CN101481903A - 跨缆吊机倒退拼装架设山区悬索桥主桁方法 - Google Patents

跨缆吊机倒退拼装架设山区悬索桥主桁方法 Download PDF

Info

Publication number
CN101481903A
CN101481903A CNA2009101148594A CN200910114859A CN101481903A CN 101481903 A CN101481903 A CN 101481903A CN A2009101148594 A CNA2009101148594 A CN A2009101148594A CN 200910114859 A CN200910114859 A CN 200910114859A CN 101481903 A CN101481903 A CN 101481903A
Authority
CN
China
Prior art keywords
loop wheel
purlin
truss
wheel machine
cable loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009101148594A
Other languages
English (en)
Other versions
CN101481903B (zh
Inventor
上官兴
郭友根
许文鹏
官华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN2009101148594A priority Critical patent/CN101481903B/zh
Publication of CN101481903A publication Critical patent/CN101481903A/zh
Application granted granted Critical
Publication of CN101481903B publication Critical patent/CN101481903B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种跨缆吊机倒退拼装架设山区悬索桥主桁方法,包括以下步骤:1.在山区悬索桥两岸塔柱下方隧道洞口前方设置钢桁梁杆件拼装场,在两岸的台座上同时拼装首节桁梁,并安装吊杆;2.边桁的拼装;3.中部桁片的安装;4.重复上述步骤直至完成主桁的拼接。本发明利用跨缆吊机作为移动式空中行车用倒退法实现桁梁由桥台向跨中后退拼装,由于起重设备不在已拼好的桁梁上,而在承载力很大的主缆上,从而极大减小了悬臂挠度,改变了桁梁线型控制的复杂式,它具有安全性高、施工速度快的特点。

Description

跨缆吊机倒退拼装架设山区悬索桥主桁方法
技术领域
本发明涉及架桥方法,尤其是一种跨缆吊机倒退拼装架设山区悬索桥主桁方法。
背景技术
许多高等级公路在崇山峻岭V型峡谷中穿越,随之出现了大跨径悬索桥,这些山区悬索桥没有水平运梁的条件,这就很容易采用国外已用过的“桥面吊机”,由两岸向跨中进行钢桁的分片拼装的施工方案。而“桥面吊机”架设桁式主梁悬索桥存在一些问题:1、工期长,按“桥面吊机”分片拼装的平均施工速度2×1.5(m/天)计算,很难满足中国桥梁建设工期的需要;2、需临时起吊设备、安全性差,桥面吊机悬臂拼装的桁梁节段,需要设置一套临时起吊设备,这套临时设备不仅要提升悬臂安装的桁梁,还要承担百余吨桥面吊机的自重,使临时起吊装置受力不明确,并造成提升力的严重超载;3、高空人工操作多,存在安全隐患,当临时提升装置提升并安装好桁梁吊杆后,又需要全部拆除再搬迁转移到下一节段重新安装,这样全桥需百次以上的高空操作来拆装过程,容易造成重大的安全事故;4、桥面吊机自重大,在已装好的桥面上行走困难,为减小桥面吊机(130吨)在行走过程中对主桁产生的次应力,主桁必需部分设“临时铰”,桥面吊机过铰时很难保证轨道梁的平顺,另外在遇到风暴时桁梁临时铰将成为结构的最薄弱点,需要特别设计从而增加了施工的费用;5、桁梁线型控制复杂,桁段拼装到吊杆安装前,在自重和桥面吊机施工荷载作用下其悬臂下绕量可达数米之多,造成桁梁线型控制困难。
发明内容
本发明的目的就是提供一种安全性高、造价低、施工速度快,能极大减小悬臂扰度,并优化桁梁线型控制模式的跨缆吊机倒退拼装架设山区悬索桥主桁方法。
本发明的跨缆吊机倒退拼装架设山区悬索桥主桁方法,包括以下步骤:
1、在山区悬索桥两岸塔柱下方隧道洞口前方设置钢桁梁杆件拼装场,钢桁梁散件运入后,在两岸的台座上同时用跨缆吊机、龙门吊、汽车吊协同拼装首节桁梁,并安装吊杆,接着在桁梁上弦顶面铺设纵向小钢梁、横木、钢轨和纵向滚动平车;
2、边桁的拼装,首先拼两侧边纵桁,用运梁车将两片边桁分次平面运至拼装场,通过跨缆吊机上的空中行车同时起吊两片边桁,边桁采用交替荡移就位,运行至结构吊杆下面,将边桁就位,并安装结构吊杆使其不产生悬臂状态;
3、中部桁片的安装,以跨缆吊机上空中行车上的跑车进行整体吊装,运行到新节段位置,落位于两侧边桁中,然后在空中横向杆件装上螺栓形成桁梁;
4、不断重复步骤2和3,山区悬索桥两岸的跨缆吊机,同时向跨中作业,直至完成主桁的拼接,空中行车退出工作。
上述的跨缆吊机,包括跨缆吊机横梁、起升机构、跨缆吊机行走机构,跨缆吊机行走机构设在跨缆吊机横梁的两端,使用时,骑跨在悬索桥两根主缆上,跨缆吊机横梁上的起升机构通过吊缆与空中行车相连,空中行车由纵梁和横向扁担梁组成,纵梁和横向扁担梁固接,横向扁担梁的端部装有伸缩扁担,与吊缆相连的固定吊点设在横向扁担梁上,纵梁上设有跑车。
本发明的跨缆吊机倒退拼装架设山区悬索桥主桁方法,利用跨缆吊机作为移动式空中行车用倒退法实现桁梁由桥台向跨中后退拼装,由于起重设备不在已拼好的桁梁上,而在承载力很大的主缆上,从而极大减小了悬臂扰度,改变了桁梁线型控制的复杂式,它具有安全性高、施工速度快的特点。
附图说明
图1为本发明的跨缆吊机结构示意图;
图2为图1中的A-A向示意图;
图3为本发明的跨缆吊机使用状态示意图;
图4为本发明的边桁吊装示意图;
图5为图4中的侧向示意图;
图6为发明的中部桁片吊装示意图;
图7为图6中的侧向示意图。
具体实施方式
一种跨缆吊机包括跨缆吊机横梁1、起升机构2、跨缆吊机行走机构3,跨缆吊机行走机构3设在跨缆吊机横梁1的两端,使用时,骑跨在悬索桥两根主缆4上,跨缆吊机横梁1上的起升机构2通过吊缆5与空中行车9相连,空中行车9由纵梁7和横向扁担梁8组成,纵梁7和横向扁担梁8固接,横向扁担梁8的端部装有伸缩扁担6,与吊缆5相连的固定吊点4设在横向扁担梁8上,纵梁7上设有跑车10。
采用该跨缆吊机倒退拼装架设山区悬索桥主桁方法,包括以下步骤:
1、在山区悬索桥两岸塔柱下方隧道洞口前方设置钢桁梁杆件拼装场,钢桁梁散件运入后,在两岸的台座上同时用跨缆吊机、龙门吊、汽车吊协同拼装首节桁梁,并安装吊杆,接着在桁梁上弦顶面铺设纵向小钢梁、横木、钢轨和纵向滚动平车;
2、边桁11的拼装,首先拼两侧边纵桁,用运梁车将两片边桁分次平面运至拼装场,通过跨缆吊机上的空中行车同时起吊两片边桁11,边桁11采用交替荡移就位,运行至结构吊杆下面,将边桁11就位,并安装结构吊杆使其不产生悬臂状态;
3、中部桁片12的安装,以跨缆吊机上空中行车9上的跑车10进行整体中部桁片12吊装,运行到新节段位置,落位于两侧边桁11中,然后在空中横向杆件装上螺栓形成桁梁;
4、不断重复步骤2和3,山区悬索桥两岸的跨缆吊机,同时向跨中作业,直至完成主桁的拼接,空中行车退出工作。

Claims (1)

1、一种跨缆吊机倒退拼装架设山区悬索桥主桁方法,包括以下步骤:
(a)、在山区悬索桥两岸塔柱下方隧道洞口前方设置钢桁梁杆件拼装场,钢桁梁散件运入后,在两岸的台座上同时用跨缆吊机、龙门吊、汽车吊协同拼装首节桁梁,并安装吊杆,接着在桁梁上弦顶面铺设纵向小钢梁、横木、钢轨和纵向滚动平车;
(b)、边桁(11)的拼装,首先拼两侧边纵桁,用运梁车将两片边桁(11)分次平面运至拼装场,通过跨缆吊机上的空中行车同时起吊两片边桁(11),边桁(11)采用交替荡移就位,运行至结构吊杆下面,将边桁(11)就位,并安装结构吊杆使其不产生悬臂状态;
(c)、中部桁片(12)的安装,以跨缆吊机上空中行车(9)上的跑车(10)进行整体中部桁片(12)吊装,运行到新节段位置,落位于两侧边桁(11)中,然后在空中横向杆件装上螺栓形成桁梁;
(d)、不断重复步骤(b)和(c),山区悬索桥两岸的跨缆吊机,同时向跨中作业,直至完成主桁的拼接,空中行车退出工作;
所述的跨缆吊机包括跨缆吊机横梁(1)、起升机构(2)、跨缆吊机行走机构(3),跨缆吊机行走机构(3)设在跨缆吊机横梁(1)的两端,跨缆吊机横梁(1)上的起升机构(2)通过吊缆(5)与空中行车(9)相连,空中行车(9)由纵梁(7)和横向扁担梁(8)组成,纵梁(7)和横向扁担梁(8)固接,横向扁担梁(8)的端部装有伸缩扁担(6),与吊缆(5)相连的固定吊点(4)设在横向扁担梁(8)上,纵梁(7)上设有跑车(10)。
CN2009101148594A 2009-01-19 2009-01-19 跨缆吊机倒退拼装架设山区悬索桥主桁方法 Expired - Fee Related CN101481903B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101148594A CN101481903B (zh) 2009-01-19 2009-01-19 跨缆吊机倒退拼装架设山区悬索桥主桁方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101148594A CN101481903B (zh) 2009-01-19 2009-01-19 跨缆吊机倒退拼装架设山区悬索桥主桁方法

Publications (2)

Publication Number Publication Date
CN101481903A true CN101481903A (zh) 2009-07-15
CN101481903B CN101481903B (zh) 2010-09-22

Family

ID=40879180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101148594A Expired - Fee Related CN101481903B (zh) 2009-01-19 2009-01-19 跨缆吊机倒退拼装架设山区悬索桥主桁方法

Country Status (1)

Country Link
CN (1) CN101481903B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102153022A (zh) * 2011-04-11 2011-08-17 西南交通大学 自行式液压缆载吊机
CN102720138A (zh) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 钢桁梁架设系统、方法及提升站
CN103061262A (zh) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 一种跨缆吊机及其应用方法
CN105839537A (zh) * 2016-04-11 2016-08-10 中交第四公路工程局有限公司 跨缆吊机带梁行走吊装悬索桥加劲梁的施工方法
CN110644372A (zh) * 2019-10-08 2020-01-03 焦作大学 一种山区高空附塔悬臂式提梁桁吊系统
CN111691305A (zh) * 2020-06-11 2020-09-22 中交二公局第二工程有限公司 一种悬索桥主梁安装方法
CN112695645A (zh) * 2021-01-06 2021-04-23 中铁大桥局集团有限公司 一种大跨度悬索桥加劲梁架设方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100354477C (zh) * 2005-07-03 2007-12-12 路桥集团第二公路工程局 钢箱梁悬索桥陆上、浅滩区梁段安装双吊机荡移施工方法
CN200992687Y (zh) * 2006-12-30 2007-12-19 中交第二公路工程局有限公司 一种悬索桥钢箱粱安装的吊具装置

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102153022A (zh) * 2011-04-11 2011-08-17 西南交通大学 自行式液压缆载吊机
CN103061262A (zh) * 2011-10-19 2013-04-24 中交第一公路工程局有限公司 一种跨缆吊机及其应用方法
CN103061262B (zh) * 2011-10-19 2016-02-24 中交第一公路工程局有限公司 一种跨缆吊机及其应用方法
CN102720138A (zh) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 钢桁梁架设系统、方法及提升站
CN105839537A (zh) * 2016-04-11 2016-08-10 中交第四公路工程局有限公司 跨缆吊机带梁行走吊装悬索桥加劲梁的施工方法
CN105839537B (zh) * 2016-04-11 2017-04-12 中交第四公路工程局有限公司 跨缆吊机带梁行走吊装悬索桥加劲梁的施工方法
CN110644372A (zh) * 2019-10-08 2020-01-03 焦作大学 一种山区高空附塔悬臂式提梁桁吊系统
CN110644372B (zh) * 2019-10-08 2021-02-12 焦作大学 一种山区高空附塔悬臂式提梁桁吊系统
CN111691305A (zh) * 2020-06-11 2020-09-22 中交二公局第二工程有限公司 一种悬索桥主梁安装方法
CN112695645A (zh) * 2021-01-06 2021-04-23 中铁大桥局集团有限公司 一种大跨度悬索桥加劲梁架设方法

Also Published As

Publication number Publication date
CN101481903B (zh) 2010-09-22

Similar Documents

Publication Publication Date Title
CN101481903B (zh) 跨缆吊机倒退拼装架设山区悬索桥主桁方法
CN100543235C (zh) 斜拉索辅助全悬臂架设钢桁梁的方法及系统
CN202936736U (zh) 一种斜拉桥组合梁施工桥面吊机
CN105421249A (zh) 一种拖吊结合式新型挂篮结构及施工方法
CN201943007U (zh) 活动支架不变幅架梁吊机
CN201338911Y (zh) 大起重量及大起升高度吊装起重机
CN201106155Y (zh) 斜拉索辅助全悬臂架设钢桁梁装置
CN205223872U (zh) 一种拖吊结合式新型挂篮结构
CN105648916A (zh) 一种架桥机及该架桥机的架设方法
CN106276627B (zh) 一种多塔连跨起吊缆索起重机
CN101831876B (zh) 移动造桥机及其架桥方法
CN103774543B (zh) 一种上承式索拱组合结构桥
CN101935984A (zh) 斜拉桥钢桁梁架梁吊机的走行装置及使用方法
CN111691305A (zh) 一种悬索桥主梁安装方法
CN203716044U (zh) 一种下承或中承式索拱组合结构桥
CN201713767U (zh) 桥梁架设架桥机
CN202280022U (zh) 倒挂式三角斜爬挂篮
CN206069230U (zh) 一种多塔连跨起吊缆索起重机
CN102205929A (zh) 一种用于大跨径t梁吊装的钢管立柱构成的高低门吊
CN202450450U (zh) 一种悬索桥的加固改造结构
CN201647844U (zh) 一种无桥台提梁站
CN104912365B (zh) 一种狭窄场地立体停车架
CN110042760B (zh) 一种可带载移动缆载吊机
CN203716045U (zh) 一种上承式索拱组合结构桥
CN113502743A (zh) 一种钢桁架拱桥拱肋及主梁安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20090715

Assignee: Wuhan Iron and steel bridge heavy industry (Zhuhai) Co., Ltd.

Assignor: East-China Communication Univ

Contract record no.: 2012440000439

Denomination of invention: Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling

Granted publication date: 20100922

License type: Exclusive License

Record date: 20120806

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100922

Termination date: 20130119

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20090715

Assignee: Wuhan Iron and steel bridge heavy industry (Zhuhai) Co., Ltd.

Assignor: East-China Communication Univ

Contract record no.: 2012440000439

Denomination of invention: Method for constructing hilly region rope-suspension bridge main beam by span cable supported crane assembling

Granted publication date: 20100922

License type: Exclusive License

Record date: 20120806

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model