CN202899588U - Assembling scaffold structure - Google Patents

Assembling scaffold structure Download PDF

Info

Publication number
CN202899588U
CN202899588U CN 201220410346 CN201220410346U CN202899588U CN 202899588 U CN202899588 U CN 202899588U CN 201220410346 CN201220410346 CN 201220410346 CN 201220410346 U CN201220410346 U CN 201220410346U CN 202899588 U CN202899588 U CN 202899588U
Authority
CN
China
Prior art keywords
vertical rod
cross bar
pedal
base
scaffolding structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220410346
Other languages
Chinese (zh)
Inventor
贺贵仁
章国良
沈亚兵
郑文仁
杨开宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Original Assignee
China Petroleum and Chemical Corp
Sinopec Ningbo Engineering Co Ltd
Sinopec Ningbo Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Ningbo Engineering Co Ltd, Sinopec Ningbo Technology Research Institute filed Critical China Petroleum and Chemical Corp
Priority to CN 201220410346 priority Critical patent/CN202899588U/en
Application granted granted Critical
Publication of CN202899588U publication Critical patent/CN202899588U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to an assembling scaffold structure which comprises bases, uprights and pedals. One end of each upright is connected with each base. Each pedal is erected on each upright. The assembling scaffold structure is characterized in that the number of the bases is multiple. Each base respectively comprises a support baseboard and a connecting upright with one end connected with the support baseboard. The number of the uprights and transverse rods is matched with the number of the bases. Each upright and each corresponding connecting upright are connected in an inserting and matching mode. Each upright respectively comprises a plurality of sections. End portions of adjacent sections are mutually connected in an inserted and sleeved mode. Each transverse rod is erected on two adjacent uprights through a connecting device. Each pedal is arranged in a frame enclosed by the transverse rods through a locking device. Compared with the prior art, the assembling scaffold structure has the advantages of being fast in erection speed, high in using safety, small in consumption in the process of use, beneficial for improving civilized construction, removing safety risks, improving economic benefit and the like.

Description

A kind of assembling scaffolding structure
Technical field
The utility model relates to the installing construction scaffold, specifically refers to a kind of assembling scaffolding structure.
Background technology
The present main fastener type steel pipe scaffold that uses in the installing construction, this scaffold be generally by steel tube member bar, fastener, base, and scaffold floor forms.The advantage of fastener type steel pipe scaffold is: processing is simple, convenient in carrying, highly versatile etc.But its shortcoming is outstanding equally, and safety is relatively poor, set up that effect is low, loss is large, become the one of the main reasons that affects construction and installation industry construction safety, construction speed, civilized construction and economic benefit.And the scaffold of ordinary steel springboard structure easily skids in the sleet sky, and wooden springboard and bamboo springboard then easily catch fire, the fastener loss is large, and constructor's muscle power and quality is had certain requirement.
Summary of the invention
Technical problem to be solved in the utility model be the present situation for prior art provide a kind of use safely, set up that speed is fast, the assembling scaffolding structure of highly versatile and convenient transportation.
The utility model solves the problems of the technologies described above the technical scheme that adopts: this assembly type scaffolding structure, comprise that base, an end are connected to the vertical rod on the base and are erected at pedal in the described vertical rod, it is characterized in that described base has a plurality of, each base includes support baseboard and is connected end and is fixed on connection column on the support baseboard; The quantity of described vertical rod and described cross bar and the quantity of described base are suitable; Each vertical rod respectively connects the column inserting and connects with corresponding, and every vertical rod included multistage, and the mutual sleeve in the end of adjacent each section connects; Described cross bar is erected in two adjacent vertical rods by linkage, and described pedal is arranged on the framework that cross bar surrounds by locking device.
Can on irregular ground, firmly set up, use safely in order to make scaffold, can on each described column, all have screw thread, and each column is bolted with nut outward, the upper surface of described nut is provided with the groove suitable with described vertical rod, and the lower end of described vertical rod is contained in the groove on the corresponding nut.Like this, can change the height of vertical rod by the height of adjusting nut, so that each pedal can be positioned at same horizontal plane, thereby guarantee to use safety.
Linkage in the such scheme can have multiple, and preferably, described linkage can be for being arranged on the eye-splice on each described vertical rod sidewall, and the two ends of described cross bar have the inserted block suitable with described eye-splice.
Use safety for the processing, saving cost and the assurance that make things convenient for pedal, described pedal can comprise framework and the gauze wire cloth that is arranged on the described framework.Framework and gauze wire cloth normally weld together.
Preferably, can also be provided with the suitable claw of a plurality of and described cross bar on the sidewall of described framework, each described claw removably is buckled on each self-corresponding cross bar, thereby described pedal and described cross bar are linked together.This structure packaging efficiency is high, and uses safety.
For highly larger scaffold, in order to guarantee the intensity of each and every one parts, can also be provided with pin-and-hole in the position of each described vertical rod phase sleeve, pivot pin interts in the pin-and-hole of the correspondence in adjacent two vertical rods.Improve the load bearing stength of vertical rod by pivot pin, simple in structure and effective.
Compared with prior art, in fast, safe to use, the use procedure of assembling scaffold building speed provided by the utility model loss few, help to improve civilized construction, the each side advantage such as eliminate safe hidden trouble, increase economic efficiency.
Description of drawings
Fig. 1 is the partial schematic diagram of base and vertical rod assembly structure among the utility model embodiment;
Fig. 2 is the partial schematic diagram of vertical rod and cross bar assembly structure among the utility model embodiment;
Fig. 3 is the plane structure schematic diagram of pedal among the utility model embodiment;
Fig. 4 is the lateral view of Fig. 3;
Fig. 5 is the partial schematic diagram of pedal and cross bar assembly structure among the utility model embodiment.
The specific embodiment
Embodiment is described in further detail the utility model below in conjunction with accompanying drawing.
To shown in Figure 5, this assembling scaffolding structure comprises such as Fig. 1:
Base 1 has a plurality ofly, selects as required.It comprises support baseboard 11, and base plate 11 is provided with jack, and an end of column 12 is plugged in welding in the jack, and column 12 has external screw thread, and column is bolted with nut 13 outward, and the upper surface of nut 13 is provided with the groove 14 suitable with following vertical rod 2.
Vertical rod 2 has many, and the lower end of each vertical rod is plugged in the groove 14 on the nut.For irregular job site, ground, can change by adjusting nut 13 height of vertical rod, thereby each vertical rod is positioned on the sustained height so that pedal 4 as far as possible on a horizontal plane.Each vertical rod has included multistage, and the mutual sleeve in the end of adjacent each section connects; And sleeve part together is provided with the pin-and-hole (not shown), and the pivot pin (not shown) is interted to play in pin-and-hole and reinforced and the load-bearing effect.Determine the hop count of vertical rod according to the required height of setting up scaffold.The sidewall of vertical rod 2 is provided with a plurality of eye-splices 21, is four in the present embodiment.The quantity of eye-splice is relevant with the shape of following pedal 4, and the pedal in the present embodiment is rectangle.If pedal is triangle, the quantity of eye-splice can be three.The two ends of described cross bar have the inserted block suitable with described eye-splice.
Can make up according to the shape of following pedal 4 after above-mentioned base 1 and vertical rod 2 are pegged graft, for example pedal is triangle, and three groups of bases are gone along with sb. to guard him with vertical rod and are in the same place so, if rectangle is gone along with sb. to guard him together for four groups so.In the present embodiment pedal be shaped as rectangle, the element number of base and vertical rod is determined in unit of together formation that per four groups of bases and vertical rod are safeguarded according to the required size of setting up scaffold.
Cross bar 3 has many, and the two ends of cross bar have the inserted block 31 suitable with eye-splice 21, and the inserted block at every cross bar two ends is plugged in the eye-splice 21 corresponding in the adjacent vertical rod, is formed for the framework of fixed pedestal 4.Be erected in two adjacent vertical rods by linkage.
Pedal 4 has a plurality ofly, according to the area of setting up scaffold and highly selected, is constructor's working platform, sets up on the framework of cross bar 3 and column 2 formation of going along with sb. to guard him, and it comprises rectangular frame 41 and is welded on gauze wire cloth 41 on the rectangular frame 41.The sidewall of framework 41 is provided with the suitable claw 43 of a plurality of and cross bar 3, and each claw 43 removably is buckled on each self-corresponding cross bar 3, thereby pedal 4 and cross bar 3 are linked together.

Claims (6)

1. an assembling scaffolding structure comprises that base, an end are connected to the vertical rod on the base and are erected at pedal in the described vertical rod, it is characterized in that described base has a plurality of, and each base includes support baseboard and is connected end and is fixed on connection column on the support baseboard; The quantity of described vertical rod and cross bar and the quantity of described base are suitable; Each vertical rod respectively connects the column inserting and connects with corresponding, and every vertical rod included multistage, and the mutual sleeve in the end of adjacent each section connects; Described cross bar is erected in two adjacent vertical rods by linkage, and described pedal is arranged on the framework that cross bar surrounds by locking device.
2. assembling scaffolding structure according to claim 1, it is characterized in that all having screw thread on each described column, and each column is bolted with nut outward, and the upper surface of described nut is provided with the groove suitable with described vertical rod, and the lower end of described vertical rod is contained in the groove on the corresponding nut.
3. assembling scaffolding structure according to claim 1 and 2 is characterized in that described linkage is the eye-splice that is arranged on each described vertical rod sidewall, and the two ends of described cross bar have the inserted block suitable with described eye-splice.
4. assembling scaffolding structure according to claim 3 is characterized in that described pedal comprises framework and the gauze wire cloth that is arranged on the described framework.
5. assembling scaffolding structure according to claim 4, the sidewall that it is characterized in that described framework is provided with the suitable claw of a plurality of and described cross bar, each described claw removably is buckled on each self-corresponding cross bar, thereby described pedal and described cross bar are linked together.
6. assembling scaffolding structure according to claim 1 is characterized in that the position of each described vertical rod phase sleeve is provided with pin-and-hole, and pivot pin interts in the pin-and-hole of the correspondence in adjacent two vertical rods.
CN 201220410346 2012-08-17 2012-08-17 Assembling scaffold structure Expired - Lifetime CN202899588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220410346 CN202899588U (en) 2012-08-17 2012-08-17 Assembling scaffold structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220410346 CN202899588U (en) 2012-08-17 2012-08-17 Assembling scaffold structure

Publications (1)

Publication Number Publication Date
CN202899588U true CN202899588U (en) 2013-04-24

Family

ID=48120274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220410346 Expired - Lifetime CN202899588U (en) 2012-08-17 2012-08-17 Assembling scaffold structure

Country Status (1)

Country Link
CN (1) CN202899588U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088570A (en) * 2016-06-08 2016-11-09 重庆大学 A kind of variable-angle aseismatic bearing and using method
CN109098419A (en) * 2018-08-10 2018-12-28 开平市宏强机械设备有限公司 A kind of four column truss scaffold of aluminium alloy
CN111894258A (en) * 2020-07-15 2020-11-06 中铁五局集团有限公司 Adjustable support rod of scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088570A (en) * 2016-06-08 2016-11-09 重庆大学 A kind of variable-angle aseismatic bearing and using method
CN106088570B (en) * 2016-06-08 2018-02-27 重庆大学 A kind of variable-angle aseismatic bearing and application method
CN109098419A (en) * 2018-08-10 2018-12-28 开平市宏强机械设备有限公司 A kind of four column truss scaffold of aluminium alloy
CN111894258A (en) * 2020-07-15 2020-11-06 中铁五局集团有限公司 Adjustable support rod of scaffold

Similar Documents

Publication Publication Date Title
CN205000621U (en) Slope is with firm scaffold
CN202467236U (en) Bracket used during removal of concrete body support
CN103206074A (en) Elevator shaft template construction method, platform and support
CN202899588U (en) Assembling scaffold structure
CN213626572U (en) Tool type external cantilever operation platform
CN213418433U (en) Stair combined type operation platform
CN219528334U (en) Scaffold for building construction
CN205875657U (en) Plug -in type steel pipe scaffold frame
CN201193200Y (en) Portable elevating device
CN203361590U (en) Folding scaffold special for electric power construction
CN202925871U (en) Movable operating platform for aloft work
CN212453580U (en) Novel safe cat ladder of dish mouth formula scaffold frame
CN208734038U (en) Detachable mobile working platform
CN204983712U (en) But socket joint round pin stationary height -adjusting protection canopy
CN211058395U (en) Large steel sheet beam type shed frame
CN201284550Y (en) Fastener type steel pipe full scaffold
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN210767782U (en) Guide rail pole setting connecting piece that convenient concatenation was used
CN203977833U (en) A kind of wall-attached builder's jack
CN201991203U (en) Scaffold
CN201310182Y (en) Steel-tube full scaffold of fastener type
CN203729653U (en) Wind-resistant reinforced type iron tower
CN220645154U (en) Socket type disc buckle type shaping tripod outer protection frame
CN208219349U (en) A kind of modularization steel structure frame of hot-mix plant recycling equipment for asphalt mixture
CN219528341U (en) Construction platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130424