。
3.按照权利要求1所述的方法,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的冷凝器(22)的冷凝集水箱(24)中。
4.按照权利要求1所述的方法,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的冷却水中。
5.蒸汽发电设备(10),具有发电机(20)、高压汽轮机(14)和至少一个用电消耗器(46),该用电消耗器在蒸汽发电设备(10)的起速阶段期间能够接入到发电机(20),用于在发电机(20)和供电电网同步之前提高高压汽轮机(14)的蒸汽质量流。
6.按照权利要求5所述的蒸汽发电设备,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的供水箱(26)中。
7.按照权利要求5所述的蒸汽发电设备,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的冷凝器(22)的冷凝集水箱(24)中。
8.按照权利要求5所述的蒸汽发电设备,其特征在于,所述用电消耗器(46)呈电阻的形式并设置在蒸汽发电设备(10)的冷却水中。
CN2007800492663A 2007-01-04 2007-12-19 蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法 Expired - Fee Related CN101573511B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP07000140.9 2007-01-04
EP07000140A EP1953350A3 (de) 2007-01-04 2007-01-04 Turbinenschaufel
PCT/EP2007/064237 WO2008080854A2 (de) 2007-01-04 2007-12-19 Turbinenschaufel

Publications (2)

Publication Number Publication Date
CN101573511A CN101573511A (zh) 2009-11-04
CN101573511B true CN101573511B (zh) 2012-08-22

Family

ID=39580471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007800492663A Expired - Fee Related CN101573511B (zh) 2007-01-04 2007-12-19 蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法

Country Status (5)

Country Link
US (1) US8387388B2 (zh)
EP (2) EP1953350A3 (zh)
JP (1) JP5027887B2 (zh)
CN (1) CN101573511B (zh)
WO (1) WO2008080854A2 (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4240155B1 (ja) * 2008-03-06 2009-03-18 三浦工業株式会社 蒸気システム
CN102812212B (zh) * 2010-01-27 2016-04-13 联合工艺公司 有机兰金循环(orc)负载跟踪发电系统及操作的方法
NO331329B1 (no) * 2010-02-18 2011-11-28 Energreen As Fluidkjolt lastmotstand for bruk ved energiproduksjon og anvendelse av denne
KR20140123048A (ko) * 2012-01-19 2014-10-21 지멘스 악티엔게젤샤프트 발전소용 보조 증기 발생기
EP2738458B2 (de) * 2012-11-30 2023-05-24 Lumenion AG Kraftwerksanlage und Verfahren zum Erzeugen von elektrischem Strom
DE102013205053B4 (de) * 2013-03-21 2015-05-07 Kraftwerke Mainz-Wiesbaden AG Verfahren zum Betrieb eines einen Wasser-Dampf-Kreislauf aufweisenden Kraftwerks
WO2015080697A1 (en) * 2013-11-26 2015-06-04 Volvo Truck Corporation Supplemental heating in waste heat recovery
EP2918796A1 (de) * 2014-03-13 2015-09-16 Siemens Aktiengesellschaft Dampfkraftanlage mit Dampferzeuger umfassend eine Trommeldruckhaltearmatur
CN105781641B (zh) * 2015-07-04 2018-03-20 佛山恒益发电有限公司 火力发电厂发电设备以及电网同步控制方法
CN105041388B (zh) * 2015-07-04 2017-04-05 国网山东省电力公司滨州供电公司 一种发电设备以及发电设备的电网同步方法
DE102019216616A1 (de) * 2019-10-29 2021-04-29 Siemens Aktiengesellschaft Anlage mit elektrischem Speicher zum schnelleren Anfahren einer Dampfturbine und Verfahren
DE102023203690A1 (de) * 2023-04-21 2024-10-24 Siemens Energy Global GmbH & Co. KG Verfahren zum Anwärmen von Einströmventilen von Turbinen und Schnellschlussventil zum Durchführen des Verfahrens

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4432960C1 (de) * 1994-09-16 1995-11-30 Steinmueller Gmbh L & C Verfahren zum Betrieb eines Dampfkraftwerkes und Dampfkraftwerk
DE10227709A1 (de) * 2001-06-25 2003-02-27 Alstom Switzerland Ltd Dampfturbinenanlage sowie Verfahren zu deren Betrieb

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2811837A (en) * 1956-08-24 1957-11-05 Gen Electric Governing system for reheat turbine
US3216199A (en) * 1962-05-15 1965-11-09 United Aircraft Corp Power conversion system
US3875384A (en) * 1973-11-06 1975-04-01 Westinghouse Electric Corp Protection system for transferring turbine and steam generator operation to a backup mode especially adapted for multiple computer electric power plant control systems
US3943718A (en) * 1974-01-07 1976-03-16 Berry Clyde F Steam generation system
US4368520A (en) * 1980-09-29 1983-01-11 Westinghouse Electric Corp. Steam turbine generator control system
US4474012A (en) * 1983-07-13 1984-10-02 General Electric Company Steam turbine pressure rate limiter
CZ382892A3 (en) * 1992-02-20 1993-09-15 Asea Brown Boveri Device with a gas turbine and method for starting thereof
US6951105B1 (en) * 2004-04-20 2005-10-04 Smith Edward J Electro-water reactor steam powered electric generator system
DE112006000673A5 (de) 2005-03-30 2008-02-14 Alstom Technology Ltd. Turbinenanlage mit zuschaltbarem Nebenstrang

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4432960C1 (de) * 1994-09-16 1995-11-30 Steinmueller Gmbh L & C Verfahren zum Betrieb eines Dampfkraftwerkes und Dampfkraftwerk
DE10227709A1 (de) * 2001-06-25 2003-02-27 Alstom Switzerland Ltd Dampfturbinenanlage sowie Verfahren zu deren Betrieb

Also Published As

Publication number Publication date
WO2008080854A3 (de) 2009-01-29
CN101573511A (zh) 2009-11-04
EP2100010A2 (de) 2009-09-16
WO2008080854A2 (de) 2008-07-10
JP2010514985A (ja) 2010-05-06
EP1953350A3 (de) 2009-01-07
US20100313564A1 (en) 2010-12-16
US8387388B2 (en) 2013-03-05
EP2100010B1 (de) 2015-07-15
EP1953350A2 (de) 2008-08-06
JP5027887B2 (ja) 2012-09-19

Similar Documents

Publication Publication Date Title
CN101573511B (zh) 蒸汽发电设备和提高其高压汽轮机的蒸汽质量流的方法
CN101287892B (zh) 用于加热蒸汽轮机的方法
JP4540472B2 (ja) 廃熱式蒸気発生装置
CN106194296A (zh) 一种从电站锅炉抽蒸汽的热电解耦供热系统
CN107504543B (zh) 利用电锅炉供热提高热电联产机组深度调峰方法
US8387356B2 (en) Method of increasing power output of a combined cycle power plant during select operating periods
US9605564B2 (en) Method for operating a power plant
JP5183305B2 (ja) 汽力発電設備における起動バイパス系統
US20100263605A1 (en) Method and system for operating a steam generation facility
US7458219B2 (en) Steam power plant provided with a retrofit kit and method for retrofitting a steam power plant
CN105874272B (zh) 用于热电联产的方法和设备
JP4818391B2 (ja) 蒸気タービンプラント及びその運転方法
CN105899875B (zh) 用于热电联产的方法和设备
JP4287981B2 (ja) 複合サイクルプラント
CN102537930B (zh) 直流锅炉的清洗方法
Orlov et al. Using full-flow cogeneration turbine condensate to heat various heat transfer agents
CN105980773B (zh) 用于热电联产的方法和设备
CN104775857A (zh) 一种火力发电单元机组的高压缸快速启动系统
JP2022124996A (ja) 火力発電プラントおよび火力発電プラントの制御方法
RU2420664C2 (ru) Многорежимная теплофикационная установка
CN104775858A (zh) 一种火力发电单元机组的中压缸快速启动系统
RU2600655C2 (ru) Способ работы теплоэлектроцентрали с открытой теплофикационной системой и устройство для его осуществления
WO2022176846A1 (ja) 火力発電プラントおよび火力発電プラントの制御方法
CN105041388A (zh) 一种发电设备以及发电设备的电网同步方法
DK2625390T3 (en) Fossil-fired steam generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20181219