CN101363209A - 一种防止桥头跳车技术 - Google Patents

一种防止桥头跳车技术 Download PDF

Info

Publication number
CN101363209A
CN101363209A CNA2008101326173A CN200810132617A CN101363209A CN 101363209 A CN101363209 A CN 101363209A CN A2008101326173 A CNA2008101326173 A CN A2008101326173A CN 200810132617 A CN200810132617 A CN 200810132617A CN 101363209 A CN101363209 A CN 101363209A
Authority
CN
China
Prior art keywords
bridge
road
materials
road surface
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101326173A
Other languages
English (en)
Inventor
张雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008101326173A priority Critical patent/CN101363209A/zh
Publication of CN101363209A publication Critical patent/CN101363209A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明公开了一种防止桥头跳车技术,从距离桥一公里以外的地方开始,添加上与桥梁建筑使用的材料最一致的料,越接近桥梁,所用材料与桥梁材料的比例越接近;对于引桥部分的压实不首先使用压道车,在距桥300m的引桥部分,首先要用夯一窝一窝地硬打,打过一层后在夯窝灌上50%的井水和雨水,等水渗下去后再加上第二层土错开原来的夯窝再打,特别是道路和桥梁的结合部,夯夯必须打到位,一直打到路面高于桥面时再用压道车压,当压到路面与桥面相平时,再向路上和桥上加同配方的材料再压,当压到桥面的上部与路面部分相同的材料超过300cm时,即可以在上面铺设油料,桥面为凹凸不平小坑的糙面,这样便于上面的材料与桥面牢牢结合,不被分离。

Description

一种防止桥头跳车技术
技术领域
本发明属于道路桥梁建筑工程技术领域,涉及桥头跳车,具体涉及一种防止桥头跳车技术。
背景技术
全世界的公路,只要车辆行驶遇到公路和桥梁的结合部,就会出现咯噔咯噔声和震动,世界上把这种现象叫做桥头跳车,是一项世界性研究课题,直到目前尚未被攻克。
发明内容
本发明的目的是提供一种防止桥头跳车技术,首先从材料学的角度分析,出现桥头跳车的现象第一是由于桥梁和道路使用的材料不同,沉降系数也不同,其次是由于桥梁和道路的结合部压道车压不实,因此出现在道路和桥梁施工完后过不了多长时间路面就低于桥面,因此出现桥头跳车,再一个原因就是天气变化,例如修好路一但出现下雨,路面就会低于桥面,以后雨多了路面还会下降。
本发明解决其技术问题所采用的技术方案是:在施工时,一旦遇到道路和桥梁的结合部,即引桥部分,从距离桥一公里以外的地方开始,就要对路基的使用材料进行调整,添加上与桥梁建筑使用的材料最一致的料,越接近桥梁,所用材料与桥梁材料的比例越接近;对于引桥部分的压实不首先使用压道车,在距桥300m的引桥部分,首先要用夯一窝一窝地硬打,打过一层后在夯窝灌上50%的井水和雨水(取阴阳平衡),等水渗下去后再加上第二层土错开原来的夯窝再打,特别是道路和桥梁的结合部,夯夯必须打到位(压道车压时这里是一个压不实的暗三角形,这个部位往往最易沉降),一直打到路面高于桥面时再用压道车压,当压到路面与桥面相平时,再向路上和桥上加同配方的材料再压,当压到桥面的上部与路面部分相同的材料超过300cm时,即可以在上面铺设油料,需要注意的是桥面上不得采用光面,而是为凹凸不平小坑的糙面,这样便于上面的材料与桥面牢牢结合,不被分离。
附图说明
图1是现行的路桥结合图;
图2是本发明的路桥结合图。
在图中,1、桥梁,2、路基,3、路面,4、底层,5、中层,6、上层,7、桥面,8、桥光面。
具体实施方式
在架设桥梁1时,要在桥面7的桥表面8设置多个凹凸不平的混凝土小坑,同时开始筑桥两头的引桥路基2,在铺设底层3开始,首先找出原土进行石夯夯实,再铺底层4,并按200cm——300cm厚的基料夯实一次的方法逐层夯实,每夯实一层,在夯窝里灌满1∶1的井水与雨水的混合水,水渗透后垫上基料再夯,每夯实一层后隔两天后再夯一层,底层4最厚,具体情况具体确定,底层4的上边一层是中层5,铺设方法与底层4相同,只是材料上要优于底层4,中层5铺设完成后,隔7天再铺上层6,方法同前,当将上层6铺设完成后,上层6就与桥面7持平,这时需在上层6上继续加料,使其高于桥面7,再用压道车压实,路面3与桥面7上同时上同成份的料,厚度为300mm以上,用同重量的压道车压实,最后不论是桥上还是路上,全部铺上沥青路面,就不再出现桥头跳车的现象了。

Claims (1)

1、一种防止桥头跳车技术,由桥梁、路基、路面、底层、中层、上层、桥面、桥表面构成。其特征是:从距离桥一公里以外的地方开始,添加上与桥梁建筑使用的材料最一致的料,越接近桥梁,所用材料与桥梁材料的比例越接近;对于引桥部分的压实不首先使用压道车,在距桥300m的引桥部分,首先要用夯一窝一窝地硬打,打过一层后在夯窝灌上50%的井水和雨水,等水渗下去后再加上第二层土错开原来的夯窝再打,特别是道路和桥梁的结合部,夯夯必须打到位,一直打到路面高于桥面时再用压道车压,当压到路面与桥面相平时,再向路上和桥上加同配方的材料再压,当压到桥面的上部与路面部分相同的材料超过300cm时,即可以在上面铺设油料,桥面为凹凸不平小坑的糙面,这样便于上面的材料与桥面牢牢结合,不被分离。
CNA2008101326173A 2008-07-08 2008-07-08 一种防止桥头跳车技术 Pending CN101363209A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101326173A CN101363209A (zh) 2008-07-08 2008-07-08 一种防止桥头跳车技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101326173A CN101363209A (zh) 2008-07-08 2008-07-08 一种防止桥头跳车技术

Publications (1)

Publication Number Publication Date
CN101363209A true CN101363209A (zh) 2009-02-11

Family

ID=40389794

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101326173A Pending CN101363209A (zh) 2008-07-08 2008-07-08 一种防止桥头跳车技术

Country Status (1)

Country Link
CN (1) CN101363209A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974874A (zh) * 2010-11-03 2011-02-16 中铁第四勘察设计院集团有限公司 高速铁路刚性结构物过渡段碾压方法
CN102251482A (zh) * 2011-05-10 2011-11-23 吴江市明港道桥工程有限公司 桥梁搭板与水稳基层接合部位的施工方法
CN102286907A (zh) * 2011-07-06 2011-12-21 浙江大学 一种基于门式水泥搅拌墙处理桥头跳车的方法
CN103290780A (zh) * 2013-06-18 2013-09-11 浙江大学宁波理工学院 路桥连接处的结构及利用该结构消除不均匀沉降的方法
CN104278604A (zh) * 2014-10-29 2015-01-14 河南省公路工程局集团有限公司 高速公路马鞍形施工便道修筑方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974874A (zh) * 2010-11-03 2011-02-16 中铁第四勘察设计院集团有限公司 高速铁路刚性结构物过渡段碾压方法
CN102251482A (zh) * 2011-05-10 2011-11-23 吴江市明港道桥工程有限公司 桥梁搭板与水稳基层接合部位的施工方法
CN102286907A (zh) * 2011-07-06 2011-12-21 浙江大学 一种基于门式水泥搅拌墙处理桥头跳车的方法
CN102286907B (zh) * 2011-07-06 2013-07-10 浙江大学 一种基于门式水泥搅拌墙处理桥头跳车的方法
CN103290780A (zh) * 2013-06-18 2013-09-11 浙江大学宁波理工学院 路桥连接处的结构及利用该结构消除不均匀沉降的方法
CN104278604A (zh) * 2014-10-29 2015-01-14 河南省公路工程局集团有限公司 高速公路马鞍形施工便道修筑方法

Similar Documents

Publication Publication Date Title
CN200981968Y (zh) 透水性人行步道
CN101660294B (zh) 一种钢桥桥面铺装结构及铺装方法
US20110064517A1 (en) Reinforced pervious concrete
US11479506B2 (en) Dry mix and concrete composition containing bed ash and related methods
CN101363209A (zh) 一种防止桥头跳车技术
CN101187194A (zh) 吹填砂膨胀聚苯乙烯颗粒混合轻质路堤填料的填筑方法
CN107805987A (zh) 深厚软基路段的厚垫层泡沫轻质土路基结构及施工方法
CN201296895Y (zh) 一种纵向裂缝破损路面修复结构
CN105421571A (zh) 下水井及雨水井施工工艺
CN205368926U (zh) 透水性强的园路路面层结构
CN205224122U (zh) 地下室防水底板
CN101082199A (zh) 一种道路路面结构及其施工方法
CN102807869B (zh) 一种土壤固化剂
CN208917622U (zh) 一种再生透水路面结构
CN204000529U (zh) 工程用沥青路面结构
CN204589746U (zh) 一种适用于吹填软土地区重载交通条件的复合路面结构
CN208250850U (zh) 一种钢渣路面铺装结构
CN105155387A (zh) 一种园林道路结构
CN103225512A (zh) 一种制作预应力后背进行箱涵顶进施工方法
JP4555460B2 (ja) 透水性ブロック舗装及び透水性ブロック舗装の施工方法
CN206127789U (zh) 公路隧道行车减振降噪结构
JPH02157304A (ja) 運動場路盤舗装施工法
CN102322010A (zh) 道路表面多孔隙树脂封层及其施工方法
CN208486142U (zh) 一种新型多孔径流透水路面
CN110846970A (zh) 碾压混凝土及其制备的调头道路结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090211