CN101447065A - Method for uniformly collecting engineering progress data - Google Patents

Method for uniformly collecting engineering progress data Download PDF

Info

Publication number
CN101447065A
CN101447065A CNA2007101711392A CN200710171139A CN101447065A CN 101447065 A CN101447065 A CN 101447065A CN A2007101711392 A CNA2007101711392 A CN A2007101711392A CN 200710171139 A CN200710171139 A CN 200710171139A CN 101447065 A CN101447065 A CN 101447065A
Authority
CN
China
Prior art keywords
project
progress
middle table
network
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101711392A
Other languages
Chinese (zh)
Inventor
王怡风
陆伟明
王斌
胡万荣
杨文威
朱坚中
戴强
吕裕山
钱展佳
孙红军
林坚
陈祖元
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CNA2007101711392A priority Critical patent/CN101447065A/en
Publication of CN101447065A publication Critical patent/CN101447065A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method for uniformly collecting engineering progress data, comprising the steps as follows: a middle table is generated; according to the completed middle table, the task of progress is established and a planning value is filled in the middle table; the task is sent to network and practical value is filled in the task; managers can the progress information of all projects; the project information of single project is indicated in the form of Gantt chart in a project constructor; all indexes of the whole project group can be displayed according to the pre-arranging. Compared with the prior art, the method creates a progress management network for each project separately, automatically establishes the network for progress management for each project, and establishes different task items according to the types of the projects.

Description

A kind of method of unifying collecting engineering progress data
Technical field
The present invention relates to the method for collecting engineering progress data, particularly a kind of method of unifying collecting engineering progress data.
Background technology
Along with the scale of electrical network constantly enlarges, about 20000 of the annual project of building of Utilities Electric Co., about 80000 of contract quantity, and construction unit is distributed in each electric company, in power supply branch and other subsidiary companies, since the ERP of Utilities Electric Co. reaches the standard grade, all projects all enter into ERP system, the various expense situations and the state status of project have all effectively been managed in ERP, but if also put the construction speed of engineering itself into the ERP management, because construction party outsourcing often, they can't enter ERP system, therefore this becomes a difficult point, if by project manager's unified management of Utilities Electric Co., workload is huge so, may realize hardly, now, according to of the requirement of capital construction portion of State Grid Corporation of China to milestone management, the Shanghai Electric Power independent development progress control import the program of SAP-PS system, to concentrate transparent progress an effectively management is arranged to projects.
Summary of the invention
Purpose of the present invention is exactly the method that a kind of unified collecting engineering progress data simple to operate is provided in order to overcome the defective that above-mentioned prior art exists.
Purpose of the present invention can be achieved through the following technical solutions: a kind of method of unifying collecting engineering progress data, it is characterized in that, and comprise the steps:
(1) generates middle table;
(2), create the operation of progress, and insert planned value according to the middle table of finishing;
(3) assign network and insert actual value;
(4) managerial personnel can check the progress msg of projects;
(5) to single project, the form with Gantt chart in the project constructor embodies project information;
(6) to whole project cluster, can be according to the various indexs of default demonstration.
Described various index comprises the completion promptness rate, the completion promptness rate that goes into operation, promptness rate goes into operation.
Compared with prior art, the inventive method has the following advantages:
Build the progress control network for each menu original creation, each project of giving is created the network of progress control automatically, and creates different operation items according to item types;
Lead-in item schedule value, actual value are also assigned network automatically, the Microsoft Excel that the data that gather up according to the constituent parts project manager produce, and the information in establishment or the operation of the progress of modification comprises date of enterprise and actual date automatically;
Gantt chart shows, according to the information in scheduling network and the operation, shows corresponding Gantt chart;
Statistical study, the progress msg based on importing carries out various statistical study on BW.
Embodiment
Embodiment 1
One, collect data:
(1) in the engineering department website, sets up engineering progress management system, state's net milestone and project cluster are managed.Generate simultaneously " middle table ", as the carrier of lean production, ERP, three system interlinks of state's net milestone;
(2) " middle table " electrical form for solidifying comprises plan and actual progress, divides emphasis and two kinds of forms of general data;
(3) main project " middle table " adds my 10 project codes of company for the milestone progress;
(4) general data " middle table " by 10 project codes, project name, plans go into operation, actually go into operation, plan to be completed, 6 indexs of practical completion form.
Two, data importing:
Because data message among the SAP and structure are very complicated, progress msg is not certain value of simply writing in some fields or the renewal database table, and relate to establishment and revise operations such as network, operation, common changing mode can't realize that data importing arrives the operation of SAP, therefore used the BDC among the SAP (Batch Input) technology to import, can realize that the batch data of various complexity generates.
(1) according to the middle table of finishing, creates the operation of progress automatically, and insert planned value;
(2) assign network and insert actual value automatically;
(3) project manager, managerial personnel can check a project process information in the project constructor of SAP.
Three, statistical study:
(1), can in the project constructor, the form with Gantt chart embody project information at single project;
(2) for whole project cluster, can add up various indexs as requested, as: the completion promptness rate, promptness rate etc. goes into operation.

Claims (2)

1. a method of unifying collecting engineering progress data is characterized in that, comprises the steps:
(1) generates middle table;
(2), create the operation of progress, and insert planned value according to the middle table of finishing;
(3) assign network and insert actual value;
(4) managerial personnel can check the progress msg of projects;
(5) to single project, the form with Gantt chart in the project constructor embodies project information;
(6) to whole project cluster, can be according to the various indexs of default demonstration.
2. a kind of method of unifying collecting engineering progress data according to claim 1 is characterized in that, described various indexs comprise the completion promptness rate, the completion promptness rate that goes into operation, promptness rate goes into operation.
CNA2007101711392A 2007-11-28 2007-11-28 Method for uniformly collecting engineering progress data Pending CN101447065A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101711392A CN101447065A (en) 2007-11-28 2007-11-28 Method for uniformly collecting engineering progress data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101711392A CN101447065A (en) 2007-11-28 2007-11-28 Method for uniformly collecting engineering progress data

Publications (1)

Publication Number Publication Date
CN101447065A true CN101447065A (en) 2009-06-03

Family

ID=40742732

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101711392A Pending CN101447065A (en) 2007-11-28 2007-11-28 Method for uniformly collecting engineering progress data

Country Status (1)

Country Link
CN (1) CN101447065A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102541880A (en) * 2010-12-17 2012-07-04 金蝶软件(中国)有限公司 Gantt chart generating method and system
CN102955991A (en) * 2011-08-31 2013-03-06 国家电网公司 Method and device for displaying work of transformer substation in real time
CN104376392A (en) * 2013-08-13 2015-02-25 国家电网公司 Power transmission and transformation information processing method and device
CN108985604A (en) * 2018-07-04 2018-12-11 成都希盟科技有限公司 Compression of time limit for a project method for construction plan establishment
CN109754181A (en) * 2018-12-30 2019-05-14 国网北京市电力公司 The treating method and apparatus of engineering project information

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102541880A (en) * 2010-12-17 2012-07-04 金蝶软件(中国)有限公司 Gantt chart generating method and system
CN102955991A (en) * 2011-08-31 2013-03-06 国家电网公司 Method and device for displaying work of transformer substation in real time
CN102955991B (en) * 2011-08-31 2016-03-23 国家电网公司 The method and apparatus of real-time exhibition work of transformer substation
CN104376392A (en) * 2013-08-13 2015-02-25 国家电网公司 Power transmission and transformation information processing method and device
CN108985604A (en) * 2018-07-04 2018-12-11 成都希盟科技有限公司 Compression of time limit for a project method for construction plan establishment
CN108985604B (en) * 2018-07-04 2021-06-08 成都希盟泰克科技发展有限公司 Construction period compression method for construction planning
CN109754181A (en) * 2018-12-30 2019-05-14 国网北京市电力公司 The treating method and apparatus of engineering project information

Similar Documents

Publication Publication Date Title
Ming et al. Collaborative process planning and manufacturing in product lifecycle management
CN104615617B (en) A kind of substation equipment dispatching and monitoring information processing system
CN108537503A (en) software development management system
CN103413004A (en) Three-dimensional assembly process generation method and system for aerospace product
CN109035060A (en) A kind of structured processes management system and management method
EP4160544A1 (en) Three-dimensional model application method and system for nuclear power engineering modular construction
CN109377186A (en) A kind of process management device and method
CN107729668A (en) Technological design coordination management system and its method based on threedimensional model
CN101799754A (en) Method and system for developing web application
CN101447065A (en) Method for uniformly collecting engineering progress data
JP2021520560A (en) A method for scheduling semiconductor trailing factories
CA2791313A1 (en) Unified process management system and method
CN102411501A (en) Browser/server (B/S)-structure-software-system-based flexible communication customization system and method
CN103927185A (en) Network topology modeling device based on energy management and guiding method thereof
CN112070450A (en) TCM system
CN113034051A (en) Intelligent factory dynamic plan scheduling system
CN115879728A (en) Based on capital construction overall process platform system
He et al. ISA-95 tool for enterprise modeling
Govindarajan et al. An approach for integrating legacy systems in the manufacturing industry
CN103150164B (en) The quick SOWF framework method that a kind of transaction rules drives
CN110348607A (en) The industry of more power business system data fusions expands overall process one and opens figure monitoring method and system
CN114048188A (en) Cross-database data migration system and method
CN103699977A (en) Workflow management system and method based on mobile communication
US20220277268A1 (en) Project management apparatus, project management method, and recording medium
CN201126588Y (en) Apparatus for unitedly capturing job schedule data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20090603