CN205224557U - Lift scaffold pole setting connection structure - Google Patents
Lift scaffold pole setting connection structure Download PDFInfo
- Publication number
- CN205224557U CN205224557U CN201521065319.9U CN201521065319U CN205224557U CN 205224557 U CN205224557 U CN 205224557U CN 201521065319 U CN201521065319 U CN 201521065319U CN 205224557 U CN205224557 U CN 205224557U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- rod
- connecting rod
- pole
- bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
本实用新型公开了一种升降脚手架立杆连接结构,包括上立杆、下立杆及连接所述上立杆及所述下立杆的连接件,所述上立杆为空心方管,所述下立杆为空心方管,所述连接件包括一连接杆,所述上立杆、下立杆分别套设在所述连接杆两端,所述上立杆上穿设有两个第一螺栓,所述下立杆上穿设有两个第二螺栓,所述第一螺栓穿过上立杆及连接杆,所述第二螺栓穿过下立杆及连接杆,所述第一螺栓与所述第二螺栓垂直设置。本实用新型结构简单、稳定性强、拆装方便,便于施工过程中的安装、维护、更换。
The utility model discloses a connecting structure for a vertical rod of a lifting scaffold, which comprises an upper vertical rod, a lower vertical rod and a connecting piece connecting the upper vertical rod and the lower vertical rod, the upper vertical rod is a hollow square tube, and the The lower vertical rod is a hollow square tube, the connecting piece includes a connecting rod, the upper vertical rod and the lower vertical rod are respectively sleeved on both ends of the connecting rod, and two second A bolt, two second bolts are pierced on the lower vertical rod, the first bolt passes through the upper vertical rod and the connecting rod, the second bolt passes through the lower vertical rod and the connecting rod, the first The bolts are vertically arranged with the second bolts. The utility model has the advantages of simple structure, strong stability, convenient disassembly and assembly, and is convenient for installation, maintenance and replacement in the construction process.
Description
技术领域 technical field
本实用新型涉及建筑施工领域,具体涉及一种连接建筑升降脚手架立杆的连接结构。 The utility model relates to the field of building construction, in particular to a connection structure for connecting upright poles of building lifting scaffolding.
背景技术 Background technique
脚手架(scaffold)指施工现场为工人操作并解决垂直和水平运输而搭设的各种支架。在一些大型的施工场地,一般采用钢结构的脚手架,其稳定性更强,安全性更高。 Scaffold refers to various supports set up on the construction site for workers to operate and solve vertical and horizontal transportation. In some large construction sites, steel scaffolding is generally used, which has stronger stability and higher safety.
脚手架的高度由立杆决定,在大型的施工场地,一般高度较高,常用的立杆无法达到要求的高度,通常是采用多根立杆连接的方式来达到所要求的高度。在现有技术中,上下立杆的连接一般采用承接式连接,如在上下立杆的中间设置有一个连接棒,该连接棒两端的直径小于上下立杆的直径,连接棒中间部分凸出,直径大于上下立杆外径,使用时,将连接棒插在下立杆内,上立杆再插在连接棒上,由于连接棒中间部分凸出,上立杆就能立于连接棒上,达到上下立杆连接的目的。这种承接式的连接方式,虽结构简单、拆装方便,但同时存在着稳定性差、强度低的缺点。 The height of scaffolding is determined by the poles. In large construction sites, the height is generally higher, and the commonly used poles cannot reach the required height. Usually, multiple poles are connected to achieve the required height. In the prior art, the connection of the upper and lower vertical rods generally adopts a joint connection. For example, a connecting rod is arranged in the middle of the upper and lower vertical rods. The diameter is larger than the outer diameter of the upper and lower vertical rods. When in use, insert the connecting rod into the lower vertical rod, and then insert the upper vertical rod on the connecting rod. Since the middle part of the connecting rod protrudes, the upper vertical rod can stand on the connecting rod to achieve The purpose of connecting the upper and lower poles. Although this receiving type connection method has a simple structure and is convenient for disassembly and assembly, it also has the disadvantages of poor stability and low strength.
发明内容 Contents of the invention
本实用新型的目的是提供一种结构稳定、易于操作的升降脚手架立杆连接结构。 The purpose of the utility model is to provide a structure-stable and easy-to-operate elevating scaffold pole connecting structure.
为达到上述目的,本实用新型采用的技术方案是:一种升降脚手架立杆连接结构,包括上立杆、下立杆及连接所述上立杆及所述下立杆的连接件,所述上立杆为空心方管,所述下立杆为空心方管,所述连接件包括一连接杆,所述上立杆、下立杆分别套设在所述连接杆两端,所述上立杆上穿设有两个第一螺栓,所述下立杆上穿设有两个第二螺栓,所述第一螺栓穿过上立杆及连接杆,所述第二螺栓穿过下立杆及连接杆,所述第一螺栓与所述第二螺栓垂直设置。 In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a connection structure of a lifting scaffold pole, including an upper pole, a lower pole and a connecting piece connecting the upper pole and the lower pole. The upper vertical rod is a hollow square tube, the lower vertical rod is a hollow square tube, the connecting piece includes a connecting rod, and the upper vertical rod and the lower vertical rod are respectively sleeved on both ends of the connecting rod. Two first bolts are pierced on the pole, and two second bolts are pierced on the lower pole. The first bolts pass through the upper pole and the connecting rod, and the second bolts pass through the lower pole. The rod and the connecting rod, the first bolt and the second bolt are vertically arranged.
上述技术方案中,所述上立杆上相对的两个面上设置有与第一螺栓相对应的第一通孔,所述连接杆上设置有与所述第一通孔相对应的第一内通孔,所述第一螺栓穿过第一通孔、第一内通孔将上立杆与连接杆锁定;所述下立杆上相对的两个面上设置有与第二螺栓相对应的第二通孔,所述连接杆上设置有与所述第二通孔相对应的第二内通孔,所述第二螺栓穿过第二通孔、第二内通孔将下立杆与连接杆锁定。 In the above technical solution, first through holes corresponding to the first bolts are provided on the two opposite surfaces of the upper vertical rod, and first through holes corresponding to the first through holes are provided on the connecting rod. Inner through hole, the first bolt passes through the first through hole, and the first inner through hole locks the upper vertical rod and the connecting rod; The second through hole, the connecting rod is provided with a second inner through hole corresponding to the second through hole, the second bolt passes through the second through hole, and the second inner through hole connects the lower vertical rod Locked with connecting rod.
优选的技术方案,所述连接杆外径与所述上立杆、下立杆的内径相配合。连接杆外径与上下立杆内径贴合,使得整体结构更加稳定。 In a preferred technical solution, the outer diameter of the connecting rod matches the inner diameter of the upper vertical rod and the lower vertical rod. The outer diameter of the connecting rod fits the inner diameter of the upper and lower vertical rods, making the overall structure more stable.
优选的技术方案,所述连接杆为一空心方管。 In a preferred technical solution, the connecting rod is a hollow square tube.
由于上述技术方案运用,本实用新型与现有技术相比具有下列优点: Due to the application of the above-mentioned technical solutions, the utility model has the following advantages compared with the prior art:
1、本实用新型结构简单、稳定性强、拆装方便,便于施工过程中的安装、维护、更换; 1. The utility model has the advantages of simple structure, strong stability, convenient disassembly and assembly, and is convenient for installation, maintenance and replacement during construction;
2、本实用新型的第一螺栓与第二螺栓垂直设置,使得连接杆的受力更均匀,使整个连接结构更牢固; 2. The first bolt and the second bolt of the utility model are vertically arranged, so that the force of the connecting rod is more uniform, and the whole connection structure is firmer;
3、本实用新型配件少,易生产,降低了生产成本及安装时间。 3. The utility model has few accessories, is easy to produce, and reduces production cost and installation time.
附图说明 Description of drawings
图1为本实用新型主视图; Fig. 1 is a front view of the utility model;
图2为本实用新型侧视图; Fig. 2 is a side view of the utility model;
图3为本实用新型俯视图。 Fig. 3 is a top view of the utility model.
其中:1、上立杆;2、下立杆;3、连接杆;4、第一螺栓;5、第二螺栓。 Among them: 1. Upper pole; 2. Lower pole; 3. Connecting rod; 4. First bolt; 5. Second bolt.
具体实施方式 detailed description
下面结合附图及实施例对本实用新型作进一步描述: Below in conjunction with accompanying drawing and embodiment the utility model is further described:
实施例一: Embodiment one:
如图1-3所示,一种升降脚手架立杆连接结构,包括上立杆1、下立杆2及连接上立杆1及下立杆2的连接件,上立杆1为空心方管,下立杆2为空心方管,连接件包括一连接杆3,上立杆1、下立杆2分别套设在连接杆3两端,上立杆1上穿设有两个第一螺栓4,下立杆2上穿设有两个第二螺栓5,第一螺栓4穿过上立杆1及连接杆3,第二螺栓5穿过下立杆2及连接杆3,第一螺栓4与第二螺栓5垂直设置。 As shown in Figure 1-3, a lifting scaffold pole connection structure, including the upper pole 1, the lower pole 2 and the connecting piece connecting the upper pole 1 and the lower pole 2, the upper pole 1 is a hollow square tube , the lower vertical rod 2 is a hollow square tube, the connector includes a connecting rod 3, the upper vertical rod 1 and the lower vertical rod 2 are respectively sleeved on both ends of the connecting rod 3, and the upper vertical rod 1 is pierced with two first bolts 4. There are two second bolts 5 on the lower pole 2, the first bolt 4 passes through the upper pole 1 and the connecting rod 3, the second bolt 5 passes through the lower pole 2 and the connecting rod 3, the first bolt 4 and the second bolt 5 are vertically arranged.
上立杆1上相对的两个面上设置有与第一螺栓4相对应的第一通孔,连接杆3上设置有与第一通孔相对应的第一内通孔,第一螺栓4穿过第一通孔、第一内通孔将上立杆1与连接杆3锁定;下立杆2上相对的两个面上设置有与第二螺栓5相对应的第二通孔,连接杆3上设置有与第二通孔相对应的第二内通孔,第二螺栓5穿过第二通孔、第二内通孔将下立杆2与连接杆3锁定。 The first through hole corresponding to the first bolt 4 is provided on the opposite two faces on the upper vertical rod 1, and the first inner through hole corresponding to the first through hole is provided on the connecting rod 3. The first bolt 4 Through the first through hole and the first inner through hole, the upper vertical rod 1 and the connecting rod 3 are locked; the two opposite surfaces of the lower vertical rod 2 are provided with second through holes corresponding to the second bolts 5, and the connection The rod 3 is provided with a second inner through hole corresponding to the second through hole, and the second bolt 5 passes through the second through hole and the second inner through hole to lock the lower vertical rod 2 and the connecting rod 3 .
连接杆3外径与上立杆1、下立杆2的内径相配合。连接杆3外径与上下立杆2内径贴合,使得整体结构更加稳定。 The inner diameter of connecting rod 3 outer diameters matches with upper vertical rod 1, lower vertical rod 2. The outer diameter of the connecting rod 3 fits with the inner diameter of the upper and lower vertical rods 2, so that the overall structure is more stable.
上下立杆2连接方法: Connection method of upper and lower poles 2:
将连接杆3下端放置在下立杆2上端部,将第二通孔及第二内通孔一一对应,将两个第二螺栓5分别穿过第二通孔及第二内通孔,将下立杆2与连接杆3锁定;将上立杆1下端部套装在连接杆3上端部,将第一通孔及第一内通孔一一对应,将两个第一螺栓4分别穿过第一通孔及第一内通孔,将上立杆1与连接杆3锁定;最后调节第一螺栓4及第二螺栓5并锁紧。 Place the lower end of the connecting rod 3 on the upper end of the lower vertical rod 2, match the second through hole and the second inner through hole one by one, pass the two second bolts 5 through the second through hole and the second inner through hole respectively, and place the Lock the lower vertical rod 2 with the connecting rod 3; put the lower end of the upper vertical rod 1 on the upper end of the connecting rod 3, match the first through hole and the first inner through hole one by one, and pass the two first bolts 4 respectively The first through hole and the first inner through hole lock the upper vertical rod 1 and the connecting rod 3; finally adjust the first bolt 4 and the second bolt 5 and lock them.
本实用新型的第一螺栓4与第二螺栓5互相垂直设置,使得连接杆3的受力更均匀,整个连接结构更牢固、稳定。 The first bolt 4 and the second bolt 5 of the present invention are arranged perpendicular to each other, so that the force on the connecting rod 3 is more uniform, and the entire connection structure is firmer and more stable.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521065319.9U CN205224557U (en) | 2015-12-18 | 2015-12-18 | Lift scaffold pole setting connection structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521065319.9U CN205224557U (en) | 2015-12-18 | 2015-12-18 | Lift scaffold pole setting connection structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205224557U true CN205224557U (en) | 2016-05-11 |
Family
ID=55899632
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521065319.9U Expired - Fee Related CN205224557U (en) | 2015-12-18 | 2015-12-18 | Lift scaffold pole setting connection structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205224557U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113898162A (en) * | 2021-11-02 | 2022-01-07 | 中建八局第四建设有限公司 | Scaffold connecting structure |
-
2015
- 2015-12-18 CN CN201521065319.9U patent/CN205224557U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113898162A (en) * | 2021-11-02 | 2022-01-07 | 中建八局第四建设有限公司 | Scaffold connecting structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204024004U (en) | A kind of scaffold take dismantling device fast | |
| CN105201195A (en) | Liftable supporting leg type elevator shaft construction platform and method | |
| CN106939690A (en) | The anti-load-bearing scaffold that inclines of one kind | |
| CN205224557U (en) | Lift scaffold pole setting connection structure | |
| CN104989098A (en) | Laminated plate support frame | |
| CN204531341U (en) | A kind of for the passageway platform between building and construction elevator | |
| CN104343234A (en) | Simple steel operation platform for civil residential elevator shaft and manufacturing method | |
| CN107806242B (en) | A high-strength scaffold connector for construction | |
| CN204212384U (en) | A kind of combined type full hall construction bearing support | |
| CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
| CN104481127A (en) | Rigidly-connected and high-strength die plate supporting system | |
| CN203347201U (en) | Telescopic scaffold steel pipe | |
| CN206784905U (en) | Socket joint key slot type connector for vertical rod | |
| CN202031309U (en) | Suspending operation platform for structural concrete constructions | |
| CN205617772U (en) | Gallows structure under lifting foot hand rack special use | |
| CN205875657U (en) | Plug -in type steel pipe scaffold frame | |
| CN213449387U (en) | a scaffold | |
| CN207420011U (en) | A kind of high intensity scaffold fastenings for building | |
| CN210888048U (en) | Sleeve pipe support module for building | |
| CN207348447U (en) | A kind of scaffold lifting is early to tear system open | |
| CN204152174U (en) | A kind of scaffold being convenient to dismounting and expansion | |
| CN207647029U (en) | A kind of two-way building detached column of putting more energy into | |
| CN204940827U (en) | A kind of scaffold oblique pull fixed head for building | |
| CN206769340U (en) | A kind of easy-to-dismount construction platform | |
| CN204299207U (en) | A kind of frame supported system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |