CN103743302B - Deep-tunnel time-space delay type rock burst prevention method - Google Patents

Deep-tunnel time-space delay type rock burst prevention method Download PDF

Info

Publication number
CN103743302B
CN103743302B CN201410014133.4A CN201410014133A CN103743302B CN 103743302 B CN103743302 B CN 103743302B CN 201410014133 A CN201410014133 A CN 201410014133A CN 103743302 B CN103743302 B CN 103743302B
Authority
CN
China
Prior art keywords
time
space
type rock
rock burst
potential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410014133.4A
Other languages
Chinese (zh)
Other versions
CN103743302A (en
Inventor
冯夏庭
赵周能
丰光亮
刘国锋
肖亚勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201410014133.4A priority Critical patent/CN103743302B/en
Publication of CN103743302A publication Critical patent/CN103743302A/en
Application granted granted Critical
Publication of CN103743302B publication Critical patent/CN103743302B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a deep-tunnel potential time-space delay type rock burst prevention method. The method includes: respectively controlling a strong or extremely strong time-space delay type rock burst area and a slight or medium time-space delay type rock burst area, and bursting each tunnel face with set advance per round within a set radius range by taking the time-space delay type rock burst area as the center; adopting high-precision millisecond delay caps to initiate burst with single-section maximum initiating explosive charge not more than 20 kilograms; controlling a burst interval of the tunnel faces located in the same hole section as the time-space delay type rock burst area; staggering burst time of the tunnel faces in the hole section adjacent to the time-space delay type rock burst area; preferentially excavating a tunnel nearest to the time-space delay type rock burst area when more than two tunnels exist at the same elevation, and increasing distance among the tunnel faces of different tunnels along the axis direction. By control on surrounding excavation and burst activities, accumulated damage due to burst is reduced, and influence on potential time-space delay type rock burst due to excavation and burst disturbance is reduced; safety of tunnel construction is guaranteed, and construction progress of projects is quickened.

Description

A kind of Deep-tunnel time-space delay type rock burst prevention method
Technical field
The invention belongs to technical field of tunnel construction, be specifically related to a kind of Deep-tunnel time-space delay type rock burst prevention method, be applicable to the buried hard rock tunnel engineerings such as mine, traffic, water conservancy and hydropower.
Background technology
After after the rock burst of space-time retarded type refers to buried region of high stress excavate and unload, Stress relief balances, the rock burst occurred under external disturbance effect, mainly occur in beyond tunnel current face excavation unloading effect coverage, during generation, often a period of time is excavated in delayed rock burst region in time, spatially delayed current face certain distance, generally betides the region beyond Bei Dong footpath, current face rear three.Because delayed digging time is longer and far away apart from current face, the rock burst of space-time retarded type often makes people be difficult to or be neglectful in taking precautions, thus add disguise and the destructiveness of rock burst hazard, usually make equipment and personnel suffer " surprise attack ", cause immeasurable loss and injures and deaths.
Up to now, the prevention and controls of rock burst is mainly for the rock burst occurred near current face (China Patent Publication No. CN101270967 B, Dan Zhigang, " stress-relief blasting method "; " railway construction technology ", o. 11th in 2012, Li Chenzhi, " buried high-ground stress diversion tunnel stress relieving Technology of Blasting application "; " northeast water conservancy and hydropower ", o. 11th in 2008, Hou Yonghe, " advanced burst stress overcoring method and application thereof "), and relate to the very few of space-time retarded type rock burst, and the identification of space-time retarded type rock burst generation area is mainly according to field observation and the experience of workmen, the judged result accuracy rate drawn thus is extremely low, and often occur erroneous judgement and fail to judge, add the difficulty of space-time retarded type rock-burst prevention.For the hole section of potential space-time retarded type rock burst, method traditional both at home and abroad, measure such as anchor, net, the spray etc. mainly taked in digging process with rock burst section are prevented and treated rock burst, but long for circulation timei owing to arranging anchor pole, bar-mat reinforcement and spraying the operation of concrete again, cause the rock burst of space-time retarded type usually just to occur before it has been arranged; Processed again after then allowing rock burst occur in the mode waited for or dodge in addition.Practice shows, said method fails to obtain gratifying effect.Therefore, the rock burst of space-time retarded type happens occasionally in deep tunnel, causes huge pressure at heart, cause serious threat to engineering construction safety to workmen.
Summary of the invention
The object of the invention is the problems referred to above being to exist for prior art, a kind of Deep-tunnel time-space delay type rock burst prevention method is provided.
To achieve these goals, technical solution of the present invention is:
A kind of deep tunnel potential space-time retarded type rock-burst prevention method, comprises the following steps:
When potential space-time retarded type rock burst region is potential strong or extremely strong space-time retarded type rock burst district:
Step 1.1a, centered by potential strong or extremely strong space-time retarded type rock burst district, radius is in the scope of 350m, and the cyclic advance of each face explosion is 1.8-2m;
Step 1.2a, employing high accuracy millisecond detonator detonate, and the maximum explosive quantity of single hop is not more than 20 kilograms;
Step 1.3a, extend strong with potential or extremely strong space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 24 hours blasting time;
Step 1.4a, potential strong or extremely strong space-time retarded type rock burst district of staggering are close to hole section face blasting time, and blasting time interval, front and back is greater than 4 hours;
Step 1.5a, same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential strong or extremely strong space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged;
When potential space-time retarded type rock burst region is slight or medium space-time retarded type rock burst region:
Step 1.1b, centered by potential slight or medium space-time retarded type rock burst district, radius is in the scope of 150m, and the cyclic advance of each face explosion is 3-3.5m;
Step 1.2b, employing high accuracy millisecond detonator detonate, and the maximum explosive quantity of single hop is not more than 20 kilograms;
Step 1.3b, extend slight with potential or medium space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 12 hours blasting time;
Step 1.4b, potential slight or medium space-time retarded type rock burst district of staggering are close to hole section face blasting time, and blasting time interval, front and back is greater than 2 hours;
Step 1.5b, same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential slight or medium space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged.
A kind of deep tunnel potential space-time retarded type rock-burst prevention method,
It is when potential space-time retarded type rock burst region is potential strong or extremely strong space-time retarded type rock burst district, further comprising the steps of,
Step 2a, check the supporting intensity in potential strong or extremely strong space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole is 1-1.2m, the column pitch of anchor pole is 1-1.2m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm;
Step 3a, tunnel arch foot, abutment wall, spandrel and vault in potential strong or extremely strong space-time retarded type rock burst region arrange stress relief hole, and be arranged in the centre of adjacent anchor pole, its pitch of holes is anchor spacing, and the degree of depth is the bolthole degree of depth, and diameter is 40-50mm;
After step 4a, extension bar-mat reinforcement, before multiple pneumatically placed concrete, adopt cement mortar shutoff stress relief hole;
When potential space-time retarded type rock burst region is slight or medium space-time retarded type rock burst region, further comprising the steps of:
Step 2b: the supporting intensity checking potential slight or medium space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole is 1.5-1.8m, the column pitch of anchor pole is 1.5-1.8m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm.
Described extremely strong time casement retarded type rock burst refer to that the quick-fried hole degree of depth is greater than the rock burst of 3m;
Described strong time casement retarded type rock burst refer to that the quick-fried hole degree of depth is the rock burst of 1-3m;
Described medium time casement retarded type rock burst refer to that the quick-fried hole degree of depth is the rock burst of 0.5-1m;
Described slight time casement retarded type rock burst refer to that the quick-fried hole degree of depth is the rock burst of 0-0.5m;
Described high accuracy millisecond detonator detonates and refers to employing millisecond delay cap, the explosive detonated in each big gun hole with Millisecond time difference order; The maximum explosive quantity of single hop refers to a certain section of other total charge that explosive payload is maximum in segment blast, it therewith the intensity of concussion of blasting caused by separate explosion have direct relation.
The present invention compared with prior art, has the following advantages:
The present invention is directed to the longer and potential space-time retarded type rock burst generation area be positioned at beyond current face three Bei Dong footpath of delayed digging time, first, movable by controlling Excavation blasting around, reduce explosion accumulated damage, reduce Excavation blasting disturbance to the impact of potential space-time retarded type rock burst; Secondly, apply suspension roof support in time to improve Surrounding Rock Strength, increase the ability that country rock builds up strain energy; In addition, by high stress concentrations peak value, the strong deep wall rock of intensity high-bearing capacity is transferred to by layout stress relief hole for strong or extremely strong space-time retarded type rock burst region.Effectively can avoid the generation of space-time retarded type rock burst after taking above-mentioned measure, thus ensure that safety for tunnel engineering and the construction speed accelerating engineering.
Accompanying drawing explanation
Fig. 1 is the floor map in space-time retarded type rock burst region of the present invention.
Fig. 2 is space-time retarded type rock burst region microseismic event plane distribution schematic diagram in embodiment 1 and 2.
Fig. 3 is that the A-A of Fig. 1 under excavating condition is topped bar to sectional view in tunnel.
Fig. 4 is that the A-A of Fig. 1 under tunnel full-section excavation operating mode is to sectional view.
In figure: 1-tunnel; 2-face; 3-potential space-time retarded type rock burst region; 4-microseismic event; 5-anchor pole; 6-stress relief hole; 7-tops bar in tunnel; 8-full section of tunnel.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme of the present invention is described in further detail:
embodiment 1:
The present embodiment is described in detail for tunnel 7 excavations of topping bar, when monitor there is potential strong or extremely strong space-time retarded type rock burst region beyond Bei Dong footpath, current face rear three, tunnel 1 time, take following steps:
Step 1: reduce face concussion of blasting around potential strong or extremely strong space-time retarded type rock burst region, concrete measure is as follows, 1) centered by potential strong or extremely strong space-time retarded type rock burst district, radius is in the scope of 350m, and the cyclic advance of each face explosion is 1.8-2m;
2) adopt high accuracy millisecond detonator to detonate, the maximum explosive quantity of single hop is not more than 20 kilograms;
3) extend strong with potential or extremely strong space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 24 hours blasting time;
4) stagger potential strong or extremely strong space-time retarded type rock burst district contiguous hole section face blasting time, blasting time interval, front and back is greater than 4 hours;
5) same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential strong or extremely strong space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged, utilize the tunnel excavation space nearest apart from potential strong or extremely strong space-time retarded type rock burst district to carry out damping;
Step 2: the supporting intensity checking potential strong or extremely strong space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole 5 is 1-1.2m, the column pitch of anchor pole 5 is 1-1.2m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm;
Step 3: stress relief hole 6 arranged by the tunnel arch foot in potential strong or extremely strong space-time retarded type rock burst region, abutment wall, spandrel and vault, and be arranged in the centre of adjacent anchor pole 5, its pitch of holes is anchor spacing, and the degree of depth is the bolthole degree of depth, and diameter is 40-50mm;
Step 4: after hanging bar-mat reinforcement, before multiple pneumatically placed concrete, adopts cement mortar shutoff stress relief hole 6.
embodiment 2:
The present embodiment is described in detail for tunnel 7 excavations of topping bar, when monitor there is potential slight or medium space-time retarded type rock burst beyond Bei Dong footpath, current face rear three time, take following steps:
Step 1: reduce face concussion of blasting around potential slight or medium space-time retarded type rock burst region, concrete measure is as follows,
1) centered by potential slight or medium space-time retarded type rock burst district, radius is in the scope of 150m, and the cyclic advance of each face explosion is 3-3.5m;
2) adopt high accuracy millisecond detonator to detonate, the maximum explosive quantity of single hop is not more than 20 kilograms;
3) extend slight with potential or medium space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 12 hours blasting time;
4) stagger potential slight or medium space-time retarded type rock burst district contiguous hole section face blasting time, blasting time interval, front and back is greater than 2 hours;
5) same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential slight or medium space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged, carry out damping to utilize the tunnel excavation space nearest apart from potential slight or medium space-time retarded type rock burst district;
Step 2: the supporting intensity checking potential slight or medium space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole 5 is 1.5-1.8m, the column pitch of anchor pole 5 is 1.5-1.8m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm.
The technical problem that technical scheme of the present invention solves is, for the space-time retarded type Rockburst Problem that Bei Dong footpath, deep tunnel current face rear three exists with exterior domain, a kind of Deep-tunnel time-space delay type rock burst prevention method is provided, by taking to reduce the vibrations of potential space-time retarded type rock burst areas adjacent face sinking and blasting, suspension roof support is applied in time in the potential space-time retarded type rock burst region of supporting intensity weakness, the technical measures such as stress relief hole are arranged to potential strong or extremely strong space-time retarded type rock burst region, reach and reduce or eliminate Bei Dong footpath, deep tunnel current face rear three with the risk of exterior domain generation space-time retarded type rock burst, reduce the various losses that the rock burst of space-time retarded type causes, accelerate the object of engineering construction progress.In the middle part of certain deep tunnel, the statistics of strong rock burst section space-time retarded type rock burst shows, under the equal condition of accumulative hole segment length, the hole section generation space-time retarded type rock burst number of times of technical solution of the present invention is taked only to account for the 20-30% not taking technical solution of the present invention hole section rock burst number of times, and implement in the hole section of technical solution of the present invention with slight in the majority to medium rock burst, significantly reduce space-time retarded type rockburst risk, significantly reduce the various losses that the rock burst of space-time retarded type causes, accelerate engineering construction progress widely.
Specific embodiment described herein is only to the explanation for example of the present invention's spirit.Those skilled in the art can make various amendment or supplement or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present invention or surmount the scope that appended claims defines.

Claims (2)

1. a deep tunnel potential space-time retarded type rock-burst prevention method, is characterized in that, comprise the following steps:
When potential space-time retarded type rock burst region is potential strong or extremely strong space-time retarded type rock burst district:
Step 1.1a, centered by potential strong or extremely strong space-time retarded type rock burst district, radius is in the scope of 350m, and the cyclic advance of each face explosion is 1.8-2m;
Step 1.2a, employing high accuracy millisecond detonator detonate, and the maximum explosive quantity of single hop is not more than 20 kilograms;
Step 1.3a, extend strong with potential or extremely strong space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 24 hours blasting time;
Step 1.4a, potential strong or extremely strong space-time retarded type rock burst district of staggering are close to hole section face blasting time, and blasting time interval, front and back is greater than 4 hours;
Step 1.5a, same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential strong or extremely strong space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged;
When potential space-time retarded type rock burst region is slight or medium space-time retarded type rock burst region:
Step 1.1b, centered by potential slight or medium space-time retarded type rock burst district, radius is in the scope of 150m, and the cyclic advance of each face explosion is 3-3.5m;
Step 1.2b, employing high accuracy millisecond detonator detonate, and the maximum explosive quantity of single hop is not more than 20 kilograms;
Step 1.3b, extend slight with potential or medium space-time retarded type rock burst district and be in face explosion interval time of identical hole section, successively interval is greater than 12 hours blasting time;
Step 1.4b, potential slight or medium space-time retarded type rock burst district of staggering are close to hole section face blasting time, and blasting time interval, front and back is greater than 2 hours;
Step 1.5b, same elevation exist more than 2 tunnels be arranged in parallel time, the tunnel that preferential excavation is nearest apart from potential slight or medium space-time retarded type rock burst district, and different tunnel tunnel face pulls open the distance being not less than 150m along tunnel axis direction, advance in staged.
2. a kind of deep tunnel according to claim 1 potential space-time retarded type rock-burst prevention method, is characterized in that,
It is when potential space-time retarded type rock burst region is potential strong or extremely strong space-time retarded type rock burst district, further comprising the steps of,
Step 2a, check the supporting intensity in potential strong or extremely strong space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole is 1-1.2m, the column pitch of anchor pole is 1-1.2m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm;
Step 3a, tunnel arch foot, abutment wall, spandrel and vault in potential strong or extremely strong space-time retarded type rock burst region arrange stress relief hole, and be arranged in the centre of adjacent anchor pole, its pitch of holes is anchor spacing, and the degree of depth is the bolthole degree of depth, and diameter is 40-50mm;
After step 4a, extension bar-mat reinforcement, before multiple pneumatically placed concrete, adopt cement mortar shutoff stress relief hole;
When potential space-time retarded type rock burst region is slight or medium space-time retarded type rock burst region, further comprising the steps of:
Step 2b: the supporting intensity checking potential slight or medium space-time retarded type rock burst region, suspension roof support is applied in time for only completing just stir cement and soft soil in deep ground region, the line space of anchor pole is 1.5-1.8m, the column pitch of anchor pole is 1.5-1.8m, the region that length should be less than 1 through country rock Long term safety coefficient, diameter is 32mm.
CN201410014133.4A 2014-01-13 2014-01-13 Deep-tunnel time-space delay type rock burst prevention method Active CN103743302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410014133.4A CN103743302B (en) 2014-01-13 2014-01-13 Deep-tunnel time-space delay type rock burst prevention method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410014133.4A CN103743302B (en) 2014-01-13 2014-01-13 Deep-tunnel time-space delay type rock burst prevention method

Publications (2)

Publication Number Publication Date
CN103743302A CN103743302A (en) 2014-04-23
CN103743302B true CN103743302B (en) 2015-02-25

Family

ID=50500346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410014133.4A Active CN103743302B (en) 2014-01-13 2014-01-13 Deep-tunnel time-space delay type rock burst prevention method

Country Status (1)

Country Link
CN (1) CN103743302B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518232A (en) * 2018-04-11 2018-09-11 中铁十七局集团有限公司 The anti-rock burst method for protecting support of single-track railway tunnel of corresponding different rock burst intensity grades

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6102628A (en) * 1998-03-30 2000-08-15 Council Of Scientific & Industrial Research Arch useful for withstanding effect of rockburst occurring in underground mines/tunnels
CN101270667A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Surrounding rock supporting method for ultra-strong or strong or medium rock burst tunnel section deep imbedded in underground chamber
CN101560882A (en) * 2009-05-14 2009-10-21 中国水电顾问集团华东勘测设计研究院 Digging method for preventing strong or strong rock burst on active face
RU2381369C1 (en) * 2008-08-28 2010-02-10 Открытое акционерное общество "Научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр ВНИМИ" Method for prevention of rock bursts in rocks of mine soil
CN101915104A (en) * 2010-07-30 2010-12-15 中国水电顾问集团华东勘测设计研究院 Rock burst control method for deep tunnel excavation by adopting TBM (Tunnel Boring Machine)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6102628A (en) * 1998-03-30 2000-08-15 Council Of Scientific & Industrial Research Arch useful for withstanding effect of rockburst occurring in underground mines/tunnels
CN101270667A (en) * 2008-04-30 2008-09-24 中国水电顾问集团华东勘测设计研究院 Surrounding rock supporting method for ultra-strong or strong or medium rock burst tunnel section deep imbedded in underground chamber
RU2381369C1 (en) * 2008-08-28 2010-02-10 Открытое акционерное общество "Научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр ВНИМИ" Method for prevention of rock bursts in rocks of mine soil
CN101560882A (en) * 2009-05-14 2009-10-21 中国水电顾问集团华东勘测设计研究院 Digging method for preventing strong or strong rock burst on active face
CN101915104A (en) * 2010-07-30 2010-12-15 中国水电顾问集团华东勘测设计研究院 Rock burst control method for deep tunnel excavation by adopting TBM (Tunnel Boring Machine)

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
锦屏山隧道岩爆综合防治施工技术;侯景德;《铁道建筑技术》;20100620(第6期);第38-44页 *
陈炳瑞等.深埋隧洞岩爆孕育规律与机制:时滞型岩爆.《岩石力学与工程学报》.2012,第31卷(第3期),第561-569页. *

Also Published As

Publication number Publication date
CN103743302A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN107764144B (en) A kind of tunnel Millisecond Controlled Blasting method
CN101270967B (en) Stress-relief blasting method
CN104634199B (en) Utilize primacord and Nonel detonator to realize the method for tunnel perimeter eye photoface exploision
CN101144384B (en) Tunnel engineering non-blasting weak disturbance excavating method
CN101915105B (en) United method for tunneling super-strong or strong rock burst hole section of TBM construction tunnel
CN103821516A (en) Method for preventing rock burst through secondary pressure relief
CN104406470B (en) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN102494571A (en) Construction method for damped blasting of tunnels
CN106555593B (en) A kind of big cross section soft rock tunnel is got out of a predicament or an embarrassing situation the construction method of excavation synchronous with inverted arch
CN109339797A (en) A kind of minimum clear-distance tunnel is appeared damping construction method
CN104457465A (en) Deep-buried tunnel blasting excavation effect control method
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN104819670A (en) Pre-drilling mesopore shaft excavation blasting method
CN105715276A (en) Forepoling method for actively preventing and controlling rock outburst
CN106401588A (en) Method for preventing and treating rock burst during exploiting of working face in fault zone
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN103711494B (en) The prevention and controls of bottom slab crack and lifting is brought out in a kind of buried hard rock tunnel rock burst
CN111043924B (en) Efficient blasting method for blocking stemming of tunnel soft rock full-section multistage ultra-deep hole double-end stemming
CN108843329A (en) Tunnel excavation construction method based on the analysis of country rock subregion failure evolvement
CN104482817A (en) Deep-buried tunnel stress relieving pre-splitting blasting method
CN103743302B (en) Deep-tunnel time-space delay type rock burst prevention method
CN102980453B (en) Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface
CN103075936B (en) Rock pillar rockburst step-by-step relief water filling blasting method in deep-buried tunnel penetrating process
CN103075935B (en) Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel
CN103185491B (en) Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant