CN204139579U - The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding - Google Patents

The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding Download PDF

Info

Publication number
CN204139579U
CN204139579U CN201420338713.4U CN201420338713U CN204139579U CN 204139579 U CN204139579 U CN 204139579U CN 201420338713 U CN201420338713 U CN 201420338713U CN 204139579 U CN204139579 U CN 204139579U
Authority
CN
China
Prior art keywords
welded
unfolding
folding
lattice column
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420338713.4U
Other languages
Chinese (zh)
Inventor
刘有才
张荣灿
冯成锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Original Assignee
ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd filed Critical ZHEJIANG ZHONGCHENG BUILDING ENGINEERING Co Ltd
Priority to CN201420338713.4U priority Critical patent/CN204139579U/en
Application granted granted Critical
Publication of CN204139579U publication Critical patent/CN204139579U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the lattice bearing post of a kind of corner linearly attached wall lifting false work of folding and unfolding, comprise steel lattice column, climb support, horizontal cross bar, steel fastener and embedded part, described steel lattice column lower end is fixedly connected with reinforced concrete foundation by the built-in fitting be embedded in reinforced concrete foundation, above-mentioned steel lattice column is welded with gusset plate, the described support that climbs is removably connected by bolt and gusset plate, described horizontal cross bar one end is by being embedded in adjacent reinforced concrete bodies structure (beam, post, wall) built-in fitting be welded and fixed, the other end and above-mentioned steel lattice column are welded and fixed, horizontal cross bar two ends are all welded with floor.The utility model has that reasonable stress, construction are simple, convenient disassembly, quality assurance, the advantage such as safe and reliable.

Description

The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding
Technical field
The utility model belongs to industry and civilian construction construction field, is specifically related to the lattice bearing post of a kind of corner linearly attached wall lifting false work of folding and unfolding.
Background technology
At present in high level and construction of super highrise building, electronic integral lifting scaffold generally uses, and this connection system for guide rail construction technology is used for traditional rule high level and Super High is quite ripe.But in the urban construction in modern age, the building of moulding uniqueness is more and more widely used, traditional electronic integral lifting scaffold often to come with some shortcomings part in saddle supporting, be difficult to the building using these moulding uniquenesses, bring very large inconvenience to construction, therefore design a kind of lattice bearing post being applied to the rectangle floor gap corner linearly attached wall lifting false work of folding and unfolding.
utility model content
The purpose of this utility model is the defect existed for prior art, provides the lattice bearing post of a kind of corner linearly attached wall lifting false work of folding and unfolding, it has, and reasonable stress, construction are simple, convenient disassembly, quality assurance, the advantage such as safe and reliable.
For achieving the above object, the utility model adopts following technical proposals:
The lattice bearing post of a kind of corner linearly attached wall lifting false work of folding and unfolding, comprise steel lattice column, climb support, horizontal cross bar, steel fastener and embedded part, described steel lattice column lower end is fixedly connected with reinforced concrete foundation by the built-in fitting be embedded in reinforced concrete foundation, described steel lattice column is welded with gusset plate, the described support that climbs is connected with gusset plate by bolt, described horizontal cross bar one end is by being embedded in adjacent reinforced concrete bodies structure (beam, post, wall) in built-in fitting be welded and fixed, the other end and described steel lattice column are welded and fixed, horizontal cross bar two ends are all welded with floor.
Above-mentioned steel lattice column is connected by 4 angle steel batten plates and surrounds combination rectangular frame.
Above-mentioned steel lattice column is connected by bolt head and the tail by a section standard knot, and every root standard knot head and the tail are all welded with connector and connect floor.
The above-mentioned support that climbs is the plate type support that electronic integral lifting scaffold carries.
Above-mentioned horizontal cross bar is round seamless steel pipe, two side by side, each direction.
Compared with prior art, the utility model tool has the following advantages:
Lattice bearing post designed by the utility model designs for assembling, can highly increase according to different building structure or reduce standard form post in actual applications, be fixed on reinforced concrete foundation bottom whole load-bearing lattice column, each floor place is connected with agent structure by horizontal cross bar, electronic integral lifting scaffold is completed by the support that climbs be arranged on steel lattice column and climbs or decline work, solves the defect that the special high level of shape and the electronic integral lifting scaffold of super highrise building cannot support.
Accompanying drawing explanation
Fig. 1 is structural plan of the present utility model schematic diagram.
Fig. 2 is A-A place section in Fig. 1
Fig. 3 is Fig. 1 interior joint assembling detail drawing.
Detailed description of the invention
Preferred embodiment accompanying drawings of the present utility model is as follows:
embodiment one:
See Fig. 1, Fig. 2, Fig. 3.The lattice bearing post of a kind of corner linearly attached wall lifting false work of folding and unfolding, comprise steel lattice column 1, climb support 4, horizontal cross bar 2, steel fastener 7 and embedded part 3, it is characterized in that, described steel lattice column 1 lower end is fixedly connected with reinforced concrete foundation 6 by the built-in fitting 3 be embedded in reinforced concrete foundation 6, described steel lattice column 1 is welded with gusset plate 8, the described support 4 that climbs is connected with gusset plate 8 by bolt, described horizontal cross bar 2 one end is by being embedded in adjacent reinforced concrete bodies structure 5(beam, post, wall) in built-in fitting 3 be welded and fixed, the other end and described steel lattice column 1 are welded and fixed, horizontal cross bar 2 two ends are all welded with floor 9.
embodiment two:
The present embodiment is substantially identical with embodiment one, and special feature is as follows:
Above-mentioned steel lattice column 1 is connected by 4 L75 × 10mm angle steel batten plate 380mm × 300mm and surrounds the combination rectangular frame that sectional dimension is 400mm × 400mm
Above-mentioned steel lattice column 1 is connected by bolt head and the tail by a section standard knot, and every root standard knot head and the tail are all welded with connector 7 and connect floor 9.
The above-mentioned support 4 that climbs is the plate type support that electronic integral lifting scaffold carries.
Above-mentioned horizontal cross bar 2 is Φ 89 × 4mm round seamless steel pipe, two side by side, each direction.
Above-mentioned gusset plate 8 is L75 × 10mm angle steel.

Claims (5)

1. the lattice bearing post of a corner linearly attached wall lifting false work of folding and unfolding, comprise steel lattice column (1), climb support (4), horizontal cross bar (2), steel fastener (7) and embedded part (3), it is characterized in that, described steel lattice column (1) lower end is fixedly connected with reinforced concrete foundation (6) by the built-in fitting (3) be embedded in reinforced concrete foundation (6), described steel lattice column (1) is welded with gusset plate (8), the described support that climbs (4) is connected with gusset plate (8) by bolt, described horizontal cross bar (2) one end is welded and fixed by the built-in fitting (3) be embedded in adjacent reinforced concrete bodies structure (5), the other end and described steel lattice column (1) are welded and fixed, horizontal cross bar (2) two ends are all welded with floor (9).
2. the lattice bearing post of the corner according to claim 1 linearly attached wall lifting false work of folding and unfolding, it is characterized in that, described steel lattice column (1) is connected by 4 angle steel batten plates and surrounds combination rectangular frame.
3. the lattice bearing post of the corner according to claim 1 and 2 linearly attached wall lifting false work of folding and unfolding, it is characterized in that, described steel lattice column (1) is connected by bolt head and the tail by a section standard knot, and every root standard knot head and the tail are all welded with connector (7) and connect floor (9).
4. the lattice bearing post of the corner according to claim 1 linearly attached wall lifting false work of folding and unfolding, is characterized in that, described in climb the plate type support that support (4) carries for electronic integral lifting scaffold.
5. the lattice bearing post of the corner according to claim 1 linearly attached wall lifting false work of folding and unfolding, it is characterized in that, described horizontal cross bar (2) is round seamless steel pipe, two side by side, each direction.
CN201420338713.4U 2014-06-24 2014-06-24 The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding Expired - Fee Related CN204139579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420338713.4U CN204139579U (en) 2014-06-24 2014-06-24 The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420338713.4U CN204139579U (en) 2014-06-24 2014-06-24 The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding

Publications (1)

Publication Number Publication Date
CN204139579U true CN204139579U (en) 2015-02-04

Family

ID=52416274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420338713.4U Expired - Fee Related CN204139579U (en) 2014-06-24 2014-06-24 The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding

Country Status (1)

Country Link
CN (1) CN204139579U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429996A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Double-column lift device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429996A (en) * 2016-08-24 2017-02-22 无锡科通工程机械制造有限公司 Double-column lift device

Similar Documents

Publication Publication Date Title
CN103104092B (en) Support composite structure of beam and slab
CN201546435U (en) Bolted stayed cantilever scaffold
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN203729576U (en) Ringlock type steel tube scaffold
CN103015535B (en) A kind of the H weak direction of principal axis of type post and the firm access node structure of H type beam and preparation method thereof
CN203201140U (en) Beam slab support
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN203514808U (en) Wall formwork supporting composite structure
CN204938791U (en) A kind of support connecting structure of tower crane support beam
CN204139579U (en) The lattice bearing post of the corner linearly attached wall lifting false work of folding and unfolding
CN106351245A (en) Tower crane foundation base and construction method thereof
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN204212264U (en) Large span steel reinforced concrete braced structures
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN103669817B (en) Building structure overhanging scaffold external corner assembling type frame body device
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN203795842U (en) Ring-buckling and direct-inserting type steel pipe support
CN203640257U (en) Support of overhanging type scaffold
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN202430823U (en) Detachable steel bar processing protective shed
CN205397790U (en) A subassembly that is used for construction elevator to attach wall pull rod overlength
CN204983719U (en) Assembly type structure faces flat protection of edge water and chooses net
CN204727504U (en) A kind of support connecting structure of tower crane support beam
CN203547114U (en) Wall connecting assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20150624

EXPY Termination of patent right or utility model