CN103410519B - Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method - Google Patents

Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method Download PDF

Info

Publication number
CN103410519B
CN103410519B CN201310337665.7A CN201310337665A CN103410519B CN 103410519 B CN103410519 B CN 103410519B CN 201310337665 A CN201310337665 A CN 201310337665A CN 103410519 B CN103410519 B CN 103410519B
Authority
CN
China
Prior art keywords
face
tunnel
rock burst
sphere
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310337665.7A
Other languages
Chinese (zh)
Other versions
CN103410519A (en
Inventor
陈洪凯
董平
廖云平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Institute of Geology and Mineral Resources
Original Assignee
Chongqing Institute of Geology and Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Institute of Geology and Mineral Resources filed Critical Chongqing Institute of Geology and Mineral Resources
Priority to CN201310337665.7A priority Critical patent/CN103410519B/en
Publication of CN103410519A publication Critical patent/CN103410519A/en
Application granted granted Critical
Publication of CN103410519B publication Critical patent/CN103410519B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a tunnel boring is with anti-rock burst face structure, is used for blasting, excavation operation's face including the tunnel boring in-process, and its improvement lies in: the palm surface is shaped like a special-shaped surface formed by intersecting a spherical surface or an ellipsoid with the ground. The beneficial technical effects of the invention are as follows: the probability of rock burst disasters can be effectively reduced, and the capacity of the tunnel for resisting the rock burst disasters is improved; meanwhile, the effective free face area formed by the tunnel face is larger, so that the explosion effect can be effectively improved, the disturbance damage to surrounding rocks is reduced, and the construction efficiency is improved.

Description

Tunnel piercing anti-rock burst face structure and anti-rock burst tunnel piercing method
Technical field
The present invention relates to a kind of tunnelling technology, particularly relate to the anti-rock burst face structure of a kind of tunnel piercing and anti-rock burst tunnel piercing method.
Background technology
Rock burst is a kind of accidental pollution event, particularly common in tunnel excavating process; The destructiveness of rock burst is very big, not only can do great damage to excavated surface, and the life security of entail dangers to constructor, spoiled work equipment; At present, in work progress, how effectively to avoid rock burst hazard to occur and effectively resist the problem of rock burst hazard, protection constructor life security, having become global problem urgently to be resolved hurrily in underground rock and rock mechanics field.
In prior art, the prophylactico-therapeutic measures for rock burst mainly contains water spray, advanced stress relieving explosion, steel fiber shotcrete and hangs soft protecting net etc.; But in engineering practice, the effect that previous protective measure is played is not very desirable.
In prior art, when carrying out tunnel piercing, its face structure is generally the plane perpendicular to ground, face edge is caused to there is rib curve, easily near rib curve, there is stress concentration phenomenon in the country rock body around face, make the subregion on the country rock body around face there is very large peak stress, if now implement explosion, very easily bring out rock burst.
After adopting the present invention program, the country rock body tendency near face can be made comparatively to relax, smooth, there is not rib curve in face, thus effectively avoid the internal stress of country rock body around face, occur stress concentration phenomenon, owing to being provided with advanced section, except constructability, the stress on face can also be discharged to a certain extent in advance, further, increase effective free free face area, alleviate the disturbance damage of explosion to country rock, final raising country rock body is to the resistance of blast disturbance or holding capacity, significantly reduce the probability of happening of rock burst hazard, and, the solution of the present invention can also play the supporting role similar to conventional " dome " structure to a certain extent, improve the stability of country rock body inside face.
Such analysis is conceived to the effect of the present invention on defence rock burst hazard, in addition, the present invention can also make the effective free free face area of country rock body around face significantly increase, thus play raising blasting efficiency, reduce the effect of unit location explosive consumption, can be for reference as application number be CN200810046140.7(title: the application process of horizontal V-shaped tunnel face for digging tunnel) application for a patent for invention, by comparison, the face that the present invention program obtains can be larger for the free free face area of excavation operation, obviously, in raising blasting efficiency, the solution of the present invention has better effect, and, the present invention also possesses the effect of defence rock burst hazard simultaneously.
On aforementioned schemes basis, in order to reduce engineering difficulty and operation complexity, the invention allows for following preferred version: when described face adopts sphere to cut formed shaped face mutually with ground, the centre of sphere height of sphere lower than tunnel height half, be above the ground level; When described face adopts ellipsoid to cut formed shaped face mutually with ground, the real axis of the spheroid at ellipsoid place is parallel with tunnel piercing direction, and the level height of real axis lower than tunnel height half, be above the ground level.
Same as the prior artly, the present invention when applying by arranging explosion eye and snubber carries out development blasting on face, based on the present invention program, explosion eye and snubber can adopt following preferred version to arrange: described face is provided with snubber array and multiple explosion eye; When described face adopts sphere to cut formed shaped face mutually with ground, the longitudinal center line of snubber array is parallel with tunnel piercing direction and crossing with the centre of sphere of described sphere; When described face adopts ellipsoid to cut formed shaped face mutually with ground, the longitudinal center line of snubber array overlaps with the real axis of the spheroid at ellipsoid place; The projection of described face on tunnel piercing direction forms a hemispheric plane of projection; The projection on the projection surface of described longitudinal center line forms initial point, and multiple explosion eye is that the center of circle is by annular array formal distribution on the projection surface with initial point.Wherein, snubber array can by the rectangular array arranged in form of 3 × 3; In addition, explosion eye also can divide into reliever, additional eye and periphery hole by its particular location.
On the basis of aforementioned schemes, the invention allows for a kind of anti-rock burst tunnel piercing method, comprise: in tunnel excavating process, the region that there is rock burst hidden danger in the country rock body section overlapped with the tunnel path preset forms rock burst hidden danger section, all the other sections in the tunnel path preset form ordinary crossing section, in the tunneling process of ordinary crossing section, conventional means is adopted to tunnel; When conventional means tunnels, the face adopted is defined as conventional face; Its difference is: when tunnel piercing is to the juncture area of ordinary crossing section and rock burst hidden danger section, tunnel as follows:
1) on conventional face, arrange multiple boring, multiple boring forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring for: sphere or ellipsoid cut formed shaped face mutually with ground;
2) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, and conventional face is destroyed, and namely the country rock body newly exposed forms the first anti-rock burst face, the surface configuration of the first anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
3) on the first anti-rock burst face, arrange multiple boring (also crying big gun hole), multiple boring forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring for: sphere or ellipsoid cut formed shaped face mutually with ground;
4) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, first anti-rock burst face is destroyed, namely the country rock body newly exposed forms the second anti-rock burst face, the surface configuration of the second anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
5) repeat step 4), adopt the tunneling method of anti-rock burst face to continue to tunnel forward, until by rock burst hidden danger section, then use conventional means instead and tunnel.
In prior art, when drilling through borehole, the degree of depth of general boring makes at the bottom of hole basically identical with explosion position, after explosion terminates, boring is all destroyed, when continuing explosion, to need on new face setting-out again to go out bore position, extremely bother, for this problem, the present invention has also done following improvement: be provided with advanced section in described boring, and the degree of depth of advanced section is greater than the explosion position of blasting cartridge, is filled with stemming in advanced section.After adopting this scheme, after explosion terminates, advanced section can not be totally disrupted, hole clearly can be left on the new face formed, thus do not need when making ensuing blast to carry out setting-out again to bore position, only need to calculate drilling depth, and continue to creep into forward the new borehole that can obtain position and be applicable to along advanced section, improve efficiency of construction.Stemming, for filling the space in advanced section, avoids detonation stresses to discharge to advanced fragment position.
Because prior art, blasting cartridge of the present invention adopts following preferred version: described blasting cartridge is made up of housing, the ring-type energy gathering cap that is encapsulated in the explosive in housing and is arranged at surface of shell.
In order to adapt with the solution of the present invention and make face be shaped better, the present invention has also carried out following optimal design to ring-type energy gathering cap: described ring-type energy gathering cap is cannelure, and the axis of cannelure and blasting cartridge are axially in a certain angle; The axis of cannelure is vertical with the tangent plane at this explosion position place on shaped face.
Being referred from prior art, when igniting, adopting short-delay blasting mode to ignite.
Advantageous Effects of the present invention is: effectively can reduce the probability that rock burst hazard occurs, and improves the ability that rock burst hazard resisted by tunnel; Meanwhile, the effective free free face area formed by face is comparatively large, effectively can improve explosive effect, alleviate the disturbance damage to country rock, improves efficiency of construction.
Summary of the invention
For the problem in background technology, the present invention proposes the anti-rock burst face structure of a kind of tunnel piercing, comprise the face for explosion, digging operation in tunnel excavating process, its innovation is: described face surface configuration cuts formed shaped face with ground mutually for sphere or ellipsoid.
The principle of aforementioned schemes is: rock burst hazard depend primarily on two key factors, first internal cause, namely country rock body must be high energy storage rock mass, and stress suffered by it is close to rock mass strength; It two is external causes, and the one or many that high energy storage rock mass is subject to imposed load triggers; In constructing tunnel, the main manifestations of aforesaid imposed load is detonation during Upon Blasting for Tunnel Driving, and after the fragility between the internal stress and rock mass strength of country rock body balances and broken by detonation, rock burst hazard just there occurs;
Accompanying drawing explanation
Fig. 1, face perspective view of the present invention (region, country rock surface in figure within the scope of circle is face, and shown in arrow, direction is tunneling direction, and shown in mark A, eyelet is advanced section snubber);
The perspective view (in figure, shown in arrow, direction is tunneling direction) of Fig. 2, conventional face;
The borehole setting position schematic diagram (in figure, shown in arrow, direction is tunneling direction) of Fig. 3, rock burst hidden danger section and position, ordinary crossing section boundary;
(in figure, shown in arrow, direction is tunneling direction for Fig. 4, borehole setting position schematic diagram when tunneling in rock burst hidden danger segment limit; Mark face shown in C in figure and be the face that goes out of front onepull operation Final finishing, shown in mark D, dotted line is the face profile being about in ensuing blast be formed);
Fig. 5, borehole distributing position schematic diagram on the projection surface (shown in mark A, black eyelet is snubber);
Fig. 6, blasting cartridge cross-sectional view (shown in mark E, part is the stemming of filling);
Fig. 7, blasting cartridge structural representation (mark the axis that rectilinear direction shown in f is cannelure in figure, in figure, shown in f, direction is only signal, and the axis of the blasting cartridge at diverse location place there are differences).
Detailed description of the invention
The anti-rock burst face structure of a kind of tunnel piercing, comprise the face for explosion, digging operation in tunnel excavating process, its innovation is: described face surface configuration cuts formed shaped face with ground mutually for sphere or ellipsoid.
Mathematically, the analytical function expression formula of sphere or ellipsoid can be illustrated by following formula:
Wherein, a is major semiaxis, and b is semi-minor axis; When corresponding to the physical size in actual tunnel, b is tunnel width, and the direction of a and tunnel piercing direction are in the same way; As a=b, face is sphere; As a > b, face is ellipsoid, and now, a is the real axis of the spheroid at ellipsoid place, and b is the imaginary axis.Below when determining concrete snubber and explosion eye position, first can design the position (also namely determining the numerical value of x and z) of snubber and explosion eye, then substituting into the degree of depth (also namely solving y value) that above formula calculates snubber and explosion eye.
Further, when described face adopts sphere to cut formed shaped face mutually with ground, the centre of sphere height of sphere lower than tunnel height half, be above the ground level; When described face adopts ellipsoid to cut formed shaped face mutually with ground, the real axis of the spheroid at ellipsoid place is parallel with tunnel piercing direction, and the level height of real axis lower than tunnel height half, be above the ground level.
Further, the projection of described face on tunnel piercing direction forms a hemispheric plane of projection; Described face is provided with snubber array and multiple explosion eye; The longitudinal center line of snubber array overlaps with the described centre of sphere, or the longitudinal center line of snubber array overlaps with described real axis; The projection on the projection surface of described longitudinal center line forms initial point, and multiple explosion eye is that the center of circle is by annular array formal distribution on the projection surface with initial point.
A kind of anti-rock burst tunnel piercing method, comprise: in tunnel excavating process, the region that there is rock burst hidden danger in the country rock body section overlapped with the tunnel path preset forms rock burst hidden danger section, all the other sections in the tunnel path preset form ordinary crossing section, in the tunneling process of ordinary crossing section, conventional means is adopted to tunnel; When conventional means tunnels, the face adopted is defined as conventional face 1; It is different from prior art part: when tunnel piercing is to the juncture area of ordinary crossing section and rock burst hidden danger section, tunnel as follows:
1) on conventional face 1, arrange multiple boring 2, multiple boring 2 forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring 2 for: sphere or ellipsoid cut formed shaped face mutually with ground;
2) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, and conventional face 1 is destroyed, and namely the country rock body newly exposed forms the first anti-rock burst face, the surface configuration of the first anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
3) on the first anti-rock burst face 3, arrange multiple boring 2, multiple boring 2 forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring 2 for: sphere or ellipsoid cut formed shaped face mutually with ground;
4) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, first anti-rock burst face 3 is destroyed, namely the country rock body newly exposed forms the second anti-rock burst face, the surface configuration of the second anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
5) repeat step 4), adopt the tunneling method of anti-rock burst face to continue to tunnel forward, until by rock burst hidden danger section, then use conventional means instead and tunnel.
Further, be provided with advanced section 2-1 in described boring 2, the degree of depth of advanced section 2-1 is greater than the explosion position of blasting cartridge, is filled with stemming in advanced section 2-1.
Further, described blasting cartridge is made up of housing 4, the ring-type energy gathering cap 5 that is encapsulated in the explosive in housing 4 and is arranged at housing 4 surface.
Further, described ring-type energy gathering cap 5 is cannelure, and the axis of cannelure and blasting cartridge are axially in a certain angle; The axis of cannelure is vertical with the tangent plane at this explosion position place on shaped face.
Further, during ignition, short-delay blasting mode is adopted to ignite.

Claims (6)

1. the anti-rock burst face structure of tunnel piercing, comprises the face for explosion, digging operation in tunnel excavating process, it is characterized in that: described face surface configuration cuts formed shaped face with ground mutually for sphere or ellipsoid;
When described face adopts sphere to cut formed shaped face mutually with ground, the centre of sphere height of sphere lower than tunnel height half, be above the ground level; When described face adopts ellipsoid to cut formed shaped face mutually with ground, the real axis of the spheroid at ellipsoid place is parallel with tunnel piercing direction, and the level height of real axis lower than tunnel height half, be above the ground level;
Described face is provided with snubber array and multiple explosion eye; When described face adopts sphere to cut formed shaped face mutually with ground, the longitudinal center line of snubber array is parallel with tunnel piercing direction and crossing with the centre of sphere of described sphere; When described face adopts ellipsoid to cut formed shaped face mutually with ground, the longitudinal center line of snubber array overlaps with the real axis of the spheroid at ellipsoid place; The projection of described face on tunnel piercing direction forms a hemispheric plane of projection; The projection on the projection surface of described longitudinal center line forms initial point, and multiple explosion eye is that the center of circle is by annular array formal distribution on the projection surface with initial point.
2. an anti-rock burst tunnel piercing method, comprise: in tunnel excavating process, the region that there is rock burst hidden danger in the country rock body section overlapped with the tunnel path preset forms rock burst hidden danger section, all the other sections in the tunnel path preset form ordinary crossing section, in the tunneling process of ordinary crossing section, conventional means is adopted to tunnel; When conventional means tunnels, the face adopted is defined as conventional face (1); It is characterized in that: when tunnel piercing is to the juncture area of ordinary crossing section and rock burst hidden danger section, tunnel as follows:
1) on conventional face (1), arrange multiple boring (2), multiple boring (2) forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring (2) for: sphere or ellipsoid cut formed shaped face mutually with ground;
2) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, conventional face (1) is destroyed, namely the country rock body newly exposed forms the first anti-rock burst face, the surface configuration of the first anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
3) multiple boring (2) is set on the first anti-rock burst face (3), multiple boring (2) forms snubber array and explosion eye respectively, the contoured surface shape at place at the bottom of the hole of multiple boring (2) for: sphere or ellipsoid cut formed shaped face mutually with ground;
4) at explosion intraocular filling blasting cartridge, implement after filling to ignite; After blast, country rock body within the scope of detonation caves in snubber array direction, first anti-rock burst face (3) is destroyed, namely the country rock body newly exposed forms the second anti-rock burst face, the surface configuration of the second anti-rock burst face is that sphere or ellipsoid cut formed shaped face mutually with ground;
5) repeat step 4), adopt the tunneling method of anti-rock burst face to continue to tunnel forward, until by rock burst hidden danger section, then use conventional means instead and tunnel.
3. anti-rock burst tunnel piercing method according to claim 2, is characterized in that: be provided with advanced section (2-1) in described boring (2), and the degree of depth of advanced section (2-1) is greater than the explosion position of blasting cartridge, is filled with stemming in advanced section (2-1).
4. anti-rock burst tunnel piercing method according to claim 2, is characterized in that: described blasting cartridge is made up of with the ring-type energy gathering cap (5) being arranged at housing (4) surface housing (4), the explosive be encapsulated in housing (4).
5. anti-rock burst tunnel piercing method according to claim 4, is characterized in that: described ring-type energy gathering cap (5) is cannelure, and the axis of cannelure and blasting cartridge are axially in a certain angle; The axis of cannelure is vertical with the tangent plane at this explosion position place on shaped face.
6. anti-rock burst tunnel piercing method according to claim 2, is characterized in that: during ignition, adopts short-delay blasting mode to ignite.
CN201310337665.7A 2013-08-06 2013-08-06 Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method Expired - Fee Related CN103410519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310337665.7A CN103410519B (en) 2013-08-06 2013-08-06 Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310337665.7A CN103410519B (en) 2013-08-06 2013-08-06 Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method

Publications (2)

Publication Number Publication Date
CN103410519A CN103410519A (en) 2013-11-27
CN103410519B true CN103410519B (en) 2015-04-08

Family

ID=49603553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310337665.7A Expired - Fee Related CN103410519B (en) 2013-08-06 2013-08-06 Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method

Country Status (1)

Country Link
CN (1) CN103410519B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104564088B (en) * 2014-12-31 2016-08-17 中铁隧道集团有限公司 A kind of advanced double pilot tunnel construction methods discharging tunnel high stress rock burst destruction
CN105065004B (en) * 2015-07-31 2017-07-07 中铁一局集团有限公司 A kind of Shallow Large Span rock tunnel Portal Section weak blast excavation construction method
CN105604554B (en) * 2015-12-22 2018-04-06 中国矿业大学 A kind of Driving Face in Coal Tunnel end face form that adjusts keeps the stable method in side top
CN106225613B (en) * 2016-08-25 2018-05-22 中铁十一局集团第三工程有限公司 A kind of efficient segmentation method of ignition in tunnel excavating process
CN106431163B (en) * 2016-09-29 2019-02-12 中铁隧道集团有限公司 A kind of agent for fixing for stablizing face for loess tunnel
CN106403740B (en) * 2016-11-25 2018-08-31 中国葛洲坝集团易普力股份有限公司 Accurately control the method that structural plane excavates photoface exploision hole direction diagonally downward
CN106767208B (en) * 2017-01-13 2019-07-19 贵州大学 A kind of blasting method and structure of efficient demolition set
CN111997664A (en) * 2020-09-08 2020-11-27 宁波朗达工程科技有限公司 Rock burst prevention tunnel construction platform
CN114251107B (en) * 2021-12-16 2023-04-28 中国电建集团成都勘测设计研究院有限公司 Tunnel collapse processing method
CN116026200A (en) * 2023-03-03 2023-04-28 中铁十四局集团大盾构工程有限公司 Rapid pre-fracturing blasting method for shield tunnel explosive-gathering explosive bag

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4183470B2 (en) * 2002-10-02 2008-11-19 鹿島建設株式会社 Underground structure and its construction method
CN101182773A (en) * 2007-12-20 2008-05-21 中铁十二局集团有限公司 Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method
CN101560882B (en) * 2009-05-14 2011-10-05 中国水电顾问集团华东勘测设计研究院 Digging method for preventing strong or strong rock burst on active face

Also Published As

Publication number Publication date
CN103410519A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103410519B (en) Rock burst-proof tunnel face structure for tunneling and rock burst-proof tunneling method
CN102269554B (en) Method for treating underground mine goaf by forming covering layer by chamber blasting technology
Xia et al. Weakening effects of hydraulic fracture in hard roof under the influence of stress arch
CN107165638B (en) A kind of deep tunnel rock burst active preventing control method
CN106767205B (en) The bustling micro- vibration comprehensively control blasting method of urban district subway running tunnel
CN108643910A (en) A method of controlling caving for coal mine stope tight roof Advance presplitting
CN104790949B (en) Huge thick tight roof high methane high seam Roof Control and method and the drilling machine improving gas drainage under suction efficiency
CN109184762B (en) Rock bolt modified surrounding rock impact ground pressure prevention method for extra-thick coal seam
CN105423832B (en) Blast construction method of orientation window of thick-wall brick chimney
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN101793486A (en) High-grade highway rock cutting blasting construction process
CN105466292A (en) Medium-length hole blasting technology used in semi-coal-rock roadway
CN205245910U (en) Shallow hole blasting structure
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN206235254U (en) Soft rock monoblock type bias double buffering bed course joint-cutting cumulative presplit blasting device
CN113482725B (en) Tunnel high-ground-stress section prevention and control construction method
Sazid et al. Effective explosive energy utilization for engineering blasting–initial results of an inventive stemming plug, SPARSH
CN102269544A (en) One-end-closed cumulative blasting slotted pipe device
Yang et al. Experimental study and engineering practice of pressured water coupling blasting
CN104457461A (en) Detonation and penetration-improvement method and application thereof
Xiaolei Similar simulation test of overlying rock failure and crack evolution in fully mechanized caving face with compound roof
CN101493305A (en) Damping blasting method for tunnel diggin
CN107990798A (en) The definite method of mountain area civil buildings blasting vibration allowable safety distance
Wu et al. Mode of overlying rock roofing structure in large mining height coal face and analysis of support resistance
CN208567661U (en) A kind of advanced stress relieving explosion arragement construction of face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150408

Termination date: 20170806