CN102955991A - Method and device for displaying work of transformer substation in real time - Google Patents
Method and device for displaying work of transformer substation in real time Download PDFInfo
- Publication number
- CN102955991A CN102955991A CN2011102554605A CN201110255460A CN102955991A CN 102955991 A CN102955991 A CN 102955991A CN 2011102554605 A CN2011102554605 A CN 2011102554605A CN 201110255460 A CN201110255460 A CN 201110255460A CN 102955991 A CN102955991 A CN 102955991A
- Authority
- CN
- China
- Prior art keywords
- transformer station
- sampling time
- time section
- job
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention provides a method and a device for displaying work of a transformer substation in real time, and aims to solve the problem that a running commander can not timely and intuitively master a working progress situation of the current transformer substation in the prior art. The method comprises the following steps of: receiving a timing trigger signal; acquiring working information which is required to be finished by the transformer substation within a sampling time period and actually finished working recording information; performing comparison analysis on the working information which is required to be finished by the transformer substation within the sampling time period and the actually finished working record information, and determining a working progress of the transformer substation within the sampling time period; associating the working progress of the transformer substation within the sampling time period with a progress mark; and outputting the working progress with the progress mark of the transformer substation within the sampling time period to display equipment. By using the technical scheme, the running commander can timely and intuitively master the current working situation of the transformer substation.
Description
Technical field
The present invention relates to the power supply technique field, relate in particular to the method and apparatus of a kind of real-time exhibition transformer station work.
Background technology
The at present week of transformer station plan is issued once weekly with the form of Microsoft Excel.The work program that the maintenance unit arranges every day take the week plan as the basis, and the running command personnel also understand the working condition on the same day by week plan form, as for the progress specific to a job, then need phone contact transformer station to go and find out what's going on.
In the prior art, the running command personnel can't in time grasp the job schedule situation of current transformer station intuitively, for this problem, not yet propose at present effective solution.
Summary of the invention
Fundamental purpose of the present invention provides the method and apparatus of a kind of real-time exhibition transformer station work, can't in time grasp intuitively the problem of the job schedule situation of current transformer station with the running command personnel in the prior art of solving.
To achieve these goals, according to an aspect of the present invention, provide the method for a kind of real-time exhibition transformer station work.
The method of real-time exhibition of the present invention transformer station work comprises: receive timing pip; Obtain job information and the actual job record information of finishing that transformer station's sampling time section should be finished; Job information and the actual job record information of finishing that should finish transformer station's sampling time section are analyzed, and determine the job schedule of transformer station's sampling time section; According to default job schedule and the corresponding relation between the progress mark, carry out related to the job schedule of transformer station's sampling time section with the progress mark; Output is arrived display device with the job schedule of transformer station's sampling time section of progress mark.
Further, obtain after the job information and the actual job record information of finishing that transformer station's sampling time section should finish, the method also comprises: the job information that should finish according to transformer station's sampling time section, according to the corresponding relation between every action in the default job information and the risk class, determine every risk class that action is corresponding in the job information that transformer station's sampling time section should finish; According to default risk class and the corresponding relation between the risk class mark, every action is carried out related with the risk class mark in the job information that should finish transformer station's sampling time section; The job information that output should be finished with transformer station's sampling time section of risk class mark is to display device.
Further, obtain after the job information and the actual job record information of finishing that transformer station's sampling time section should finish, the method also comprises: judge in the job information that transformer station's sampling time section should finish whether comprise the power supply mission bit stream; When comprising the power supply mission bit stream in the job information that transformer station's sampling time section should be finished, according to the corresponding relation between default every power supply task and the power supply grade, determine every power supply grade corresponding to mission bit stream of powering that comprises in the job information that transformer station's sampling time section should finish; According to the corresponding relation between default power supply grade and the power supply grade mark, every the power supply mission bit stream that comprises in the job information that should finish transformer station's sampling time section carries out related with the grade mark of powering; Output with the job information that should finish of transformer station's sampling time section of power supply grade mark to display device.
Further, the job schedule of transformer station's sampling time section comprises: the work that does not begin, the work of well afoot and the work of having finished.
The device of a kind of real-time exhibition transformer station work is provided according to a further aspect in the invention.
The device of real-time exhibition of the present invention transformer station work comprises: the trigger pip receiving equipment is used for receiving timing pip; Information receiving device is used for obtaining job information and the actual job record information of finishing that transformer station's sampling time section should be finished; Messaging device, the job information and the actual job record information of finishing that are used for should finishing transformer station's sampling time section are analyzed, and determine the job schedule of transformer station's sampling time section; Progress mark associate device is used for carrying out related to the job schedule of transformer station's sampling time section with the progress mark according to default job schedule and the corresponding relation between the progress mark; The job schedule output device, be used for output with the job schedule of transformer station's sampling time section of progress mark to display device.
Further, device also comprises: risk class is determined equipment, for the job information that should finish according to transformer station's sampling time section, according to the corresponding relation between every action in the default job information and the risk class, determine every risk class that action is corresponding in the job information that transformer station's sampling time section should finish; Risk class mark associate device is used for according to default risk class and the corresponding relation between the risk class mark, and every action is carried out related with the risk class mark in the job information that should finish transformer station's sampling time section; The first job information output device is used for job information that output should finish with transformer station's sampling time section of risk class mark to display device.
Further, device also comprises: the information judgment device is used for judging whether the job information that transformer station's sampling time section should be finished comprises the power supply mission bit stream; Power supply classification equipment, when comprising the power supply mission bit stream for the job information that should finish when transformer station's sampling time section, according to the corresponding relation between default every power supply task and the power supply grade, determine every power supply grade corresponding to mission bit stream of powering that comprises in the job information that transformer station's sampling time section should finish; Power supply grade mark associate device is used for according to the corresponding relation between default power supply grade and the power supply grade mark, and every the power supply mission bit stream that comprises in the job information that should finish transformer station's sampling time section carries out related with the grade mark of powering; The second job information output device is used for job information that output should finish with transformer station's sampling time section of power supply grade mark to display device.
Further, the job schedule of transformer station's sampling time section comprises: the work that does not begin, the work of well afoot and the work of having finished.
According to technical scheme of the present invention, adopt the mode of the work of Timing Processing transformer station, and job schedule and progress mark are carried out related, make the running command personnel can grasp in time, intuitively the present behavior of transformer station.
Description of drawings
Figure of description is used to provide a further understanding of the present invention, consists of the application's a part, and illustrative examples of the present invention and explanation thereof are used for explaining the present invention, do not consist of improper restriction of the present invention.In the accompanying drawings:
Fig. 1 is the process flow diagram according to the key step of the method for the real-time exhibition transformer station work of the embodiment of the invention; And
Fig. 2 is the structural representation according to the device of the real-time exhibition transformer station work of the embodiment of the invention.
Embodiment
Need to prove that in the situation of not conflicting, embodiment and the feature among the embodiment among the application can make up mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the present invention in detail.
Fig. 1 is that as shown in Figure 1, the method mainly comprises the steps: according to the process flow diagram of the key step of the method for the real-time exhibition transformer station work of the embodiment of the invention
Step S101: receive timing pip.
In this step, according to the needs in the cycle of grasping transformer station's job schedule, set cycle regular hour, according to the operational data of the time cycle processing transformer station that sets, realize the purpose of real-time exhibition transformer station job schedule.
Step S103: obtain job information and the actual job record information of finishing that transformer station's sampling time section should be finished.
Preferably, the job information that should finish of transformer station's sampling time section comprises: the former work program information of transformer station's sampling time section, before uncompleted job information and change of plan information.
Step S105: job information and the actual job record information of finishing that should finish transformer station's sampling time section are analyzed, and determine the job schedule of transformer station's sampling time section.
Preferably, the job schedule of transformer station's sampling time section comprises: the work that does not begin, the work of well afoot and the work of having finished.
Step S107: according to default job schedule and the corresponding relation between the progress mark, carry out related to the job schedule of transformer station's sampling time section with the progress mark.
In this step, the progress mark can be various ways, for example represents different job schedules with different colors.
Preferably, default job schedule and the corresponding relation between the progress mark are: the work of using " green " expression not begin; With the work of " redness " expression well afoot, the work of using " grey " expression to finish.
Step S109: output is arrived display device with the job schedule of transformer station's sampling time section of progress mark.Display device is according to the information that receives, and real-time exhibition is with the job schedule of transformer station's sampling time section of progress mark.
Except the method for above-mentioned real-time exhibition with the job schedule of transformer station's sampling time section of progress mark, the method of real-time exhibition of the present invention transformer station work also comprises: the method for the risk class in the job information of real-time exhibition transformer station sampling time section mainly comprises following content:
A: the job information that should finish according to transformer station's sampling time section, according to the corresponding relation between every action in the default job information and the risk class, determine every risk class that action is corresponding in the job information that transformer station's sampling time section should finish.
In this step, the corresponding relation between action and the risk class is mainly decided the significance level of operation of power networks according to every action.Represent the work of risk maximum to represent the work that risk is larger with the secondary risk with primary risk, represent the work of average risk with tertiary risk.
B: according to default risk class and the corresponding relation between the risk class mark, every action is carried out related with the risk class mark in the job information that should finish transformer station's sampling time section.
In this step, the risk class mark can be various ways, and for example the pentagram with different numbers represents different risk class, also can represent with the mark of other shapes of different numbers.
Preferably, default risk class and the corresponding relation between the risk class mark are: with the work of " pentagram " expression primary risk, with the work of " two pentagram " expression secondary risk, with the work of " three pentagram " expression tertiary risk.
C: the job information that output should be finished with transformer station's sampling time section of risk class mark is to display device.Display device is according to the information that receives, the job information that transformer station's sampling time section of real-time exhibition risk class mark should be finished.
The method of real-time exhibition of the present invention transformer station work also comprises: the method for the power supply grade in the job information of real-time exhibition transformer station sampling time section mainly comprises following content:
A: judge in the job information that transformer station's sampling time section should finish whether comprise the power supply mission bit stream.
B: when comprising the power supply mission bit stream in the job information that transformer station's sampling time section should be finished, according to the corresponding relation between default every power supply task and the power supply grade, determine every power supply grade corresponding to mission bit stream of powering that comprises in the job information that transformer station's sampling time section should finish.
In this step, the power supply task classification mainly according to this power supply task significance level.Represent the most important work of power supply task with one-level power supply task, represent the work that the power supply task is larger with secondary power supply task, represent the work of the task of generally powering with three grades of power supply tasks.
C: according to the corresponding relation between default power supply grade and the power supply grade mark, every the power supply mission bit stream that comprises in the job information that should finish transformer station's sampling time section carries out related with the grade mark of powering.
In this step, the power supply grade mark can be various ways, and for example the flag with different colours represents different power supply grades, also can represent with the mark of other shapes of different colours or number.
Preferably, the corresponding relation between default power supply grade and the power supply grade mark is: with " red flag " expression one-level power supply task, with " green flag " expression secondary power supply task, with three grades of power supply tasks of " yellow flag " expression.
D: output with the job information that should finish of transformer station's sampling time section of power supply grade mark to display device.The information that the display device basis receives, the job information that real-time exhibition should be finished with transformer station's sampling time section of power supply grade mark.
The method of real-time exhibition of the present invention transformer station work adopts the mode of the work of Timing Processing transformer station, and job schedule and progress mark is carried out related, makes the running command personnel can grasp in time, intuitively the present behavior of transformer station.
Fig. 2 is the structural representation according to the device 200 of the real-time exhibition transformer station work of the embodiment of the invention.As shown in Figure 2, this device mainly comprises:
Trigger pip receiving equipment 201 is used for receiving timing pip;
Information receiving device 203 is used for obtaining job information and the actual job record information of finishing that transformer station's sampling time section should be finished.
Progress mark associate device 207 is used for carrying out related to the job schedule of transformer station's sampling time section with the progress mark according to default job schedule and the corresponding relation between the progress mark.
Job schedule output device 209, be used for output with the job schedule of transformer station's sampling time section of progress mark to display device.
Risk class is determined equipment 211, for the job information that should finish according to transformer station's sampling time section, according to the corresponding relation between every action in the default job information and the risk class, determine every risk class that action is corresponding in the job information that transformer station's sampling time section should finish.
Risk class mark associate device 213 is used for according to default risk class and the corresponding relation between the risk class mark, and every action is carried out related with the risk class mark in the job information that should finish transformer station's sampling time section.
The first job information output device 215 is used for job information that output should finish with transformer station's sampling time section of risk class mark to display device.
Power supply classification equipment 223, when comprising the power supply mission bit stream for the job information that should finish when transformer station's sampling time section, according to the corresponding relation between default every power supply task and the power supply grade, determine every power supply grade corresponding to mission bit stream of powering that comprises in the job information that transformer station's sampling time section should finish.
Power supply grade mark associate device 225 is used for according to the corresponding relation between default power supply grade and the power supply grade mark, and every the power supply mission bit stream that comprises in the job information that should finish transformer station's sampling time section carries out related with the grade mark of powering.
The second job information output device 227 is used for job information that output should finish with transformer station's sampling time section of power supply grade mark to display device.
From the above description as can be known, the method and apparatus of real-time exhibition of the present invention transformer station work, adopt the mode of the work of Timing Processing transformer station, and job schedule and progress mark are carried out related, will work risk class and risk class mark carry out related and will power grade and power supply grade mark carry out relatedly, make the running command personnel can grasp in time, intuitively present behavior, risk class and the power supply task dispatching specifying information of transformer station.
Obviously, those skilled in the art should be understood that, above-mentioned each equipment of the present invention or each step can realize with general calculation element, they can concentrate on the single calculation element, perhaps be distributed on the network that a plurality of calculation elements form, alternatively, they can be realized with the executable program code of calculation element, thereby, they can be stored in the memory storage and be carried out by calculation element, perhaps they are made into respectively each integrated device electronics, perhaps a plurality of equipment in them or step are made into single integrated circuit equipment and realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (8)
1. the method for a real-time exhibition transformer station job is characterized in that, comprising:
Receive timing pip;
Obtain job information and the actual job record information of finishing that transformer station's sampling time section should be finished;
Job information and the actual job record information of finishing that should finish described transformer station sampling time section are analyzed, and determine the job schedule of described transformer station sampling time section;
According to default described job schedule and the corresponding relation between the progress mark, carry out related to the job schedule of described transformer station sampling time section with described progress mark;
Output is arrived display device with the job schedule of transformer station's sampling time section of described progress mark.
2. method according to claim 1 is characterized in that, described obtaining after the job information and the actual job record information of finishing that transformer station's sampling time section should finish, and described method also comprises:
The job information that should finish according to described transformer station sampling time section, according to the corresponding relation between every action in the default described job information and the risk class, determine every risk class that described action is corresponding in the job information that described transformer station sampling time section should finish;
According to default described risk class and the corresponding relation between the risk class mark, every described action is carried out related with described risk class mark in the job information that should finish described transformer station sampling time section;
The job information that output should be finished with transformer station's sampling time section of described risk class mark arrives described display device.
3. method according to claim 1 is characterized in that, described obtaining after the job information and the actual job record information of finishing that transformer station's sampling time section should finish, and described method also comprises:
Judge in the job information that described transformer station sampling time section should finish and whether comprise the power supply mission bit stream;
When comprising the power supply mission bit stream in the job information that described transformer station sampling time section should be finished, according to default every described power supply task and the corresponding relation of powering between the grade, determine described power supply grade corresponding to every described power supply mission bit stream that comprises in the job information that described transformer station sampling time section should finish;
According to default described power supply grade and the corresponding relation of powering between the grade mark, every the described power supply mission bit stream that comprises in the job information that should finish described transformer station sampling time section carries out related with described power supply grade mark;
The job information that output should be finished with transformer station's sampling time section of described power supply grade mark arrives described display device.
4. each described method in 3 according to claim 1 is characterized in that the job schedule of described transformer station sampling time section comprises: the work that does not begin, the work of well afoot and the work of having finished.
5. the device of a real-time exhibition transformer station job is characterized in that, comprising:
The trigger pip receiving equipment is used for receiving timing pip;
Information receiving device is used for obtaining job information and the actual job record information of finishing that transformer station's sampling time section should be finished;
Messaging device, the job information and the actual job record information of finishing that are used for should finishing described transformer station sampling time section are analyzed, and determine the job schedule of described transformer station sampling time section;
Progress mark associate device is used for carrying out related to the job schedule of described transformer station sampling time section with described progress mark according to default described job schedule and the corresponding relation between the progress mark;
The job schedule output device, be used for output with the job schedule of transformer station's sampling time section of described progress mark to display device.
6. device according to claim 5 is characterized in that, described device also comprises:
Risk class is determined equipment, for the job information that should finish according to described transformer station sampling time section, according to the corresponding relation between every action in the default described job information and the risk class, determine every risk class that described action is corresponding in the job information that described transformer station sampling time section should finish;
Risk class mark associate device, be used for according to default described risk class and the corresponding relation between the risk class mark, every described action is carried out related with described risk class mark in the job information that should finish described transformer station sampling time section;
The first job information output device is used for exporting the job information that should finish with transformer station's sampling time section of described risk class mark and arrives described display device.
7. device according to claim 5 is characterized in that, described device also comprises:
The information judgment device is used for judging whether the job information that described transformer station sampling time section should be finished comprises the power supply mission bit stream;
Power supply classification equipment, when comprising the power supply mission bit stream for the job information that should finish when described transformer station sampling time section, according to default every described power supply task and the corresponding relation of powering between the grade, determine described power supply grade corresponding to every described power supply mission bit stream that comprises in the job information that described transformer station sampling time section should finish;
Power supply grade mark associate device, be used for according to default described power supply grade and the corresponding relation of powering between the grade mark, every the described power supply mission bit stream that comprises in the job information that should finish described transformer station sampling time section carries out related with described power supply grade mark;
The second job information output device is used for exporting the job information that should finish with transformer station's sampling time section of described power supply grade mark and arrives described display device.
8. each described device in 7 according to claim 5 is characterized in that the job schedule of described transformer station sampling time section comprises: the work that does not begin, the work of well afoot and the work of having finished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110255460.5A CN102955991B (en) | 2011-08-31 | 2011-08-31 | The method and apparatus of real-time exhibition work of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110255460.5A CN102955991B (en) | 2011-08-31 | 2011-08-31 | The method and apparatus of real-time exhibition work of transformer substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102955991A true CN102955991A (en) | 2013-03-06 |
CN102955991B CN102955991B (en) | 2016-03-23 |
Family
ID=47764774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110255460.5A Active CN102955991B (en) | 2011-08-31 | 2011-08-31 | The method and apparatus of real-time exhibition work of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102955991B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1475950A (en) * | 2002-08-15 | 2004-02-18 | 英业达股份有限公司 | Item management system and method |
CN1831855A (en) * | 2006-04-04 | 2006-09-13 | 天津大学 | Real-time analysing and control system and method for large underground hole group construction at network environment |
CN101447065A (en) * | 2007-11-28 | 2009-06-03 | 上海市电力公司 | Method for uniformly collecting engineering progress data |
CN101710400A (en) * | 2009-12-15 | 2010-05-19 | 中科华核电技术研究院有限公司 | Method and device for evaluating risk of nuclear power station |
-
2011
- 2011-08-31 CN CN201110255460.5A patent/CN102955991B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1475950A (en) * | 2002-08-15 | 2004-02-18 | 英业达股份有限公司 | Item management system and method |
CN1831855A (en) * | 2006-04-04 | 2006-09-13 | 天津大学 | Real-time analysing and control system and method for large underground hole group construction at network environment |
CN101447065A (en) * | 2007-11-28 | 2009-06-03 | 上海市电力公司 | Method for uniformly collecting engineering progress data |
CN101710400A (en) * | 2009-12-15 | 2010-05-19 | 中科华核电技术研究院有限公司 | Method and device for evaluating risk of nuclear power station |
Also Published As
Publication number | Publication date |
---|---|
CN102955991B (en) | 2016-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zuo et al. | Vehicle scheduling of an urban bus line via an improved multiobjective genetic algorithm | |
CN104216785B (en) | General policies task system and its implementation | |
Gehlot et al. | An introduction to systems modeling and simulation with colored petri nets | |
SG115362A1 (en) | Asset management and scheduling graphical user interface for media streamer | |
CN108345970A (en) | Logistic storage simulation method, platform and system | |
CN113253696B (en) | Intelligent equipment cooperative operation method and system based on industrial Internet | |
CN101299153A (en) | Computer auxiliary assembly process control method facing to manual assembly | |
JP2009157528A (en) | Production instruction method in cell production system | |
WO2022085939A1 (en) | Factory simulation-based scheduling system using reinforcement learning | |
WO2004051421A3 (en) | Capacity planning method and system | |
CN105974891A (en) | Mold production process self-adaptive control method based on dynamic spectacular | |
CN111260181A (en) | Workshop self-adaptive production scheduling device based on distributed intelligent manufacturing unit | |
CN106503896A (en) | Construction equipment management method based on BIM technology | |
Hosseini et al. | Flow production of construction processes through implementing lean construction principles and simulation | |
CN107527163A (en) | A kind of project implementation method and device | |
CN105128893B (en) | Method and system for generating train whole-course operation time information | |
Grzybowska et al. | SECI model and facilitation in change management in metallurgical enterprise | |
CN102955991A (en) | Method and device for displaying work of transformer substation in real time | |
CN105227648B (en) | A kind of subway comprehensive monitoring system time sequence triggering method based on time bucket | |
CN216034421U (en) | Integrated operation progress monitoring system for railway passenger station and whole station | |
CN102968692A (en) | Method and device for adjusting electric power workload | |
TW200501206A (en) | System and method for automated dispatch and transportation of work-in-process | |
CN104252667A (en) | Material production scheduling simulation device | |
CN102236836A (en) | Network interaction and cooperation modeling | |
CN201338638Y (en) | Station autonomous controlling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |