CN101343874A - Wrapping pile - Google Patents

Wrapping pile Download PDF

Info

Publication number
CN101343874A
CN101343874A CNA200710018257XA CN200710018257A CN101343874A CN 101343874 A CN101343874 A CN 101343874A CN A200710018257X A CNA200710018257X A CN A200710018257XA CN 200710018257 A CN200710018257 A CN 200710018257A CN 101343874 A CN101343874 A CN 101343874A
Authority
CN
China
Prior art keywords
pile
wrapping
soil
sleeve
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710018257XA
Other languages
Chinese (zh)
Other versions
CN101343874B (en
Inventor
黄明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi long fine Construction Engineering Co., Ltd.
Original Assignee
SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd filed Critical SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority to CN200710018257XA priority Critical patent/CN101343874B/en
Publication of CN101343874A publication Critical patent/CN101343874A/en
Application granted granted Critical
Publication of CN101343874B publication Critical patent/CN101343874B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a novel building foundation treatment technique in the salty soil area. The invention aims at developing a novel building foundation treatment technique in the salty soil area - a wrapped pile, that is, a pile material is wrapped with a geotechnical fabric bag. The artificial foundation processed with the method is called as a wrapped pile compound foundation. The invention adopts the structure: the pile material 1 is surrounded and fixed in the geotechnical fabric bag 2 to limit the sideward movement of the pile material 1, a radial surrounding force 5 of the pile is enhanced and improved, a radial supporting force 6 of the surrounding soil of the pile is also enhanced, the vertical load can be transferred to the deep part of the pile, and the supporting force of the whole pile is exerted, and the foundation bearing force is enhanced. The novel building foundation treatment technique has the advantages that the concentration of the bottom surface stress of a bearing table can be reduced, the burden of loads of the pile and soil is adjusted, thereby guaranteeing that the pile and soil play an obvious role in bearing the loads jointly, the filling material can also be saved by about 30 percent, the novel building foundation treatment technique is reasonable and economical, the construction is simple, and the quality of pile building is high.

Description

Wrapping pile
(1), described field: the present invention relates to a kind of saline soil area building lot and handle new technology.
(2), background technology:
The method for processing foundation of saline soil area has following four kinds at present:
1, adopt reinforced concrete pile or piling bar, the bittern corrosion harmfulness is difficult to solve, and does not reach to use can be corroded the length of time bad and lost efficacy, simultaneously the cost height.
2, the reinforcement mechanism of replacement stone pile composite foundation is the ground extruding processing effect to foundation soil, by injection broken stone pile in soil and the water, the gas that squeeze in the soil, to reach the compacted effect of stake week soil, improvement foundation soil engineering properties and the intensity that increases ground.But the underground water of saline soil area is bittern, and proportion height, viscosity are big, discharges difficulty and slowly, undesirable with the compacted effect of broken stone pile method, bearing capacity difficulty reaches designing requirement, after the draining convalescence long, have a strong impact on the construction and the delay duration of follow-up engineering.
3, other granular piles, its compacted effect is undesirable, stake Zhou Tuwei weak soil (shearing force is low), stake week, soil was on the low side to the radial support power of stake, and the bulging failure zone appeared near the stake top when pile body was subjected to vertical pressure, can not obtain designed radial support power, cylinder will produce bulging and destroy, settling amount is big, and bearing capacity is low, does not reach designing requirement.
4, dynamic compaction method, local form " spongy soil " influences the construction of follow-up engineering and delays the duration, and bearing capacity does not reach designing requirement.
Salinized soil is under the jurisdiction of silty clay and the silt that contains bittern, and the distortion hard intensity is low, engineering property is poor, corrosivity is strong.More than the method for processing foundation of four kinds of saline soil areas all undesirable.
(3), summary of the invention:
The objective of the invention is to develop a kind of new method-Wrapping pile that carries out the ground processing at saline soil area, be about to material of body of a pile and wrap up with geotechnological cloth bag.The artificial foundation who handles with this method is called " Wrapping pile composite foundation ".This method can thoroughly solve the shortcoming of above-mentioned four kinds of saline soil area method for processing foundation, improves the bearing capacity of foundation slab characteristic value significantly, meets design requirement and the construction period weak point.
Technical solution of the present invention:
Wrapping pile is formed integral body by material of body of a pile (1) and geotechnological cloth bag (2) and a stake hole (3), adopt spiral drilling machine construction stake hole (3), after stake hole (3) is drilled to, geotechnological cloth bag (2) is enclosed within outside the sleeve (4), be lowered to then in the hole (3), reach projected depth, in sleeve (4), inject quantitative material of body of a pile (1) again, after having annotated, vibration sleeve (4) makes material of body of a pile (1) vibratory compaction when mentioning (extraction) sleeve (4), after the Wrapping pile construction of monoblock ground is finished, at top construction rubble mattress layer, form a Wrapping pile composite foundation again.
It is characterized in that: material of body of a pile (1) is enclosed solid in geotechnological cloth bag (2), the shifted laterally of restriction material of body of a pile (1), can improve and improve pile body and radially enclose limit power (5), also can improve the radial support power (6) of stake week soil, vertical load can be delivered to the deep of stake, bring into play the support force of whole pile body, improve the bearing capacity of ground.
The material of described geotechnological cloth bag (2) is a polypropylene, has characteristics acidproof, alkaline-resisting, anticorrosive, that intensity is high, stability is strong.
Described material of body of a pile (1) is a rubble.
Described material of body of a pile (1) also can replace with sandstone or synthetic soil or concrete.
Described spiral drilling machine construction stake hole, stake bore dia 200~300mm, hole depth is decided according to design, can guarantee not destroy the original structure of foundation soil.
Described sleeve (4) is the steel pipe that adapts with the stake hole.
The described particle diameter of quantitative material of body of a pile (1) that injects in sleeve (4) is by the designing requirement grating.
Advantage of the present invention and effect:
Through on probation, compare with background technology, this scheme can either reduce cushion cap bottom surface stress to be concentrated, and adjusts sharing of the native load of stake, and then guarantee that stake soil bears load jointly and play tangible effect, can save filler about 30% again, rationally economical again, and construction is simple, the pile quality height, compare and characteristic value of foundation bearing capacity can be doubled with similar method for processing foundation, shorten the construction period twice, can give full play to economic benefit of investment.
(4), description of drawings:
Accompanying drawing is a Wrapping pile overall structure schematic diagram, number in the figure: the 1-material of body of a pile, and 2-geotechnique cloth bag, 3-stake hole, 4-sleeve, 5-radially enclose limit power, 6-radial support power.
(5), specific embodiment: referring to accompanying drawing, in this Wrapping pile, material of body of a pile 1 encloses solid in geotechnological cloth bag 2,1 shifted laterally of restriction material of body of a pile, can improve and improve pile body and radially enclose limit power 5, also can improve the radial support power 6 of stake week soil, vertical load can be delivered to the deep of stake, bring into play the support force of whole pile body, improve the bearing capacity of ground.
This Wrapping pile adopts spiral drilling machine construction stake hole 3, after stake hole 3 is drilled to, geotechnological cloth bag 2 is enclosed within outside the sleeve 4, is lowered to then in the hole 3, reach projected depth, in sleeve 4, inject quantitative material of body of a pile 1 again, vibrate sleeve 4 when after having annotated, mentioning (extraction) sleeve 4, make material of body of a pile 1 vibratory compaction, after the Wrapping pile construction of monoblock ground is finished, at top construction rubble mattress layer, form a Wrapping pile composite foundation again.

Claims (8)

1, Wrapping pile is formed integral body by material of body of a pile (1) and geotechnological cloth bag (2) and a stake hole (3), adopt spiral drilling machine construction stake hole (3), after stake hole (3) is drilled to, geotechnological cloth bag (2) is enclosed within outside the sleeve (4), be lowered to then in the hole (3), reach projected depth, in sleeve (4), inject quantitative material of body of a pile (1) again, after having annotated, vibration sleeve (4) makes material of body of a pile (1) vibratory compaction when mentioning (extraction) sleeve (4), after the Wrapping pile construction of monoblock ground is finished, at top construction rubble mattress layer, form a Wrapping pile composite foundation again.
2, Wrapping pile according to claim 1, it is characterized in that: material of body of a pile (1) is enclosed solid in geotechnological cloth bag (2), the shifted laterally of restriction material of body of a pile (1), can improve and improve pile body and radially enclose limit power (5), also can improve the radial support power (6) of stake week soil, vertical load can be delivered to the deep of stake, brings into play the support force of whole pile body, improves the bearing capacity of ground.
3, Wrapping pile according to claim 1 and 2 is characterized in that: the material of geotechnological cloth bag (2) is a polypropylene.
4, Wrapping pile according to claim 1 and 2 is characterized in that: material of body of a pile (1) is a rubble.
5, Wrapping pile according to claim 1 and 2 is characterized in that: material of body of a pile (1) also can replace with sandstone or synthetic soil or concrete.
6, Wrapping pile according to claim 1 and 2 is characterized in that: spiral drilling machine construction stake hole (3), and stake hole (3) diameter 200~300mm, hole depth is decided according to design, can guarantee not destroy the original structure of foundation soil.
7, Wrapping pile according to claim 1 and 2 is characterized in that: sleeve (4) is the steel pipe that adapts with the stake hole.
8, Wrapping pile according to claim 1 and 2 is characterized in that: the particle diameter that injects quantitative material of body of a pile (1) in sleeve (4) is by the designing requirement grating.
CN200710018257XA 2007-07-13 2007-07-13 Method for processing foundation by wrapping piles in salty soil area Active CN101343874B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710018257XA CN101343874B (en) 2007-07-13 2007-07-13 Method for processing foundation by wrapping piles in salty soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710018257XA CN101343874B (en) 2007-07-13 2007-07-13 Method for processing foundation by wrapping piles in salty soil area

Publications (2)

Publication Number Publication Date
CN101343874A true CN101343874A (en) 2009-01-14
CN101343874B CN101343874B (en) 2010-06-23

Family

ID=40245981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710018257XA Active CN101343874B (en) 2007-07-13 2007-07-13 Method for processing foundation by wrapping piles in salty soil area

Country Status (1)

Country Link
CN (1) CN101343874B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787696A (en) * 2010-03-23 2010-07-28 中交第一公路勘察设计研究院有限公司 Pile filling technology of large-diameter bagged concrete
CN101787698A (en) * 2010-03-24 2010-07-28 陕西长嘉实业发展有限公司 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
CN101858077A (en) * 2010-04-27 2010-10-13 河海大学 Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN101899828A (en) * 2010-04-27 2010-12-01 河海大学 Construction method of bagged rammed small-diameter soil-cement pile composite foundation
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN102220759A (en) * 2010-02-07 2011-10-19 谢世尊 New drilling (punching) bored concrete pile construction method
CN105544512A (en) * 2015-12-21 2016-05-04 河海大学 Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method
CN105568954A (en) * 2015-12-11 2016-05-11 武汉广益交通科技股份有限公司 Over-water construction method of geotechnical cloth bag bulk piles
CN106337413A (en) * 2016-09-07 2017-01-18 东南大学 Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof
CN108385667A (en) * 2018-05-11 2018-08-10 山东大学 A kind of geotextiles anti-block water permeable pile driving construction device and method
CN108442365A (en) * 2018-05-18 2018-08-24 山东大学 A kind of anti-clogging strengthening water penetration pile and construction method
CN115492087A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2104880U (en) * 1991-04-01 1992-05-20 顾尧章 Pile made of sand and crushed stone
CN1186141A (en) * 1997-12-25 1998-07-01 叶长生 Bored concrete piles and its construction
CN2437731Y (en) * 1998-01-20 2001-07-04 南昌县第二建筑工程公司珠海西区分公司 Pile enlarging equipment for tamping enlarging tube-sunken cast-in-situ pile

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102220759A (en) * 2010-02-07 2011-10-19 谢世尊 New drilling (punching) bored concrete pile construction method
CN101787696A (en) * 2010-03-23 2010-07-28 中交第一公路勘察设计研究院有限公司 Pile filling technology of large-diameter bagged concrete
CN101787698A (en) * 2010-03-24 2010-07-28 陕西长嘉实业发展有限公司 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
CN101787698B (en) * 2010-03-24 2011-08-03 陕西长嘉实业发展有限公司 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
CN101858077B (en) * 2010-04-27 2011-12-14 河海大学 Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN101858077A (en) * 2010-04-27 2010-10-13 河海大学 Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN101899828A (en) * 2010-04-27 2010-12-01 河海大学 Construction method of bagged rammed small-diameter soil-cement pile composite foundation
CN101899828B (en) * 2010-04-27 2012-05-23 河海大学 Construction method of bagged rammed small-diameter soil-cement pile composite foundation
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN101942829B (en) * 2010-09-28 2011-10-19 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN105568954A (en) * 2015-12-11 2016-05-11 武汉广益交通科技股份有限公司 Over-water construction method of geotechnical cloth bag bulk piles
CN105568954B (en) * 2015-12-11 2018-01-19 武汉广益交通科技股份有限公司 A kind of over-water construction geotechnique cloth bag granular pile construction method
CN105544512A (en) * 2015-12-21 2016-05-04 河海大学 Reinforced sack grouting stone-breaking pile with heat transferring tube buried therein and construction method
CN106337413A (en) * 2016-09-07 2017-01-18 东南大学 Water-draining stiff geo-textile bag cement-soil composite pile and construction method thereof
CN108385667A (en) * 2018-05-11 2018-08-10 山东大学 A kind of geotextiles anti-block water permeable pile driving construction device and method
CN108442365A (en) * 2018-05-18 2018-08-24 山东大学 A kind of anti-clogging strengthening water penetration pile and construction method
CN108442365B (en) * 2018-05-18 2020-11-06 山东大学 Anti-blocking reinforced permeable pile and construction method
CN115492087A (en) * 2022-09-28 2022-12-20 中铁二院昆明勘察设计研究院有限责任公司 Construction method of high-speed railway stone-sandwiched soft plastic soil foundation reinforcing pile

Also Published As

Publication number Publication date
CN101343874B (en) 2010-06-23

Similar Documents

Publication Publication Date Title
CN101343874B (en) Method for processing foundation by wrapping piles in salty soil area
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN100476082C (en) Post-grouting construction method for long helical bore grouting pile and grouting device thereof
CN101858077B (en) Construction method of composite foundation with bagged compacting and slurry cementing small-diameter gravel pile
CN107417182B (en) Expansion type high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN105714773A (en) Foundation treatment method
CN103711114A (en) Foundation treatment method
CN211816174U (en) Foundation structure for foundation treatment in severe collapsible loess region
CN104746512A (en) Cement soil stiffness composite pile and pile forming method thereof
CN101736730A (en) Mixed reinforcement method of high-fill sand foundation
CN103015438A (en) Collapsible loess subgrade landslide treatment method
CN202644518U (en) Post-inserted reinforcement cage cement fly ash gravel pile
CN104652407B (en) A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof
CN216689341U (en) Composite foundation treatment structure with combined effect of soil compaction piles and CFG piles
CN103806434A (en) Method for processing saturated overwet soil foundation for prespud operation by using graded construction slag soilbag
CN103981863A (en) Up-and-down integrated composite pile of discrete material pile and concrete pipe and construction method of composite pile
CN103615002B (en) A kind of expansion end broken stone pile pile steel pipe and construction method
CN103410143A (en) Construction method for improving bearing capacity of hollow pile foundation
HU225407B1 (en) Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof
CN204530685U (en) Cement soil stiffness composite pile
CN1891913A (en) Counterweight punching-expanding replacement method
CN102619218B (en) Rear slotting reinforcing cage CFG and piling method thereof
CN201671102U (en) Foundation structure of large-load industrial building
CN106087946A (en) A kind of carbonate rock boulder strong rammer is combined to change to fill changes foundation reinforcement method
CN202787295U (en) Dispersive pile-permeable concrete pile novel dual compound foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160505

Address after: The 710001 Shaanxi Road, Beilin District Xi'an City, No. 88 Xinxing Hotel, room 711

Patentee after: Shaanxi long fine Construction Engineering Co., Ltd.

Address before: 710001, Xinxing Hotel, No. 88 Jianguo Road, Shaanxi, Xi'an, 710

Patentee before: Shaanxi Changjia Industry Development Co., Ltd.