CN201284550Y - Fastener type steel pipe scaffold - Google Patents

Fastener type steel pipe scaffold Download PDF

Info

Publication number
CN201284550Y
CN201284550Y CNU2008201395713U CN200820139571U CN201284550Y CN 201284550 Y CN201284550 Y CN 201284550Y CN U2008201395713 U CNU2008201395713 U CN U2008201395713U CN 200820139571 U CN200820139571 U CN 200820139571U CN 201284550 Y CN201284550 Y CN 201284550Y
Authority
CN
China
Prior art keywords
scaffold
steel pipe
bar
fastener type
type steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201395713U
Other languages
Chinese (zh)
Inventor
姚富新
花周建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sijian Construction Group Co Ltd
Original Assignee
Nantong Sijian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sijian Construction Group Co Ltd filed Critical Nantong Sijian Construction Group Co Ltd
Priority to CNU2008201395713U priority Critical patent/CN201284550Y/en
Application granted granted Critical
Publication of CN201284550Y publication Critical patent/CN201284550Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a fastener type steel pipe full hall scaffold; the scaffold is provided with 3 spans longitudinally and 3 spans laterally, and is loaded within the scope of 3 spans * 3 spans; no extra span is arranged out of the loading area; the height-width ratio of a support is 1.7; the height of the scaffold is 8.0m; the pace of vertical posts is 1.825m; the longitudinal spacing of the vertical posts is 1.5m, and the lateral spacing of the vertical posts is 1.5m; the scaffold is set up with a steel pipe with the diameter of 48*3.5; and all nodes are connected by fasteners. The top of the scaffold directly bears the load above with a lateral horizontal lever; one lateral horizontal lever at the upper part is arranged in the middle between every two adjacent vertical posts. The fastener type steel pipe full hall scaffold has safe and firm structure, and is convenient to be set up and torn down.

Description

The full hall of a kind of fastener type steel pipe scaffold
Technical field
The utility model relates to the fastener type steel pipe scaffold that a kind of building site is used, the full hall of especially a kind of fastener type steel pipe scaffold.
Background technology
The full hall of the fastener type steel pipe scaffold of building site use at present, the physical dimension of setting up that does not have series, do not have design code accurately, do not have the full hall of a contacting piece formula steel pipe scaffold critical load to limit, do not have full scaffolding structure critical load requirement one to one of series.Set up by rule of thumb at the scene, on the one hand, causes the waste of material cost to increase, and on the other hand, causes potential safety hazard.
The utility model content
The purpose of this utility model is to provide a kind of full hall of fastener type steel pipe scaffold with Rational structure size, and provides corresponding critical load, makes the economical rationality of the full hall of fastener type steel pipe scaffold, safe and applicable.
The utility model is to realize above-mentioned purpose like this:
The full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube, vertical equity bar and transverse horizontal bar; Node connects with the malleable cast iron fastener, and upper load is directly born by the transverse horizontal bar in the scaffold top, the upper lateral horizon bar longitudinally between adjacent vertical rod the middle part arrange one.Scaffold vertical 3 is striden, and horizontal 3 stride, and strides 3 * 3 stride in the scope and to load; The outer nothing of loading zone adds strides; The support depth-width ratio is 1.7.
Scaffold top cross horizon bar epithelium is 7.7m to pole steel tube bottom surface distance, the scaffold upright rod end face on earth identity distance from, be the high 8.0m of frame, adjacent vertical equity bar or adjacent transverse horizon bar axial line distance, be vertical rod step pitch 1.825m, pole steel tube longitudinal pitch 1.5m, pole steel tube horizontal spacing 1.5m.
Upper load is directly born by the transverse horizontal bar in the scaffold top, the upper lateral horizon bar longitudinally between adjacent pole steel tube the middle part arrange one.
The full hall of this fastener type steel pipe scaffolding structure safety and firmness, supporting structure is simple, takes and tears open conveniently, steel pipe scaffold template stand economical rationality, safe and applicable.
Description of drawings
Fig. 1 is the full hall of a fastener type steel pipe scaffold front view;
Fig. 2 is the full hall of a fastener type steel pipe scaffold vertical view;
Fig. 3 is the full hall of a fastener type steel pipe scaffold lateral view;
Fig. 4 is the full hall of a fastener type steel pipe scaffold load test assembling front view;
Fig. 5 is the full hall of a fastener type steel pipe scaffold loading zone vertical view;
Fig. 6 is the full hall of a fastener type steel pipe scaffold load test assembling side elevation;
Among the figure: 1, transverse horizontal bar; 2, vertical equity bar; 3, pole steel tube; 4, malleable cast iron fastener; 5, reaction frame; 6, fixing reaction frame steel pipe; 7, distribution beam; 8, i iron; 9, jack; 10, i iron formula parallels.
The specific embodiment
The full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube 3, vertical equity bar 2 and transverse horizontal bar 1; Node connects with malleable cast iron fastener 4, and upper load is directly born by the transverse horizontal bar in the scaffold top, the top cross horizon bar longitudinally between adjacent vertical rod the middle part arrange one.Scaffold vertical 3 is striden, and horizontal 3 stride, and strides 3 * 3 stride in the scope and to load, and loading zone is outer not to be had to add and strides; Support depth-width ratio=7.7 ÷ (3 * 1.5)=1.7; The bar of sweeping the floor is the support lower crosspiece, and D is the bar height of sweeping the floor.
Scaffold top cross horizon bar epithelium is 7.7m to pole steel tube bottom surface distance, the scaffold upright rod end face on earth identity distance from, be the high 8.0m of frame, adjacent vertical equity bar or adjacent transverse horizon bar axial line distance, be that vertical rod step pitch E is 1.825m, pole steel tube horizontal spacing A is 1.5m, and pole steel tube longitudinal pitch B is 1.5m, and the bar height D that sweeps the floor is 0.4m.
Scaffold top cross horizon bar epithelium is 7.7m to the pole steel tube bottom surface apart from F, and support upper lateral horizon bar epithelium is 0.3m (shown in the figure) to the pole steel tube end face apart from G.
Test is shown in Fig. 4-6, the full hall of this fastener type steel pipe scaffold is through jack 9 loadings, top reaction frame 5 girders, reaction frame returns back to top load is reached distribution beam 7, distribution beam 7 reaches i iron 8 with load, i iron 8 reaches support top cross horizon bar 1 with load, realizes the loading test of full hall scaffold.Determine the every square meter 5.00kN of critical load, average single vertical rod critical load 6.33kN through loading test.

Claims (3)

1, the full hall of a kind of fastener type steel pipe scaffold comprises pole steel tube (3), vertical equity bar (2) and transverse horizontal bar (1); It is characterized in that: node connects with malleable cast iron fastener (4); Upper load is directly born by transverse horizontal bar (1) in the scaffold top, the top cross horizon bar longitudinally between adjacent vertical rod the middle part arrange one; Scaffold vertical 3 is striden, and horizontal 3 stride; Loading zone is 3 to stride * 3 scopes of striding; The scaffold depth-width ratio is 1.7.
2, the full hall of a kind of fastener type steel pipe according to claim 1 scaffold, it is characterized in that: scaffold upper lateral horizon bar epithelium is 7.7m to pole steel tube (3) bottom surface distance, the scaffold upright rod end face on earth identity distance from 8.0m, adjacent vertical equity bar (2) axial line distance is 1.825m, adjacent transverse horizon bar (1) axial line distance is 1.825m, adjacent pole steel tube (3) longitudinal pitch 1.5m, adjacent pole steel tube (4) horizontal spacing 1.5m.
3, the full hall of a kind of fastener type steel pipe according to claim 1 scaffold is characterized in that arranging one in the middle part of scaffold upper lateral horizon bar is longitudinally between adjacent pole steel tube (3).
CNU2008201395713U 2008-10-27 2008-10-27 Fastener type steel pipe scaffold Expired - Fee Related CN201284550Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201395713U CN201284550Y (en) 2008-10-27 2008-10-27 Fastener type steel pipe scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201395713U CN201284550Y (en) 2008-10-27 2008-10-27 Fastener type steel pipe scaffold

Publications (1)

Publication Number Publication Date
CN201284550Y true CN201284550Y (en) 2009-08-05

Family

ID=40949535

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201395713U Expired - Fee Related CN201284550Y (en) 2008-10-27 2008-10-27 Fastener type steel pipe scaffold

Country Status (1)

Country Link
CN (1) CN201284550Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276889A (en) * 2013-05-13 2013-09-04 南京工程学院 Method for lateral displacement resistance of full-fastener-type steel tube scaffolds
CN103276885A (en) * 2013-05-13 2013-09-04 南京工程学院 Method for preventing high and large formwork full hall fastener type tubular steel scaffolding from lateral displacement
CN105804379A (en) * 2016-06-08 2016-07-27 中国二十二冶集团有限公司 Fastener-type full-hall scaffold supporting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276889A (en) * 2013-05-13 2013-09-04 南京工程学院 Method for lateral displacement resistance of full-fastener-type steel tube scaffolds
CN103276885A (en) * 2013-05-13 2013-09-04 南京工程学院 Method for preventing high and large formwork full hall fastener type tubular steel scaffolding from lateral displacement
CN103276889B (en) * 2013-05-13 2015-09-09 南京工程学院 Full hall fastener type steel pipe scaffold anti-side shifting method
CN105804379A (en) * 2016-06-08 2016-07-27 中国二十二冶集团有限公司 Fastener-type full-hall scaffold supporting method

Similar Documents

Publication Publication Date Title
CN208220164U (en) Architecture construction security maintenance cantilevered structure
CN103206074A (en) Elevator shaft template construction method, platform and support
CN201284550Y (en) Fastener type steel pipe scaffold
CN202688885U (en) High-stability fastener type full space support
CN102322134B (en) Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold
CN201381637Y (en) Fastener type steel pipe scaffold template bracket
CN100554629C (en) A kind of buckled type steel pipe scaffold formwork support
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN102182300B (en) Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame
CN213626572U (en) Tool type external cantilever operation platform
CN101560829B (en) Buckled type steel pipe scaffold formwork support with large height-width ratio
CN101560828B (en) Buckled type steel pipe scaffold formwork support of cross strut
CN201310182Y (en) Steel-tube full scaffold of fastener type
CN201284556Y (en) Fastener type steel pipe scaffold template stand
CN201381638Y (en) Fastener type steel pipe scaffold template bracket
CN202899588U (en) Assembling scaffold structure
CN203320427U (en) Triangular hanging basket
CN201284557Y (en) Fastener type steel pipe scaffold template stand
CN100540826C (en) A kind of buckled type steel pipe scaffold formwork support
CN201284558Y (en) Fastener type steel pipe scaffold template stand
CN201310191Y (en) Template support of steel-tube scaffold of fastener type
CN102182311B (en) Method for increasing wall connecting piece and improving and determining bearing capacity of support frame
CN212453580U (en) Novel safe cat ladder of dish mouth formula scaffold frame
CN205314515U (en) Scaffold of building a wall
CN101566006B (en) Large step pitch fastener type steel pipe scaffold template support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090805

Termination date: 20161027