CN101143689B - Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame - Google Patents

Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame Download PDF

Info

Publication number
CN101143689B
CN101143689B CN200710050011A CN200710050011A CN101143689B CN 101143689 B CN101143689 B CN 101143689B CN 200710050011 A CN200710050011 A CN 200710050011A CN 200710050011 A CN200710050011 A CN 200710050011A CN 101143689 B CN101143689 B CN 101143689B
Authority
CN
China
Prior art keywords
climbing
inner climbing
tube
straight beam
jacket frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200710050011A
Other languages
Chinese (zh)
Other versions
CN101143689A (en
Inventor
胡建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leshan Li'an construction machinery limited liability company
Original Assignee
胡建锋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 胡建锋 filed Critical 胡建锋
Priority to CN200710050011A priority Critical patent/CN101143689B/en
Publication of CN101143689A publication Critical patent/CN101143689A/en
Application granted granted Critical
Publication of CN101143689B publication Critical patent/CN101143689B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention double-beam inner climbing base and an inner climbing holder applied to an inner climbing tower crane, which include frame structures consisting of straight beams and ring beams which are welded. The invention is characterized in that the straight beams of the inner climbing base and the inner climbing holder adopt coordinate double pipes to form double-piped straight beams; king-size expansion support legs are arranged in the double pipes of the straight beams; a leg post of the inner climbing base is provided with a safety expansion support rod; both ends of the ring beam of the inner climbing holder are provided with safety locking roof bars; the ring beam on one side is provided with a spring safety self-locking device. The inner climbing base and an inner climbing holderof the invention can meet the special requirements for application of large or super-large inner climbing tower cranes in large-size elevator shafts.

Description

The double-beam shape internal climbing foundation of internally climbing tower crane and inner climbing jacket frame
Technical field
The present invention relates to the tower crane auxiliary equipment, particularly a kind of double-beam shape internal climbing foundation and inner climbing jacket frame that is used for internal-climbing tower crane.
Background technology
The utility model patent (ZL02245259.1) that the applicant proposed in 2002 discloses a kind of novel internal-climbing tower crane, it is on the basis of original inner climbing type tower machine, from the installation of internally climbing tower crane, climb, use a whole set of technology of dismounting and carried out a series of improvement, make the tower machine in climb lifting process and realized mechanization, automation.The principal character of this machine by interior climb up joint, in climb down joint, entablatrance and jacking crossbeam and form central lifting body, by inner climbing jacket frame, in climb guide frame, cat ladder, embedded box and form the stock climbing system, form the sprocket wheel lift system by lifting standard knot, lifting crossbeam, elevator chain rope, by the insurance clamp with turn over claw certainly and form anti-creep and rise drop device, forms the tower machine oneself tears mechanism etc. open from tearing frame and circular arc ears plate, pulley yoke open by counterweight, solved internally climbing tower crane preferably and in high-building construction, applied a difficult problem.But the applicant still finds to exist some unsatisfactory places in practice, as: the large-scale internally climbing tower crane more than existing QTP5512 (55 meters of brachiums, 1.2 tons of lift heavys), when the large-scale elevator more than 2.4 * 2.6m uses since existing internal climbing foundation and inner climbing jacket frame load-carrying capacity deficiency, stability not enough, have certain potential safety hazard.Thereby be necessary partial structure part, particularly internal climbing foundation and the inner climbing jacket frame of internally climbing tower crane are done further to improve.
Summary of the invention
The present invention is on the basis of existing technology, the internal climbing foundation and the inner climbing jacket frame structure of internally climbing tower crane is improved, and proposed a kind of double-beam shape internal climbing foundation and inner climbing jacket frame of new internally climbing tower crane.The technical scheme that adopts is: the double-beam shape internal climbing foundation of internally climbing tower crane and inner climbing jacket frame, comprise the framed structure that forms by straight beam and ring beam assembly welding, and it is characterized in that:
The straight beam of a, internal climbing foundation adopts the two-tube straight beam of two-tube formation arranged side by side, device has telescopic outrigger and hydraulic ram in straight beam two-tube, the piston rod of hydraulic ram is connected with telescopic outrigger, the motion of control telescopic outrigger, eight groups of ten six roots of sensation safety telescopic struts that formed by setting nut and screw combinations are housed on four socles of internal climbing foundation, and the square top board of a block length is equipped with in the termination of every group of strut;
The straight beam of b, inner climbing jacket frame is the two-tube straight beam of two-tube formation arranged side by side, and device has telescopic outrigger in straight beam two-tube, on the tube bottom plate of straight beam support roller is housed, and the ring beam two ends of inner climbing jacket frame are provided with the fixedly nut of safe locking push rod.
On the wherein side ring beam of inner climbing jacket frame two spring type safety self-locking devices are housed.
Beneficial effect of the present invention is mainly reflected in: the specific (special) requirements of using in the large size electro stair shaft at large-scale and super-huge internally climbing tower crane, on the basis of internal climbing foundation that has internally climbing tower crane now and inner climbing jacket frame technology, adopted the telescopic outrigger of two-tube straight beam and lengthening, adopt the motion of hydraulic ram control telescopic outrigger, this is that the internal climbing foundation of prior art and inner climbing jacket frame are subjected to its structural limitations and can't realize.In addition, the invention allows for safe strut and technical schemes such as top board, safe locking device and spring type safety self-locking mechanism are set, load-carrying capacity, stability, the safety of internally climbing tower crane are improved greatly, in the large size electro stair shaft, apply a difficult problem thereby solved large-scale and super-huge internally climbing tower crane.
Description of drawings
Fig. 1 is an internal climbing foundation structural representation of the present invention;
Fig. 2 is an inner climbing jacket frame structural representation of the present invention.
Number in the figure is respectively: the two-tube straight beam of 1-, 2-telescopic outrigger, 3-hydraulic ram, the 4-telescopic strut, 5-top board, 6-ring beam, the 7-socle, 8-adapter sleeve, the two-tube straight beam of 9-, the 10-support roller, 11-push rod nut, 12-telescopic outrigger, 13-arc brace panel, the 14-leading sheave, 15-ring beam, 16-safe self-locking mechanism.Be described further below in conjunction with drawings and Examples:
The specific embodiment
Fig. 1 is an embodiment of the double-beam shape internal climbing foundation of internally climbing tower crane of the present invention, and its integral body is a kind of tower structure that is formed by straight beam 1 and ring beam 6 assembly weldings, lays fully enclosed safe operation platform in the bottom surface of framework.The straight beam of internal climbing foundation both sides adopts the two-tube straight beam 1 of two-tube formation arranged side by side, and the two-tube straight beam 1 of this example is two rectangular tubes that are listed as one that form with the steel plate assembly welding, under the situation with good conditionsi, also can adopt other to make manufacturing process.All device has telescopic outrigger 2 and hydraulic ram 3 in straight beam two-tube, the direction of extension of its two telescopic outriggers 2 is opposite each other, just because of having adopted two-tube straight beam 1 arranged side by side, just make the length of telescopic outrigger 2 extend greatly than the telescopic outrigger of prior art, and enough extending spaces have been arranged, satisfied the specific (special) requirements that large-scale and super-huge internally climbing tower crane is used in the large size electro stair shaft.The piston rod of hydraulic ram 3 is connected with telescopic outrigger 2, by the elongation and the contraction that push away, spur do control telescopic outrigger 2 of piston rod.On four socles 7 of internal climbing foundation, eight groups of ten six roots of sensation safety telescopic struts 4 that formed by setting nut and screw combinations are welded, the square top board 5 of a block length all is equipped with in the termination of every group of strut, oblong top board 5 is by steel plate, with telescopic strut 4 cooresponding sleeve pipes and be located at steel plate fwd plancon and form, under the running condition, oblong top board 5 is withstood on the interior wall of elevator by telescopic strut 4.The outside of four socle 7 upper ends is provided with adapter sleeve 8, and under the condition of service, internal climbing foundation is connected by the tower machine standard knot of adapter sleeve 8 with its top, also has pipe link to link to each other with digonal link between four socles, has guaranteed the fastness of general frame.
Shown in Figure 2, the straight beam of inner climbing jacket frame both sides is to adopt the two-tube straight beam 9 of square two-tube formation arranged side by side equally, form one arranged side by side with the steel plate assembly welding, in straight beam two-tube, be respectively charged into telescopic outrigger 12, the direction of extension of two telescopic outriggers is opposite each other, on each mouth of pipe base plate of straight beam two support rollers 10 is housed, and holds up the telescopic outrigger in the pipe slightly, telescopic outrigger 12 can be slided on support roller 10 in stretching process, and the front end of telescopic outrigger 12 is provided with draw ring.On two-tube straight beam, be provided with arc brace panel 13, be provided with the cat ladder connecting panel below the straight beam, four interior angle apparatus of inner climbing jacket frame be leading sheave 14, in view of inner climbing jacket frame and cat ladder be connected and the effect of leading sheave same as the prior art, no longer describe in detail here.
Be provided with the fixedly nut 11 of safe locking push rod near ring beam 15 two ends of inner climbing jacket frame, and supporting four the locking push rods (super-huge inner climbing jacket frame is established eight) that are provided with, form safe locking device, when the tower machine is devoted oneself to work, with the body of the tower of locking push rod locking internally climbing tower crane.
Adopt two spring type safety self-locking devices 16 on the wherein side ring beam 15 of inner climbing jacket frame, substituted the safe self-locking mechanism on the former inner climbing jacket frame, the safe self-locking when climbing in order to realization stock cat ladder system improving and complete machine.

Claims (2)

1. the double-beam shape internal climbing assembly of an internally climbing tower crane comprises internal climbing foundation and inner climbing jacket frame, forms framed structure by straight beam and ring beam assembly welding, it is characterized in that:
The straight beam of a, internal climbing foundation adopts the two-tube straight beam of two-tube formation internal climbing foundation (1) arranged side by side, device has telescopic outrigger (2) and hydraulic ram (3) in straight beam two-tube, the piston rod of hydraulic ram (3) is connected with telescopic outrigger (2), eight groups of ten six roots of sensation safety telescopic struts (4) that formed by setting nut and screw combinations are housed on four socles (7) of internal climbing foundation, and the square top board of a block length (5) is equipped with in the termination of safe telescopic strut;
The straight beam of b, inner climbing jacket frame is by the two-tube two-tube straight beam of inner climbing jacket frame (9) that constitutes arranged side by side, device telescopic outrigger (12) in straight beam two-tube, support roller (10) is housed on the tube bottom plate of straight beam, and the ring beam of inner climbing jacket frame (15) two ends are provided with the fixedly nut of safe locking push rod (11).
2. the double-beam shape internal climbing assembly of internally climbing tower crane according to claim 1, what it is characterized in that inner climbing jacket frame wherein is equipped with two spring type safety self-locking devices (16) on the side ring beam (15).
CN200710050011A 2007-09-14 2007-09-14 Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame Expired - Fee Related CN101143689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710050011A CN101143689B (en) 2007-09-14 2007-09-14 Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710050011A CN101143689B (en) 2007-09-14 2007-09-14 Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame

Publications (2)

Publication Number Publication Date
CN101143689A CN101143689A (en) 2008-03-19
CN101143689B true CN101143689B (en) 2010-05-19

Family

ID=39206450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710050011A Expired - Fee Related CN101143689B (en) 2007-09-14 2007-09-14 Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame

Country Status (1)

Country Link
CN (1) CN101143689B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303820A (en) * 2011-06-30 2012-01-04 胡建锋 Novel climbing ladder for internal-climbing tower crane
CN102890003B (en) * 2012-09-28 2015-01-28 杭州科曼萨杰牌建设机械有限公司 Simulation test method of internal-climbing tower crane and test platform device
CN207375654U (en) * 2017-04-28 2018-05-18 中国建筑股份有限公司 A kind of non-closed tower crane climbing frame apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2244552Y (en) * 1996-01-12 1997-01-08 胡建锋 Internal climbing type tower crane
CN2466126Y (en) * 2001-02-28 2001-12-19 长沙中联重工科技发展股份有限公司 Self-lifting internal creeping lifting-up system
CN2679123Y (en) * 2002-12-19 2005-02-16 胡建锋 Internally creeping tower crane
CN201087080Y (en) * 2007-09-14 2008-07-16 胡建锋 Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2244552Y (en) * 1996-01-12 1997-01-08 胡建锋 Internal climbing type tower crane
CN2466126Y (en) * 2001-02-28 2001-12-19 长沙中联重工科技发展股份有限公司 Self-lifting internal creeping lifting-up system
CN2679123Y (en) * 2002-12-19 2005-02-16 胡建锋 Internally creeping tower crane
CN201087080Y (en) * 2007-09-14 2008-07-16 胡建锋 Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2000-233892A 2000.08.29

Also Published As

Publication number Publication date
CN101143689A (en) 2008-03-19

Similar Documents

Publication Publication Date Title
CN210559009U (en) Four-cylinder jacking system of lifting tower
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN104481194B (en) A kind of flip-chip method of vertical type tubular equipment
CN201116267Y (en) Externally hung supporting device for internally climbing tower crane
CN206071141U (en) Transformer substation framework beam
CN101143689B (en) Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN202785364U (en) Movable dual-door-type mast hoisting device
CN201087080Y (en) Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane
CN101633483A (en) Integral lifting apparatus for steel structure net rack
CN207160223U (en) A kind of fulcrum-variable pin joint formula steel girder platform
CN106006455A (en) Hydraulic elevator capable of achieving formwork erecting without scaffold
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN2923644Y (en) Superhigh super-large high-tonnage walking derricktype lifting machine
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN113585860B (en) Method for assembling and disassembling double-arm holding pole
CN105110205A (en) Reverse disassembling method for tower crane
CN205314515U (en) Scaffold of building a wall
CN204823738U (en) Two roof beam electric hoist formula hoist girder orthotic devices
CN210013125U (en) Stretch-draw regularization operation platform
CN209618736U (en) Jacking apparatus is climbed in a kind of derrick crane
CN209780229U (en) Jacking platform system of integrated tower crane
CN209584868U (en) A kind of sunpender underneath type Bridge Erector box beam
CN206487128U (en) A kind of Guiding Support Elevating Scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LESHAN LI'AN CONSTRUCTION MACHINERY CO., LTD.

Free format text: FORMER OWNER: HU JIANFENG

Effective date: 20100528

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 614000 NO.243, BUILDING 17, XINJIYUAN RESIDENTIAL QUATER, NO.2, SOUTH SECTION, FENGHUANG ROAD, SHIZHONG DISTRICT, YUESHAN CITY, SICHUAN PROVINCE TO: 614000 EAST SIDE, YINGBIN AVENUE, YUESHAN CITY HIGH-TECH DEVELOPMENT AREA, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20100528

Address after: 614000 east side of Yingbin Road, hi tech Development Zone, Sichuan, Leshan

Patentee after: Leshan Li'an construction machinery limited liability company

Address before: 614000, No. 17, No. 243, new era community, 2 Fenghuang Road, South Central, Sichuan, Leshan

Patentee before: Hu Jianfeng

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20200914