CN201305857Y - Pile upper-stacked and lower-hung static load testing device - Google Patents

Pile upper-stacked and lower-hung static load testing device Download PDF

Info

Publication number
CN201305857Y
CN201305857Y CNU2008201993026U CN200820199302U CN201305857Y CN 201305857 Y CN201305857 Y CN 201305857Y CN U2008201993026 U CNU2008201993026 U CN U2008201993026U CN 200820199302 U CN200820199302 U CN 200820199302U CN 201305857 Y CN201305857 Y CN 201305857Y
Authority
CN
China
Prior art keywords
load
pile
case
foundation pile
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201993026U
Other languages
Chinese (zh)
Inventor
李道华
钱勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008201993026U priority Critical patent/CN201305857Y/en
Application granted granted Critical
Publication of CN201305857Y publication Critical patent/CN201305857Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a pile upper-stacked and lower-hung static load testing device. Main beam steel brackets are arranged on the ground at two sides of a foundation pile; two ends of the main beam are disposed on the main beam steel brackets; a jack is arranged between the main beam and the foundation pile; a secondary beam is arranged on the main beam along the direction vertical to the main beam; the secondary beam and the main beam form a counterweight platform; an upper-stacked steel load reinforcing box is arranged on the secondary beam; a secondary beam support saddle also serving as a lower load box and a lower load box are hung at two sides of the secondary beam in the width direction through connecting pieces; a reinforcing baffle taking the shape of the Chinese character Kou(mouth) or Jing(a well) is positioned and fixed in the upper-stacked steel load reinforcing box; and a displacement sensor is arranged on the side wall of the jack, close to the lower load box, to measure the settlement of the foundation pile. The pile upper-stacked and lower-hung static load testing device adopts a hoisting device to add a counterweight to the upper-stacked steel load reinforcing box, and after the static-load testing of the pile is finished, the upper-stacked steel load reinforcing box is taken down at one time. The pile upper-stacked and lower-hung static load testing device is safe and quick in construction and high in efficiency, and adopts mechanical hoisting manner and saves man power and cost.

Description

Upper-stacking and lower-hanging combined load static load test pile apparatus
Technical field
The utility model relates to the preloading device of a kind of construction work ground and the detection of static load of pile foundation lotus vertical bearing capacity, particularly a kind of upper-stacking and lower-hanging combined load static load test pile apparatus.
Background technology
The construction of construction-engineering project, particularly highrise building, large-scale structure needs to use a large amount of pile foundations.According to the requirement of country about ground and pile foundation engineering inspection of quality standard, reply foundation pile test pile and engineering piles are carried out the bearing capacity static load and are detected, to determine and to check its bearing capacity of single pile, as the mandatory term of pile quality acceptance requirement.Traditional static loading test ballast platform counterforce device is to use the sand pocket counterweight on the ballast platform; Stack sand pocket very heavy, feel unwell complete, consume a large amount of sand pockets, speed is slow, efficiency of construction is low.
Summary of the invention
The purpose of this utility model is a kind of upper-stacking and lower-hanging combined load static load test pile apparatus.
The utility model technology realizes by following technical proposal: a kind of upper-stacking and lower-hanging combined load static load test pile apparatus, in the foundation pile both sides along same straight line, with the equidistant girder steel structure support of settling on the ground of foundation pile, the two ends of girder are placed on the girder steel structure support, place jack between girder and foundation pile; Pay beam along in a row arranging perpendicular to the direction of girder, the length direction of paying beam is symmetrical in foundation pile and is placed on the girder, pays beam and girder and forms the ballast platform; Settle heap steel work load reinforcement case on pair beam, the both sides paying the beam width direction are symmetrical in foundation pile, pay beam support double load case and following load case down by extension under the connector; Heap steel work load is strengthened in the case on described, and positioning and fixing strengthens plate washer with " mouth " font of the big muzzle osculum of foundation pile vertical centre axial symmetry or plate washer strengthened in " well " font; On the sidewall of the close load case down of jack, displacement transducer is housed, in order to measure the settling amount of foundation pile.
The described road clearance of hanging the load case down is than paying beam support the double big 5-30 centimetre of load case of hanging down.The outer wall of strengthening case at last heap steel work load is equipped with cat ladder and scale.
The beneficial effects of the utility model are:
1. adopt hanging device upwards to pile the steel work load and strengthen case and add the counterweight material, after the static load test pile is finished, disposablely last heap steel work load is strengthened case hang down; Construction safety, fast, mechanization lifting, efficient height, save manpower and cost.
2. descend the extension casing to alleviate the counterweight on ballast platform top, help reducing the desired height of going up heap steel work load reinforcement case; Also reduce the whole center of gravity of upper-stacking and lower-hanging combined load static load test pile apparatus, improved the stability of ballast platform and integrally.
3. strengthen being provided with in the case " mouth ", " well " font reinforcement plate washer at last heap steel work load, last heap steel work load is strengthened the lateral wall pressure of case in order to reduce filler, box height be can increase as far as possible, under the identical situation of floor space, maximum volume and preloading weight obtained.The volume that last heap steel work load is strengthened case is determined according to the heap(ed) capacity of test requirements document.
4. the load of static load test pile is very large, and assembly of the present utility model adopts the high strength steel member, to guarantee construction safety.
5. the outer wall of strengthening case at last heap steel work load is equipped with cat ladder 2 and scale 3, watches situation and the quantity thereof that load is strengthened the counterweight material in the case for the constructor.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is schematic perspective view of the present utility model (foundation pile and the jack that are positioned at the center are blocked by the girder steel structure support).
Fig. 2 is structural representation of the present utility model (removing the girder steel structure support of termination, to show foundation pile and jack).
Fig. 3 is the vertical view that heap steel work load is strengthened case of going up of Fig. 2, and strengthens plate washer to show " well " font that heap steel work load is strengthened in the case.
Fig. 4 is the A-A generalized section of Fig. 2.
The specific embodiment
Embodiment 1 is shown in Fig. 1-4: a kind of upper-stacking and lower-hanging combined load static load test pile apparatus, in foundation pile 12 both sides along same straight line, with the equidistant girder steel structure supports 10 of on ground 8, settling of foundation pile 12, the two ends of girder 9 are placed on the girder steel structure support 10, place jack 11 between girder 9 and foundation pile 12; Pay beam 4 along in a row arranging perpendicular to the direction of girder 9, the length direction of paying beam 4 is symmetrical in foundation pile 12 and is placed on the girder 9, pays beam 4 and forms the ballast platform with girder 9.Settle heap steel work load reinforcement case 1 on pair beam 4, the both sides paying beam 4 widths are symmetrical in foundation pile 12, load case 6 and following load case 7 under holding concurrently by 5 times extension pair beam supports of connector.Strengthen in the case 1 at last heap steel work load, positioning and fixing is strengthened plate washer 13 with " mouth " font of the big muzzle osculum of foundation pile vertical centre axial symmetry.On the sidewall of jack 11 close load casees 7 down, displacement transducer 15 is housed, in order to measure the settling amount of foundation pile 12.
The road clearance of hanging load case 7 down is bigger 16 centimeters than paying the double extension down of beam support load case 6.The outer wall of strengthening case 1 at last heap steel work load is equipped with cat ladder 2 and scale 3, watches situation and the quantity thereof that heap steel work load is strengthened the counterweight material in the case 1 for the constructor.
Embodiment 2 is shown in Fig. 2-3: a kind of upper-stacking and lower-hanging combined load static load test pile apparatus, strengthen in the case 1 at last heap steel work load, positioning and fixing is strengthened plate washer 14 with " well " font of foundation pile vertical centre axial symmetry, or plate washer is strengthened in bar shaped, triangle, rhombus etc.The road clearance of hanging load case 7 down is bigger 10 centimeters than paying the double extension down of beam support load case 6.All the other are identical with embodiment 1.

Claims (3)

1, a kind of upper-stacking and lower-hanging combined load static load test pile apparatus, it is characterized in that: in foundation pile (12) both sides along same straight line, with foundation pile (12) equidistant on ground (8) go up to settle girder steel structure support (10), the two ends of girder (9) are placed on the girder steel structure support (10), place jack (11) between girder (9) and foundation pile (12); Pay beam (4) along in a row arranging perpendicular to the direction of girder (9), the length direction of paying beam (4) is symmetrical in foundation pile (12) and is placed on the girder (9), pays beam (4) and forms the ballast platform with girder (9); On Fu Liang (4), settle heap steel work load reinforcement case (1),, be symmetrical in foundation pile (12), load case (6) and following load case (7) under extension pair beam support is held concurrently down by connector (5) in the both sides of Fu Liang (4) width; Heap steel work load is strengthened in the case (1) on described, and positioning and fixing is strengthened plate washer (13) or " well " font with " mouth " font of the big muzzle osculum of foundation pile vertical centre axial symmetry and strengthened plate washer (14); On the sidewall of the close load case (7) down of jack (11), displacement transducer (15) is housed.
2, the heap extension combined type load static load test pile apparatus down of going up according to claim 1 is characterized in that: the described road clearance of hanging load case (7) down is than paying beam support the double big 5-30 centimetre of load case (6) of hanging down.
3, the heap of going up according to claim 1 is hung combined type load static load test pile apparatus down, it is characterized in that: the outer wall of strengthening case (1) at last heap steel work load is equipped with cat ladder (2) and scale (3).
CNU2008201993026U 2008-11-26 2008-11-26 Pile upper-stacked and lower-hung static load testing device Expired - Lifetime CN201305857Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201993026U CN201305857Y (en) 2008-11-26 2008-11-26 Pile upper-stacked and lower-hung static load testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201993026U CN201305857Y (en) 2008-11-26 2008-11-26 Pile upper-stacked and lower-hung static load testing device

Publications (1)

Publication Number Publication Date
CN201305857Y true CN201305857Y (en) 2009-09-09

Family

ID=41098325

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201993026U Expired - Lifetime CN201305857Y (en) 2008-11-26 2008-11-26 Pile upper-stacked and lower-hung static load testing device

Country Status (1)

Country Link
CN (1) CN201305857Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410180A (en) * 2013-08-23 2013-11-27 南昌永祺科技发展有限公司 Direct-reading pile foundation displacement detection device
CN105951899A (en) * 2016-07-04 2016-09-21 河北基业建筑检测有限公司 Moving machine for detection table of static load of foundation pile
CN105971033A (en) * 2016-06-17 2016-09-28 侯伯贵 Counterweight combined water tanks for pressure test of foundation tubular piles and pressure test method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410180A (en) * 2013-08-23 2013-11-27 南昌永祺科技发展有限公司 Direct-reading pile foundation displacement detection device
CN105971033A (en) * 2016-06-17 2016-09-28 侯伯贵 Counterweight combined water tanks for pressure test of foundation tubular piles and pressure test method
CN105951899A (en) * 2016-07-04 2016-09-21 河北基业建筑检测有限公司 Moving machine for detection table of static load of foundation pile
CN105951899B (en) * 2016-07-04 2017-11-10 苏志彬 Foundation pile dead load monitor station shifting machine

Similar Documents

Publication Publication Date Title
CN101413274B (en) Upper-stacking and lower-hanging combined load static load test pile apparatus
CN204255832U (en) Crab-bolt pullout tests charger
CN203164057U (en) Test device for multidirectional loading of side slope in geotechnical engineering
CN103422517B (en) Superposing type pile body self-rebound force balance loading case
CN201305857Y (en) Pile upper-stacked and lower-hung static load testing device
CN201386291Y (en) Static load test device of composite foundation
CN215366868U (en) Prepressing system for hanging basket of cantilever beam
CN104328810A (en) Improved method for detecting bearing capacity of precast pipe-pile single-pile foundation
CN201268853Y (en) Box type girder for foundation pile statical test loading reaction test system
CN203904852U (en) Bracket device used for cast-in-situ #0 section construction of beam column oblique crossing system
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN111074794A (en) Prepressing system for hanging basket of cantilever beam
CN206057094U (en) The slow test loading system of beam slab after the completion of a kind of erection for high-altitude
CN107130649A (en) A kind of large-tonnage concrete block preloading static load of pile foundation device
CN203101031U (en) Simple pulling force test support
CN209585138U (en) A kind of Loading Test of Composite Foundation device
CN203145017U (en) Large-sized chute device for pouring mass concrete into deep foundation pit
CN207633330U (en) Filling pile cage of reinforcement absolute altitude and verticality control device under a kind of concrete water
CN207001228U (en) Support is stacked to steel reinforcement cage
CN220955535U (en) Lifting counterweight bracket
CN216275869U (en) Vertical resistance to compression static load test equipment of high pile basis single pile of photovoltaic electric field tubular pile
CN217896597U (en) Bridge pile foundation static load detection device
CN205688821U (en) A kind of overhanging unloading platform tool-type limit for tonnage support
CN105908982B (en) A kind of overhanging unloading platform tool-type limit for tonnage support
CN201411356Y (en) Tank wall hoisting work device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20090909

Effective date of abandoning: 20081126