CN101560882B - Digging method for preventing strong or strong rock burst on active face - Google Patents

Digging method for preventing strong or strong rock burst on active face Download PDF

Info

Publication number
CN101560882B
CN101560882B CN2009100983914A CN200910098391A CN101560882B CN 101560882 B CN101560882 B CN 101560882B CN 2009100983914 A CN2009100983914 A CN 2009100983914A CN 200910098391 A CN200910098391 A CN 200910098391A CN 101560882 B CN101560882 B CN 101560882B
Authority
CN
China
Prior art keywords
hole
distance
tunnel
shot hole
slotting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100983914A
Other languages
Chinese (zh)
Other versions
CN101560882A (en
Inventor
张春生
褚卫江
单治纲
周垂一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2009100983914A priority Critical patent/CN101560882B/en
Publication of CN101560882A publication Critical patent/CN101560882A/en
Application granted granted Critical
Publication of CN101560882B publication Critical patent/CN101560882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to a digging method for preventing a strong or strong rock burst on an active face. The technical problem to be solved is to provide an active face strong or strong rock burst prevention digging method capable of effectively reducing the rock burst frequency on the active face and reducing the destructiveness of the rock burst. The method comprises the following specific steps: a, carrying out the shothole arrangement and charging design according to a conventional slotting proposal; b, drilling tunneling shotholes and stress-relief shotholes on the slotted active face; c, charging the tunneling shotholes in a convention mode, and charging the stress-relief shotholes in the 32 mm hole bottom within a deep buried range from 2 to 3m; d, detonating the stress-relief shotholes and the tunneling shotholes in turn; and e, tapping slag, and repeating the steps till the digging is completed. The method is mainly applied to deep buried hard rock tunnel projects for traffic, mining, water conservancy and hydraulic power, and the like.

Description

Strong or the strong rock burst on active control excavation method of a kind of face
Technical field
The present invention relates to the strong or strong rock burst on active control excavation method of a kind of face.Mainly be applicable to buried hard rock tunnel engineerings such as traffic, mining, water conservancy and hydropower.
Background technology
In tectonic movement zone strongly, tend to suffer from various forms of rock bursts in the work progress of buried hard rock tunnel, wherein give construction operation personnel's personal safety and threat that plant equipment causes the most serious with strong, the strong rock burst on active that occur in face.Conventional face as shown in Figure 1 if directly tunnel explosion, is easy to take place rock burst.And the face rock burst has very strong deterrent effect to constructor's psychology, in case enter potential strong rock burst hole section, the work holdup that causes because of the fear to rock burst and construction speed are dragged and waited phenomenon of common occurrence slowly.
As if the ACTIVE CONTROL method of face rock burst is a lot, comprising: water water softening, be drilled with the stress relieving hole, stress relieving explosion or the like, practice shows that said method may not obtain gratifying effect.
Summary of the invention
The technical problem to be solved in the present invention is: at the strong rock burst hole section of objective reality, provide a kind of and can effectively reduce the face rock burst generation frequency, weaken the strong or strong rock burst on active control excavation method of face of rock burst destructiveness, to guarantee normal driving speed and the workman person personal safety in the pore-creating powder charge process.
The technical solution adopted in the present invention is: at the face rock burst control excavation method that extremely strong, strong rock burst hole section is provided under the same inventive concept respectively, technical data is slightly different,
Face strong rock burst on active control excavation method is characterized in that concrete steps comprise,
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, leave the V-type slotting on conventional face, this slotting the widest part is a 0.25-0.3 tunnel diameter doubly apart from the distance in excavation sideline, and the narrowest place of slotting is a 0.15-0.2 tunnel diameter doubly;
B, be drilled with driving shot hole and stress relieving shot hole on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, the stress relieving shot hole has four row, symmetry is distributed in the slotting both sides, distance apart from excavation sideline, two side is respectively 0.8-1.2m and 1.8-2.2m, the stress relieving shot hole all is inclined to the tunnel axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, and the hole length of described stress relieving shot hole is than the long 4-5m of digging footage L;
C, for the driving shot hole, carry out powder charge according to conventionally form, for the stress relieving shot hole, adopt the buried scope powder charge of 32mm hole bottom 2-3m;
D, successively detonate the stress relieving shot hole and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.
Described slotting the widest part is 0.3 times a tunnel diameter apart from the distance in excavation sideline, and the narrowest place is 0.15 times a tunnel diameter.
Described stress relieving shot hole has 16 altogether of four lines, four row, the distance of excavating two row pitch-row sidewalls of two sides near tunnel 3 is 1m, the distance of two row pitch-row sidewalls of close tunnel 3 axis is 2m, and hole length adopts the buried scope powder charge of 32mm hole bottom 2.5m than the long 4.5m of digging footage.
The strong rock burst control of face excavation method is characterized in that concrete steps comprise,
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, leave the V-type slotting on conventional face, this slotting the widest part is a 0.25-0.3 tunnel diameter doubly apart from the distance in excavation sideline, and the narrowest place of slotting is a 0.15-0.2 tunnel diameter doubly;
B, be drilled with driving shot hole and stress relieving shot hole on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, the stress relieving shot hole has four row, symmetry is distributed in the slotting both sides, distance apart from excavation sideline, two side is respectively 0.8-1.2m and 1.8-2.2m, the stress relieving shot hole all is inclined to the tunnel axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, and the hole length of described stress relieving shot hole is than the long 2.5-3.5m of digging footage L;
C, for the driving shot hole, carry out powder charge according to conventionally form, for the stress relieving shot hole, adopt the buried scope powder charge of 32mm hole bottom 1-1.2m;
D, successively detonate the stress relieving shot hole and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.
Described slotting the widest part is 0.3 times a tunnel diameter apart from the distance in excavation sideline, and the narrowest place is 0.15 times a tunnel diameter.
Described stress relieving shot hole has 16 altogether of four lines, four row, the distance of excavating two row pitch-row sidewalls of two sides near tunnel 3 is 1m, the distance of two row pitch-row sidewalls of close tunnel 3 axis is 2m, and hole length adopts the buried scope powder charge of 32mm hole bottom 1.1m than the long 3m of digging footage.
The invention has the beneficial effects as follows: the present invention tunnels explosion and stress relieving explosion on the face that has the V-type slotting, push the high stress areas of front of tunnel heading to deep (high stress areas is the power source of strong rock burst), by strengthening the anti-rock burst impact capacity that yield range laccolite thickness improves the face country rock; Before the driving explosion, carry out the stress relieving explosion, reduced the energy level and the face rock burst risk of rock mass stress concentrated area, the place ahead, thereby guaranteed the personal safety of constructor in pore-creating and powder charge process; Simultaneously, because the present invention does not fundamentally change the operating type of conventional driving explosion, therefore can ensure construction speed to greatest extent.
Description of drawings
Fig. 1 is the face structure of background technology among the present invention.
Fig. 2 is the arrangement diagram of slotting and stress relieving shot hole among the present invention.
Fig. 3 is the left view of Fig. 2.
The specific embodiment
As Fig. 2, shown in Figure 3, D is tunnel 3 diameters among the present invention, and L is a digging footage.
Embodiment 1: face strong rock burst on active control excavation method, it is characterized in that concrete steps comprise,
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, leave V-type slotting 1 on conventional face, this slotting the widest part is 0.3 times tunnel 3 diameter D apart from the distance in excavation sideline, and slotting 1 the narrowest place is 0.15 times tunnel 3 diameter D;
B, be drilled with driving shot hole and stress relieving shot hole 2 on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, stress relieving shot hole 2 has four row, totally ten six, symmetry is distributed in slotting 1 both sides, distance apart from excavation sideline, two side is respectively 1m and 2m, stress relieving shot hole 2 all is inclined to tunnel 3 axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, the long long 4.5m of chi L that tunnels in the hole of described stress relieving shot hole 2;
C, for the driving shot hole, carry out powder charge according to conventionally form, for stress relieving shot hole 2, adopt the buried scope powder charge of 32mm hole bottom 2.5m;
D, successively detonate stress relieving shot hole 2 and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.
Slotting 1 explosion and driving explosion two procedures prerequisite each other in this example, after each procedure was finished, the face rock burst risk in the next process implementation process can be controlled effectively, and guarantees the personal safety of constructor in pore-creating and powder charge process.
Embodiment 2: the strong rock burst control of face excavation method, it is characterized in that concrete steps comprise,
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, leave V-type slotting 1 on conventional face, this slotting the widest part is 0.3 times tunnel 3 diameter D apart from the distance in excavation sideline, and slotting 1 the narrowest place is 0.15 times tunnel 3 diameter D;
B, be drilled with driving shot hole and stress relieving shot hole 2 on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, stress relieving shot hole 2 has four row, totally ten six, symmetry is distributed in slotting 1 both sides, distance apart from excavation sideline, two side is respectively 1m and 2m, stress relieving shot hole 2 all is inclined to tunnel 3 axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, and the hole length of described stress relieving shot hole 2 is than the long 3m of digging footage L;
C, for the driving shot hole, carry out powder charge according to conventionally form, for stress relieving shot hole 2, adopt the buried scope powder charge of 32mm hole bottom 1.1m;
D, successively detonate stress relieving shot hole 2 and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.

Claims (6)

1. face strong rock burst on active control excavation method, its concrete steps comprise:
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, on conventional face, leave V-type slotting (1), this slotting the widest part is 0.25-0.3 tunnel (a 3) diameter doubly apart from the distance in excavation sideline, and the narrowest place of slotting (1) is 0.15-0.2 tunnel (a 3) diameter doubly apart from the distance in excavation sideline;
B, be drilled with driving shot hole and stress relieving shot hole (2) on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, stress relieving shot hole (2) has four row, symmetry is distributed in slotting (1) both sides, distance apart from excavation sideline, two side is respectively 0.8-1.2m and 1.8-2.2m, stress relieving shot hole (2) all is inclined to tunnel (3) axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, and the hole length of described stress relieving shot hole (2) is than the long 4-5m of digging footage L;
C, for the driving shot hole, carry out powder charge according to conventionally form, for stress relieving shot hole (2), adopting diameter is the hole of 32mm, in the buried scope powder charge of distance hole bottom 2-3m;
D, successively detonate stress relieving shot hole (2) and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.
2. face strong rock burst on active control excavation method according to claim 1, it is characterized in that: described slotting (1) the widest part is 0.3 times tunnel (a 3) diameter apart from the distance in excavation sideline, and the narrowest place is 0.15 times tunnel (3) diameter apart from the distance in excavation sideline.
3. face strong rock burst on active control excavation method according to claim 1 and 2, it is characterized in that: described stress relieving shot hole (2) has 16 altogether of four lines, four row, the distance of excavating two row pitch-row sidewalls of two side near tunnel (3) is 1m, the distance of two row pitch-row sidewalls of close tunnel (3) axis is 2m, hole length is than the long 4.5m of digging footage, adopting diameter is the hole of 32mm, in the buried scope powder charge of distance hole bottom 2.5m.
4. the strong rock burst control of face excavation method, its concrete steps comprise,
A, carry out according to conventional slotting scheme that shot hole is arranged and the powder charge design, on conventional face, leave V-type slotting (1), this slotting the widest part is 0.25-0.3 tunnel (a 3) diameter doubly apart from the distance in excavation sideline, and the narrowest place of slotting (1) is 0.15-0.2 tunnel (a 3) diameter doubly apart from the distance in excavation sideline;
B, be drilled with driving shot hole and stress relieving shot hole (2) on the face of slotting offering, the layout of wherein tunneling avalanche shot hole in the shot hole and smooth blasting hole designs with reference to the arrangement form of routine, stress relieving shot hole (2) has four row, symmetry is distributed in slotting (1) both sides, distance apart from excavation sideline, two side is respectively 0.8-1.2m and 1.8-2.2m, stress relieving shot hole (2) all is inclined to tunnel (3) axis, the two row holes that its middle distance sidewall is nearer and the angle of tunnel axis are 15 degree, two angles that are listed as holes and tunnel axis far away apart from sidewall are 20 degree, and the hole length of described stress relieving shot hole (2) is than the long 2.5-3.5m of digging footage L;
C, for the driving shot hole, carry out powder charge according to conventionally form, for stress relieving shot hole (2), adopting diameter is the hole of 32mm, in the buried scope powder charge of distance hole bottom 1-1.2m;
D, successively detonate stress relieving shot hole (2) and the driving shot hole;
E, slag tap, and the repetitive cycling above-mentioned steps is finished until excavation.
5. the strong rock burst control of face according to claim 4 excavation method, it is characterized in that: described slotting (1) the widest part is 0.3 times tunnel (a 3) diameter apart from the distance in excavation sideline, and the narrowest place is 0.15 times tunnel (3) diameter apart from the distance in excavation sideline.
6. according to claim 4 or the strong rock burst control of 5 described faces excavation method, it is characterized in that: described stress relieving shot hole (2) has 16 altogether of four lines, four row, the distance of excavating two row pitch-row sidewalls of two side near tunnel (3) is 1m, the distance of two row pitch-row sidewalls of close tunnel (3) axis is 2m, hole length is than the long 3m of digging footage, adopting diameter is the hole of 32mm, in the buried scope powder charge of distance hole bottom 1.1m.
CN2009100983914A 2009-05-14 2009-05-14 Digging method for preventing strong or strong rock burst on active face Active CN101560882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100983914A CN101560882B (en) 2009-05-14 2009-05-14 Digging method for preventing strong or strong rock burst on active face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100983914A CN101560882B (en) 2009-05-14 2009-05-14 Digging method for preventing strong or strong rock burst on active face

Publications (2)

Publication Number Publication Date
CN101560882A CN101560882A (en) 2009-10-21
CN101560882B true CN101560882B (en) 2011-10-05

Family

ID=41219837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100983914A Active CN101560882B (en) 2009-05-14 2009-05-14 Digging method for preventing strong or strong rock burst on active face

Country Status (1)

Country Link
CN (1) CN101560882B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2032914B1 (en) * 2022-08-11 2023-03-31 Univ Zaozhuang Tunnelling method for preventing rock burst in high stress area

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220866B (en) * 2011-04-17 2013-09-18 山东科技大学 Pressure relief and consolidation synergizing prevention and control method for rock burst in deep coal drift
CN102445117B (en) * 2011-12-06 2014-10-08 兰州大学 V-notch blasting and smooth blasting combination control blasting procedure
CN102494570B (en) * 2011-12-06 2013-12-25 兰州大学 Energy collecting blasting and smooth surface blasting combined control blasting method
CN102692164B (en) * 2012-06-14 2014-08-13 中国水电顾问集团华东勘测设计研究院 Stress unloading, water injecting and drilling and blasting method for longitudinal structure surface structural strong rockburst regions
CN102937399B (en) * 2012-11-20 2014-12-03 武汉大学 Stress relief blasting method based on ground stress transient release
CN102980453B (en) * 2012-12-12 2015-01-28 中国水电顾问集团华东勘测设计研究院 Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface
CN103075936B (en) * 2013-02-17 2015-07-08 中国水电顾问集团华东勘测设计研究院 Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN103134402B (en) * 2013-02-17 2015-01-28 中国水电顾问集团华东勘测设计研究院 Stress slant symmetrical type deeply buried tunnel rock burst removing time-share blasting method
CN103185491B (en) * 2013-02-17 2015-04-01 中国水电顾问集团华东勘测设计研究院 Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels
CN103410519B (en) * 2013-08-06 2015-04-08 重庆地质矿产研究院 Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method
CN103498681B (en) * 2013-10-14 2015-09-23 兖州煤业股份有限公司 Fully mechanized coal face tight roof large area is abnormal presses prevention method
CN103743302B (en) * 2014-01-13 2015-02-25 中国科学院武汉岩土力学研究所 Deep-tunnel time-space delay type rock burst prevention method
CN103711494B (en) * 2014-01-13 2015-10-28 中国科学院武汉岩土力学研究所 The prevention and controls of bottom slab crack and lifting is brought out in a kind of buried hard rock tunnel rock burst
CN103742156B (en) * 2014-01-13 2015-08-12 中国科学院武汉岩土力学研究所 Unidirectional driving opportunity and mode defining method is changed in opposite directions before buried hard rock tunnel is through
CN104314574B (en) * 2014-10-13 2017-01-18 福州市规划设计研究院 Hard rock tunnel non-blasting digging blocking method and construction method
CN105065004B (en) * 2015-07-31 2017-07-07 中铁一局集团有限公司 A kind of Shallow Large Span rock tunnel Portal Section weak blast excavation construction method
CN105604554B (en) * 2015-12-22 2018-04-06 中国矿业大学 A kind of Driving Face in Coal Tunnel end face form that adjusts keeps the stable method in side top
CN105715276A (en) * 2016-03-16 2016-06-29 福州大学 Forepoling method for actively preventing and controlling rock outburst
CN106225617B (en) * 2016-08-09 2018-08-21 武汉大学 A kind of rock-burst prevention method based on quick-fried rammer hydrofracturing
CN107083967B (en) * 2017-06-20 2023-06-27 武汉大学 Method and system for assisting tunnel boring machine in tunneling extremely hard rock by utilizing hydraulic fracturing technology
CN109139020B (en) * 2018-09-12 2020-06-02 南华大学 Static blasting excavation subsection unloading method for underground chamber in rock burst area
CN110332865A (en) * 2019-07-08 2019-10-15 中南大学 Deep high stress stope upper centripetal deep hole combined blasting method
CN114737977B (en) * 2022-04-22 2024-10-01 福建省交建集团工程有限公司 Rock burst prevention tunnel face structure for tunneling and rock burst prevention tunneling method
CN114909962B (en) * 2022-05-23 2023-09-08 中铁二十二局集团第三工程有限公司 Construction method for damping and explosion control during tunnel approaching construction
CN115420161B (en) * 2022-08-29 2023-06-30 四川公路桥梁建设集团有限公司 Underground chamber rock burst prevention and treatment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5232268A (en) * 1992-04-01 1993-08-03 Dynatec Mining Limited Method of breaking a full face of rock for constructing shafts and tunnels
SE524164C2 (en) * 2001-05-10 2004-07-06 Inco Ltd drilling Procedure
KR20080029786A (en) * 2006-09-29 2008-04-03 주식회사 성보이엔씨 The method of tunnelblasting by using changeable blasting pattern
CN101270667A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Surrounding rock supporting method for ultra-strong or strong or medium rock burst tunnel section deep imbedded in underground chamber
CN101270967A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Stress-relief blasting method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5232268A (en) * 1992-04-01 1993-08-03 Dynatec Mining Limited Method of breaking a full face of rock for constructing shafts and tunnels
US5232268B1 (en) * 1992-04-01 1995-05-09 Dynatec International Limited Method of breaking a full face of rock for constructing shafts and tunnels
US5232268B2 (en) * 1992-04-01 1996-10-15 Dynatec International Limited Method of breaking a full face of rock for constructing shafts and tunnels
SE524164C2 (en) * 2001-05-10 2004-07-06 Inco Ltd drilling Procedure
KR20080029786A (en) * 2006-09-29 2008-04-03 주식회사 성보이엔씨 The method of tunnelblasting by using changeable blasting pattern
CN101270667A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Surrounding rock supporting method for ultra-strong or strong or medium rock burst tunnel section deep imbedded in underground chamber
CN101270967A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Stress-relief blasting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2032914B1 (en) * 2022-08-11 2023-03-31 Univ Zaozhuang Tunnelling method for preventing rock burst in high stress area

Also Published As

Publication number Publication date
CN101560882A (en) 2009-10-21

Similar Documents

Publication Publication Date Title
CN101560882B (en) Digging method for preventing strong or strong rock burst on active face
CN101349533B (en) Dip laneway digging hole layout mode
CN101270967B (en) Stress-relief blasting method
CN108729924B (en) Quick construction method for mechanical excavation of urban hard rock tunnel
CN102937399B (en) Stress relief blasting method based on ground stress transient release
CN101915105B (en) United method for tunneling super-strong or strong rock burst hole section of TBM construction tunnel
CN103321644A (en) Mechanical mode and control blasting combined tunneling method
AU2020100911A4 (en) Shield structure for effectively controlling ground subsidence
CN103821516A (en) Method for preventing rock burst through secondary pressure relief
CN102519328B (en) Stone drift driving method adopting technologies of water cutting and cut blasting
CN104482817B (en) A kind of deep-lying tunnel stress relieving presplit blasting method
CN102506623A (en) Deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate
CN102494571A (en) Construction method for damped blasting of tunnels
CN101967977A (en) Construction method for controlling rock pillar type rock burst in process of double-head tunneling deep-buried tunnel transfixion
CN110145313A (en) It is adapted to the vertical shaft composite supporting construction of mine deep stratum and high stress areas
CN108060925A (en) The steel for shot structure of small section tunnel Cut Blasting
CN110924972A (en) Construction method of hard rock tunnel
CN103291312A (en) Shield tunneling machine capable of realizing three-dimensional grouting
CN103711494B (en) The prevention and controls of bottom slab crack and lifting is brought out in a kind of buried hard rock tunnel rock burst
CN206592127U (en) Great burying TBM construction tunnel rock burst processing structures
CN109405688A (en) Close on the blasting construction method in existing operation tunnel
CN207111096U (en) TBM construction tunnel fault belts hole section processing structure
CN103075936B (en) Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN209672960U (en) Close on the blasting arrangement in existing operation tunnel
CN103075935A (en) Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant