CN109754181A - The treating method and apparatus of engineering project information - Google Patents

The treating method and apparatus of engineering project information Download PDF

Info

Publication number
CN109754181A
CN109754181A CN201811645874.7A CN201811645874A CN109754181A CN 109754181 A CN109754181 A CN 109754181A CN 201811645874 A CN201811645874 A CN 201811645874A CN 109754181 A CN109754181 A CN 109754181A
Authority
CN
China
Prior art keywords
construction
destination item
goes
application information
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811645874.7A
Other languages
Chinese (zh)
Inventor
赵宇彤
赵乐
李伟
高鑫
马靖珺
马龙飞
张建玺
陆斯悦
王培祎
徐蕙
焦然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811645874.7A priority Critical patent/CN109754181A/en
Publication of CN109754181A publication Critical patent/CN109754181A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind for the treatment of method and apparatus of engineering project information.This method comprises: obtaining the application information that goes into operation of destination item, and the application information that will go into operation is sent to corresponding interface;In the case where the feedback information based on the application information corresponding interface that goes into operation determines destination item by audit, the application information that goes into operation according to destination item generates the stock list of destination item, and the stock of destination item is singly sent to corresponding interface;The feedback information based on single corresponding interface of stocking up determine material needed for destination item examined harvest finish in the case where, the construction archives of destination item are generated according to the application information that goes into operation of destination item.By the application, solve the problems, such as that project process situation can not be controlled in time in the related technology.

Description

The treating method and apparatus of engineering project information
Technical field
This application involves projects to manage field, in particular to a kind for the treatment of method and apparatus of engineering project information.
Background technique
As coal changes the lasting development of electricity work, coal changes the problems in electrical engineering work progress and also highlights in succession.Coal The problems such as Gai electricity unit in charge of construction is numerous, construction personnel's ability level difference, construction process disunity etc., change the prison of electrical engineering to coal It controls work belt and carrys out no small pressure.Coal changes the spies such as electrical engineering is weighed, is pressed for time with heavy workload, task, job location relatively disperses Point.Especially job location is not fixed, more dispersed, and the village of today and construction tomorrow is likely to different.Such case, Further coal is caused to change being unable to control for electrical engineering work progress.
For the technical issues of project process situation can not be controlled in time in the related technology, effective solution is not yet proposed at present Certainly scheme.
Summary of the invention
The application provides a kind for the treatment of method and apparatus of engineering project information, to solve project process feelings in the related technology The problem of condition can not be controlled in time.
According to the one aspect of the application, a kind of processing method of engineering project information is provided.This method comprises: obtaining The application information that goes into operation of destination item, and the application information that goes into operation is sent to corresponding interface, wherein the letter of application that goes into operation It include the arrangement and method for construction of the destination item in breath;Institute is being determined based on the feedback information for going into operation application information corresponding interface In the case where destination item is stated by audit, the application information that goes into operation according to the destination item generates the standby of the destination item Material list, and the stock of the destination item is singly sent to corresponding interface;In the feedback letter based on single corresponding interface of stocking up Material needed for breath determines the destination item has been examined harvest and finish in the case where, the application information that goes into operation according to the destination item is raw At the construction archives of the destination item, wherein the construction archives are used to record the construction detail of the destination item, and institute It states construction archives and is also used to record the construction drawing of construction personnel's upload, construction picture, the construction drawing and the construction drawing Piece is matched with corresponding coding.
Optionally, the application information that goes into operation of the destination item includes: the project name of the destination item, the target The arrangement and method for construction of the applicant of project, the beginning and ending time of the destination item and the destination item.
Optionally, after the application information that goes into operation is sent to corresponding interface, the method also includes: described in reception The first feedback information that the application information that goes into operation corresponding interface returns;Determine that the destination item is according to first feedback information It is no to pass through audit;In the case where the destination item does not pass through audit, the prompt information that the audit fails is sent to the mesh The motions sponsor of the application information that goes into operation of mark project;In the case where the destination item is by audit, continue to execute according to described in The application information that goes into operation of destination item generates the stock list of the destination item, and the stock of the destination item is singly sent to The step of corresponding interface.
Optionally, the stock for generating the destination item according to the application information that goes into operation of the destination item singly include: according to The stock list of the destination item is determined according to the arrangement and method for construction in the application information that goes into operation of the destination item, wherein described standby Material list includes: construction device therefor inventory and bill of materials used of constructing.
Optionally, after the stock of the destination item is singly sent to corresponding interface, the method also includes: it receives The second feedback information that single corresponding interface of stocking up returns;The destination item construction is determined according to second feedback information Whether required equipment material is complete;In the case that the equipment material needed for destination item construction is not complete, institute is determined The target goods and materials that destination item lacks are stated, and after getting the storage information of target goods and materials, determines the destination item construction Required equipment material is complete;In the case that the equipment material needed for destination item construction is complete, foundation is continued to execute The application information that goes into operation of the destination item generates the construction archives step of the destination item.
Optionally, the construction archives of the destination item include: material equipment get inventory, construction details inventory, apply Work change inventory and construction are told somebody what one's real intentions are in the case where inventory, in going into operation described in application information generation according to the destination item After the construction archives of destination item, the method also includes: in the case where construction personnel gets material equipment, described in acquisition The material equipment that construction personnel fills in gets inventory, and gets inventory generation based on the material equipment and get licence;? In the case that construction personnel carries out project under construction, the construction details inventory that the construction personnel fills in is obtained;In the target item In the case that construction variation occurs for mesh, the construction change inventory that the construction personnel fills in is obtained;It is completed in the destination item In the case where construction, obtains the construction filled in of construction personnel and tell somebody what one's real intentions are inventory.
Optionally, the storage mode of construction drawing and construction picture is using compression packet mode storage.
According to the another aspect of the application, a kind of processing unit of engineering project information is provided.The device includes: first Acquiring unit is sent to corresponding interface for obtaining the application information that goes into operation of destination item, and by the application information that goes into operation, In, it include the arrangement and method for construction of the destination item in the application information that goes into operation;First generation unit, for being opened based on described In the case that the feedback information of work application information corresponding interface determines the destination item by audit, according to the destination item The application information that goes into operation generate the stock list of the destination item, and the stock of the destination item is singly sent to correspondence and is connect Mouthful;Second generation unit, for determining the destination item required thing based on the feedback information for stocking up single corresponding interface Material examined harvest finish in the case where, the application information that goes into operation according to the destination item generates the construction shelves of the destination item Case, wherein the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to store and apply Construction drawing, the construction picture of worker person's upload, the construction drawing and the construction picture are matched with corresponding coding.
According to the another aspect of the application, a kind of storage medium is provided, the storage medium includes the program of storage, In, described program executes the processing method of engineering project information described in above-mentioned any one.
According to the another aspect of the application, a kind of processor is provided, the processor is for running program, wherein institute State the processing method that engineering project information described in above-mentioned any one is executed when program operation.
By the application, using following steps: obtaining the application information that goes into operation of destination item, and by the letter of application that goes into operation Breath is sent to corresponding interface, wherein includes the arrangement and method for construction of the destination item in the application information that goes into operation;Based on described In the case that the feedback information of the application information that goes into operation corresponding interface determines the destination item by audit, according to the target item The purpose application information that goes into operation generates the stock list of the destination item, and the stock of the destination item is singly sent to correspondence and is connect Mouthful;The material needed for determining the destination item based on the feedback information for stocking up single corresponding interface, which has been examined, harvests complete situation Under, the application information that goes into operation according to the destination item generates the construction archives of the destination item, wherein the construction archives For recording the construction detail of the destination item, and the construction archives are also used to store the construction drawing of construction personnel's upload Paper, construction picture, solve the technical issues of project process situation can not be controlled in time in the related technology.
That is, by carrying out unified planning to the main flow in engineering project, so that the practical process journey of engineering project Degree can be reported promptly and accurately, reach the technical effect of control engineering project in time.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, the schematic reality of the application Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is the flow chart according to the processing method of engineering project information provided by the embodiments of the present application;
Fig. 2 is according to a kind of application process schematic diagram that optionally goes into operation provided by the embodiments of the present application;
Fig. 3 is according to a kind of optional stock flow diagram provided by the embodiments of the present application;
Fig. 4 is according to a kind of optional construction process schematic diagram provided by the embodiments of the present application;And
Fig. 5 is the schematic diagram according to the processing unit of engineering project information provided by the embodiments of the present application.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
According to an embodiment of the present application, a kind of processing method of engineering project information is provided.
Fig. 1 is the flow chart according to the processing method of the engineering project information of the embodiment of the present application.As shown in Figure 1, the party Method the following steps are included:
Step S102 obtains the application information that goes into operation of destination item, and the application information that goes into operation is sent to correspondence and is connect Mouthful, wherein it include the arrangement and method for construction of the destination item in the application information that goes into operation;
Step S104 is determining that the destination item passes through based on the feedback information for going into operation application information corresponding interface In the case where audit, the application information that goes into operation according to the destination item generates the stock list of the destination item, and will be described The stock of destination item is singly sent to corresponding interface;
Step S106, the material needed for determining the destination item based on the feedback information for stocking up single corresponding interface is Inspection harvest finish in the case where, the application information that goes into operation according to the destination item generates the construction archives of the destination item, In, the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to store constructor Construction drawing, the construction picture of member's upload, the construction drawing and the construction picture are matched with corresponding coding.
The processing method of engineering project information provided by the embodiments of the present application, by the letter of application that goes into operation for obtaining destination item Breath, and the application information that goes into operation is sent to corresponding interface, wherein it include the destination item in the application information that goes into operation Arrangement and method for construction;Determining that the destination item passes through audit based on the feedback information for going into operation application information corresponding interface In the case of, the application information that goes into operation according to the destination item generates the stock list of the destination item, and by the target item Purpose stock is singly sent to corresponding interface;The destination item institute is being determined based on the feedback information for stocking up single corresponding interface Need material examined harvest finish in the case where, the construction of the destination item is generated according to the application information that goes into operation of the destination item Archives, wherein the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to store Construction drawing, the construction picture of construction personnel's upload, solve the skill that project process situation can not be controlled in time in the related technology Art problem.
That is, by carrying out unified planning to the main flow in engineering project, so that the practical process journey of engineering project Degree can be reported promptly and accurately, reach the technical effect of control engineering project in time.
It is worth emphasizing that: above-mentioned construction archives are also used to record the construction drawing of construction personnel's upload, construction picture.? That is, in the processing method of engineering project information provided by the embodiments of the present application, by enabling construction personnel in the construction process and Shi Shangchuan construction drawing and construction picture, allow staff to control construction speed and construction quality in time.
It should be noted that the processing method of engineering project information provided by the present application relates generally to three construction process, One, the application process that goes into operation, stock process and construction process.
For it is above-mentioned go into operation application process it should be understood that by the application information that goes into operation be sent to corresponding interface it Afterwards, the method also includes following steps: step S103a, and the first of the application information corresponding interface that goes into operation described in reception return is anti- Feedforward information;Step S103b determines whether the destination item passes through audit according to first feedback information;Step S103c, In the case where the destination item does not pass through audit, prompt information the going into operation to the destination item that the audit fails is sent The motions sponsor of application information;Step S103d is continued to execute in the case where the destination item is by audit according to the mesh The application information that goes into operation of mark project generates the stock list of the destination item, and the stock of the destination item is singly sent to pair The step of answering interface.
That is, as shown in Fig. 2, running engineering information processing side after getting the request slip that goes into operation of motion personnel initiation The request slip that goes into operation then is sent at corresponding responsible person's communicating terminal by the server of method, when responsible person is whole by the communication In the case that the client of operation engineering information processing method determines the request slip that goes into operation by audit in end, engineering information is run It is single then to generate stock based on the request slip that goes into operation, and the stock is singly sent to corresponding responsible person and is led to for the server of processing method It interrogates at terminal.
In addition, if responsible person determines the application that goes into operation by running the client of engineering information processing method in communicating terminal In the case that Dan Wei is by audit, the server of engineering information processing method is run, then the request slip that goes into operation is retracted into motion It at the communicating terminal of personnel, so that motion personnel accordingly modify the request slip that goes into operation, and resubmits, until this goes into operation Request slip is by examining or terminating motion.
In an optional example, above-mentioned go into operation applies for that unirecord goes into operation application information, and the application information that goes into operation is specific Including the following contents: the project name of the destination item, the applicant of the destination item, the destination item start-stop when Between and the destination item arrangement and method for construction.
Illustrate for above-mentioned stock requirements of process: by the stock of the destination item be singly sent to corresponding interface it Afterwards, the method also includes step S105a, receive second feedback information that single corresponding interface of stocking up returns;Step Whether S105b, equipment material needed for determining the destination item construction according to second feedback information are complete;Step S105c determines the mesh that the destination item lacks in the case that the equipment material needed for destination item construction is not complete Goods and materials are marked, and after getting the storage information of target goods and materials, equipment material needed for determining the destination item construction is complete; Step S105d is continued to execute in the case that the equipment material needed for destination item construction is complete according to the target item The purpose application information that goes into operation generates the construction archives step of the destination item.
In a kind of optional example, as shown in figure 3, being run at engineering information after the stock list for generating destination item The stock can be singly sent at corresponding responsible person's communicating terminal by the server of reason method.At this point, responsible person is whole by communication The stock list received is terminated, and whether the material equipment detected in stock list is complete, if the material in stock list is self-contained, The responsible person determines that the material equipment in the stock list is neat by running the client of engineering information processing method in communicating terminal Entirely, and the server-side of operation engineering information processing method is enabled to establish construction archives.
In addition, if responsible person detects that the material equipment in stock list is not complete, by running work in communicating terminal The server-side of the client of journey information processing method, Xiang Yunhang engineering information processing method sends shopping list, at this point, responsible person Then the material equipment lacked is purchased based on the shopping list.Hereafter, if the server-side of operation engineering information processing method Detect the storage information of target goods and materials, it is determined that equipment material needed for the destination item construction is complete, to establish construction Archives.
In another optional example, whether material equipment in above-mentioned detection stock list is complete can to pass through server Material equipment storage information is inquired to determine.
In another optional example, the application information that goes into operation according to the destination item generates the destination item Stock is single specifically: the stock of the destination item is determined according to the arrangement and method for construction in the application information that goes into operation of the destination item It is single, wherein the stock singly includes: construction device therefor inventory and bill of materials used of constructing.
It should be understood that shopping list includes: purchasing detail and quantity and it is expected that arrival time etc. of equipment.
It should be understood that when be successfully established construction archives/material it is self-contained when, then show that the engineering project can be opened Work.
For above-mentioned construction process it should be understood that described in being generated in the application information that goes into operation according to the destination item After the construction archives of destination item, the method also includes: step S107a, the case where construction personnel gets material equipment Under, it obtains the material equipment that the construction personnel fills in and gets inventory, and inventory generation is got based on the material equipment and is got Licence;Step S107b obtains the construction that the construction personnel fills in the case where construction personnel carries out project under construction Details inventory;Step S107c obtains what the construction personnel filled in the case where construction variation occurs for the destination item Construction change inventory;In the case where the destination item is completed to construct, obtains the construction filled in of construction personnel and tell somebody what one's real intentions are inventory.
That is, the construction archives of destination item include at least: material equipment gets inventory, construction details inventory, construction change More inventory and inventory of telling somebody what one's real intentions are of constructing.
That is, as shown in figure 4, generating the construction of the destination item in the application information that goes into operation according to the destination item After archives, then the notification sheet that goes into operation is sent to the communicating terminal of construction personnel, and the case where construction personnel gets material equipment Under, it obtains the material equipment that the construction personnel fills in and gets inventory, and inventory generation is got based on the material equipment and is got Licence, construction personnel then can get licence based on this and get corresponding material equipment at this time.
Further, construction personnel passes through operation engineering information processing method in the case where carrying out project under construction in real time Client send construction details inventory to server-side, wherein construction details inventory include: project name, reporter, the date, Morning weather, weather in afternoon, the highest temperature, the lowest temperature, photo site, construction teams and groups, this construction number, this construction in Appearance, construction progress and construction progress picture (including: construction drawing, construction picture).
It is emphasized that: the client of operation engineering information processing method, can be right after getting construction progress picture The construction progress picture such as is compressed, is encoded at the sequence of operations, to improve storage speed, surfing, uploading speed.Its In, specific compressed encoding operation is as follows:
1, the client of engineering information processing method is run after getting construction progress picture, automatically according to working as the day before yesterday Phase, time, temperature, humidity, location information carry out carrying out coded treatment to construction progress picture, to set construction progress picture Set label.
2, construction progress picture is carried out compression processing by the client for running engineering information processing method, and the compression is schemed Piece is stored in the memory of communicating terminal locating for client.In addition, also corresponding contracting can be generated based on construction progress picture Sketch map browses demand to meet user, and the clarity of the thumbnail is sufficient for the basic browsing demand of user.
It 3, can be based on the contracting of user's selection when the client for running engineering information processing method uploads construction progress picture Sketch map uploads its corresponding compression figure, wherein the naming method for compressing figure is corresponding with the encoded information of the compression figure, than just using Family subsequent query.
In addition, multiple uploading pictures can be carried out packing processing automatically by client if uploading pictures are more.
4, in the case where the client of operation engineering information processing method does not upload the successful situation of construction progress picture, client Network signal can be monitored automatically, and uploads the project progress picture automatically again at the network signal stronger moment.
Finally, user can inquire the progress of the engineering project based on any information of engineering project, In, any information of engineering project can be with are as follows: project name, reporter, beginning and ending time etc..
In addition, progress of the user query to engineering project, and when showing the construction progress picture of the engineering project, The client of operation engineering information processing method can first show the thumbnail of the construction progress picture, and determine further in user The complete information that the construction progress picture can be just downloaded when the construction progress picture is shown, to save user time.
Further, if having variation during site operation, the responsible person that constructs will fill according to practical alteration to be applied Work changes inventory, wherein the main contents that construction changes inventory are related to: reporter, date, project name, affiliated contract, change Drawing and related accessories, change reason, changed content after the amount of money, proposition change unit, original image paper and related accessories data, change Deng.
Further, in the case where the destination item is completed to construct, then construction personnel can complete according to practice of construction Situation fills in inventory of confiding a technological secret, wherein inventory of confiding a technological secret relates generally to: title of confiding a technological secret, project name, work order Position, reporter, date, place of telling somebody what one's real intentions are, unit of being told somebody what one's real intentions are, the people that tells somebody what one's real intentions are, the people that told somebody what one's real intentions are, content of telling somebody what one's real intentions are etc..
In conclusion the processing method of engineering project information provided by the embodiments of the present application, the following technical effects are achieved:
1, construction process is controlled using unified, standardization process, reaches and precisely grasps construction speed etc. Situation.
2, picture is handled using suitable Image Compression, to carry out data according to the actual situation on site The operation such as upload.
3, the picture that possesses the encoded informations such as date, temperature, position improves in-stockroom operation and the search operaqtion of picture Convenience.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of processing units of engineering project information, it should be noted that the application is real The processing unit for applying the engineering project information of example can be used for executing provided by the embodiment of the present application for engineering project information Processing method.The processing unit of engineering project information provided by the embodiments of the present application is introduced below.
Fig. 5 is the schematic diagram according to the processing unit of the engineering project information of the embodiment of the present application.As shown in figure 5, the dress Set includes: first acquisition unit 51, the first generation unit 53 and the second generation unit 55.
First acquisition unit 51 is sent out for obtaining the application information that goes into operation of destination item, and by the application information that goes into operation It send to corresponding interface, wherein include the arrangement and method for construction of the destination item in the application information that goes into operation;
First generation unit 53, for determining the mesh based on the feedback information for going into operation application information corresponding interface In the case that mark project is by audit, the stock of the destination item is generated according to the application information that goes into operation of the destination item It is single, and the stock of the destination item is singly sent to corresponding interface;
Second generation unit 55, for determining the destination item based on the feedback information for stocking up single corresponding interface Required material examined harvest finish in the case where, the application information that goes into operation according to the destination item generates applying for the destination item Work archives, wherein the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to deposit Construction drawing, the construction picture that construction personnel uploads are stored up, the construction drawing and the construction picture are matched with corresponding coding.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, the destination item is opened Work application information includes: the start-stop of the applicant, the destination item of the project name of the destination item, the destination item The arrangement and method for construction of time and the destination item.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, described device further include: the One receiving unit, for after the application information that goes into operation is sent to corresponding interface, to go into operation application information pair described in reception The first feedback information for answering interface to return;First determination unit, for determining the target item according to first feedback information Whether mesh passes through audit;First transmission unit does not lead in the case where the destination item does not pass through audit, sending audit The prompt information crossed to the destination item the application information that goes into operation motions sponsor;First execution unit, in the target In the case that project is by audit, continues to execute and generate the destination item according to the application information that goes into operation of the destination item Stock is single, and the step of stock of the destination item is singly sent to corresponding interface.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, according to the destination item The application information that goes into operation to generate the stock of the destination item singly include: in the application information that goes into operation according to the destination item Arrangement and method for construction determines the stock list of the destination item, wherein the stock singly includes: construction device therefor inventory and construction institute Use bill of materials.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, the method also includes: the Two receiving units are answered for after the stock of the destination item is singly sent to corresponding interface, receiving the stock single pair The second feedback information that interface returns;Second determination unit, for determining the destination item according to second feedback information Whether equipment material needed for construction is complete;Third determination unit, for the equipment material needed for destination item construction In the case where incomplete, the target goods and materials that the destination item lacks are determined, and after getting the storage information of target goods and materials, Equipment material needed for determining the destination item construction is complete;Second execution unit, in destination item construction institute In the case that the equipment material needed is complete, continues to execute and generate the target item according to the application information that goes into operation of the destination item Purpose construction archives step.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, in the destination item Construction archives include: that material equipment gets inventory, construction details inventory, construction change inventory and construction and tells somebody what one's real intentions are the feelings of inventory Under condition, after the application information that goes into operation according to the destination item generates the construction archives of the destination item, the method Further include: second acquisition unit, for obtaining what the construction personnel filled in the case where construction personnel gets material equipment Material equipment gets inventory, and gets inventory generation based on the material equipment and get licence;Third acquiring unit, is used for In the case where construction personnel carries out project under construction, the construction details inventory that the construction personnel fills in is obtained;4th obtains list Member, the construction change inventory filled in the case where construction variation occurs for the destination item, obtaining the construction personnel; 5th acquiring unit, for obtaining the construction that construction personnel fills in and telling somebody what one's real intentions are clearly in the case where the destination item is completed to construct It is single.
Optionally, in the processing unit of engineering project information provided by the embodiments of the present application, construction drawing and construction drawing The storage mode of piece is using compression packet mode storage.
The processing unit of engineering project information provided by the embodiments of the present application, by first acquisition unit 51, for obtaining The application information that goes into operation of destination item, and the application information that goes into operation is sent to corresponding interface, wherein the letter of application that goes into operation It include the arrangement and method for construction of the destination item in breath;First generation unit 53, for corresponding based on the application information that goes into operation In the case that the feedback information of interface determines the destination item by audit, the application information that goes into operation according to the destination item The stock list of the destination item is generated, and the stock of the destination item is singly sent to corresponding interface;Second generation unit 55, examined for the material needed for determining the destination item based on the feedback information for stocking up single corresponding interface harvest it is complete In the case of, the application information that goes into operation according to the destination item generates the construction archives of the destination item, wherein the construction Archives are used to record the construction detail of the destination item, and the construction archives are also used to store the construction of construction personnel's upload Drawing, construction picture, the construction drawing and the construction picture are matched with corresponding coding, solve project in the related technology The technical issues of process situation can not be controlled in time.
That is, by carrying out unified planning to the main flow in engineering project, so that the practical process journey of engineering project Degree can be reported promptly and accurately, reach the technical effect of control engineering project in time.
The processing unit of the engineering project information includes processor and memory, above-mentioned first acquisition unit 51, first Generation unit 53 and the second generation unit 55 etc. store in memory as program unit, are stored in by processor execution Above procedure unit in reservoir realizes corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set one Or more, come to manage engineering project in time by adjusting kernel parameter.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, if read-only memory (ROM) or flash memory (flash RAM), memory include that at least one is deposited Store up chip.
The embodiment of the invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor The processing method of the existing engineering project information.
The embodiment of the invention provides a kind of processor, the processor is for running program, wherein described program operation The processing method of engineering project information described in Shi Zhihang.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can The program run on a processor, processor perform the steps of the application information that goes into operation for obtaining destination item when executing program, And the application information that goes into operation is sent to corresponding interface, wherein comprising the destination item in the application information that goes into operation Arrangement and method for construction;Determining that the destination item passes through the feelings of audit based on the feedback information for going into operation application information corresponding interface Under condition, the application information that goes into operation according to the destination item generates the stock list of the destination item, and by the destination item Stock be singly sent to corresponding interface;It is determined needed for the destination item based on the feedback information for stocking up single corresponding interface Material examined harvest finish in the case where, the application information that goes into operation according to the destination item generates the construction shelves of the destination item Case, wherein the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to record and apply Construction drawing, the construction picture of worker person's upload, the construction drawing and the construction picture are matched with corresponding coding.
Optionally, the application information that goes into operation of the destination item includes: the project name of the destination item, the target The arrangement and method for construction of the applicant of project, the beginning and ending time of the destination item and the destination item.
Optionally, after the application information that goes into operation is sent to corresponding interface, the method also includes: described in reception The first feedback information that the application information that goes into operation corresponding interface returns;Determine that the destination item is according to first feedback information It is no to pass through audit;In the case where the destination item does not pass through audit, the prompt information that the audit fails is sent to the mesh The motions sponsor of the application information that goes into operation of mark project;In the case where the destination item is by audit, continue to execute according to described in The application information that goes into operation of destination item generates the stock list of the destination item, and the stock of the destination item is singly sent to The step of corresponding interface.
Optionally, the stock for generating the destination item according to the application information that goes into operation of the destination item singly include: according to The stock list of the destination item is determined according to the arrangement and method for construction in the application information that goes into operation of the destination item, wherein described standby Material list includes: construction device therefor inventory and bill of materials used of constructing.
Optionally, after the stock of the destination item is singly sent to corresponding interface, the method also includes: it receives The second feedback information that single corresponding interface of stocking up returns;The destination item construction is determined according to second feedback information Whether required equipment material is complete;In the case that the equipment material needed for destination item construction is not complete, institute is determined The target goods and materials that destination item lacks are stated, and after getting the storage information of target goods and materials, determines the destination item construction Required equipment material is complete;In the case that the equipment material needed for destination item construction is complete, foundation is continued to execute The application information that goes into operation of the destination item generates the construction archives step of the destination item.
Optionally, the construction archives of the destination item include: material equipment get inventory, construction details inventory, apply Work change inventory and construction are told somebody what one's real intentions are in the case where inventory, in going into operation described in application information generation according to the destination item After the construction archives of destination item, the method also includes: in the case where construction personnel gets material equipment, described in acquisition The material equipment that construction personnel fills in gets inventory, and gets inventory generation based on the material equipment and get licence;? In the case that construction personnel carries out project under construction, the construction details inventory that the construction personnel fills in is obtained;In the target item In the case that construction variation occurs for mesh, the construction change inventory that the construction personnel fills in is obtained;It is completed in the destination item In the case where construction, obtains the construction filled in of construction personnel and tell somebody what one's real intentions are inventory.
Optionally, the storage mode of construction drawing and construction picture is using compression packet mode storage.Equipment herein can To be server, PC, PAD, mobile phone etc..
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just The program of beginningization there are as below methods step: the application information that goes into operation of destination item is obtained, and the application information that goes into operation is sent To corresponding interface, wherein include the arrangement and method for construction of the destination item in the application information that goes into operation;Based on the Shen that goes into operation Please information corresponding interface feedback information determine the destination item by audit in the case where, according to opening for the destination item Work application information generates the stock list of the destination item, and the stock of the destination item is singly sent to corresponding interface;? Material needed for determining the destination item based on the feedback information for stocking up single corresponding interface has been examined harvest and finish in the case where, according to The construction archives of the destination item are generated according to the application information that goes into operation of the destination item, wherein the construction archives are used for The construction detail of the destination item is recorded, and the construction archives are also used to record the construction drawing of construction personnel's upload, apply Work picture, the construction drawing and the construction picture are matched with corresponding coding.
Optionally, the application information that goes into operation of the destination item includes: the project name of the destination item, the target The arrangement and method for construction of the applicant of project, the beginning and ending time of the destination item and the destination item.
Optionally, after the application information that goes into operation is sent to corresponding interface, the method also includes: described in reception The first feedback information that the application information that goes into operation corresponding interface returns;Determine that the destination item is according to first feedback information It is no to pass through audit;In the case where the destination item does not pass through audit, the prompt information that the audit fails is sent to the mesh The motions sponsor of the application information that goes into operation of mark project;In the case where the destination item is by audit, continue to execute according to described in The application information that goes into operation of destination item generates the stock list of the destination item, and the stock of the destination item is singly sent to The step of corresponding interface.
Optionally, the stock for generating the destination item according to the application information that goes into operation of the destination item singly include: according to The stock list of the destination item is determined according to the arrangement and method for construction in the application information that goes into operation of the destination item, wherein described standby Material list includes: construction device therefor inventory and bill of materials used of constructing.
Optionally, after the stock of the destination item is singly sent to corresponding interface, the method also includes: it receives The second feedback information that single corresponding interface of stocking up returns;The destination item construction is determined according to second feedback information Whether required equipment material is complete;In the case that the equipment material needed for destination item construction is not complete, institute is determined The target goods and materials that destination item lacks are stated, and after getting the storage information of target goods and materials, determines the destination item construction Required equipment material is complete;In the case that the equipment material needed for destination item construction is complete, foundation is continued to execute The application information that goes into operation of the destination item generates the construction archives step of the destination item.
Optionally, the construction archives of the destination item include: material equipment get inventory, construction details inventory, apply Work change inventory and construction are told somebody what one's real intentions are in the case where inventory, in going into operation described in application information generation according to the destination item After the construction archives of destination item, the method also includes: in the case where construction personnel gets material equipment, described in acquisition The material equipment that construction personnel fills in gets inventory, and gets inventory generation based on the material equipment and get licence;? In the case that construction personnel carries out project under construction, the construction details inventory that the construction personnel fills in is obtained;In the target item In the case that construction variation occurs for mesh, the construction change inventory that the construction personnel fills in is obtained;It is completed in the destination item In the case where construction, obtains the construction filled in of construction personnel and tell somebody what one's real intentions are inventory.
Optionally, the storage mode of construction drawing and construction picture is using compression packet mode storage.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM), Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element There is also other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can provide as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The above is only embodiments herein, are not intended to limit this application.To those skilled in the art, Various changes and changes are possible in this application.It is all within the spirit and principles of the present application made by any modification, equivalent replacement, Improve etc., it should be included within the scope of the claims of this application.

Claims (10)

1. a kind of processing method of engineering project information characterized by comprising
The application information that goes into operation of destination item is obtained, and the application information that goes into operation is sent to corresponding interface, wherein is described to open It include the arrangement and method for construction of the destination item in work application information;
In the case where determining the destination item by audit based on the feedback information for going into operation application information corresponding interface, The application information that goes into operation according to the destination item generates the stock list of the destination item, and by the stock of the destination item Singly it is sent to corresponding interface;
The material needed for determining the destination item based on the feedback information for stocking up single corresponding interface, which has been examined, harvests complete feelings Under condition, the application information that goes into operation according to the destination item generates the construction archives of the destination item, wherein the construction shelves Case is used to record the construction detail of the destination item, and the construction archives are also used to record the construction drawing of construction personnel's upload Paper, construction picture, the construction drawing and the construction picture are matched with corresponding coding.
2. the method according to claim 1, wherein the application information that goes into operation of the destination item includes: described The project name of destination item, the applicant of the destination item, the beginning and ending time of the destination item and the target item Purpose arrangement and method for construction.
3. the method according to claim 1, wherein by the application information that goes into operation be sent to corresponding interface it Afterwards, the method also includes:
The first feedback information that the application information that goes into operation described in reception corresponding interface returns;
Determine whether the destination item passes through audit according to first feedback information;
In the case where the destination item does not pass through audit, the prompt information that the audit fails is sent to the destination item The motions sponsor for the application information that goes into operation;
In the case where the destination item is by audit, continues to execute and generated according to the application information that goes into operation of the destination item The stock list of the destination item, and the step of stock of the destination item is singly sent to corresponding interface.
4. the method according to claim 1, wherein the application information that goes into operation according to the destination item generates institute The stock for stating destination item singly includes: that arrangement and method for construction in the application information that goes into operation according to the destination item determines the target The stock list of project, wherein the stock singly includes: construction device therefor inventory and bill of materials used of constructing.
5. the method according to claim 1, wherein being connect the stock of the destination item to be singly sent to correspondence After mouthful, the method also includes:
Receive the second feedback information that single corresponding interface of stocking up returns;
Whether equipment material needed for determining the destination item construction according to second feedback information is complete;
In the case that the equipment material needed for destination item construction is not complete, the target that the destination item lacks is determined Goods and materials, and after getting the storage information of target goods and materials, equipment material needed for determining the destination item construction is complete;
In the case that the equipment material needed for destination item construction is complete, opening according to the destination item is continued to execute Work application information generates the construction archives step of the destination item.
6. the method according to claim 1, wherein the construction archives in the destination item include: that material is set It is standby to get inventory, construction details inventory, construction change inventory and construction and tell somebody what one's real intentions are in the case where inventory, according to the target After the application information that goes into operation of project generates the construction archives of the destination item, the method also includes:
In the case where construction personnel gets material equipment, obtains the material equipment that the construction personnel fills in and get inventory, and Inventory generation, which is got, based on the material equipment gets licence;
In the case where construction personnel carries out project under construction, the construction details inventory that the construction personnel fills in is obtained;
In the case where construction variation occurs for the destination item, the construction change inventory that the construction personnel fills in is obtained;
In the case where the destination item is completed to construct, obtains the construction filled in of construction personnel and tell somebody what one's real intentions are inventory.
7. the method according to claim 1, wherein the storage mode of construction drawing and construction picture is using compression Packet mode storage.
8. a kind of processing unit of engineering project information characterized by comprising
First acquisition unit is sent to pair for obtaining the application information that goes into operation of destination item, and by the application information that goes into operation Answer interface, wherein include the arrangement and method for construction of the destination item in the application information that goes into operation;
First generation unit, for determining the destination item based on the feedback information for going into operation application information corresponding interface In the case where audit, the application information that goes into operation according to the destination item generates the stock list of the destination item, and will The stock of the destination item is singly sent to corresponding interface;
Second generation unit, for determining the destination item required thing based on the feedback information for stocking up single corresponding interface Material examined harvest finish in the case where, the application information that goes into operation according to the destination item generates the construction shelves of the destination item Case, wherein the construction archives are used to record the construction detail of the destination item, and the construction archives are also used to store and apply Construction drawing, the construction picture of worker person's upload, the construction drawing and the construction picture are matched with corresponding coding.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution Benefit require any one of 1 to 7 described in engineering project information processing method.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 7 described in engineering project information processing method.
CN201811645874.7A 2018-12-30 2018-12-30 The treating method and apparatus of engineering project information Pending CN109754181A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811645874.7A CN109754181A (en) 2018-12-30 2018-12-30 The treating method and apparatus of engineering project information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811645874.7A CN109754181A (en) 2018-12-30 2018-12-30 The treating method and apparatus of engineering project information

Publications (1)

Publication Number Publication Date
CN109754181A true CN109754181A (en) 2019-05-14

Family

ID=66405032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811645874.7A Pending CN109754181A (en) 2018-12-30 2018-12-30 The treating method and apparatus of engineering project information

Country Status (1)

Country Link
CN (1) CN109754181A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113515790A (en) * 2021-07-12 2021-10-19 哈尔滨工业大学 Fishing gear interactive customization method and system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447065A (en) * 2007-11-28 2009-06-03 上海市电力公司 Method for uniformly collecting engineering progress data
US20110246256A1 (en) * 2010-04-06 2011-10-06 Oracle International Corporation Product lifecycle management techniques
CN104537452A (en) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 Electric power project computer management system
CN104573903A (en) * 2014-07-31 2015-04-29 林耀 Computer program for process control over enterprise production scheduling and production flow management
CN104715420A (en) * 2013-12-17 2015-06-17 国家电网公司 Method and device for processing electric power engineering data
CN105976089A (en) * 2016-04-27 2016-09-28 中交第二航务工程局有限公司 Construction data classification system based on building information model and method thereof
CN106557908A (en) * 2016-11-15 2017-04-05 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal
CN106779578A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal and mobile terminal
CN106845811A (en) * 2017-01-11 2017-06-13 国家电网公司 Coal based on multifactor adaptability changes the planing method for being electrically accessed power network
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107644259A (en) * 2017-07-12 2018-01-30 重庆雅智兰能源管理有限公司 Electric power system fault auto form delivering monitoring method and system
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447065A (en) * 2007-11-28 2009-06-03 上海市电力公司 Method for uniformly collecting engineering progress data
US20110246256A1 (en) * 2010-04-06 2011-10-06 Oracle International Corporation Product lifecycle management techniques
CN104715420A (en) * 2013-12-17 2015-06-17 国家电网公司 Method and device for processing electric power engineering data
CN104573903A (en) * 2014-07-31 2015-04-29 林耀 Computer program for process control over enterprise production scheduling and production flow management
CN104537452A (en) * 2014-11-04 2015-04-22 无锡鹰智科技有限公司 Electric power project computer management system
CN105976089A (en) * 2016-04-27 2016-09-28 中交第二航务工程局有限公司 Construction data classification system based on building information model and method thereof
CN106557908A (en) * 2016-11-15 2017-04-05 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal
CN106779578A (en) * 2016-11-15 2017-05-31 北京威科伟业信息技术有限公司 A kind of engineering construction control method based on WEB terminal and mobile terminal
CN106845811A (en) * 2017-01-11 2017-06-13 国家电网公司 Coal based on multifactor adaptability changes the planing method for being electrically accessed power network
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN107644259A (en) * 2017-07-12 2018-01-30 重庆雅智兰能源管理有限公司 Electric power system fault auto form delivering monitoring method and system
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113515790A (en) * 2021-07-12 2021-10-19 哈尔滨工业大学 Fishing gear interactive customization method and system

Similar Documents

Publication Publication Date Title
CN107688899A (en) Business process monitoring method and device
CN101472140B (en) System for distributing and requiring multimedia program and implementing method thereof
CN109428904A (en) The publication of business object, acquisition methods, apparatus and system
CN109508319B (en) 3D cross-platform resource management system and method
CN111125784A (en) Artificial intelligence training model method, device and medium based on block chain
CN106991134A (en) A kind of large data cloud storage method stored based on object
CN109729049A (en) The sharing method and device of information
CN108259942A (en) Obtain the method, apparatus and system of preview advertisement
CN109754181A (en) The treating method and apparatus of engineering project information
CN110110516A (en) Log recording method, apparatus and system
CN110213105A (en) It is a kind of cross-platform micro- using creation method
CN111124617A (en) Method and device for creating block chain system, storage medium and electronic device
CN110507986A (en) The treating method and apparatus of animation information
CN108021954A (en) The startup method and apparatus of business procedure
CN105760911A (en) Method and device for applying associated identification codes
CN110020298A (en) Parameter display method and apparatus
CN108509494B (en) File processing method and device
CN110347308A (en) The method and apparatus of mobile terminal cleaning similar documents
CN112035156A (en) E-commerce platform docking device, method, equipment and medium
CN110019508A (en) A kind of method of data synchronization, apparatus and system
CN109816715A (en) Determine the method, equipment and storage medium of type of vehicle
CN110008086A (en) A kind of log generation method, device and a kind of client
CN109561126A (en) A kind of method of data synchronization and device, storage medium, processor
CN105528722A (en) Method and device for sending/receiving data packet, data packet transmission system and mobile equipment
CN115202673A (en) Application construction method and device based on cloud server and computer equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190514

RJ01 Rejection of invention patent application after publication