CN209585138U - A kind of Loading Test of Composite Foundation device - Google Patents

A kind of Loading Test of Composite Foundation device Download PDF

Info

Publication number
CN209585138U
CN209585138U CN201920231807.4U CN201920231807U CN209585138U CN 209585138 U CN209585138 U CN 209585138U CN 201920231807 U CN201920231807 U CN 201920231807U CN 209585138 U CN209585138 U CN 209585138U
Authority
CN
China
Prior art keywords
supporting leg
composite foundation
bearing
loading test
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920231807.4U
Other languages
Chinese (zh)
Inventor
李振海
吴水娟
吕志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luxun Engineering Testing And Appraisal Co Ltd
Original Assignee
Shandong Luxun Engineering Testing And Appraisal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luxun Engineering Testing And Appraisal Co Ltd filed Critical Shandong Luxun Engineering Testing And Appraisal Co Ltd
Priority to CN201920231807.4U priority Critical patent/CN209585138U/en
Application granted granted Critical
Publication of CN209585138U publication Critical patent/CN209585138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a kind of Loading Test of Composite Foundation devices, including the first supporting leg, second supporting leg and bearing plate, first supporting leg and the second supporting leg upper end are fixedly connected to fixed link, bearing plate upper end is installed by four displacement sensors, displacement sensor one end is fixedly connected on datum line beam, datum line beam one end is fixedly connected with one section and is freely placed on reference stake, bearing plate upper ends jack, very heavy side wall is connected with oil pressure sensor by oil pressure pipe, jack upper ends bearing beam, two fixed links and bearing beam upper end fixed placement several I-steel.The utility model improves the service performance of the Loading Test of Composite Foundation device, composite foundation reinforcement Singe Pile with Static Load Experiment and Pile Composite Foundation static load test can only be carried out to a step erection of equipment both achievable two kinds of experiments, the time is saved, cost is saved, ensure that the progress of work.

Description

A kind of Loading Test of Composite Foundation device
Technical field
The utility model relates to experimental rig technical field, specially a kind of Loading Test of Composite Foundation device.
Background technique
In civil engineering construction, at present for heavy construction structure, settle and bearing capacity control in terms of, pile foundation without It is suspected to be foundation form preferred in current engineer application, however in multilayer and small sized multiple story building pile foundation plinth cost with respect to mistake It is high.In order to reduce basement process cost again while meeting requirement of engineering, composite foundation comes into being, wherein You Yichang Long-short pile composite foundation is the most prominent, has given full play to natural rock-filled bearing capacity, while reducing sedimentation, has met upper layer and build Building structure requirement, and the influence driven piles for ambient enviroment is reduced, while greatly reducing ground cost, it is to exist in recent years A kind of foundation form being widely adopted in multilayer and small high-rise engineering.Pile body and foundation bottom are mainly considered in theory of pile foundation The influence to interact to integrally mafic shape gives full play to the bearing capacity of stake and ignores phase of the inter-pile soil directly between basis Interaction, using inter-pile soil as the safety stock of foundation bearing capacity.Now when carrying out Loading Test of Composite Foundation, including Two detection projects: composite foundation reinforcement Singe Pile with Static Load Experiment and Pile Composite Foundation static load test, both tests It needs separately to do, and needs to put two groups, waste time, Expenses Cost influences job schedule.
Utility model content
The purpose of this utility model is to provide a kind of Loading Test of Composite Foundation devices, to solve in above-mentioned background technique What is proposed is carrying out composite foundation reinforcement Singe Pile with Static Load Experiment and when Pile Composite Foundation static load test, is needing separately to do Two kinds of tests, and need to carry out the problem of putting facility, wasting time, Expenses Cost, influence job schedule respectively.
In order to solve the above technical problems, the utility model provides the following technical solutions: a kind of Loading Test of Composite Foundation dress It sets, including the first supporting leg, the second supporting leg and bearing plate, first supporting leg and the second supporting leg upper end are fixedly connected with There is fixed link, is fixedly connected to several reference stakes at left and right sides of the bearing plate upper end, several described reference stake upper ends It is fixedly connected with datum line beam, there are four displacement sensor, institute's displacement sensors one end is fixed to be connected for the bearing plate upper end installation It connects on datum line beam, described datum line beam one end is fixedly connected with one section and is freely placed on reference stake, the bearing plate upper ends Jack, the very heavy side wall are connected with oil pressure sensor by oil pressure pipe, the jack upper ends bearing beam, and two The fixed link and bearing beam upper end fixed placement several I-steel are provided with clump weight on several described I-steel.
Preferably, the bearing beam is located in the middle part of I-steel lower end, and the first supporting leg and the second supporting leg are symmetrical arranged In bearing beam two sides.
Preferably, the clump weight is provided with several pieces, and clump weight is staggeredly superimposed.
Preferably, the distance between two described I-steel are equal to 0.5 times of clump weight width.
Preferably, first supporting leg and the second supporting leg upper end are located in same level.
Compared with prior art, the utility model has the beneficial effects that
1. the utility model makes bearing beam gradually contact top I-shaped by moving up bearing beam using jack Steel, then the load of clump weight is transmitted on bearing plate through bearing beam classification, and then the ground of bearing plate lower end generates sedimentation, from And bearing plate is driven to move down, the displacement sensor in datum line beam upper end measures the degree of settlement of foundation, passes through simultaneously Oil pressure sensor measures the oil pressure value in jack, thus solve carry out composite foundation reinforcement Singe Pile with Static Load Experiment and It when Pile Composite Foundation static load test, needs separately to do two kinds of tests, and needs to carry out putting respectively facility, when waste Between, Expenses Cost, the technical issues of influencing job schedule, improve the service performance of the Loading Test of Composite Foundation device, can Composite foundation reinforcement Singe Pile with Static Load Experiment and Pile Composite Foundation static load test had only been carried out a step erection of equipment both Achievable two kinds of experiments, save the time, save cost, ensure that the progress of work.
2. can be guaranteed by fixed link during using Loading Test of Composite Foundation device by setting fixed link First supporting leg and the second supporting leg have preferable stability, to be propped up clump weight by bearing beam using jack Support, the progress tested convenient for subsequent two kinds.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the left view of the utility model embodiment.
In figure: 1, the first supporting leg;2, the second supporting leg;3, bearing plate;4, reference stake;5, datum line beam;6, displacement sensing Device;7, jack;8, oil pressure sensor;9, bearing beam;10, fixed link;11, I-steel;12, clump weight.
Specific embodiment
It, can be by composite foundation reinforcement single pile static load in order to improve the service performance of the Loading Test of Composite Foundation device Lotus test and Pile Composite Foundation static load test only carry out a step erection of equipment both achievable two kinds of experiments, save the time, section Cost-saving ensure that the progress of work, the utility model embodiment provide a kind of Loading Test of Composite Foundation device.Below will In conjunction with the attached drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is clearly and completely retouched It states, it is clear that the described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Based on this Embodiment in utility model, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, fall within the protection scope of the utility model.
Embodiment 1
A kind of Loading Test of Composite Foundation device, including the first supporting leg 1, are present embodiments provided referring to FIG. 1-2, Two supporting legs 2 and bearing plate 3, the first supporting leg [] [] [] 1 and 2 upper end of the second supporting leg are fixedly connected to fixed link 10, Several benchmark stanchions 4 are fixedly connected at left and right sides of 3 upper end of bearing plate, several 4 upper ends of reference stake are fixedly connected with base Quasi- beam 5, the installation of 3 upper end of bearing plate is there are four displacement sensor 6, and 6 one end of displacement sensor is fixedly connected on datum line beam 5, base Quasi- 5 one end of beam is fixedly connected with one section and is freely placed on reference stake 4,3 upper ends jack 7 of bearing plate, and 7 side wall of jack is logical It crosses oil pressure pipe and is connected with oil pressure sensor 8,7 upper ends bearing beam 9 of jack, two fixed links 10 and 9 upper end of bearing beam are solid Surely several I-steel 11 are placed, are provided with clump weight 12 on several I-steel 11.
In the present embodiment, jack 7, displacement sensor 6 and oil pressure sensor 8 is driven to carry out work by external power supply first Make, wherein 6 model RPS0680MD601A01JCQ-503B-0-50mm of displacement sensor, 8 model CYB- of oil pressure sensor 10S55CP09-03,7 model QF320TRCH-2050 of jack are made by moving up bearing beam 9 using jack 7 Bearing beam gradually contacts top I-steel, and then the load of clump weight 12 is transmitted on bearing plate 3 through the classification of bearing beam 9, then I-steel 11 is detached from the support of the first supporting leg 1 and the second supporting leg 2, and then the weight of clump weight 12 is covered through bearing beam 9 and is pressed in On bearing plate 3, then the ground of 3 lower end of bearing plate generates recess sedimentation, to drive bearing plate 3 to move down, in datum line beam 5 The displacement sensor 6 of upper end measures the degree of ground recess sedimentation, and measures progress by oil pressure sensor 8 simultaneously The hydraulic oil pressure value in jack 7 is measured, it can be quiet by composite foundation reinforcement Singe Pile with Static Load Experiment and Pile Composite Foundation Load test only carry out a step erection of equipment both it is achievable two kinds experiment, save the time, save cost, ensure that work into Degree, improves the service performance of the Loading Test of Composite Foundation device.
Embodiment 2
Be further improved on the basis of embodiment 1 referring to FIG. 1-2: bearing beam 9 is located in 11 lower end of I-steel Portion, and the first supporting leg 1 and the second supporting leg 2 are symmetricly set on 9 two sides of bearing beam, pass through the first supporting leg 1 and the second support Leg 2 is symmetricly set on 11 two sides of I-steel, can preferably guarantee to be supported clump weight 12, clump weight 12 is provided with several Block, and clump weight 12 is staggeredly superimposed, it is structurally reasonable, convenient for clump weight 12 is overlapped placement, guarantee the stabilization of clump weight 12 Property, the distance between two I-steel 11 are equal to 0.5 times of 12 width of clump weight, can preferably guarantee that clump weight 12 will not be from It is fallen between two I-steel 11, the first supporting leg 1 and 2 upper end of the second supporting leg are located in same level, it is ensured that work The initial position of word steel 11 is level, convenient for the load classification of clump weight 12 is transmitted to pressure-bearing through bearing beam 9 by jack 7 On plate 3.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of Loading Test of Composite Foundation device, including the first supporting leg (1), the second supporting leg (2) and bearing plate (3), Be characterized in that: first supporting leg (1) and the second supporting leg (2) upper end are fixedly connected to fixed link (10), the pressure-bearing Several reference stakes (4) are fixedly connected at left and right sides of plate (3) upper end, several described reference stake (4) upper ends are fixedly connected Have datum line beam (5), there are four displacement sensor (6), institute displacement sensors (6) one end is solid for bearing plate (3) the upper end installation Surely it is connected on datum line beam (5), described datum line beam (5) one end is fixedly connected with one section and is freely placed on reference stake (4), described to hold Pressing plate (3) upper ends jack (7), jack (7) side wall is connected with oil pressure sensor (8) by oil pressure pipe, described Jack (7) upper ends bearing beam (9), two fixed links (10) and bearing beam (9) upper end fixed placement several works Word steel (11) is provided with clump weight (12) on several described I-steel (11).
2. a kind of Loading Test of Composite Foundation device according to claim 1, it is characterised in that: bearing beam (9) position In the middle part of I-steel (11) lower end, and the first supporting leg (1) and the second supporting leg (2) are symmetricly set on bearing beam (9) two sides.
3. a kind of Loading Test of Composite Foundation device according to claim 1, it is characterised in that: the clump weight (12) sets Several pieces are equipped with, and clump weight (12) is staggeredly superimposed.
4. a kind of Loading Test of Composite Foundation device according to claim 1, it is characterised in that: two I-steel The distance between (11) it is equal to 0.5 times of clump weight (12) width.
5. a kind of Loading Test of Composite Foundation device according to claim 1, it is characterised in that: first supporting leg (1) it is located in same level with the second supporting leg (2) upper end.
CN201920231807.4U 2019-02-23 2019-02-23 A kind of Loading Test of Composite Foundation device Expired - Fee Related CN209585138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920231807.4U CN209585138U (en) 2019-02-23 2019-02-23 A kind of Loading Test of Composite Foundation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920231807.4U CN209585138U (en) 2019-02-23 2019-02-23 A kind of Loading Test of Composite Foundation device

Publications (1)

Publication Number Publication Date
CN209585138U true CN209585138U (en) 2019-11-05

Family

ID=68356027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920231807.4U Expired - Fee Related CN209585138U (en) 2019-02-23 2019-02-23 A kind of Loading Test of Composite Foundation device

Country Status (1)

Country Link
CN (1) CN209585138U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112146969A (en) * 2020-09-22 2020-12-29 中国能源建设集团江苏省电力设计院有限公司 Large in-situ load integrated testing device for underwater composite foundation and implementation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112146969A (en) * 2020-09-22 2020-12-29 中国能源建设集团江苏省电力设计院有限公司 Large in-situ load integrated testing device for underwater composite foundation and implementation method

Similar Documents

Publication Publication Date Title
CN206512764U (en) A kind of horizontally loading test system for applying vertical load in stake top
CN101892636A (en) Integral lifting reconstruction method for high-span overweight continuous box girder
CN112854008A (en) Prefabricated bridge pier and beam integrated bridge girder erection machine and construction method thereof
CN208668482U (en) A kind of foundation bearing force checking device
CN110820950B (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN209585138U (en) A kind of Loading Test of Composite Foundation device
CN110700332A (en) Existing building reinforcing pile foundation static load test counterforce device and test method thereof
CN205421365U (en) Composite foundation loading test device
CN208533582U (en) A kind of existing building reinforcing pile foundation static loading test device
CN206692230U (en) A kind of skyscraper row is hung
CN201102883Y (en) Steel cable sliding and lifting device
CN201241333Y (en) Large-scale steel suspension box cofferdam elevating device with load
CN103147469B (en) Vertical compression-resistance static load test method for foundation pile of high-rise building
CN108589905B (en) Truss corridor integral post-lifting construction system and construction method thereof
CN208718334U (en) A kind of support frame of assembled architecture cantilevered plate
CN110700303A (en) Pile foundation profile steel combined tower crane foundation construction method
CN207194045U (en) A kind of building pile foundation dead-load detection device
CN113668401B (en) Hoisting process based on installation and transportation platform on long-span bridge pier
CN115059126A (en) Device and method for pit-type static load test of existing building pile foundation
CN205917726U (en) Stake girder construction integral type tower crane foundation structure
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
CN210342024U (en) Bidirectional counter-force beam uplift test pile device
CN209624259U (en) A kind of crawler type static-load testing device
CN203361019U (en) T-beam lifting device for highway and railway bridge construction
CN208251191U (en) Civil engineering large-tonnage static load system mobile chassis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Zhenhai

Inventor after: Wu Shuijuan

Inventor after: Lv Zhiqiang

Inventor after: Liu Guanglu

Inventor after: Guo Chengtao

Inventor after: Lin Yan Su

Inventor before: Li Zhenhai

Inventor before: Wu Shuijuan

Inventor before: Lv Zhiqiang

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105