CN103061262A - 一种跨缆吊机及其应用方法 - Google Patents
一种跨缆吊机及其应用方法 Download PDFInfo
- Publication number
- CN103061262A CN103061262A CN2011103288411A CN201110328841A CN103061262A CN 103061262 A CN103061262 A CN 103061262A CN 2011103288411 A CN2011103288411 A CN 2011103288411A CN 201110328841 A CN201110328841 A CN 201110328841A CN 103061262 A CN103061262 A CN 103061262A
- Authority
- CN
- China
- Prior art keywords
- lift
- support
- hinged
- shoulder pole
- main push
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 239000000725 suspension Substances 0.000 claims abstract description 35
- 230000033001 locomotion Effects 0.000 claims description 13
- 239000000203 mixture Substances 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000465 moulding Methods 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 230000003252 repetitive effect Effects 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 230000009977 dual effect Effects 0.000 claims description 2
- 238000012423 maintenance Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 14
- 230000001105 regulatory effect Effects 0.000 abstract 3
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract 1
- 210000001364 upper extremity Anatomy 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000002950 deficient Effects 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110328841.1A CN103061262B (zh) | 2011-10-19 | 2011-10-19 | 一种跨缆吊机及其应用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110328841.1A CN103061262B (zh) | 2011-10-19 | 2011-10-19 | 一种跨缆吊机及其应用方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103061262A true CN103061262A (zh) | 2013-04-24 |
CN103061262B CN103061262B (zh) | 2016-02-24 |
Family
ID=48104129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110328841.1A Active CN103061262B (zh) | 2011-10-19 | 2011-10-19 | 一种跨缆吊机及其应用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103061262B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758042A (zh) * | 2014-01-16 | 2014-04-30 | 中交第一公路工程局有限公司 | 一种紧缆机 |
CN103790114A (zh) * | 2014-01-28 | 2014-05-14 | 柳州欧维姆机械股份有限公司 | 液压牵引与滚轮行走结合的缆载吊机及其行走方法 |
CN110143526A (zh) * | 2018-02-11 | 2019-08-20 | 中交路桥建设有限公司 | 一种可适用不同主缆中心距的缆载吊机 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007051426A (ja) * | 2005-08-15 | 2007-03-01 | Public Works Research Institute | 橋梁及び橋梁の構築方法 |
CN200992687Y (zh) * | 2006-12-30 | 2007-12-19 | 中交第二公路工程局有限公司 | 一种悬索桥钢箱粱安装的吊具装置 |
CN101481903A (zh) * | 2009-01-19 | 2009-07-15 | 华东交通大学 | 跨缆吊机倒退拼装架设山区悬索桥主桁方法 |
CN101559905A (zh) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | 一种缆载吊机 |
CN101863423A (zh) * | 2010-06-23 | 2010-10-20 | 广东省长大公路工程有限公司 | 一种悬索桥施工用的钢箱梁缆载吊机 |
CN102153022A (zh) * | 2011-04-11 | 2011-08-17 | 西南交通大学 | 自行式液压缆载吊机 |
-
2011
- 2011-10-19 CN CN201110328841.1A patent/CN103061262B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007051426A (ja) * | 2005-08-15 | 2007-03-01 | Public Works Research Institute | 橋梁及び橋梁の構築方法 |
CN200992687Y (zh) * | 2006-12-30 | 2007-12-19 | 中交第二公路工程局有限公司 | 一种悬索桥钢箱粱安装的吊具装置 |
CN101481903A (zh) * | 2009-01-19 | 2009-07-15 | 华东交通大学 | 跨缆吊机倒退拼装架设山区悬索桥主桁方法 |
CN101559905A (zh) * | 2009-05-12 | 2009-10-21 | 广东省长大公路工程有限公司 | 一种缆载吊机 |
CN101863423A (zh) * | 2010-06-23 | 2010-10-20 | 广东省长大公路工程有限公司 | 一种悬索桥施工用的钢箱梁缆载吊机 |
CN102153022A (zh) * | 2011-04-11 | 2011-08-17 | 西南交通大学 | 自行式液压缆载吊机 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758042A (zh) * | 2014-01-16 | 2014-04-30 | 中交第一公路工程局有限公司 | 一种紧缆机 |
CN103758042B (zh) * | 2014-01-16 | 2015-11-25 | 中交第一公路工程局有限公司 | 一种紧缆机 |
CN103790114A (zh) * | 2014-01-28 | 2014-05-14 | 柳州欧维姆机械股份有限公司 | 液压牵引与滚轮行走结合的缆载吊机及其行走方法 |
CN110143526A (zh) * | 2018-02-11 | 2019-08-20 | 中交路桥建设有限公司 | 一种可适用不同主缆中心距的缆载吊机 |
Also Published As
Publication number | Publication date |
---|---|
CN103061262B (zh) | 2016-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103074854B (zh) | 后支点三角托架挂篮及应用该挂篮的桥梁施工方法 | |
CN208815424U (zh) | 一种桥梁下行式挂篮 | |
CN102094392B (zh) | 桥梁施工中的下承式挂篮及其应用 | |
CN104631335A (zh) | 新型大吨位架桥机及其施工方法 | |
CN112195798B (zh) | 节段拼装一体化架桥机及其施工方法 | |
CN106044552A (zh) | 一种多支腿轮胎式铺轨起重机及施工方法 | |
CN110016863B (zh) | 一种能变幅的自爬式钢系梁吊机及使用方法 | |
CN206800212U (zh) | 用于预制节段梁逐跨施工的架桥机 | |
CN217350492U (zh) | 一种新型桥面安装用起吊装置 | |
CN115305835A (zh) | 一种运用架梁起重机架设双节间整节段钢桁梁的施工方法 | |
CN110904841B (zh) | 桥梁主梁抬升方法及抬升系统 | |
CN206800208U (zh) | 用于预制节段梁逐跨施工架桥机的辅助支撑支腿结构 | |
CN103061262A (zh) | 一种跨缆吊机及其应用方法 | |
CN102094394A (zh) | 过隧道型下导梁式定点起吊架桥机 | |
CN109778713A (zh) | 一种钢桁梁桥现场悬吊滑移拼装装置及方法 | |
CN105735142A (zh) | 一种用于预应力混凝土桥梁预制节段逐跨拼装施工的架桥机 | |
CN107604825B (zh) | T型梁桥的架桥方法 | |
CN110344334B (zh) | 采用背索式架桥机的两跨连做钢混组合桥梁施工方法 | |
CN102071641A (zh) | 水泥梁驮运桥机布支腿式运架一体架桥机及其架桥工法 | |
CN105648908A (zh) | 一种用于跨既有线或跨河桥梁装修小车及施工方法 | |
CN205932963U (zh) | 一种多支腿轮胎式铺轨起重机 | |
CN205711767U (zh) | 用于预应力混凝土桥梁预制节段逐跨拼装施工的架桥机 | |
CN115092825A (zh) | 一种新型桥面起吊装置及使用方法 | |
CN211171648U (zh) | 一种牵索挂篮行走装置 | |
CN209722761U (zh) | 一种钢桁梁桥现场悬吊滑移拼装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Document name: Notification of an Office Action |
|
DD01 | Delivery of document by public notice |
Addressee: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Document name: Notification to Go Through Formalities of Registration |
|
DD01 | Delivery of document by public notice |
Addressee: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Document name: Notification that Entitlement to Patent Deemed Abandoned |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. Document name: Notification of Decision on Request for Restoration of Right |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Document name: Notification of Passing Examination on Formalities |