CN205875657U - Plug -in type steel pipe scaffold frame - Google Patents
Plug -in type steel pipe scaffold frame Download PDFInfo
- Publication number
- CN205875657U CN205875657U CN201620645465.7U CN201620645465U CN205875657U CN 205875657 U CN205875657 U CN 205875657U CN 201620645465 U CN201620645465 U CN 201620645465U CN 205875657 U CN205875657 U CN 205875657U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- cross bar
- steel pipe
- pole
- pole setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model discloses a plug -in type steel pipe scaffold frame, including adjustable base, a plurality of pole settings that the upwards extension of suit on adjustable base screw rod is connected, the horizontal pole that is connected with the pole setting, the work platform of arrangement on the horizontal pole, it strengthens the vaulting pole and links the wall device to connect the shear force of pole setting, the upper end of pole setting is the upper end of " protruding a " font, connection between the pole setting is the upper end of the lower tip suit of upper portion pole setting at " protruding " font of lower part pole setting, the fixed socket that sets up of lower extreme of pole setting, the fixed plug that sets up in both ends of horizontal pole, being connected between horizontal pole and pole setting is that the plug with the horizontal pole inserts the socket of pole setting, a through -hole is do not offered to the upper end and the lower tip of pole setting, in assembling, the through -hole of through -hole and the lower part pole setting upper end of tip aligns under the pole setting of upper portion, the bolt passes the nut of screwing on behind the through -hole. The utility model discloses simple structure, it is convenient to install, uses safe and reliable, has improved work efficiency, has reduced manufacturing cost, has eliminated the potential safety hazard.
Description
Technical field
This utility model belongs to building field, particularly relates to steel pipe scaffold.
Background technology
In architectural engineering and mine engineering are built, steel pipe scaffold is generally used, and this steel pipe scaffold is by general
Logical steel pipe carries out longitudinally connected formation vertical rod, connects cross bar, and platform of arranging work on cross bar, this steel pipe between vertical rod
And the connection between longitudinally connected and cross bar and vertical rod between steel pipe typically uses connection fastener to connect, use junction button
Part assembles steel pipe scaffold, and labor intensity is big, inefficiency, and the nut on fastener often turns and can wear and tear rotten, causes peace
Full hidden danger, fastener also can be lost and damaged in transport and unloading process, causes economic loss.
Summary of the invention
Problem to be solved in the utility model is to provide a kind of plug-in type steel pipe scaffold, this steel pipe scaffold assembling side
Just, improve work efficiency, eliminate potential safety hazard, decrease economic loss.
To achieve these goals, plug-in type steel pipe scaffold provided by the utility model includes: adjustable base, suit
Cross bar that the some vertical rods upwardly extending connection on adjustable base screw rod are connected with vertical rod, the work being placed on cross bar
Make platform, the shearing of connecting upright pole strengthens strut and the wall attaching parts being connected with vertical rod.
The upper end of described vertical rod is inserted external diameter and is slightly less than the fine steel tube of pipe diameter fixing connection, forms "convex" shaped
Upper end, it is the upper end of the "convex" shaped that the bottom of top vertical rod is sleeved on bottom vertical rod that extending between described vertical rod connects
Portion.
The lower end of described vertical rod is fixedly installed socket, and described socket is to be equidistantly positioned four along vertical rod external peripheral surface,
Described cross bar is a straight line steel pipe, and the two ends of cross bar are fixedly installed plug, and the connection between cross bar and vertical rod is by the plug of cross bar
Insert the socket of vertical rod.
The upper and lower end of described vertical rod offers a through hole respectively, and two through hole exists with one of them socket in vertical rod
On same vertical line, during assembling, after top vertical rod is set with bottom vertical rod, the through hole of vertical rod bottom, top and bottom vertical rod
The through hole alignment of upper end, bolt is through nut of screwing on after through hole, and so one side makes the connection between vertical rod relatively reliable,
On the other hand make that the orientation of the socket in different vertical rod is same becomes left-right and front-back arrangement longitudinally-aligned, with meet cross bar with
The connection request of vertical rod.
As further improving, the bottom of described cross bar is fixing connects a support bar, fixing between support bar and cross bar
Connecting a bracing piece, aligns with the end face of cross bar in support bar left end longitudinal section, fixing connection one internal diameter on the longitudinal section of support bar
Slightly larger than the semi-circular shape support member of vertical rod external diameter, triangle cross bar, the cross bar of this triangle have only to right angle end with
Vertical rod connects, and the other end, without being connected with vertical rod, can meet the Special use of small space.
This utility model simple in construction, it is convenient to install, safe and reliable, improves work efficiency, reduces and produces into
This, eliminate potential safety hazard.
Accompanying drawing explanation
Fig. 1 is plug-in type steel pipe scaffold schematic diagram
Fig. 2 is the front view of vertical rod.
Fig. 3 is the top view of vertical rod.
Fig. 4 is the front view of cross bar
Fig. 5 is vertical rod and the connection diagram of vertical rod and vertical rod with cross bar.
Fig. 6 is the connection diagram of vertical rod and triangular cross bar.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.
As shown in Figure 1, described plug-in type steel pipe scaffold includes: adjustable base 1, be sleeved on adjustable base 1 screw rod
Upwardly extend cross bar 3, the work platforms 4 being placed on cross bar 3 that some vertical rods 2 of connection are connected with vertical rod 2, be connected vertical
The shearing of bar 2 strengthens strut and the wall attaching parts being connected with vertical rod 2.
As shown in Fig. 2, Fig. 3, Fig. 5, the upper end of described vertical rod 2 insert external diameter be slightly less than pipe diameter fine steel tube 5 and
Being welded to connect in pipe, form the upper end of "convex" shaped, the extension connection between described vertical rod 2 is the bottom of top vertical rod 2
It is sleeved on the upper end of the "convex" shaped of bottom vertical rod 2.
As shown in Fig. 2, Fig. 3, Fig. 4, Fig. 5, the lower end of described vertical rod 2 is fixedly installed socket 6, and described socket is along vertical rod 2
External peripheral surface is equidistantly positioned four, and described cross bar 3 is a straight line steel pipe, and the two ends of cross bar 3 are fixedly installed plug 7, described
Connection between cross bar 3 and vertical rod 2 is the socket 6 that the plug 7 of cross bar 3 inserts vertical rod 2.
As shown in Fig. 2, Fig. 5, the upper and lower end of described vertical rod 2 offers a through hole 11 respectively, and two through hole 11 is with vertical
One of them socket 6 on bar 2 is on same vertical line, and during assembling, after top vertical rod 2 is set with bottom vertical rod 2, top is stood
The through hole 11 of bar bottom aligns with the through hole 11 of bottom vertical rod 2 upper end, bolt through nut of screwing on after through hole 11, such one
On the other hand aspect makes the connection between vertical rod 2 relatively reliable, makes that the orientation of the socket 6 in different vertical rod 2 is same to be become
Left-right and front-back arrangement is the most longitudinally-aligned, to meet the connection request of cross bar 3 and vertical rod 2.
As shown in Figure 6, as further improving, the fixing support bar 8 that connects in the bottom of described cross bar 3, support bar 8 with
Fixing between cross bar 3 and connect a bracing piece 9, align with the end face of cross bar 3 in support bar 8 left end longitudinal section, the longitudinal section of support bar 8
The upper fixing internal diameter semi-circular shape support member 10 slightly larger than vertical rod 2 external diameter that connects, triangle cross bar, this triangle
Cross bar has only to right angle end and is connected with vertical rod 2, and the other end, without being connected with vertical rod 2, can meet the Special use of small space.
This utility model simple in construction, it is convenient to install, safe and reliable, improves work efficiency, reduces and produces into
This, eliminate potential safety hazard.
Claims (6)
1. a plug-in type steel pipe scaffold, including adjustable base (1), is sleeved on upwardly extending on adjustable base (1) screw rod
Connect some vertical rods (2) be connected with vertical rod (2) cross bar (3), the work platforms (4) being placed on cross bar (3), be connected
The shearing of vertical rod (2) strengthens strut and the wall attaching parts being connected with vertical rod (2), it is characterised in that: described vertical rod (2) upper
End inserts external diameter and is slightly less than the fine steel tube (5) of pipe diameter fixing connection, forms the upper end of "convex" shaped, described vertical rod
(2) it is the upper end of the "convex" shaped that the bottom of top vertical rod (2) is sleeved on bottom vertical rod (2) that extension between connects.
Steel pipe scaffold the most according to claim 1, it is characterised in that: the lower end of described vertical rod (2) is fixedly installed socket
(6), the two ends of described cross bar (3) are fixedly installed plug (7), and the connection between described cross bar (3) and vertical rod (2) is by cross bar (3)
Plug (7) insert vertical rod (2) socket (6).
Steel pipe scaffold the most according to claim 2, it is characterised in that: described cross bar (3) is a straight line steel pipe.
4. according to steel pipe scaffold described in Claims 2 or 3, it is characterised in that: the bottom of described cross bar (3) is fixing connects one
Strut (8), fixes between support bar (8) with cross bar (3) and is connected a bracing piece (9), support bar (8) left end longitudinal section and cross bar
(3) end face alignment, on the longitudinal section of support bar (8), the fixing internal diameter that connects props up slightly larger than the semi-circular shape of vertical rod (2) external diameter
Support member (10), triangle cross bar.
Steel pipe scaffold the most according to claim 1 or claim 2, it is characterised in that: the socket (6) that described vertical rod (2) lower end is arranged
It is to be equidistantly positioned four along vertical rod (2) external peripheral surface.
Steel pipe scaffold the most according to claim 1 or claim 2, it is characterised in that: the upper and lower end of described vertical rod (2) is divided
Not offering a through hole (11), two through hole (11) and one of them socket (6) in vertical rod (2) are on same vertical line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620645465.7U CN205875657U (en) | 2016-06-23 | 2016-06-23 | Plug -in type steel pipe scaffold frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620645465.7U CN205875657U (en) | 2016-06-23 | 2016-06-23 | Plug -in type steel pipe scaffold frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875657U true CN205875657U (en) | 2017-01-11 |
Family
ID=57691565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620645465.7U Active CN205875657U (en) | 2016-06-23 | 2016-06-23 | Plug -in type steel pipe scaffold frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875657U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565929A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | Scaffold for construction of large-specification wall paving piece of building outer wall |
CN112459446A (en) * | 2020-12-01 | 2021-03-09 | 中冶建工集团有限公司 | Hanging basket for hanging on H-shaped steel |
-
2016
- 2016-06-23 CN CN201620645465.7U patent/CN205875657U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565929A (en) * | 2019-07-26 | 2019-12-13 | 江苏兴厦建设工程集团有限公司 | Scaffold for construction of large-specification wall paving piece of building outer wall |
CN110565929B (en) * | 2019-07-26 | 2021-08-31 | 江苏兴厦建设工程集团有限公司 | Scaffold for construction of large-specification wall paving piece of building outer wall |
CN112459446A (en) * | 2020-12-01 | 2021-03-09 | 中冶建工集团有限公司 | Hanging basket for hanging on H-shaped steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN205875657U (en) | Plug -in type steel pipe scaffold frame | |
CN203729576U (en) | Ringlock type steel tube scaffold | |
CN103362298A (en) | Mobile tower scaffold with circular disc connecting device | |
CN205206267U (en) | Safe multi -functional scaffold | |
CN205531248U (en) | Construction scaffolding component | |
CN202899588U (en) | Assembling scaffold structure | |
CN207513125U (en) | Self assembling type steel pipe scaffold | |
CN204040437U (en) | Cantilever tripod and single protective frame system of encorbelmenting | |
CN107605142A (en) | A kind of attachment type raise scaffold structure | |
CN203905517U (en) | Quickly assembled or disassembled guard bar with connecting pieces | |
CN211775976U (en) | Face simple and easy railing of limit protection | |
CN206529997U (en) | A kind of building decoration guardrail | |
CN205225068U (en) | Device is scrambleed fast to boat car pillar | |
CN205894643U (en) | Support arrangement for mobile scaffold | |
CN201574572U (en) | Angle-adjustable hanging rack for operation platform | |
CN205224557U (en) | Lift scaffold pole setting connection structure | |
CN204899189U (en) | Construction elevator connects material platform | |
CN106677519B (en) | Building scaffold support connection structure | |
CN206452859U (en) | A kind of greenhouse connecting part | |
CN205134556U (en) | Improved connecting piece for steel -structure beam columns | |
CN204738824U (en) | Steady rest is strutted to colliery monomer post | |
CN207776414U (en) | A kind of outer tripod wall-connecting piece of architectural engineering | |
CN204139635U (en) | Self-closing protective guard | |
CN207499478U (en) | Combination assembled shelf |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant |