CN206592127U - Great burying TBM construction tunnel rock burst processing structures - Google Patents

Great burying TBM construction tunnel rock burst processing structures Download PDF

Info

Publication number
CN206592127U
CN206592127U CN201720279862.1U CN201720279862U CN206592127U CN 206592127 U CN206592127 U CN 206592127U CN 201720279862 U CN201720279862 U CN 201720279862U CN 206592127 U CN206592127 U CN 206592127U
Authority
CN
China
Prior art keywords
tunnel
rock burst
tbm
advance
advance borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720279862.1U
Other languages
Chinese (zh)
Inventor
胡亚东
张世殊
姚林林
崔中涛
钟果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201720279862.1U priority Critical patent/CN206592127U/en
Application granted granted Critical
Publication of CN206592127U publication Critical patent/CN206592127U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of great burying TBM construction tunnel rock burst processing structures of tunneling with TBM technical field, the structure includes being arranged on multiple advance boreholes of tunnel face crown area, the advance borehole runs through rock burst region, and the fracture zone formed between each advance borehole by presplit blasting in drilling is connected.The utility model utilizes TBM on-line operations space reasonable Arrangement bore position and direction on tunnel face, using drillhole blasting so that rock burst region crown, spandrel position form Broken rock mass crack, discharge rock burst region high-ground stress, release rockburst risk, the structure construction procedure is safe and efficient, cost is low, high treating effect, drilling high-pressure grouting processing can subsequently be carried out, improve Broken rock mass crack integrality, the crown amount of caving in and backfill amount in follow-up TBM drivings are reduced, with significant economic and social benefit.

Description

Great burying TBM construction tunnel rock burst processing structures
Technical field
The utility model is related at tunneling with TBM technical field, more particularly to a kind of great burying TBM construction tunnel rock bursts Manage structure.
Background technology
Tunnel excavation largely uses TBM, i.e. complete-section tunnel boring machine, and TBM has drivage efficiency height, construction quality Good, country rock disturbs the advantages of small, construction safety is environmentally friendly, automated information degree is high, has been widely used in water conservancy and hydropower work The fields such as journey, metro construction, highway, railway.But it is poor to the unfavorable geological condition adaptability such as rock burst, in great burying tunnel Often due to the problems such as rock burst hazard causes TBM card machines, device damage, being limited by the fuselage and fuselage of its bulky in the construction of hole With country rock spacing very narrow and small factor, once occur card machine accident and will consume pole and carry out card machine for a long time to get rid of poverty processing operation, Influence the extremely difficult corresponding heavy parts of reparation after project progress, and device damage.
At present, in TBM construction tunnels, mainly there are two kinds for the processing method of rock burst:One kind is existed using drilling and blasting method Excavate auxiliary tunnel and detour to front of tunnel heading, then stress relieving explosion is carried out by excavating pilot tunnel forward in TBM tunneling directions side Operation, reaches the purpose of rock burst processing.Another is to excavate a crown using drilling and blasting method in front of tunnel heading more than TBM work to break The upper pilot tunnel in face, and supporting operation is carried out to upper pilot tunnel so that when later stage TBM constructions are passed through herein, supporting is complete for upper pilot tunnel Finish, TBM only needs to carry out lower section driving, reach the purpose of rock burst processing.Be limited by TBM lead to country rock space it is very narrow It is small, excavate auxiliary tunnel or pilot tunnel using drilling and blasting method to carry out the processing of the rock burst in TBM constructions, be directly faced with pilot tunnel or auxiliary tunnel It is difficult to be slagged tap by TBM narrow spaces, inefficiency, and also during drill bursting construction, TBM is in stopped status, phase That answers will influence the TBM construction speeds of whole tunnel;The position is in rock blasting region simultaneously, due to that can not transport phase to pilot tunnel The quick-fried chassis of brill answered, makes drilling and blasting method operating personnel's security risk larger, bores that quick-fried operation is difficult, implement the feasibility of pilot drive compared with It is low.
Utility model content
For overcome in the prior art for rock burst processing mode difficulty of construction it is big, risk is big, the low deficiency of operating efficiency, Technical problem to be solved in the utility model is:A kind of tunnel rock burst processing structure for being capable of fast and safe construction is provided.
The utility model solves the technical scheme that its technical problem used:Great burying TBM construction tunnel rock burst processing Structure, including tunnel and the rock burst region that rock burst is likely to occur positioned at tunnel front of tunnel heading, the vault of the tunnel face Region is provided with multiple advance boreholes, and the advance borehole runs through rock burst region, passes through presplitting in drilling between each advance borehole The fracture zone that explosion is formed is connected.
Being further that the multiple advance borehole is curved is disposed on face crown region, the advance drilling Centerline hole is apart from tunnel center apart from r not less than the 1/2 of tunnel radius.
It is further that the arc area where the advance borehole is each a ° of vertical center line of tunnel or so, a °≤ 90°。
It is further that the quantity n of the advance borehole and the spacing L of adjacent two advance borehole meet following relation:L= 2rsin(a/n-1)。
It is further to be equipped with the crushed zone crack between the advance borehole and each advance borehole and use high pressure The cement mortar that grouting is formed.
The beneficial effects of the utility model are:The utility model is closed using TBM on-line operations space on tunnel face Removing the work puts bore position and direction, using drillhole blasting so that rock burst region crown, spandrel position form Broken rock mass crack, Rock burst region high-ground stress is discharged, rockburst risk is released, the structure construction is safe and efficient, cost is low, high treating effect, can enter one Step carries out drilling high-pressure grouting processing, improves Broken rock mass crack integrality, reduce in follow-up TBM drivings the crown amount of caving in and Backfill amount, not only ensure that rock burst treatment effect, and reduce later stage supporting and backfilling working, with significant economy and society Can benefit.
Brief description of the drawings
Fig. 1 is the utility model constructing structure top view.
Fig. 2 is the utility model constructing structure front view.
Fig. 3 is the utility model constructing structure tunnel face structural representation.
Mark is 1- tunnels, 2- tunnel faces, 3- rock bursts region, 4- advance boreholes, 5- fracture zones, 6- in figure The advanced rig of TBM, 7-.
Embodiment
The utility model is further described below by way of accompanying drawing.
As shown in Figure 1, Figure 2, Figure 3 shows, great burying TBM construct tunnel rock burst processing structure, including tunnel 1 and positioned at tunnel the palm The sub- front of face 2 is likely to occur the rock burst region 3 of rock burst, and the crown region of the tunnel face 2 is provided with multiple advance boreholes 4, The advance borehole 4 runs through rock burst region 3, and the crack formed between each advance borehole 4 by presplit blasting in drilling is crushed Band 5 is connected.The processing mode for rock burst region generally comprises two kinds in the prior art, and one kind is by side tunnel excavation Rock burst region is bypassed, bursting work is carried out in rock burst region fore, another is to excavate a crown using drilling and blasting method to be more than TBM works Make the upper pilot tunnel of section, and supporting operation is carried out to upper pilot tunnel, TBM only needs to carry out lower section driving, so as to reach at rock burst The purpose of reason.Both structures or form of construction work are required for larger construction volume, and are limited by working space, and efficiency is low, also In the presence of certain potential safety hazard.Using structure described in the utility model, the advanced rig 7 that need to be only carried using TBM 6 is in tunnel Several deep holes are bored in the crown region of face 2, and explosive is then filled in deep hole carries out presplit blasting, make rock burst region crown, Spandrel position forms rock cranny crushed zone 5, and this structure can effectively discharge rock burst region high-ground stress, so as to avoid digging in TBM Rock burst hazard is met with when entering.
Because TBM 6 advanced rig 7 is located at TBM fuselage interiors, the bore position and scope of advanced rig 7 are by certain Limitation, the crown of rock burst region 3, the high-ground stress at spandrel position are effectively released in order to directly utilize advanced rig 7, and reach Purpose, the multiple advance borehole 4 is curved to be disposed on the crown region of tunnel face 2, as shown in figure 3, described advanced Drill be not less than tunnel radius apart from r the 1/2 of 4 distance between center line tunnel centers, the arc area where the advance borehole 4 For each a °, a °≤90 ° of vertical center line of tunnel or so.
Further, the quantity n of the advance borehole 4 and the spacing L of adjacent two advance borehole 4 meet following relation:L= 2rsin (a/n-1), the quantity and spacing of advance borehole 4 need the size and the high-ground stress in rock burst region according to different tunnels Situation carries out reasonable selection.
Because rock burst region crown, spandrel position form rockmass crushed zone, follow-up TBM6 is tunneled to crushed zone position When, crown, spandrel position rock mass there may be necessarily caving in, meanwhile, rock mass produces top country rock cavity after collapsing, after increase Phase supporting backfill amount.In order to avoid such situation occurs, can before TBM6 drivings advance borehole 4 and each advance borehole 4 it Between crushed zone crack 5 in be respectively provided with using high-pressure grouting formed cement mortar so that it is complete to improve Broken rock mass crack Property, reduce the crown amount of caving in and backfill amount in follow-up TBM6 drivings.
The utility model utilizes TBM on-line operations space reasonable Arrangement bore position and direction on tunnel face, adopts With drillhole blasting so that rock burst region crown, spandrel position form Broken rock mass, release rock burst region high-ground stress releases rock Quick-fried risk, the structure construction procedure is safe and efficient, cost is low, high treating effect, can further carry out drilling high-pressure grouting processing, Broken rock mass crack integrality is improved, the crown amount of caving in and backfill amount in follow-up TBM drivings is reduced, not only ensure that at rock burst Effect is managed, and reduces later stage supporting and backfilling working, with significant economic and social benefit.

Claims (5)

  1. The tunnel rock burst processing structure 1. great burying TBM constructs, including tunnel (1) and may go out in front of the tunnel face (2) The rock burst region (3) of existing rock burst, it is characterized in that:The crown region of the tunnel face (2) is provided with multiple advance boreholes (4), The advance borehole (4) runs through rock burst region (3), passes through splitting that presplit blasting in drilling is formed between each advance borehole (4) Gap crushed zone (5) is connected.
  2. The tunnel rock burst processing structure 2. great burying TBM as claimed in claim 1 constructs, it is characterized in that:The multiple advance drilling Hole (4) is curved to be disposed on tunnel face (2) crown area, advance borehole (4) the distance between center line tunnel center Apart from r be not less than tunnel radius 1/2.
  3. The tunnel rock burst processing structure 3. great burying TBM as claimed in claim 2 constructs, it is characterized in that:The advance borehole (4) The arc area at place is each a °, a °≤90 ° of vertical center line of tunnel or so.
  4. The tunnel rock burst processing structure 4. great burying TBM as claimed in claim 3 constructs, it is characterized in that:The advance borehole (4) The spacing L of quantity n and adjacent two advance borehole (4) meet following relation:L=2rsin (a/n-1).
  5. 5. the great burying TBM construction tunnel rock burst processing structures as described in claim 1,2,3 or 4 any one claims, It is characterized in that:It is equipped with crushed zone crack (5) between the advance borehole (4) and each advance borehole and uses high-pressure grouting The cement mortar of formation.
CN201720279862.1U 2017-03-21 2017-03-21 Great burying TBM construction tunnel rock burst processing structures Active CN206592127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720279862.1U CN206592127U (en) 2017-03-21 2017-03-21 Great burying TBM construction tunnel rock burst processing structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720279862.1U CN206592127U (en) 2017-03-21 2017-03-21 Great burying TBM construction tunnel rock burst processing structures

Publications (1)

Publication Number Publication Date
CN206592127U true CN206592127U (en) 2017-10-27

Family

ID=60125041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720279862.1U Active CN206592127U (en) 2017-03-21 2017-03-21 Great burying TBM construction tunnel rock burst processing structures

Country Status (1)

Country Link
CN (1) CN206592127U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930766A (en) * 2017-03-21 2017-07-07 中国电建集团成都勘测设计研究院有限公司 Great burying TBM construction tunnel rock burst processing structures
CN108166988A (en) * 2017-12-19 2018-06-15 常州工学院 A kind of rock tunnel support design method
CN112343605A (en) * 2020-11-05 2021-02-09 西南科技大学 Rock burst prevention tunnel excavation supporting method based on reduced-scale modified pressure arch

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930766A (en) * 2017-03-21 2017-07-07 中国电建集团成都勘测设计研究院有限公司 Great burying TBM construction tunnel rock burst processing structures
CN108166988A (en) * 2017-12-19 2018-06-15 常州工学院 A kind of rock tunnel support design method
CN112343605A (en) * 2020-11-05 2021-02-09 西南科技大学 Rock burst prevention tunnel excavation supporting method based on reduced-scale modified pressure arch

Similar Documents

Publication Publication Date Title
CN106930766A (en) Great burying TBM construction tunnel rock burst processing structures
WO2021103533A1 (en) Operation-controllable, roof-cutting, pressure-relief, gob-side entry retaining method
CN103615250B (en) The full Open stope mining afterwards filling of itemize studding works in coordination with mining codes
CN103670421B (en) Central authorities' inclined hole method parallel tunnel excavation method
CN206592127U (en) Great burying TBM construction tunnel rock burst processing structures
CN111502662B (en) Prevention and control method for deep pressure relief shallow part reinforcement of rock burst mine advanced coal body
AU2020100911A4 (en) Shield structure for effectively controlling ground subsidence
CN102635388A (en) Interaction permeability-increasing method of pre-splitting blasting and hydraulic cracking of coal seam
CN107355226A (en) TBM construction tunnel fault belts hole section processing structure
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN107083959A (en) A kind of gob-side entry retaining method
CN107120137A (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN109470099A (en) A kind of broken rock technique of photoface exploision and cleavage and blast mixing
CN111396118A (en) Coal seam group rapid rock cross-cut coal uncovering outburst eliminating method
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN110388206A (en) A kind of method and apparatus that coal column is left in the residual exploiting field of plasma uplink fracturing
CN113982582A (en) Method for hydraulic fracturing treatment of end triangular area suspended roof of underground coal mine coal face
CN103061732A (en) Hydraulic fracturing method of 2-3 meter hard medium sandstone stratum of roof of coal seam
CN207761705U (en) Gas drainage system based on roof horizontal drilling
CN207111096U (en) TBM construction tunnel fault belts hole section processing structure
CN206769915U (en) A kind of broken rock device
CN107956475A (en) A kind of structure and construction method for protecting development work surrounding rock stability
CN114278372A (en) Guiding arrangement method for underground directional drilling area of ultra-thick water-rich layer
CN208040311U (en) A kind of abnormity lead bit
CN218439362U (en) Excavation construction structure adopting mining diversion vertical shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant