CN201126588Y - Apparatus for unitedly capturing job schedule data - Google Patents

Apparatus for unitedly capturing job schedule data Download PDF

Info

Publication number
CN201126588Y
CN201126588Y CNU2007201984821U CN200720198482U CN201126588Y CN 201126588 Y CN201126588 Y CN 201126588Y CN U2007201984821 U CNU2007201984821 U CN U2007201984821U CN 200720198482 U CN200720198482 U CN 200720198482U CN 201126588 Y CN201126588 Y CN 201126588Y
Authority
CN
China
Prior art keywords
module
progress
engineering
project
managing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201984821U
Other languages
Chinese (zh)
Inventor
王怡风
陆伟明
王斌
胡万荣
杨文威
朱坚中
戴强
吕裕山
钱展佳
孙红军
林坚
陈祖元
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CNU2007201984821U priority Critical patent/CN201126588Y/en
Application granted granted Critical
Publication of CN201126588Y publication Critical patent/CN201126588Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a device for uniformly collecting the data of project process. The device comprises an intermediate chart generating module, a project managing module, a process analyzing module and a process browsing module. The intermediate chart generating module, the project managing module and the process analyzing module are respectively connected with the process browsing module. The intermediate chart generating module is connected with the project managing module and the process analyzing module. Compared with prior art, the method of this utility model singly establish a process managing network for each item. The network for managing process is automatically established for each item, and different operation items are established according to the style of the item.

Description

The device of unified collecting engineering progress data
Technical field
The utility model relates to the device of collecting engineering progress data, particularly the device of unified collecting engineering progress data.
Background technology
Along with the scale of electrical network constantly enlarges, about 20000 of the annual project of building of Utilities Electric Co., about 80000 of contract quantity, and construction unit is distributed in each electric company, in power supply branch and other subsidiary companies, since the ERP of Utilities Electric Co. reaches the standard grade, all projects all enter into ERP system, the various expense situations and the state status of project have all effectively been managed in ERP, but if also put the construction speed of engineering itself into the ERP management, because construction party outsourcing often, they can't enter ERP system, therefore this becomes a difficult point, if by project manager's unified management of Utilities Electric Co., workload is huge so, may realize hardly, now, according to of the requirement of capital construction portion of State Grid Corporation of China to milestone management, the Shanghai Electric Power independent development progress control import the program of SAP-PS system, to concentrate transparent progress an effectively management is arranged to projects.
Summary of the invention
The purpose of this utility model is exactly the device that a kind of unified collecting engineering progress data simple to operate is provided in order to overcome the defective that above-mentioned prior art exists.
The purpose of this utility model can be achieved through the following technical solutions: the device of unified collecting engineering progress data, it is characterized in that, comprise that middle table generation module, engineering management module, progress analysis module, progress browse module, described middle table generation module, engineering management module, progress analysis module are browsed module with progress respectively and are connected, and described middle table generation module is connected with engineering management module, progress analysis module.
Also comprise the engineering progress data memory module, this project progress data memory module is connected with the engineering management module.
Compared with prior art, the inventive method has the following advantages:
Build the progress control network for each menu original creation, each project of giving is created the network of progress control automatically, and creates different operation items according to item types;
Lead-in item schedule value, actual value are also assigned network automatically, the Microsoft Excel that the data that gather up according to the constituent parts project manager produce, and the information in establishment or the operation of the progress of modification comprises date of enterprise and actual date automatically;
Gantt chart shows, according to the information in scheduling network and the operation, shows corresponding Gantt chart;
Statistical study, the progress msg based on importing carries out various statistical study on BW.
Description of drawings
Fig. 1 is the structural representation that the utility model is unified the device of collecting engineering progress data.
Embodiment
As shown in Figure 1, the device that the utility model is unified collecting engineering progress data comprises that middle table generation module 1, engineering management module 2, progress analysis module 3, progress browse module 4, engineering progress data memory module 5, after engineering management module 2 has been collected data, generate middle table by middle table generation module 1, carry out progress statistics and analysis by progress analysis module 3, the project manager can browse module 4 by progress and browse.Engineering progress data can be stored in engineering progress data memory module 5 afterwards.

Claims (2)

1. the device of unifying collecting engineering progress data, it is characterized in that, comprise that middle table generation module, engineering management module, progress analysis module, progress browse module, described middle table generation module, engineering management module, progress analysis module are browsed module with progress respectively and are connected, and described middle table generation module is connected with engineering management module, progress analysis module.
2. the device of unified collecting engineering progress data according to claim 1 is characterized in that, also comprises the engineering progress data memory module, and this project progress data memory module is connected with the engineering management module.
CNU2007201984821U 2007-11-28 2007-11-28 Apparatus for unitedly capturing job schedule data Expired - Lifetime CN201126588Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201984821U CN201126588Y (en) 2007-11-28 2007-11-28 Apparatus for unitedly capturing job schedule data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201984821U CN201126588Y (en) 2007-11-28 2007-11-28 Apparatus for unitedly capturing job schedule data

Publications (1)

Publication Number Publication Date
CN201126588Y true CN201126588Y (en) 2008-10-01

Family

ID=40000055

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201984821U Expired - Lifetime CN201126588Y (en) 2007-11-28 2007-11-28 Apparatus for unitedly capturing job schedule data

Country Status (1)

Country Link
CN (1) CN201126588Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104376392A (en) * 2013-08-13 2015-02-25 国家电网公司 Power transmission and transformation information processing method and device
CN105072177A (en) * 2015-08-04 2015-11-18 国网上海市电力公司 Electric power construction engineering data synchronization equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104376392A (en) * 2013-08-13 2015-02-25 国家电网公司 Power transmission and transformation information processing method and device
CN105072177A (en) * 2015-08-04 2015-11-18 国网上海市电力公司 Electric power construction engineering data synchronization equipment

Similar Documents

Publication Publication Date Title
CN102385739B (en) A kind of county power supply company integration information management platform
CN103413004A (en) Three-dimensional assembly process generation method and system for aerospace product
EP4160544A1 (en) Three-dimensional model application method and system for nuclear power engineering modular construction
CN104600840A (en) Intelligent dispatching and mis-operation preventing management system and method
CN104615617A (en) Dispatch monitoring information processing system for substation equipment
SG115362A1 (en) Asset management and scheduling graphical user interface for media streamer
CN101364284A (en) Production management system for electrical power system
CN107239885A (en) A kind of electricity power engineering towards supplier digitizes handover resource management system
CN107748902A (en) A kind of method for matching somebody with somebody insertion data acquisition based on scene battalion
CN102142108A (en) Information processing method of corresponding relationship among materials and equipment suitable for power system
CN201126588Y (en) Apparatus for unitedly capturing job schedule data
CN101447065A (en) Method for uniformly collecting engineering progress data
CN103136611A (en) Digitization generation method for emergency plan
CN114048188A (en) Cross-database data migration system and method
CN103809951A (en) Graphical service arrangement and management device based on FLEX technology
CN104331360A (en) Automatic testing platform
CN102646119B (en) Method for realizing integration of standardized system and information system
CN102375912A (en) Data integration device and method among different engineering software systems
CN102393820A (en) Logical implementation method for controlling building monitoring system
Zhang et al. Research and Implementation of the State Grid Transmission Planning Simulation Platform
CN103491138A (en) Enterprise real-time information system
CN113159721A (en) Internet of things platform based on full life cycle of equipment
CN111369116A (en) Project early-stage and project early-stage management system based on visualization technology
CN109211990A (en) A kind of electrode detection software
CN105719031A (en) Workflow management technique based on trans-regional and trans-company flow cooperation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20081001