CN101413274B - Upper-stacking and lower-hanging combined load static load test pile apparatus - Google Patents
Upper-stacking and lower-hanging combined load static load test pile apparatus Download PDFInfo
- Publication number
- CN101413274B CN101413274B CN2008101362979A CN200810136297A CN101413274B CN 101413274 B CN101413274 B CN 101413274B CN 2008101362979 A CN2008101362979 A CN 2008101362979A CN 200810136297 A CN200810136297 A CN 200810136297A CN 101413274 B CN101413274 B CN 101413274B
- Authority
- CN
- China
- Prior art keywords
- load
- stacking
- case
- pile
- foundation pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The invention relates to an upward-stacking and downward-hanging combined loading static load pile test device, wherein a steel structure bracket of a main beam is arranged on the ground at two sidesof a foundation pile; two ends of the main beam are arranged on the steel structure bracket of the main beam; a jack is placed between the main beam and the foundation pile; a secondary beam is arranged on the main beam along a direction vertical to the main beam, and the secondary beam and the main beam form a ballast platform; an upward-stacking steel structure load reinforcing box is arranged on the secondary beam, and a secondary beam support saddle which also serves as a lower load box and another lower load box are hung downwards on two sides of the secondary beam along the width direction of the secondary beam through connecting pieces; a square reinforcing baffle or a reinforcing baffle with the shape like a Chinese character 'jing' is positioned and fixed in the upward-stacking steel structure load reinforcing box; and the side wall of the jack close to the lower load boxes is provided with a displacement sensor for measuring the settling amount of the foundation pile. The upward-stacking and downward-hanging combined loading static load pile test device adopts lifting equipment to add counterweight materials into the upward-stacking steel structure load reinforcing box, and the upward-stacking steel structure load reinforcing box is lifted off once when a static load pile test is finished. The upward-stacking and downward-hanging combined loading static load pile testdevice has the advantages of safe and fast construction, mechanical lifting, high efficiency, and labor and cost conservation.
Description
Technical field
The present invention relates to the preloading device that a kind of construction work ground and static load of pile foundation lotus vertical bearing capacity detect, particularly a kind of upper-stacking and lower-hanging combined load static load test pile apparatus.
Background technology
The construction of construction-engineering project, particularly highrise building, large-scale structure needs to use a large amount of pile foundations.According to the requirement of country about ground and pile foundation engineering inspection of quality standard, reply foundation pile test pile and engineering piles are carried out the bearing capacity static load and are detected, to determine and to check its bearing capacity of single pile, as the mandatory term of pile quality acceptance requirement.Traditional static loading test ballast platform counterforce device is to use the sand pocket counterweight on the ballast platform; Stack sand pocket very heavy, feel unwell complete, consume a large amount of sand pockets, speed is slow, efficiency of construction is low.
Summary of the invention
The objective of the invention is a kind of upper-stacking and lower-hanging combined load static load test pile apparatus.
The technology of the present invention realizes by following technical proposal: a kind of upper-stacking and lower-hanging combined load static load test pile apparatus, in the foundation pile both sides along same straight line, with the equidistant girder steel structure support of settling on the ground of foundation pile, the two ends of girder are placed on the girder steel structure support, place jack between girder and foundation pile; Pay beam along in a row arranging perpendicular to the direction of girder, the length direction of paying beam is symmetrical in foundation pile and is placed on the girder, pays beam and girder and forms the ballast platform; Settle heap steel work load to strengthen case on the beam paying, the both sides paying the beam width direction are symmetrical in foundation pile, hang double as down by connector and pay second time extension load case that first time of beam support hung the load case and do not made to pay beam support; Heap steel work load is strengthened in the case on described, and positioning and fixing strengthens plate washer with " mouth " font of the big muzzle osculum of foundation pile vertical centre axial symmetry or plate washer strengthened in " well " font; On the sidewall of jack, displacement transducer is housed, in order to measure the settling amount of foundation pile near second time extension load case.
The road clearance of described second time extension load case is hung the big 5-30 centimetre of load case than first time.The outer wall of strengthening case at last heap steel work load is equipped with cat ladder and scale.
The invention has the beneficial effects as follows:
1. adopt hanging device upwards to pile the steel work load and strengthen case and add the counterweight material, after the static load test pile is finished, disposablely last heap steel work load is strengthened case hang down; Construction safety, fast, mechanization lifting, efficient height, save manpower and cost.
2. descend the extension casing to alleviate the counterweight on ballast platform top, help reducing the desired height of going up heap steel work load reinforcement case; Also reduce the whole center of gravity of upper-stacking and lower-hanging combined load static load test pile apparatus, improved the stability of ballast platform and integrally.
3. strengthen being provided with in the case " mouth ", " well " font reinforcement plate washer at last heap steel work load, last heap steel work load is strengthened the lateral wall pressure of case in order to reduce filler, box height be can increase as far as possible, under the identical situation of floor space, maximum volume and preloading weight obtained.The volume that last heap steel work load is strengthened case is determined according to the heap(ed) capacity of test requirements document.
4. the load of static load test pile is very large, and assembly of the present invention adopts the high strength steel member, to guarantee construction safety.
5. the outer wall of strengthening case at last heap steel work load is equipped with cat ladder 2 and scale 3, watches situation and the quantity thereof that load is strengthened the counterweight material in the case for the constructor.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is schematic perspective view of the present invention (foundation pile and the jack that are positioned at the center are blocked by the girder steel structure support).
Fig. 2 is structural representation of the present invention (removing the girder steel structure support of termination, to show foundation pile and jack).
Fig. 3 is the vertical view that heap steel work load is strengthened case of going up of Fig. 2, and strengthens plate washer to show " well " font that heap steel work load is strengthened in the case.
Fig. 4 is the A-A generalized section of Fig. 2.
The specific embodiment
It is big 16 centimeters that the road clearance of hanging load case 7 second time is hung load case 6 than first time.
The outer wall of strengthening case 1 at last heap steel work load is equipped with cat ladder 2 and scale 3, watches situation and the quantity thereof that heap steel work load is strengthened the counterweight material in the case 1 for the constructor.
Claims (3)
1. upper-stacking and lower-hanging combined load static load test pile apparatus, it is characterized in that: in foundation pile (12) both sides along same straight line, with foundation pile (12) equidistant on ground (8) go up to settle girder steel structure support (10), the two ends of girder (9) are placed on the girder steel structure support (10), place jack (11) between girder (9) and foundation pile (12); Pay beam (4) along in a row arranging perpendicular to the direction of girder (9), the length direction of paying beam (4) is symmetrical in foundation pile (12) and is placed on the girder (9), pays beam (4) and forms the ballast platform with girder (9); On Fu Liang (4), settle heap steel work load to strengthen case (1), both sides at Fu Liang (4) width, be symmetrical in foundation pile (12), hang second time extension load case (7) that double as is paid first time extension load case (6) of beam support and do not made to pay beam support down by connector (5); Heap steel work load is strengthened in the case (1) on described, and positioning and fixing is strengthened plate washer (13) or " well " font with " mouth " font of the big muzzle osculum of foundation pile vertical centre axial symmetry and strengthened plate washer (14); On the sidewall of jack (11), displacement transducer (15) is housed near second time extension load case (7).
2. the heap of going up according to claim 1 is hung combined type load static load test pile apparatus down, and it is characterized in that: the road clearance of described second time extension load case (7) is hung the big 5-30 centimetre of load case (6) than first time.
3. the heap of going up according to claim 1 is hung combined type load static load test pile apparatus down, it is characterized in that: the outer wall of strengthening case (1) at last heap steel work load is equipped with cat ladder (2) and scale (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101362979A CN101413274B (en) | 2008-11-26 | 2008-11-26 | Upper-stacking and lower-hanging combined load static load test pile apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008101362979A CN101413274B (en) | 2008-11-26 | 2008-11-26 | Upper-stacking and lower-hanging combined load static load test pile apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101413274A CN101413274A (en) | 2009-04-22 |
CN101413274B true CN101413274B (en) | 2010-06-09 |
Family
ID=40593992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008101362979A Expired - Fee Related CN101413274B (en) | 2008-11-26 | 2008-11-26 | Upper-stacking and lower-hanging combined load static load test pile apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101413274B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015466B (en) * | 2012-12-24 | 2014-08-06 | 太原理工大学 | Device for testing liquefying effect of pile foundation indoors and liquefying effect evaluation method |
CN103542971B (en) * | 2013-10-28 | 2015-11-18 | 中国建筑第七工程局有限公司 | A kind of easy device detecting withdrawal resistance |
CN104234095B (en) * | 2014-10-13 | 2016-06-15 | 青海省建筑建材科学研究院 | A kind of static loading experiment girder steel device |
CN105277444B (en) * | 2015-04-21 | 2018-03-09 | 河南理工大学 | Fully mechanical pile foundation model test apparatus and test method based on multidirectional loading |
CN106153443B (en) * | 2016-08-19 | 2024-08-20 | 上海市政工程设计研究总院(集团)有限公司 | Counterweight loading device and loading method thereof |
CN110578346B (en) * | 2018-06-11 | 2021-03-19 | 杭州西南检测技术股份有限公司 | Step type load box for self-balancing method |
CN110004996A (en) * | 2019-05-10 | 2019-07-12 | 四川中亿创新重型装备有限公司 | A kind of integral steel structure frame ballast heap carrier and its Static Load Test Method |
CN111501859B (en) * | 2020-04-16 | 2021-08-10 | 福建省永正工程质量检测有限公司 | Self-balancing static load type pile foundation testing device and construction method |
CN115492172B (en) * | 2022-07-26 | 2024-04-09 | 长沙理工大学 | Device and method for testing influence of traffic load on pile-net composite foundation power |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2090835U (en) * | 1991-02-06 | 1991-12-18 | 徐州市建筑工程研究所 | Loading device for testing vertical bearing capacity of single pile |
CN2145379Y (en) * | 1992-11-26 | 1993-11-03 | 沈昌鲁 | Experimental device for stake base static load |
CN2408451Y (en) * | 2000-02-13 | 2000-11-29 | 云南金广建筑科学研究中心 | Positive placed cylinder post body reverse force static load test oil pressure device |
CN2775143Y (en) * | 2005-04-07 | 2006-04-26 | 云南金广建筑科学研究院 | Large diameter pile static loaded test steel reinforced concrete platform |
-
2008
- 2008-11-26 CN CN2008101362979A patent/CN101413274B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2090835U (en) * | 1991-02-06 | 1991-12-18 | 徐州市建筑工程研究所 | Loading device for testing vertical bearing capacity of single pile |
CN2145379Y (en) * | 1992-11-26 | 1993-11-03 | 沈昌鲁 | Experimental device for stake base static load |
CN2408451Y (en) * | 2000-02-13 | 2000-11-29 | 云南金广建筑科学研究中心 | Positive placed cylinder post body reverse force static load test oil pressure device |
CN2775143Y (en) * | 2005-04-07 | 2006-04-26 | 云南金广建筑科学研究院 | Large diameter pile static loaded test steel reinforced concrete platform |
Also Published As
Publication number | Publication date |
---|---|
CN101413274A (en) | 2009-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101413274B (en) | Upper-stacking and lower-hanging combined load static load test pile apparatus | |
CN204255832U (en) | Crab-bolt pullout tests charger | |
CN103061264B (en) | Method and device for pre-pressing high-position support single column in water | |
CN203164057U (en) | Test device for multidirectional loading of side slope in geotechnical engineering | |
CN103422517B (en) | Superposing type pile body self-rebound force balance loading case | |
CN201305857Y (en) | Pile upper-stacked and lower-hung static load testing device | |
CN201386291Y (en) | Static load test device of composite foundation | |
CN104328810A (en) | Improved method for detecting bearing capacity of precast pipe-pile single-pile foundation | |
CN215366868U (en) | Prepressing system for hanging basket of cantilever beam | |
CN102777050A (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN201268853Y (en) | Box type girder for foundation pile statical test loading reaction test system | |
CN111074794A (en) | Prepressing system for hanging basket of cantilever beam | |
CN205802726U (en) | Elevator car bottom reinforcement | |
CN107130649A (en) | A kind of large-tonnage concrete block preloading static load of pile foundation device | |
CN209585138U (en) | A kind of Loading Test of Composite Foundation device | |
CN201284550Y (en) | Fastener type steel pipe full scaffold | |
CN204495448U (en) | A kind of steel billet meausring apparatus of steel rolling production-line | |
CN203145017U (en) | Large-sized chute device for pouring mass concrete into deep foundation pit | |
CN203101031U (en) | Simple pulling force test support | |
CN220955535U (en) | Lifting counterweight bracket | |
CN205688821U (en) | A kind of overhanging unloading platform tool-type limit for tonnage support | |
CN210833811U (en) | Automobile weighing apparatus with shaking prevention function | |
CN209276100U (en) | A kind of forklift hoisting device | |
CN216275869U (en) | Vertical resistance to compression static load test equipment of high pile basis single pile of photovoltaic electric field tubular pile | |
CN217498496U (en) | Steel component installation and construction tool car in closed space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100609 Termination date: 20101126 |