CN108204775B CN201810031286.8A CN201810031286A CN108204775B CN 108204775 B CN108204775 B CN 108204775B CN 201810031286 A CN201810031286 A CN 201810031286A CN 108204775 B CN108204775 B CN 108204775B
Authority
CN
China
Prior art keywords
tunnel
deep
blasthole
face
principal stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810031286.8A
Other languages
Chinese (zh)
Other versions
CN108204775A (en
Inventor
苗胜军
王辉
宋元方
孔长青
郭向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201810031286.8A priority Critical patent/CN108204775B/en
Publication of CN108204775A publication Critical patent/CN108204775A/en
Application granted granted Critical
Publication of CN108204775B publication Critical patent/CN108204775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides a kind of deep-lying tunnel instant type rock burst active preventing control method, belongs to Geotechnical Engineering field.This method determines the maximum principal stress of tunnel face and the size and Orientation of minimum principal stress first;Then, in front of tunnel heading and tunnel excavation axis parallel direction central area drilling deep blasthole and keyhole, central area deep blasthole of detonating;Sealing pores are carried out to the deep blasthole of decentralised hole and keyhole aperture section with accelerated cement again, arrange conventional blasthole after high pressure water injection along tunnel contour line in face, conventional blasthole of detonating;As face is constantly pushed ahead, the above drillhole blasting scheme circulation is carried out, and during following cycle, the explosive payload of conventional blasthole can cut down according to the circumstance according to practical demolition effect.It the composite can be widely applied to the industries such as water power, mine, the traffic under large ground pressure.

Description

A kind of deep-lying tunnel instant type rock burst active preventing control method
Technical field
The present invention relates to Geotechnical Engineering fields, particularly relate to a kind of anti-prosecutor of deep-lying tunnel instant type rock burst active Method.
Background technique
It, would generally be quick by non-plastic fracture in hard crisp rock mass high-ground stress area in deep-buried underground engineering digging process It discharges strain energy and generates rock burst.Rock burst is commonly encountered in the process as hard rock Underground Engineering Excavation under buried large ground pressure Engineering geological problems often show as bursting in form because it is with sudden, and along with the unexpected release of strain energy in rock mass Ejection, greatly threatens the safety of site operation personnel and equipment.
Currently, main rock-burst prevention measure includes: (1) for metal mine deep mining, it is main suitable by selection Recovery method and adjustment mining sequence, avoid occurring high stress concentrations region in recovery process, while reducing strain energy product It is poly-.(2) for deep tunnel, " short drilling depth, multi-cycle " is used in digging process, strict control dosage, to subtract as far as possible Few influence of the explosion to country rock.Photoface exploision is used, as far as possible to reduce a possibility that stress raisers occur.(3) possible On the face that rock burst occurs, advanced stress relief hole is beaten, discharges its high stress in advance.(4) using spray anchor, anchor pole, steel wire Rigidity or the flexible supports such as net reduce the rock falling of tunnel and Stope roof, control the generation of rock burst hazard.(5) pass through It is filled the water to the rock mass after explosion, to play the role of softening country rock, it is brittle to reduce country rock.Although these methods reduce The strain energy that rock mass discharges when single explosion, has the effect of prevention and treatment rock burst certain, but these methods are with ignoring rock mass Stress and the dynamic impact of strain energy transient state release excavate efficiency as cost to sacrifice, do not solve deep-lying tunnel fundamentally Instant type Rockburst Problem.
Summary of the invention
For deficiency existing for above-mentioned common deep-lying tunnel rock burst active Control Technology, providing one kind can add the present invention Fast construction speed reduces construction cost, reduces energy loss, increasing the deep-lying tunnel instant type rock that concentrated stress releases controllability Quick-fried active preventing control method.
It is as follows that the method comprising the steps of:
(1) maximum principal stress of tunnel face and the size and Orientation of minimum principal stress are determined;
(2) for demolition effect needed for different tunnel section sizes and Practical Project, according to what is determined in step (1) The size and Orientation of principal stress determines position and the number of front of tunnel heading central area deep blasthole, in front of tunnel heading and tunnel Wide open digging axis parallel direction central area drilling deep blasthole and keyhole, hole depth 2d, wherein d is conventional blasthole hole depth, Deep blasthole includes centre bore and decentralised hole, the powder charge in the blasthole of deep, and explosive payload is not more than the 1/2 of hole depth;
(3) the central area deep blasthole in detonation step (2);
(4) sealing pores, rapid hardening water are carried out to the deep blasthole of decentralised hole and keyhole aperture section using accelerated cement After mud solidification, high pressure water injection carried out to the deep blasthole of centre bore using high-pressure pump, water injection pressure persistently rise to appearance 1~ Stop water filling after 2MPa pressure drop;
(5) according to Practical Project tunnel cross-section form, size and required demolition effect in face along tunnel contour line Then the conventional blasthole of interior arrangement, hole depth d carry out short-delay blasting, presplit blasting or photoface exploision;
(6) as face is constantly pushed ahead, the above drillhole blasting scheme circulation is carried out, during following cycle, often The explosive payload of rule blasthole gradually decreases.
Wherein, the maximum principal stress size and Orientation of tunnel face and minimum principal stress size and side in step (1) It is determined to according to field geology exploration report and on-the-spot test data.
The oval distribution in position of front of tunnel heading central area deep blasthole in step (2), ellipse include ellipse With periphery ellipse, ellipse is specifically configured to: elliptical center is located on tunnel excavation axis, and transverse direction is answered with maximum master Power direction is consistent, and ellipse short shaft direction is consistent with minimum principal stress direction, and the ratio of elliptical long axis a and short axle b are equal to maximum Principal stress σ1With minimum principal stress σ3Ratio.The actual value of a and b can be obtained by live demolition effect.
Further, the position of front of tunnel heading central area deep blasthole and number are arranged as following in step (2): In 1 deep blasthole is crept on front of tunnel heading tunnel excavation central axis, 4 deeps are arranged in oval apex in oval and periphery Blasthole or keyhole are specifically arranged or are expanded by following two situation:
One, if tunnel section size is smaller (generally 3-5m or be less than 3m) or tunnel locating for split there are micro in country rock Gap then creeps into 1 deep blasthole on front of tunnel heading tunnel excavation central axis, and creeps into 4 in oval 4 vertex positions Keyhole;
If two, country rock locating for tunnel section size larger (generally 5-8m or 8m or more) or tunnel is complete, in area In front on square tunnel excavation central axis and oval 4 vertex positions creep into 5 deep blastholes, in peripheral oval 4 vertex position Set 4 keyholes of drilling;
Its medium and deep blasthole is charging hole, and explosive payload is not more than the 1/2 of hole depth, and keyhole is non-charging hole, can be increased quick-fried Broken free face, improves blasting rock-broken and Rock Damage breaking effect.The specific location of deep blasthole and keyhole, i.e., it is oval and outer It encloses elliptical specific size and vertex position needs constantly to debug determination according to live Practical Project situation and rock-burst prevention effect.
Detailed process is as follows in step (3):
It detonates first the deep blasthole of front of tunnel heading tunnel excavation axis direction central area, igniting deep blasthole can be with The deep high stress Rock Damage rupture for promoting front of tunnel heading, realizes face stress relieving nearby and energy release, makes peak Be worth stress and energy from excavation near further to mobile in front of working face, and it is slow in front of tunnel heading to form rock crushing Area is rushed, the controllability that concentrated stress releases is increased, thus the generation of prevention and control face instant type rock burst nearby.It is next when entering When explosion recycles, conventional blast hole projectile filling can also be reduced using previous step in the broken buffer area that front of tunnel heading has been formed Amount.
The number of conventional blasthole, pattern, firing order and whether short-delay blasting, photoface exploision are used in step (5) Or the technologies such as presplit blasting demolition effect according to needed for tunnel section width and Practical Project determines.
This method, using the basic theories of unloading pressure by blasting, passes through on the basis of conventional advanced stress relief hole measure One or a set of deep blasthole and keyhole are beaten in front of tunnel heading, deep blasthole is detonated to promote the height in front of tunnel heading The rupture of stress Rock Damage realizes face stress relieving nearby and energy release in advance, makes peak stress and energy from excavation Place is further mobile to front of tunnel heading nearby, and forms fragmented rock body buffer area in front of tunnel heading, thus before making face The rigidity of square central area rock mass reduces, and lesion ruptures increase, energy release, and the stress state in entire country rock is adjusted. The central area deep blasthole drilled through is recycled in front of tunnel heading and tunnel excavation axis parallel direction when entering next explosion When, conventional hole charge can also be reduced, while can using previous step in the broken buffer area that front of tunnel heading has been formed It accelerates construction progress, reduces construction cost, achieve the purpose that prevent and treat rock burst.
The advantageous effects of the above technical solutions of the present invention are as follows:
(1) the deep blasthole and keyhole for considering principal direction of stress lay mode, can increase explosion free face, improve quick-fried Broken broken rock and Rock Damage breaking effect.
(2) for different section configuration and size, one or one are drilled through by excavating drilling depth direction in front of tunnel heading Group deep blasthole and keyhole, igniting deep blasthole can promote the deep high stress Rock Damage of front of tunnel heading to rupture, real The stress relieving nearby of existing face and energy release, make peak stress and energy from excavation near further in front of working face It is mobile, and in the fragmented rock body buffer area that front of tunnel heading forms, increase the controllability that concentrated stress releases.It is next when entering When a explosion recycles, conventional blasthole can be also reduced in the broken buffer area that front of tunnel heading has been formed using previous step Explosive payload, and convenient for protection Wall Rock of Tunnel stabilization.
(3) high pressure water injection is carried out to the deep blasthole of front of tunnel heading central area explosion, can made caused by explosion Rock Damage rupture further development promotes crackle extension perforation, and tends to the high stress of Wall Rock of Tunnel with energy accumulating Homogenization, while by after the rock mass of high pressure water injection microfissure, softening country rock is also acted as, the brittle effect of country rock is reduced.
(4) the deep blasthole of drilled through central area and keyhole are that lateral aperture can reduce during recycling Blasting Excavation Project amount accelerates construction progress, reduces construction cost.
(5) deep-lying tunnel that can be widely applied to the fields such as mining, water conservancy and hydropower, traffic under large ground pressure was excavated The Initiative defence of rock burst, has a extensive future in journey.
Detailed description of the invention
Fig. 1 is structural schematic diagram involved in deep-lying tunnel instant type rock burst active preventing control method of the invention;
Fig. 2 is A-A section powder charge schematic diagram of Fig. 1;
Fig. 3 is central area deep blasthole and keyhole artwork in the embodiment of the present invention, wherein (a) is tunnel section ruler There are the deep blastholes in micro crack and keyhole artwork for very little smaller or rock mass;(b) for tunnel section size is larger or rock The complete deep blasthole of body and keyhole artwork;
Fig. 4 is the damage of deep-lying tunnel excavation and the strain energy distribution schematic diagram that the method for the present invention is not used;
Fig. 5 is to excavate damage and strain energy distribution schematic diagram using the deep-lying tunnel of the method for the present invention, wherein (a) is deep Schematic diagram after blasthole ignition;(b) schematic diagram after being ignited for conventional blasthole.
Wherein: 1- tunnel;2- permanent support;3- gib;4- face;5- routine blasthole;The deep 6- blasthole;6a- The deep blasthole of centre bore;The deep blasthole of 6b- decentralised hole;7- keyhole;8- is crushed buffer area;Before the shot hole blasting of the deep 9- Peak stress curve;Peak stress curve after the shot hole blasting of the deep 10-;11- strain energy distribution situation;12- stemming;13- powder stick; 14- strain energy concentration region.
Specific embodiment
To keep the technical problem to be solved in the present invention, technical solution and advantage clearer, below in conjunction with attached drawing and tool Body embodiment is described in detail.
The present invention provides a kind of deep-lying tunnel instant type rock burst active preventing control method.
Substantially steps are as follows for this method:
(1) maximum principal stress of tunnel face and the size and Orientation of minimum principal stress are determined;
(2) front of tunnel heading central area deep big gun is determined according to the size and Orientation of the principal stress determined in step (1) The position in hole and number, in front of tunnel heading and tunnel excavation axis parallel direction central area drilling deep blasthole and slotting Hole, hole depth 2d, wherein d is conventional blasthole hole depth, and deep blasthole includes centre bore and decentralised hole, is filled in the blasthole of deep Medicine, explosive payload are not more than the 1/2 of hole depth;
(3) the central area deep blasthole in detonation step (2);
(4) sealing pores, rapid hardening water are carried out to the deep blasthole of decentralised hole and keyhole aperture section using accelerated cement After mud solidification, high pressure water injection carried out to the deep blasthole of centre bore using high-pressure pump, water injection pressure persistently rise to appearance 1~ Stop water filling after 2MPa pressure drop;
(5) conventional blasthole is arranged along tunnel contour line in face, hole depth d, then progress short-delay blasting, presplitting are quick-fried Broken or photoface exploision;
(6) as face is constantly pushed ahead, the above drillhole blasting scheme circulation is carried out, during following cycle, often The explosive payload of rule blasthole gradually decreases.
In the specific implementation process, as shown in Figure 1 and Figure 2, permanent support 2 and gib 3, deep are set in tunnel 1 In blasthole 6 when powder charge, it is stemming close to face 4, gos deep into Kong Zhongwei powder stick 13, specific operation process is carried out according to the following procedure:
(1) before Blasting Excavation, determine that the maximum master of face answers according to field geology exploration report and on-the-spot test data The size and Orientation of power and minimum principal stress.
(2) it for demolition effect needed for different 1 cross dimensions of tunnel and Practical Project, is answered according to the master of Wall Rock of Tunnel The size and Orientation of power determines position and the number of 4 front central area deep blasthole 6 of face.In 4 front of face and tunnel The excavation axis parallel direction central area drilling deep blasthole 6 of hole 1 and keyhole 7, hole depth 2d, the powder charge in deep blasthole 6, Explosive payload is not more than the 1/2 of hole depth.The oval distribution in the position of deep blasthole 6, it is oval that as follows, elliptical center is specifically set It is excavated on axis positioned at tunnel 1.Transverse direction is consistent with biggest principal stress direction, ellipse short shaft direction and minimum principal stress Direction is consistent.The ratio of elliptical long axis a and short axle b is equal to maximum principal stress σ1With minimum principal stress σ3Ratio.The reality of a and b Actual value can be obtained by live demolition effect.The deep of a centre bore is crept on 4 front tunnel of face, 1 central excavation axis Blasthole 6a, in oval and periphery, the deep blasthole 6b or keyhole 7 of four decentralised holes is arranged in oval apex, specifically can by with The setting of lower two kinds of situations is expanded: if (1) 1 cross dimensions of tunnel is smaller or tunnel 1 locating in country rock there are micro crack, can The deep blasthole 6a of a centre bore is crept on 4 front tunnel excavation central axis of face, and in ellipse four vertex positions Creep into four keyholes 7.(2) if 1 cross dimensions of tunnel is larger or tunnel 1 locating for country rock it is complete, can be in 4 front tunnel of face The deep blasthole 6a and oval four vertex positions that a centre bore is crept on wide open digging central axis creep into four decentralised holes Deep blasthole 6b, creep into four keyholes 7 in peripheral oval four vertex positions.The arrangement of specific deep blasthole 6 is several It is determined according to demolition effect needed for Practical Project.Central area deep blasthole 6 and the hole depth of keyhole 7 are 2d, medium and deep big gun Hole 6 is charging hole, and explosive payload should be not more than the 1/2 of hole depth, and keyhole 7 is non-charging hole, can increase explosion free face, improve quick-fried Broken broken rock and Rock Damage breaking effect.Specific deep blasthole and keyhole setting are as shown in Figure 3.
(3) the 4 front tunnel 1 of face that detonates first excavates the deep blasthole 6 of axis direction central area, ignites deep big gun Hole 6 can promote the deep high stress Rock Damage rupture in 4 front of face, realize the stress relieving nearby of face 4 and energy Release, make peak stress curve 9 and energy 14 from excavation near further to mobile in front of working face, and before face 4 Side forms rock crushing buffer area 8, increases concentrated stress and releases controllability, thus the instant type rock burst nearby of prevention and control face Occur.When entering next explosion circulation, the broken buffer area that can also have been formed using previous step in the front of face 4 8, reduce conventional hole charge.Specific unused this method and the damage of deep-lying tunnel excavation and strain energy point for using this method Cloth is as shown in Figure 4 and Figure 5, and strain energy distribution situation 11 can be clearly seen, and is crushed 8 surrounding of buffer area and forms strain energy concentration area Peak stress after peak stress curve 9 and deep shot hole blasting can be clearly seen before the shot hole blasting of deep in conjunction with Fig. 1 in domain 14 Curve 10.
(4) sealing pores, rapid hardening are carried out to the deep blasthole 6b of decentralised hole and 7 aperture of keyhole section using accelerated cement After cement slurry sets, high pressure water injection is carried out using deep blasthole 6a of the high-pressure pump to centre bore, water injection pressure persistently rises to out Stop water filling after existing 1~2MPa pressure drop, to play the role of softening country rock, it is brittle to reduce country rock.
(5) according to 1 section configuration of Practical Project tunnel, size and required demolition effect in face 4 along 1 profile of tunnel Conventional blasthole 5 is arranged in line, then hole depth d detonates by design.The number of conventional blasthole 5, pattern, detonation are suitable Sequence and whether can be as needed for 1 cross dimensions of tunnel and Practical Project using the technologies such as short-delay blasting, photoface exploision or presplit blasting Demolition effect determine.
(6) as face 4 is constantly pushed ahead, the above drillhole blasting scheme circulation is carried out, during following cycle, often The explosive payload of rule blasthole 5 can cut down according to the circumstance according to practical demolition effect.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art For, without departing from the principles of the present invention, several improvements and modifications can also be made, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (4)

1. a kind of deep-lying tunnel instant type rock burst active preventing control method, it is characterised in that: comprise the following steps that
(1) maximum principal stress of tunnel face and the size and Orientation of minimum principal stress are determined;
(2) front of tunnel heading central area deep blasthole is determined according to the size and Orientation of the principal stress determined in step (1) Position and number, in front of tunnel heading and tunnel excavation axis parallel direction central area drilling deep blasthole and keyhole, hole Depth is 2d, wherein d is conventional blasthole hole depth, and deep blasthole includes centre bore and decentralised hole, the powder charge in the blasthole of deep, dress Dose is not more than the 1/2 of hole depth;
(3) the central area deep blasthole in detonation step (2);
(4) sealing pores, Fast Setting Cement Slurry are carried out to the deep blasthole of decentralised hole and keyhole aperture section using accelerated cement After solidification, high pressure water injection is carried out using deep blasthole of the high-pressure pump to centre bore, water injection pressure persistently rises to 1~2MPa of appearance Stop water filling after pressure drop;
(5) arrange conventional blasthole along tunnel contour line in face, hole depth d, then carry out short-delay blasting, presplit blasting or Photoface exploision;
(6) as face is constantly pushed ahead, drillhole blasting scheme circulation in above step (1)-(5) is carried out, following cycle In the process, the explosive payload of conventional blasthole gradually decreases;
The oval distribution in position of front of tunnel heading central area deep blasthole in the step (2), including oval and periphery Ellipse, ellipse are specifically configured to: elliptical center is located on tunnel excavation axis, transverse direction and biggest principal stress direction Unanimously, ellipse short shaft direction is consistent with minimum principal stress direction, and the ratio of elliptical long axis a and short axle b are equal to maximum principal stress σ1With minimum principal stress σ3Ratio;
The position of front of tunnel heading central area deep blasthole and number are by following setting in the step (2): before face 1 deep blasthole is crept on square tunnel excavation central axis, oval apex is arranged 4 deep blastholes or draws in oval and periphery Slot is specifically arranged or is expanded by following two situation:
If one, tunnel section size is no more than there are micro cracks in country rock locating for 5m or tunnel, in front of tunnel heading tunnel 1 deep blasthole is crept on central excavation axis, and creeps into 4 keyholes in oval 4 vertex positions;
If two, tunnel section size is complete greater than country rock locating for 5m or tunnel, in front of tunnel heading tunnel excavation central axis Upper and oval 4 vertex positions creep into 5 deep blastholes, creep into 4 keyholes in peripheral oval 4 vertex positions;
Its medium and deep blasthole is charging hole, and explosive payload is not more than the 1/2 of hole depth, and keyhole is non-charging hole.
2. deep-lying tunnel instant type rock burst active preventing control method according to claim 1, it is characterised in that: the step (1) the maximum principal stress size and Orientation of tunnel face and minimum principal stress size and Orientation are reconnoitred according to field geology in Report and on-the-spot test data determine.
3. deep-lying tunnel instant type rock burst active preventing control method according to claim 1, it is characterised in that: the step (3) detailed process is as follows in:
The deep blasthole of detonation front of tunnel heading tunnel excavation axis direction central area first forms rock mass in front of tunnel heading Broken buffer area;
Then, when entering next explosion circulation, using previous step in the broken buffer area that front of tunnel heading has been formed, subtract Few routine hole charge.
4. deep-lying tunnel instant type rock burst active preventing control method according to claim 1, it is characterised in that: the step (5) number, pattern, the firing order demolition effect according to needed for tunnel section width and Practical Project of conventional blasthole in It determines.
CN201810031286.8A 2018-01-12 2018-01-12 A kind of deep-lying tunnel instant type rock burst active preventing control method Active CN108204775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810031286.8A CN108204775B (en) 2018-01-12 2018-01-12 A kind of deep-lying tunnel instant type rock burst active preventing control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810031286.8A CN108204775B (en) 2018-01-12 2018-01-12 A kind of deep-lying tunnel instant type rock burst active preventing control method

Publications (2)

Publication Number Publication Date
CN108204775A CN108204775A (en) 2018-06-26
CN108204775B true CN108204775B (en) 2019-11-08

Family

ID=62606131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810031286.8A Active CN108204775B (en) 2018-01-12 2018-01-12 A kind of deep-lying tunnel instant type rock burst active preventing control method

Country Status (1)

Country Link
CN (1) CN108204775B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109139020B (en) * 2018-09-12 2020-06-02 南华大学 Static blasting excavation subsection unloading method for underground chamber in rock burst area
CN111102892B (en) * 2020-01-07 2021-07-13 南昌大学 Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel
CN111779488A (en) * 2020-06-28 2020-10-16 中铁第一勘察设计院集团有限公司 Tunnel excavation method
CN112797860B (en) * 2020-12-30 2022-01-28 西南交通大学 Construction method for preventing and treating rock burst of high-ground-temperature tunnel

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864961B (en) * 2010-05-27 2011-11-16 武汉大学 Method for actively preventing and controlling rock burst
CN102937398B (en) * 2012-11-20 2014-12-03 武汉大学 Rockburst active control method based on blasting excavation disturbance control
CN104390538B (en) * 2014-10-21 2016-08-24 武汉大学 A kind of stress relieving blasting method based on face grooving
CN104457465B (en) * 2014-11-26 2016-06-08 武汉大学 A kind of deep-lying tunnel Blasting Excavation effect control method
CN104482817B (en) * 2014-12-15 2015-10-21 武汉大学 A kind of deep-lying tunnel stress relieving presplit blasting method
CN107165638B (en) * 2017-05-27 2019-05-24 江西省交通科学研究院 A kind of deep tunnel rock burst active preventing control method

Also Published As

Publication number Publication date
CN108204775A (en) 2018-06-26

Similar Documents

Publication Publication Date Title
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN101644156B (en) Method for weakening coal-rock mass by hydraulic blasting and fracturing
CN104634199B (en) Utilize primacord and Nonel detonator to realize the method for tunnel perimeter eye photoface exploision
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN104154830B (en) Medium-length hole blasting method for underground mining
CN101864961B (en) Method for actively preventing and controlling rock burst
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN104790949B (en) Huge thick tight roof high methane high seam Roof Control and method and the drilling machine improving gas drainage under suction efficiency
CN103195466A (en) Directional water pressure blasting method for improving coal bed gas permeability
CN101441055A (en) Presplit blasting method
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN103499255A (en) Method for directional energy-gathered blasting of retaining wall with low damage
CN109506529A (en) A kind of compound Cut Blasting method
CN101270967A (en) Stress-relief blasting method
CN101419040A (en) Deep hole blasting method in large aperture composite undermine
CN104819670B (en) Pre-drilling mesopore shaft excavation blasting method
CN113982582B (en) Method for treating triangular area overhead of end head by hydraulic fracturing of underground coal face of coal mine
CN110067558A (en) A kind of severe inclined thick coal seam stope drift active workings joint release prevention and treatment impulsion pressure method
CN109281672A (en) A kind of hard rock tunnel excavation method
CN104406470A (en) Deep-hole slotting blasting method for large-diameter freezing shaft in west cretaceous system soft rock area
CN105443133B (en) Subsurface rock beehive-shaped charge demolition set and method in a kind of non-excavating construction
CN104482817A (en) Deep-buried tunnel stress relieving pre-splitting blasting method
CN209230424U (en) A kind of compound burn cut
CN102620614B (en) Cave depot is slagged tap the construction method of funnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant