CN205314515U - Scaffold of building a wall - Google Patents
Scaffold of building a wall Download PDFInfo
- Publication number
- CN205314515U CN205314515U CN201620081811.3U CN201620081811U CN205314515U CN 205314515 U CN205314515 U CN 205314515U CN 201620081811 U CN201620081811 U CN 201620081811U CN 205314515 U CN205314515 U CN 205314515U
- Authority
- CN
- China
- Prior art keywords
- vertical tube
- scaffold
- pedal
- standpipe
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a scaffold of building a wall relates to building auxiliary equipment field, including four standpipes and a running -board, there are a plurality of U type supporting springs along its length direction equidistance welding on the standpipe, four corners of running -board be equipped with with U type supporting spring complex connecting rod make the running -board can the joint on the standpipe, wherein articulated on two standpipes have telescopic down tube mechanism, the end of down tube mechanism is equipped with the link, is equipped with the locating pin on two other standpipes, the top of standpipe is equipped with the protection chain that can come four standpipe encloses, the utility model discloses simple structure, low in cost, easy dismounting can live in foot pedal support through U type supporting spring, utilizes down tube mechanism can improve the stability of whole scaffold, and the practicality is strong, and the security is high.
Description
Technical field
The utility model discloses one to build a wall scaffold, relate to building auxiliary clothing arts.
Background technology
Scaffold all provides conveniently condition for building trade all the time, point substantially have small-sized, medium-sized and large-scale scale, low idle job coverage, Semi surrounding type coverage and full packaging type coverage is had again from coverage, its structure also emerges in an endless stream, and its purpose is contemplated to allow workman can reach work efficiency best, most convenient. But the dismounting inconvenience of existing scaffold, construction speed is exerted a certain influence, if application number is 201010594297.0 disclose a kind of engineering building construction scaffold, it is made up of vertical tube and transverse tube, four steel pipes of described vertical tube, vertical tube location-plate, vertical tube connecting plate form, described vertical tube location-plate is cross stamping parts, and centre is opened and used through hole, and four steel pipes are fixed on four angles of vertical tube location-plate; Vertical tube connecting plate is fixedly connected on the two ends of vertical tube; Connected by vertical tube adapter between two vertical tubes; Transverse tube is inserted by between two row's steel pipes of vertical tube, is placed on vertical tube location-plate, is locked on vertical tube by pipe clamp machine by transverse tube; Connected by transverse tube adapter between two transverse tubes. But above-mentioned scaffolding structure is complicated, inconvenience is installed, and stability neither be fine.
Utility model content
The utility model discloses one to build a wall scaffold, to solve the drawbacks described above caused in prior art.
One is built a wall scaffold, including four vertical tubes and one piece of pedal, described vertical tube is equidistantly welded with some U-shaped supporting springs along its length, four corners of described pedal are provided with the connecting rod coordinated with U-shaped supporting spring and pedal can be connected on vertical tube, wherein two vertical tubes are hinged with telescopic brace mechanism, the end of brace mechanism is provided with link, and other two vertical tubes are provided with alignment pin, and the top of vertical tube is provided with the protection chain that can be fenced up by four vertical tubes.
Preferably, described brace mechanism includes fixing bar and motion bar, and fixing bar is hinged on vertical tube, and motion bar is threaded in the other end of fixing bar, and the other end of motion bar is connected to described link.
Preferably, the bottom of described vertical tube is socketed with anti-skidding footmuff.
Preferably, described vertical tube is additionally provided with staircase.
Preferably, one of them side of described pedal is embedded with level indicator.
The utility model has the advantage of: this kind scaffolding structure of building a wall is simple, cheap, easy accessibility, pedal can be supported by U-shaped supporting spring, utilize brace mechanism can improve the stability of whole scaffold, practical, safety is high, described brace mechanism includes fixing bar and motion bar, fixing bar is hinged on vertical tube, motion bar is threaded in the other end of fixing bar, the other end of motion bar is connected to described link, this kind of brace mechanism can elongate or shorten as required, to coordinate the lifting of pedal height, the bottom of described vertical tube is socketed with anti-skidding footmuff, reduce vertical tube generation skidding, described vertical tube is additionally provided with staircase, help workmen's pedal plate, one of them side of described pedal is embedded with level indicator, can determine whether pedal is horizontal by level indicator.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model.
Fig. 2 is the side view of vertical tube in this utility model.
Wherein: 1-vertical tube, 2-pedal, 3-U type supporting spring, 4-brace mechanism, 41 fixing bars, 42 motion bars, 5-link, 6-alignment pin, 7-protects chain, the anti-skidding footmuff of 8-, 9 staircases, 10 level indicators, 11 connecting rods.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, reach purpose and effect and be easy to understand, below in conjunction with drawings and Examples, this utility model is further illustrated.
As depicted in figs. 1 and 2, one is built a wall scaffold, including four vertical tubes 1 and one piece of pedal 2, described vertical tube 1 is equidistantly welded with some U-shaped supporting springs 3 along its length, four corners of described pedal 2 are provided with the connecting rod 11 coordinated with U-shaped supporting spring 3 and make pedal 2 can be connected on vertical tube 1, wherein two vertical tubes 1 are hinged with telescopic brace mechanism 4, the end of brace mechanism 4 is provided with link 5, other two vertical tubes 1 are provided with alignment pin 6, the top of vertical tube 1 is provided with the protection chain 7 that can be fenced up by four vertical tubes 1, this kind scaffolding structure of building a wall is simple, cheap, easy accessibility, pedal 2 can be supported by U-shaped supporting spring 3, utilize brace mechanism 4 can improve the stability of whole scaffold, practical, safety is high.
It should be noted that, described brace mechanism 4 includes fixing bar 41 and motion bar 42, fixing bar 41 is hinged on vertical tube 1, motion bar 42 is threaded in the other end of fixing bar 41, the other end of motion bar 42 is connected to described link 5, this kind of brace mechanism 4 can elongate or shorten as required, to coordinate the lifting of pedal 2 height.
In the present embodiment, the bottom of described vertical tube 1 is socketed with anti-skidding footmuff 8, reduces vertical tube 1 and skidding occurs, described vertical tube 1 is additionally provided with staircase 9, help workmen's pedal plate 2.
Additionally, one of them side of described pedal 2 is embedded with level indicator 10, level indicator 10 can be passed through and determine whether pedal 2 is horizontal.
Based on above-mentioned, this utility model simple in construction, cheap, easy accessibility, pedal 2 can be supported by U-shaped supporting spring 3, utilize brace mechanism 4 can improve the stability of whole scaffold, practical, safety is high.
As known by the technical knowledge, this utility model can be realized by the embodiment of other essence without departing from its spirit or essential feature.Therefore, embodiment disclosed above, for each side, all it is merely illustrative, is not only. All within the scope of this utility model or waiting change in scope of the present utility model to be all included in the utility model.
Claims (5)
1. a scaffold of building a wall, including four vertical tubes and one piece of pedal, it is characterized in that: described vertical tube is equidistantly welded with some U-shaped supporting springs along its length, four corners of described pedal are provided with the connecting rod coordinated with U-shaped supporting spring and pedal can be connected on vertical tube, wherein two vertical tubes are hinged with telescopic brace mechanism, the end of brace mechanism is provided with link, other two vertical tubes are provided with alignment pin, and the top of vertical tube is provided with the protection chain that can be fenced up by four vertical tubes.
2. one according to claim 1 is built a wall scaffold, it is characterised in that: described brace mechanism includes fixing bar and motion bar, and fixing bar is hinged on vertical tube, and motion bar is threaded in the other end of fixing bar, and the other end of motion bar is connected to described link.
3. one according to claim 1 is built a wall scaffold, it is characterised in that: the bottom of described vertical tube is socketed with anti-skidding footmuff.
4. one according to claim 1 is built a wall scaffold, it is characterised in that: described vertical tube is additionally provided with staircase.
5. one according to claim 1 is built a wall scaffold, it is characterised in that: one of them side of described pedal is embedded with level indicator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620081811.3U CN205314515U (en) | 2016-01-27 | 2016-01-27 | Scaffold of building a wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620081811.3U CN205314515U (en) | 2016-01-27 | 2016-01-27 | Scaffold of building a wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205314515U true CN205314515U (en) | 2016-06-15 |
Family
ID=56187321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620081811.3U Expired - Fee Related CN205314515U (en) | 2016-01-27 | 2016-01-27 | Scaffold of building a wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205314515U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252651A (en) * | 2018-10-09 | 2019-01-22 | 张华涛 | Fixed rack structure for construction |
CN111764612A (en) * | 2020-06-29 | 2020-10-13 | 福建江夏学院 | Steel construction temporary support |
-
2016
- 2016-01-27 CN CN201620081811.3U patent/CN205314515U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252651A (en) * | 2018-10-09 | 2019-01-22 | 张华涛 | Fixed rack structure for construction |
CN111764612A (en) * | 2020-06-29 | 2020-10-13 | 福建江夏学院 | Steel construction temporary support |
CN111764612B (en) * | 2020-06-29 | 2021-10-15 | 福建江夏学院 | Steel construction temporary support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205314515U (en) | Scaffold of building a wall | |
CN201416263Y (en) | Disc bolt type scaffold | |
CN201083018Y (en) | Mobile multipurpose fast mounting scaffold | |
CN205802864U (en) | Novel architecture lowering or hoisting gear | |
CN201284559Y (en) | Fastener type steel pipe scaffold template stand | |
CN206053269U (en) | Bamboo ferrum mixing frame for building | |
CN205976397U (en) | Portable handling frame | |
CN205472340U (en) | People's passageway on instrument formula tower crane | |
CN101143689B (en) | Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN202957526U (en) | Working platform of concrete pole | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN207749810U (en) | A kind of Novel moveable scaffold | |
CN201714048U (en) | Chrysanthemum clip connection type scaffold | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building | |
CN105113509A (en) | Tool type foundation pit suspended step ladder | |
CN101560828A (en) | Buckled type steel pipe scaffold formwork support of cross strut | |
CN205259558U (en) | Novel scaffold for fitment | |
CN201087080Y (en) | Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane | |
CN214739699U (en) | Anti-skidding scaffold is used in house construction | |
CN203238934U (en) | Cross connector for all-round scaffold jack | |
CN203452356U (en) | Combined frame type scaffold | |
CN203050141U (en) | Protective railing for shear wall border cave entrance | |
CN201310182Y (en) | Steel-tube full scaffold of fastener type | |
CN203654714U (en) | Novel scaffold with guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160615 Termination date: 20170127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |