CN101439359A - 用于穿孔机进口台带活动接头的推料器 - Google Patents

用于穿孔机进口台带活动接头的推料器 Download PDF

Info

Publication number
CN101439359A
CN101439359A CNA2008100801131A CN200810080113A CN101439359A CN 101439359 A CN101439359 A CN 101439359A CN A2008100801131 A CNA2008100801131 A CN A2008100801131A CN 200810080113 A CN200810080113 A CN 200810080113A CN 101439359 A CN101439359 A CN 101439359A
Authority
CN
China
Prior art keywords
hydraulic cylinder
leading truck
joint
perforating machine
guide groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100801131A
Other languages
English (en)
Other versions
CN101439359B (zh
Inventor
张淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Heavy Industry Co Ltd
Original Assignee
Taiyuan Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Heavy Industry Co Ltd filed Critical Taiyuan Heavy Industry Co Ltd
Priority to CN2008100801131A priority Critical patent/CN101439359B/zh
Publication of CN101439359A publication Critical patent/CN101439359A/zh
Application granted granted Critical
Publication of CN101439359B publication Critical patent/CN101439359B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

用于穿孔机进口台带活动接头的推料器,涉及无缝钢管穿孔机。现有技术的推料器其推坯液压缸与导向架之间为固定联接,对加工、装配及设备安装的要求都较高,加工和安装的误差容易损坏液压缸。本发明在导向架的销轴孔位置、垂直水平面方向开一个长孔,孔内加衬套,衬套、接头的孔内穿入销轴,并用挡圈将其固定联接。这种推料器不仅便于加工、装配及使用,而且固定导槽安装位置的偏差、导向架的磨损,不会造成导向架中心和液压缸接头中心的偏离而损坏液压缸。

Description

用于穿孔机进口台带活动接头的推料器
技术领域
本发明涉及无缝钢管穿孔机,特别涉及一种穿孔机进口台的推料器。
背景技术
热轧穿孔是无缝钢管生产中最重要的工序,热轧穿孔机在无缝钢管生产机组中的作用是将实心坯料穿轧成空心毛管,是金属变形的第一道工序。
穿孔过程是由穿孔机轧辊旋转,顶杆小车带动顶头、顶杆运行至工作位,加热好的管坯由进口台推料器将管坯推入穿孔机主机座,管坯咬入、穿孔,进行轧制。如附图1、2所示,进口台推料器的作用是:用带有导向架1(导向架上装有推头2)的推坯液压缸3,将放在活动导槽4中的管坯推入穿孔机主机座,活动导槽可以升降,以适应不同直径规格的管坯,导向架1在固定导槽5上滑行,滑行面必须要很好的贴合。现有技术的推料器如附图3、4所示,其装有推头2的导向架1之间通过销轴6、挡板7和接头8联接,接头8与推坯液压缸3联接,为固定联接。导向架1与固定导槽5滑动配合,在固定导槽5的中间位置安装有放置管坯的活动导槽4。推坯液压缸3与导向架1之间的这种固定联接方式,对加工、装配及设备安装的要求都较高,如果固定导槽5安装位置有偏差、导向架1上的滑板磨损,都会造成导向架的中心和液压缸接头中心不在一个水平位置上,容易损坏液压缸。
发明内容
本发明的目的是克服现有技术的缺点,提供一种用于穿孔机进口台带活动接头的推料器,这种推料器不仅便于加工、装配及使用,而且固定导槽安装位置的偏差、导向架的磨损,不会造成导向架中心和液压缸接头中心的偏离而损坏液压缸。
本发明的技术方案是:
一种用于穿孔机进口台带活动接头的推料器,包括:装有推头的导向架通过销轴和接头联接,接头与推坯液压缸联接,导向架与固定导槽滑动配合,在固定导槽中间位置安装有放置管坯的活动导槽,其特征在于:所述的导向架的销轴孔位置、垂直水平面方向开一个长孔,孔内加衬套,衬套、接头的孔内穿入销轴,并用挡圈将其固定联接。
本发明与现有技术相比,由于在导向架的销轴孔位置、垂直水平面方向开一个长孔,孔内加衬套,衬套再与销轴及液压缸接头联接,然后用挡圈固定。销轴、衬套和液压缸接头成为整体,可以在导向架的长孔中上下自由活动,这样,推坯液压缸与导向架之间的联接成为一种活动接头。降低加工、装配及安装的难度,使即使加工和安装有一定误差,只是导向架的垂直位置有所不同,不会影响液压缸接头的水平位置,不容易损坏液压缸。
附图说明
图1为一种穿孔机进口台的结构示意图;
图2为图1的A-A剖视图;
图3为现有技术的穿孔机进口台推料器的液压缸与导向架固定联接示意图;
图4为图3的B-B剖视图;
图5为本发明的液压缸与导向架活动联接示意图;
图6为图5的B-B剖视图。
下面结合附图通过较佳实施例对本发明作进一步的说明。
具体实施方式
如图5、6所示,一种用于穿孔机进口台带活动接头的推料器,装有推头2的导向架1之间通过销轴6和接头8联接,接头8与推坯液压缸3联接,导向架1与固定导槽5滑动配合,在固定导槽5中间位置安装有放置管坯的活动导槽4。所述的导向架1的销轴孔位置、垂直水平面方向开一个长孔11,孔内加衬套9,衬套9与导向架1长孔的联接处在水平方向是扁的,衬套9不能在长孔中转动,只能在长孔中上下自由活动。衬套9、接头8的孔内穿入销轴6,并用挡圈10将其固定联接,限制轴向窜动。这样,销轴6、衬套9和接头8成为一个整体,可以在导向架1的长孔11中上下自由活动,推坯液压缸3与导向架1之间的联接成为一种活动接头。

Claims (1)

1、一种用于穿孔机进口台带活动接头的推料器,包括:装有推头2的导向架1之间通过销轴6和接头8联接,接头8与推坯液压缸3联接,导向架1与固定导槽5滑动配合,在固定导槽5的中间位置安装有放置管坯的活动导槽4,其特征在于:所述的导向架1的销轴孔位置、垂直水平面方向开一个长孔11,孔内加衬套9,衬套9、接头8的孔内穿入销轴6,并用挡圈10将其固定联接。
CN2008100801131A 2008-12-12 2008-12-12 用于穿孔机进口台带活动接头的推料器 Expired - Fee Related CN101439359B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100801131A CN101439359B (zh) 2008-12-12 2008-12-12 用于穿孔机进口台带活动接头的推料器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100801131A CN101439359B (zh) 2008-12-12 2008-12-12 用于穿孔机进口台带活动接头的推料器

Publications (2)

Publication Number Publication Date
CN101439359A true CN101439359A (zh) 2009-05-27
CN101439359B CN101439359B (zh) 2010-08-18

Family

ID=40724042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100801131A Expired - Fee Related CN101439359B (zh) 2008-12-12 2008-12-12 用于穿孔机进口台带活动接头的推料器

Country Status (1)

Country Link
CN (1) CN101439359B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101633058B (zh) * 2009-07-24 2011-06-08 太原重工股份有限公司 带柱塞缸的三辊导向定位装置
CN102205358A (zh) * 2011-03-30 2011-10-05 太原重工股份有限公司 金属挤压机推锭装置
CN102259117A (zh) * 2010-05-28 2011-11-30 扬州诚德钢管有限公司 一种堵头装卸机构
CN103433300A (zh) * 2013-08-07 2013-12-11 常熟市梅李机械制造有限公司 穿孔机的钢坯推送装置
CN108126989A (zh) * 2017-12-19 2018-06-08 朱兆明 一种辊轧机预打磨进料系统及其工作方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101633058B (zh) * 2009-07-24 2011-06-08 太原重工股份有限公司 带柱塞缸的三辊导向定位装置
CN102259117A (zh) * 2010-05-28 2011-11-30 扬州诚德钢管有限公司 一种堵头装卸机构
CN102205358A (zh) * 2011-03-30 2011-10-05 太原重工股份有限公司 金属挤压机推锭装置
CN103433300A (zh) * 2013-08-07 2013-12-11 常熟市梅李机械制造有限公司 穿孔机的钢坯推送装置
CN103433300B (zh) * 2013-08-07 2015-04-15 常熟市梅李机械制造有限公司 穿孔机的钢坯推送装置
CN108126989A (zh) * 2017-12-19 2018-06-08 朱兆明 一种辊轧机预打磨进料系统及其工作方法
CN108126989B (zh) * 2017-12-19 2019-10-08 万静琼 一种辊轧机预打磨进料系统及其工作方法

Also Published As

Publication number Publication date
CN101439359B (zh) 2010-08-18

Similar Documents

Publication Publication Date Title
CN101439359B (zh) 用于穿孔机进口台带活动接头的推料器
CN201534273U (zh) 双头式自由辊轴承座压装机
CN2875637Y (zh) 无缝钢管穿孔机前的推坯机
CN203817459U (zh) 一种管件打孔机的托住装置
CN102489589A (zh) 管坯防甩装置及穿孔机
CN102327897A (zh) 一种穿孔机顶头定心装置
CN101992386B (zh) 用于皮带机托辊辊体的装配制作方法
CN201632577U (zh) 芯轴扩孔用马架
CN104209574B (zh) 数控液压剪板机
US7469566B2 (en) Roll stand
CN104759497B (zh) 锥管卷板机
CN203764649U (zh) 一种带钢穿带导向板装置
CN204173438U (zh) 带钢输送装置
US20230028222A1 (en) Squeeze device
CN111890012B (zh) 压装装置
CN101947573B (zh) 地下卷取机带钢卷取装置中的对中装置
CN103008351B (zh) 穿孔机的顶杆推送设备
US5295379A (en) Vertical piercer mill
CN103008350A (zh) 可翻转的穿孔机顶头定心辊装置
CN217070229U (zh) 钢卷预开卷装置
CN201470950U (zh) 一种镗孔刀具的导向装置
CN201579258U (zh) 顶杆芯棒定位装置
CN202803775U (zh) 穿孔机三辊导向装置
CN212634016U (zh) 一种方管打孔送料装置
CN219074387U (zh) 一种能快速拆卸工装顶尖的主轴装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20211212

CF01 Termination of patent right due to non-payment of annual fee